annexure_205

Upload: harsimran-kaur

Post on 07-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 annexure_205

    1/12

    List of power stations, process industries and otherestablishments where energy audit is executed by CPRI

     A. Thermal Power StationsSl

    No. Name of the Power stationUnit rating

    ( MW)Date of

    conduct ofaudit

    01 Raichur Thermal Power Station, Raichur,Karnataka

    210 Dec. 1991

    02 Vijayawada Thermal Power Station, Vijayawada, A.P.

    210 Apr. 1992

    03 Kothagudem Thermal Power Station, Paloncha, A.P.

    110 June 1992

    04 Kothagudem Thermal Power Station, Paloncha, A.P.

    60 June 1992

    05 Amarkantak Thermal Power Station, Chachai,M.P.

    2 x 120 Apr. 1994

    06 Amarkantak Thermal Power Station, Chachai,M.P.

    2 x 30 Apr. 1994

    07 Ramagundam Thermal Power Station,Ramagundam, A.P 62.5 June 1994

    08 Ennore Thermal Power Station, Ennore , T.N. 110 Aug. 1994

    09 Vijayawada Thermal Power Station,

     Vijayawada, A.P.

    210 Mar. 1995

    10 Neyveli Lignite Corporation Ltd., Neyveli, T.N. 210 Aug. 1995

    11 Koradi Thermal Power Station, Koradi,Maharastra

    120 Nov. 1995

    12 Efficiency test at Vijayawada TPS, Vijayawad, A.P.

    210 Nov. 1995

    13 Efficiency test at Kothagudem TPS, Paloncha, A.P.

    110 Jan. 1996

    14 Efficiency test at Kothagudem TPS, Paloncha, A.P.

    60 Jan. 1996

    15 Bhusaval Thermal Power Station, Bhusaval,Maharastra

    62.5 Feb. 1996

    16 Wanakabori Thermal Power Station,Wanakabori, Gujarat 210 Mar. 1996

    17 Nasik Thermal power station, Nasik, Maharastra 210 Sept. 1996

    18 Gujarat Refinery Ltd., IOCL, Baroda, Gujarat 12.5 Oct. 1996

    19 Performance evaluation at NLC, Neyveli, T.N. 210 Dec. 1996

    20 Performance evaluation at Ennore TPS, Ennore,T.N.

    110 Dec. 1996

    21 Performance evaluation at Bhusaval TPS,

    Bhusaval, Maharastra 62.5 Dec. 1996

  • 8/18/2019 annexure_205

    2/12

     A. Thermal Power Stations (continued)

    SlNo. Name of the Power station

    Unit rating( MW)

    Date ofconduct of

    audit

    22 Barauni Refinery Ltd., IOCL, Barauni, Bihar 12.5 Dec. 199623 Haldia Refinery Ltd., IOCL, Haldia, West Bengal 12.5 Jan. 1997

    24 Mathura Refinery Ltd., IOCL, Mathura, U.P. 12.5 Feb. 1997

    25 Hasdev Thermal power station, Korba WestBank, Korba, M.P. 210 Mar. 1997

    26 Vindhyachal Super Thermal Power Station,NTPC, Vindhyachal, M.P. 210 Mar. 1997

    27 Chandrapur Super Thermal Power Station,Chandrapur, Maharastra 210 Apr. 1997

    28 Chandrapur Super Thermal Power Station,

    Chandrapur, Maharastra 500 Apr.. 199729 Performance evaluation at Raichur TPS,

    Raichur, Karnataka. 210 Sept. 1997

    30 Mettur Thermal Power Station, Mettur, T.N. 210 Sept. 1997

    31 Kahalgaon Super Thermal Power Station,Kahalgaon, Bihar 210 Mar. 1998

    32 Performance evaluation at Koradi TPS, Koradi,Maharastra 120 Mar. 1998

    33 Madras Atomic Power Station, Kalpakkam 220 Mar. 1998

    34 Performance evaluation at Chandrapur Super

    Thermal Power Station, Chandrapur,Maharashtra

    210 July 1998

    35 Panki Thermal Power Station, Panki, Kanpur,U.P.

    210 Oct. 1998

    36 Performance evaluation at Raichur ThermalPower Station, Raichur 210 July 1999

    37 CT testing at Ramagundam Super ThermalPower Project, NTPC, Ramagundam, A.P. 500 Aug. 1999

    38 Tuticorin Thermal Power Station, TNEB,Tuticorin, T.N. 210 Aug. 1999

    39 Harduaganj Thermal Power Station, UPSEB,Harduaganj, U.P. 55 & 110 Sep. 1999

    40 Raichur Thermal Power Station, Raichur 210 Sep. 1999

    41 Paras Thermal Power Station, MSEB, MH 62.5 Sept. 1999

    42 Guru Nanak Dev Thermal Power Station,Bhatinda, Punjab 110 Nov. 1999

    43 Rihand Super Thermal Power Station, NTPC,Rihand

    2 x 500 Dec. 1999

    44 Performance evaluation at Mettur ThermalPower Station, TNEB, Mettur, T.N. 210 Jan. 2000

    45 IP Station, Delhi Vidyut Board, New Delhi 62.5 Mar. 2000

  • 8/18/2019 annexure_205

    3/12

     A. Thermal Power Stations (continued)

    SlNo. Name of the Power station

    Unit rating, MW Date ofconduct of

    audit

    46 Guru Nanak Dev Thermal Power Station,Bhatinda, Punjab 110 Feb. 2001

    47 Korba Super Thermal Power Station, NTPC,Korba

    200 Apr. 2001

    48 Korba Super Thermal Power Station, NTPC,Korba

    500 Apr. 2001

    49 Kayamkulam Combined Cycle Power Project,NTPC, Kayamkulam, Kerala 360 May 2001

    50 Feroz Gandhi Unchahar Thermal PowerProject, NTPC, Unchahar (Auxiliary power

    consumption)

    4 x 210 Dec. 2001

    51 Raichur Super Thermal Power Station, KPCL,Raichur

    210 Dec. 2001

    52 Guru Nanak Dev Thermal Power Station,Bhatinda, Punjab. 110 Feb. 2002

    53 Rihand Super Thermal Power Project, NTPC,Rihand (MGR, Water balance, Lube oil and

     Auxiliary power consumption) 2 x 500 Mar. 2002

    54 Energy Audit at Panipat Power Station, Hariana 1 x 120 Sept. 2002

    55 Feroz Gandhi Unchahar Thermal Power

    Project, NTPC, (Water balance study includingcooling tower & Ash handling system) 4 x 210 Feb. 2003

    56 Ramagundam Super Thermal Power Project,NTPC, Ramagundam, A.P. (Cooling towertesting)

    2 x 2001 x 500

    May 2003

    57 Amarkantak Thermal Power Station, Chachai,M.P. (Boiler system study)

    2 x 120 July 2003

    58 Power System Audit for GNPOC, Sudan, Africa

    8 x 3.5 MW5 x 6.5 MW

     April 2004

    59 NTPC, FGUPP, Unchahar (A/C, Air compressors

    & coal mills of stage II)

    2 x 210 June 2004

    60 PG test of cooling water pumping system,NTPC, Ramagundam (Unit #7)

    500 MW August 2005

    61 Hindustan Zinc Ltd., Chittorgarh, Rajastan 2 x 77 MW February2006

    62 CT performance test at NTPC, Kahalgaon 4 x 210 MW August 2006

    63 Trombay TPS, TATA Power, Mumbai 1 x 150 MW,2 x 500 MW and

    1x180 CC

    December2006

    64 CT performance test at NTPC, Ramagundam 1 x 200 MW & 1 x

    500 MW

     April 2007

  • 8/18/2019 annexure_205

    4/12

     A. Thermal Power Stations (continued)

    SlNo. Name of the Power station

    Unit rating, MW Date ofconduct of

    audit

    65 CT performance test at NTPC, Korba 1 x 200 MW & 1 x500 MW May 2007

    66 Obra & Anpara TPS, UPRVUNL, Lucknow, UP 5 x 200 MW2 x 500 MW Feb. 2008

    67 CT performance test at NTPC, Badarpur 3 x 95 + 2 x 210MW

    June 2008Oct. 2008

    68 CT performance test at NTPC, Talcher 2 x 110 MW March 2009

    69 Agartala Gas Turbine Plant, NEEPCO, Tripura 4 x 21 MW Sept. 2009

    70 Jojobera Thermal Power Station, TATA Power,Jamshedpur

    1x67.5 MW and1 x 120 MW

     August 2010

    71 Assam gas based plant, NEEPCO, Dibrugarhcombined cycle plant

    6 x 33.5 MW GT +3 x 30 MW ST

    September2010

    72 Trombay TPS, TATA Power, Mumbai (Unit # 6) 1 x 500 MW March 2011

    73 Aux. power study at Dholpur TPS, Rajastan,(for BGR energy systems, Chennai) – GT plant

    3 x 110 MW March 2011

    74 Heat rate study at GGSSTP, PSPCL, Rupnagar,Punjab

    6 x 210 MW Aug. 2011

    75 Heat rate study at Lloyds Metal & Energy Ltd.,Chandrapur (Co-generation plant) 1 x 30 MW

    July 2011

  • 8/18/2019 annexure_205

    5/12

    B. Hydel Power Stations

    SlNo. Name of the Power station

    Unit rating,MW

    Date ofconduct of

    audit

    01 Sharavathy Jog hydel power station, KPCL(U#6) 1 x 110 MW Mar. 2001

    02 Tungabhadra hydro electric scheme, Bellary 8 x 9 MW Jan. 2002

    03 NHPC, Bairasiul, Himachal Pradesh 3 x 60 MW Nov. 2004

    04 NHPC, Salal, Jammu & Kashmir 6 x 115 MW June 2005

    05 NHPC, Tanakpur, Uttranchal 3 x 40 MW August 2006

    06 NHPC, Loktak, Manipur 3 x 35 MW Sept. 2006

    07 Indira Sagar, NHDC, Khandwa, M.P. 8 x 125 MW October 2006

    08 NHPC, Rangit, Sikkim 3 x 20 MW August 2007

    09 NHPC, Chamera-I, Himachal Pradesh 3 x 180 MW August 2007

    10 NHPC, Chamera-II, Himachal Pradesh 3 x 100 MW Aug. 200811 NHPC, Uri, Jammu & Kashmir 4 x 120 MW Oct. 2008

    12 NHPC, Dhauliganga, Uttrakhand 4 x 70 MW Sept. 2009

    13 NHPC, Dulhasti, J&K 3 x 130 MW Nov. 2009

    14 Doyang HEP, NEEPCO, Nagaland 3 x 25 MW Oct. 2009

    15 Omkareshwar PS, NHDC, Khandwa, MP 8 x 65 MW Jan. 2010

    16 NEEPCO, Ranganadi HEP, Arunachal Pradesh 3 x 135 MW Jul. 2010

    17 NHPC, Teesta-V PS, Sikkim 3 x 170 MW Aug. 2010

    18 NEEPCO, Kopili, Assam 2 x 25, 4 x 50,1 x 25 MW

    Sept. 2011

  • 8/18/2019 annexure_205

    6/12

    C. Process industries

    SlNo. Name of the Industry Product

    Date ofconduct of

    audit

    01 National Industries Ltd., Bangalore, Karnataka Sodiumsilicate

    Jan. 1990

    02 Modern Food Industries Ltd., Bangalore,Karnataka

    Bread Nov. 1990

    03 Govt. Silk Filatures, Kollegal, Mysore,Karnataka

    Silk Nov. 1991

    04 Govt. Silk Filatures, Chamarajnagar, Mysore,Karnataka

    Silk Nov. 1991

    05 Hindustan Latex Ltd., Akkulam, Trivandrum,Kerala

    Copper T Jan. 1995

    06 Kerala Ceramics Ltd., Kundara, Kerala Ceramics Mar. 1995

    07 Hindustan Latex Ltd., Peroorkada, Trivandrum,Kerala

    Condoms Nov. 1996

    08 Travancore Cochin Chemical Ltd. Cochin,Kerala

    Caustic soda Dec. 1996

    09 Apollo Tyres Ltd., Cochin, Kerala Tyre Feb. 1997

    10 Travancore Rayon’s Ltd., Ernakulam, Kerala  Rayon Feb. 1997

    11 Peninsula Polymers Ltd., Trivandrum, Kerala. Blood bag Feb. 1997

    12 Autokast Limited, Cherthala, Kerala Ferrouscastings

    Mar. 1997

    13 Karnataka soaps and detergents Ltd.,Bangalore, Karnataka.

    Soaps anddetergents May 1997

    14 Swathy cables and conductors Ltd., Manvila,Trivandrum

     Aluminiumconductors Dec. 1998

    15 KELTEC, Trivandrum Fabrication May 1999

    16 Indian Rare Earths Ltd., Chavara, Kollam,Kerala

    Rareminerals

    June 1999

    17 Foam Mattings (India) Ltd., Alleppy, Kerala Coir mattings Sept. 99

    18 Hindustan Latex Ltd., Akkulam, Trivandrum,Kerala

    Copper T,Blood bag March. 2000

    19 Rehabilitation Plantations Ltd., Kulathupuzha,Kerala

    Rubber latex,Rubber sheet Sept. 2000

    20 Fibre foam Pvt. Ltd., Cannanore, Kerala Fibremattress

    Oct. 2000

    21 Rubfila Internationals, Palakkad, Kerala Rubberthreads

    Nov. 2000

    22 English Indian Clays Ltd., Trivandrum Clay Dec. 2000

    23 Hindustan Latex Ltd., Peroorkada, Trivandrum. Condoms Jan. 2001

    24 Nagammal Mills, Nagercoil, Tamilnadu Yarns Jan. 2001

    25 Kerala Chemicals & Protein Ltd., Cochin, Kerala Gelatin Feb. 2001

  • 8/18/2019 annexure_205

    7/12

    C. Process industries (continued)  

    SlNo. Name of the Industry Product

    Date ofconduct of

    audit

    26 Kerala Chemicals & Protein Ltd., Trichure,Kerala

    Ossein March 2001

    27 Mathrubhumi printing presses, Kerala (7 Units) Printing Aug. 2001

    28 ITI Ltd., Bangalore Telephones Oct. 2001

    29 Karimtharuvi Tea Estate, Idukki, Kerala Tea Nov. 2001

    30 The Kerala Minerals and Metals Ltd., Kollam TiO2 Mar. 2002

    31 Binani Zinc, Cochin, Kerala Zinc Nov. 2002

    32 Diesel Locomotive works (DLW), Varanasi Locomotives May 2003

    33 KELTEC, Trivandrum Fabrication Sept. 2003

    34 Implementation study at KMML, Kollam TiO2 Feb. 2004

    35 Charankattu coir mfg co. Ltd., Cherthala,Karala

    Coir & Juteproducts

    Oct 2004

    36 Surya hard chrome pvt. Ltd., Bangalore Electro-plating March 2005

    37 Sunil Agro foods Ltd., Bangalore Flour milling Jan. 2006

    38 Rubber mark intermix factory, Kottayam,Kerala

    Rubber treads March 2006

    39 Hindustan organic chemicals Ltd., Kochi Phenol, Acetone, H2O2 

    Dec. 2006

    40 The Kerala Minerals and Metals Ltd., Kollam TiO2  Mar. 2007

    41Hindustan Aeronautics Ltd., Engine Division,Bangalore

     Aero Engines Sept. 2007

    42 515 Army base works shop, Bangalore Armycomponents

    Novem 2007

    43 Hindustan Latex Ltd., Akkulam, Trivandrum,Kerala

    Copper T,Blood bag

    May 2008

    44 Reliance Industries Ltd., Hazira Petro chemicals Nov. 2008

    45 Hindustan Aeronautics Ltd., Compositematerials Division, Bangalore

    Composites April 2011

  • 8/18/2019 annexure_205

    8/12

    D. Buildings / Other EstablishmentsSl

    No. Name of the EstablishmentType of

    OrganisationDate of

    conduct ofaudit

    01 Doordarshan Trivandrum Centre, Trivandrum,Kerala

    Commercial Aug. 1994

    02 Centre for Earth Science (CESS), Trivandrum,Kerala

    R and D Aug. 1994

    03 State Bank of Travancore (Head Office),Trivandrum, Kerala Commercial Feb. 1995

    04 Air India Office, Trivandrum, Kerala Commercial Apr. 1995

    05 Hotel Horizon, Trivandrum, Kerala Commercial Oct. 1995

    06 Hotel South Park, Trivandrum, Kerala Commercial Oct. 1995

    07 International Airport Authority of India,Trivandrum, Kerala Commercial Nov. 1995

    08 Vikram Sarabai Space Centre, ISRO,Trivandrum, Kerala R and D May 1996

    09 Jawaharalal Nehru Port Trust, Mumbai,Maharastra

    Port traffichandling April 1997

    10 Indian Veterinary Research Institute, Bangalore R and D May 1997

    11 ISRO, Satellite Application Centre, Bangalore R and D Nov. 1997

    12 ISRO, ISTRAC, Bangalore R and D Dec. 1997

    13 ISRO, ISTRAC, Lucknow R and D Dec. 199714 ISRO, SHAR Centre, Sriharikota R and D July 1998

    15 ISRO, NRSA, Hyderabad R and D Aug. 1998

    16 ISRO, VSSC, Valiamala, Trivandrum R and D Feb. 1999

    17 National Institute of Port Management,Uthandi, Chennai

    Training Centre Oct. 1999

    18 ISRO, LPSC, Mahendragiri, Tamilnadu R and D Nov. 1999

    19 New Mangalore Port Trust, Mangalore Port traffic Jan. 2000

    20 Cochin Port Trust, Cochin, Kerala Port traffic Sept. 2000

    21 Barvi water works, Ambernath, Mumbai Water pumping Dec. 2000

    22 Hotel Horizon, Trivandrum Commercial Sept. 200123 Mormugao port trust, Goa Port Service Mar. 2002

    24 Technopark, Trivandrum Software park May 2002

    25 Indian Institute of Remote Sensing, Dehradun R and D Sept. 2002

    26 Delhi Secretariate Building Sept 2003

    27 NSIT, New Delhi Building Sept 2003

    28 Tuticorin Port Trust, Tamilnadu Port traffic Oct. 2003

    29 Kandla Port Trust, Gujarat Port traffic Nov. 2003

    30 Kerala Institute of Medical Science, Trivandrum Hospital Mar. 2004

    31 Technopark, Trivandrum Software park May 2005

    32 Petronet CCK Ltd., Cochin Fuel oil Pumping July 2005

  • 8/18/2019 annexure_205

    9/12

    D. Buildings / Other Establishments (continued)  

    SlNo. Name of the Establishment

    Type ofOrganisation

    Date ofconduct of

    audit

    33 Centre for Earth Science (CESS), Trivandrum,Kerala

    R and D Nov. 2005

    34 ISRO, ISTRAC, Bangalore R and D Sept. 2005

    35 KINFRA tech. Park, Kochi, Kerala Tech. park Nov. 2005

    36 Central Electricity Authority, Sewa Bhawan,New Delhi

    Building Dec. 2005

    37 Jawaharalal Nehru Port Trust, Mumbai,Maharastra

    Port traffic April 2006

    38 Airports Authority of India, Chennai Building April 2006

    39 ISRO, Corporate Office, Bangalore R & D June 2006

    40 KSEB, Chalakkudy, Kerala Utility Oct. 2006

    41 Krishna Bhagya Jala Nigam Ltd., Almatty,Karnataka

    Water Pumping Nov. 2006

    42 Airports authority of India, GAGAN Project,Bangalore

    Building Jan. 2007

    43 Naval Base, Kochi Building Jan. 2007

    44 Barvi water works, Ambernath, Mumbai Water pumping Feb. 2007

    45 Pragati Gramin Bank, Bellary Bank April 2007

    46 Karwar City Municipal Corporation, Karwar Street Lighting April 2007

    47 NITK, Surathkal EducationInstitute May 2007

    48 Jubilant Biosys, Bangalore R & D July 2007

    49 Bangalore institute of Oncology, Bangalore Hospital May 2008

    50 Kerala Institute of Medical Science, Trivandrum Hospital March 2009

    51 Meenakshi Mission Hospital & Research Centre,Madurai, TN

    Hospital March 2010

    52 NEEPCO HQ, Shillong Office Aug. 2010

    53 NEEPCO office complex, Guwahati Office Jan. 2011

    54 NHDC, Khandwa, MP Colony loads May 2011

    55 ISRO, APEP, Aluva, Kerala R & D June 201156 ISRO, CMSE/IISU, Vattiyoorkavu, Trivandrum R & D June 2011

    57 ISRO, LPSC, Valiamala, Trivandrum R & D June 2011

    58 ISRO, NRSC, Hyderabad R & D Aug. 2011

    59 ISRO, NESAC, Shillong, Meghalaya R & D Sept. 2011

  • 8/18/2019 annexure_205

    10/12

    E. Building Energy Audit conducted as Consortia for BEE, Delhi

    SlNo. Name of the Establishment

    Type ofOrganisation

    Date ofconduct of

    audit

    1 Rail Bhavan, Ministry of Railways, NewDelhi Building Dec. 2002

    2 Sanchar Bhavan, Ministry of Telecoms,NewDelhi

    Building Dec. 2002

    3 IGI Airport, NewDelhi Building Jan. 2003

    4 All India Institute of Medical Sciences (AIIMS)NewDelhi

    Hospital Feb. 2003

    F. Technical dispute resolution

    SlNo. Name of the work

    Work donefor

    Date ofconduct of

    work

    1 Improvement of theoretical efficiency &capacity in 200/210 MW LMZ design LTsteam turbines

    MSEB, Mumbai May 2000

    2 Deciding heat rate of thermal power stationsof MSEB

    MSEB, Mumbai Sept. 2002

    3 R&M at pallivasal, Sengulam & Panniar hydropower stations, Kerala

    CBI, Chennai March 2008

    4 Procurement of AC variable frequency drivesat MRPL, Mangalore

    CBI, Bangalore July 2008

    5  Assessing the achievable station heat rateand improvements in Auxiliary powerconsumption and Specific oil consumption ofMSPGCL power stations (total 32 unitsvarying from 30 MW to 500 MW) 

    MERC, Mumbai Nov. 2008 toSept. 2009

    6 Investigation into deterioration of heat rate ofthe Tata Power Company’s, Trombay,Unit # 5 (500 MW)

    MERC, Mumbai January 2010

    7 Investigation into performance of thermalpower generating units at Dahanu TPS ofReliance infrastructure Limited, Maharashtra(2 x 250 MW)

    MERC, Mumbai March 2010

    8 Determination of achievable heat rate of theTata Power Company’s, Trombay, Unit #

    6 (500 MW) using RLNG fuel

    MERC, Mumbai May 2010

  • 8/18/2019 annexure_205

    11/12

     G. Base line Energy Audit for BEE, New Delhi (PAT scheme)

    SlNo. Name of the work

    Unit rating,MW

    Date ofconduct of

    work1 Yelahanka Diesel power plant, KPCL,

    Bangalore6 x 21 MW March 2011

    2 Kasaragod Diesel power plant, KPCL, Kerala 3 x 7.5 MW April 2011

    3 Brahmapuram Diesel power plant, Kochi,Kerala

    5 x 21 MW May 2011

    4 Kozhikode Diesel power plant, Kerala 8 x 16 MW June 2011

    5 Raichur TPS, KPCL, Karnataka 7 x 210 MW June 2011

    6 Bellary TPS, KPCL, Karnataka 1 x 500 MW July 2011

    7 JSW Energy Ltd., Bellary, Karnataka 2 x 130 MW +2 x 300 MW Sept. 2011

    G. List of R & M studies

    SlNo. Name of the Power station

    Unitrating(MW)

    Date ofconduct of

    audit

    01 Indra Prastha Power Station, New Delhi 4 x 62.5 Jan. 2000

    02 Guru Nanak Dev Thermal Power Station (Unit 3) 110 Feb. 200103 Harduaganj Thermal Power Station (Units 6) 60 Oct. 2001

    04 Guru Nanak Dev Thermal Power Station (Unit 4) 110 Dec. 2001

    05 Guru Nanak Dev Thermal Power Station (Unit 2) 110 Dec. 2002

    06 Harduaganj Thermal Power Station (Units 5) 60 Mar. 2002

    08 Bhusawal Thermal Power Station 62.5 April 2002

    09 Harduaganj Thermal Power Station (Units 6) 55 July2002

    10 Harduaganj Thermal Power Station (Units 1) 60 July 2002

    11 TDL-TPS Unit 4, Panipat 120 July 2002

    Harduaganj Thermal Power Station (Units 3) 55 Oct. 2002

  • 8/18/2019 annexure_205

    12/12