Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800 MW), NTPC Limited Page No. 1 Revised Form-I (Appendix-I of EIA Notification, 2006) For Amendment of Environmental Clearance for Lara Super Thermal Power Project, Stage-I of NTPC Limited (For Change of Coal Source and Transport of Coal by Road for a Limited Period) I. Basic Information Sl. No Item Details 1 Name of the Project Lara Super Thermal Power Project, Stage-I (2x800 MW). Amendment in Environmental Clearance for: Change of Coal Source from Talaipali Coal Mining Project (TLCMP) of NTPC to Lakhanpur Coal Mine of Mahanadi Coalfields Limited (MCL); Transport of Coal by Road up to Nov-2019 2. Serial No. in the schedule S. No. 1(d) 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/ lease area/number of wells to be drilled Environment clearance (EC) for Lara STPP, Stage-I has already been accorded vide MoEF & CC’s letter no. J 13012/79/2007-IA.II(T) dated 13.12.2012 for a capacity of 1600 MW (2x800 MW). The project is in its advanced stage of completion, Unit 1 (800 MW) expected to be commissioned by March, 2017 and planned for Commercial Operation (COD) in April, 2017. Lara STPP, Stage-I is linked to Talaipali Coal Mining Project of NTPC and production from the coal block is expected in November, 2019. In view of the above NTPC applied for “Bridge Linkage” vide letter dated 11.02.2016 as per Ministry of Coal (MoC) policy guidelines published on 08.02.2016. M/s Coal India Ltd. (CIL) has in-principle decided to allocate coal from Lakhanpur Coal Mine of MCL and Korea Rewa Coal Mine of SECL in its meeting for grant of Bridge Linkage held on 29.04.2016. The same has been communicated vide Office Memorandum (OM) no. CIL/S&M/Power/174 dated 09.05.2016. Further the same Bridge Linkage was approved by

Upload: others

Post on 17-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 1

Revised Form-I

(Appendix-I of EIA Notification, 2006)

For Amendment of Environmental Clearance for

Lara Super Thermal Power Project, Stage-I of

NTPC Limited (For Change of Coal Source and Transport of

Coal by Road for a Limited Period)

I. Basic Information

Sl. No Item Details

1 Name of the Project Lara Super Thermal Power Project, Stage-I (2x800 MW).

Amendment in Environmental Clearance for:

• Change of Coal Source from Talaipali Coal Mining

Project (TLCMP) of NTPC to Lakhanpur Coal Mine

of Mahanadi Coalfields Limited (MCL);

• Transport of Coal by Road up to Nov-2019

2. Serial No. in the schedule S. No. 1(d)

3. Proposed capacity/ area/ length/ tonnage

to be handled/ command area/ lease

area/number of wells to be drilled

Environment clearance (EC) for Lara STPP, Stage-I has

already been accorded vide MoEF & CC’s letter no. J

13012/79/2007-IA.II(T) dated 13.12.2012 for a capacity of

1600 MW (2x800 MW). The project is in its advanced

stage of completion, Unit 1 (800 MW) expected to be

commissioned by March, 2017 and planned for

Commercial Operation (COD) in April, 2017.

Lara STPP, Stage-I is linked to Talaipali Coal Mining

Project of NTPC and production from the coal block is

expected in November, 2019.

In view of the above NTPC applied for “Bridge Linkage”

vide letter dated 11.02.2016 as per Ministry of Coal (MoC)

policy guidelines published on 08.02.2016. M/s Coal India

Ltd. (CIL) has in-principle decided to allocate coal from

Lakhanpur Coal Mine of MCL and Korea Rewa Coal Mine

of SECL in its meeting for grant of Bridge Linkage held on

29.04.2016. The same has been communicated vide

Office Memorandum (OM) no. CIL/S&M/Power/174 dated

09.05.2016.

Further the same Bridge Linkage was approved by

Page 2: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 2

Ministry of Coal and communicated to CIL vide Letter

dated: 02.06.2016.

Under these circumstances, NTPC needs to transport the

coal from the above mentioned coal blocks (Lakhanpur

block & Korea Rewa block) to Lara STPP by road

(approx. to and fro distance-115 Km).

4. New Expansion/ Modernization Amendment in EC is sought for:

� change in coal source from Talaipali Coal Mining

Project to Lakhanpur Coal Mines of MCL and Korea

Rewa Coalfields of SECL, and

� transportation of coal from Lakhanpur coal block to

Lara STPP by road.

5. Existing capacity/ Area etc. Capacity of the project (Stage-I) is 1600 MW which is

under advanced stage of construction.

6. Category of the project i.e. ‘A’ or ‘B’ A

7. Does it attract the general condition? If

yes, please specify. Yes

8. Does it attract the specific condition? If

yes, please specify. No.

Location Lara STPP is located in Raigarh district of Chhattisgarh at

a latitude and longitude of 21o 45' 20.12” N and 83o 27'

25.80” E respectively.

Plot/ Survey/ Khasra No. -

Village Armuda, Chhapora, Bodajharia, Devalpura, Mahloi,

Riyapalli, Lara, Jhilgitar, Kandagarh

Tehsil Pussore

District Raigarh

9.

State Chhattisgarh

10 Nearest Railway station/ airport along with

distance in Kms. Nearest Railway Station is Raigarh (at about 30 km) and

nearest commercial airport is at Raipur (at about 250 km).

11 Nearest town, city, district Headquarters

along with distance in Kms. Raigarh (at about 30 km)

12 Village Panchayats, Zilla Parishad,

Municipal Corporation, Local Body

(Complete Postal Address with Telephone

Nos. to be given

Villages: Armuda, Chhapora, Bodajharia, Devalpura,

Mahloi, Riyapalli, Lara, Jhilgitar, Kandagarh.

Tehsil: Pussore

District: Raigarh

13 Name of the applicant NTPC Limited

14 Registered Address

NTPC Bhawan, Core-7, Scope Complex,

Page 3: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 3

Lodhi Road, New Delhi – 110 003.

Address for correspondence

Name R. K. Baderia

Designation(Owner/Partner/ CEO) GM & HOD (Environmental Engineering)

Address Environmental Engineering Department, Engg. Office Complex (EOC), NTPC Limited, Sector – 24, Noida (U.P.) – 201 301

Pin Code 201 301

Email [email protected]

Telephone 0120-2410325

15

Fax 0120-2410506

16 Details of alternative sites examined, if

any, location of these sites should be

shown on a topo sheet

Not Applicable as the proposal is for amendment of EC.

17 Interlinked Projects Talaipali Coal Mining Project (TLCMP)

18 Whether separate application of interlinked

project has been submitted?

19 If yes, date of submission

Talaipali Coal Mining Project is linked to cater the coal

requirement for Lara STPP.

EC for TLCMP has already been accorded by MoEF &

CC vide letter no. J-11015/279/2009-IA.II(M) dated

02.01.2013.

Stage-II forest clearance has also been accorded vide

letter no. 8-18/2012-FC dated 29.01.2014 for the

diversion of 766.393 ha of forest land.

20 If no, reason Not Applicable.

Whether the proposal involves

approval/clearance under (details of the

same and their status to be given) :

(a) The forest (Conservation) Act, 1980 Stage-II approval for diversion of forest land involved in

ultimate stage of the project has been accorded by MOEF

vide letter no. 8-21/2012-FC dated 12.05.2014 for the

diversion of 151.762 Ha forest land. Further the forest

land has been diverted by DFO, Raigarh in favour of

NTPC Lara vide letter Ref No. 2303 dated: 30.07.2016.

(b) The Wildlife (Protection) Act, 1972 Not applicable.

21

(c) The C.R.Z. Notification,1991 Not applicable.

22 Whether there is any Government Order/

Policy relevant/ relating to the site No such order exists to the best of our knowledge,

23 Forest land involved (hectares) 151.762 Ha.

Stage-II approval for diversion of forest land involved in

ultimate stage of the project has been accorded by MOEF

Page 4: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 4

vide letter dated 12.05.2014. Further the forest land has

been diverted by DFO, Raigarh in favour of NTPC Lara

vide letter Ref No. 2303 dated: 30.07.2016.

24 Whether there is any litigation pending

against the project and/ or land in which

the project is proposed to be set up? a. Name of the Court b. Case No. c. Orders/Directions of the Court, If any

and its relevance with the proposed

Project

List of pending cases is enclosed as Annexure-A.

• Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining

lease area and production capacity for mineral production, area for mineral exploration, length for

linear transport infrastructure, generation capacity for power generation etc.,)

(I) ACTIVITY

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl.

No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities

/rates, wherever possible) with source of

information data

1.1 Permanent or temporary change in land

use, land cover or topography including

increase in intensity of land use (with

respect to local land use plan)

No Proposed amendment (coal transportation by

road) shall not result in change in land use, as

no major infrastructure is required to carry out

loading, unloading activities for trucks/

dumpers and roads/ National Highway/ State

Highway already exist for transportation of coal

by road.

The route (copy of Sketch enclosed as

Annexure-B) that is proposed to be followed

for coal transportation through trucks/ dumpers

is as following:

a) Entry: The empty dumper shall run on

NH49/200 Double Lane till Belpahar Railway

crossing (approx. 59 Km from Lara STPP) and

then on State Highway and finally entering into

MCL mining area. In order to reach Lakhanpur

Mines, trucks/ dumpers shall follow the internal

approach road of MCL.

b) Exit: In order to exit, the loaded trucks/

dumpers shall run on internal mine road/

existing single lane road of Lakhanpur Mines

(approx. 7-8 Km) which is connected to

NH49/200 at Lakhanpur area Mandir (Exit

Point shown in sketch). Then the trucks/

Page 5: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 5

dumpers shall run on NH49/200 upto

Rengalpali Chowk and then follow the

approach road of Lara STPP to reach the site.

The approx. to and fro distance is 115 Km.

1.2 Clearance of existing land, vegetation and

buildings? No Not applicable as the infrastructure required for

the afore-mentioned activities is already in

place.

1.3 Creation of new land uses?

No Not applicable

1.4 Pre-construction investigations e.g. bore

holes, soil testing? No Not applicable

1.5 Construction works?

No Infrastructure facilities i.e. roads are already in

place and being used by various users.

1.6 Demolition works?

No No demolition work is envisaged.

1.7 Temporary sites used for construction

works or housing of construction workers? No -

1.8 Above ground buildings, structures or

earthworks including linear structures, cut

and fill or excavations

Yes Above ground buildings, structures or

earthworks including linear structures etc are

not applicable.

1.9 Underground works including mining or

tunneling? No No underground mining or tunneling is

envisaged.

1.10 Reclamation works?

No No reclamation works are envisaged.

1.11 Dredging? No No dredging is involved.

1.12 Offshore structures? No No new facility is being created and only a part

of existing one is intended to be used.

1.13 Production and manufacturing processes?

No The proposed activity for amendment in EC

does not involve any production or

manufacturing process. The use of coal as the

fuel in Lara STPP has already been accorded

EC. Only change in source of coal and change

in mode of transportation of coal through road

is envisaged.

1.14 Facilities for storage of goods or

materials? Yes Storage of coal and secondary fuel, water,

chemicals & oil etc. are envisaged.

1.15 Facilities for treatment or disposal of solid

waste or liquid effluents? No No solid or liquid waste is envisaged due to

transportation of coal by road from mine end to

Lara STPP. However, a comprehensive

Page 6: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 6

Environmental Management Plan for Lara

STPP, Stage-I including treatment and

disposal of liquid effluents is being

implemented.

1.16 Facilities for long term housing of

operational workers? Yes A full fledged township is being constructed at

Lara STPP.

1.17 New road, rail or sea traffic during

construction or operation? Yes Coal for Lara STPP is to be obtained from

TLCMP of NTPC located in Chhattisgarh

through MGR system. As the coal from TLCMP

will be available from November, 2019 onwards

only, bridge linkage has been facilitated by

MoC from Lakhanpur and Korea Rewa blocks

of MCL and SECL respectively till TLCMP is

operational.

In view of the above, NTPC plans to transport

coal from Lakhanpur and Korea Rewa coal

blocks to Lara STPP by road network.

Existing National Highway/ State Highway is

being used for transportation of construction

material and the same shall be used for coal

transportation also.

Considering the bridge linkage from Lakhanpur

mines for both the Units (2x800 MW), coal

(grade G-13) requirement (90% of normative

requirement) would be approx. 15,554 MT/day

for which approx. 2074 truck trips having

average capacity 15 MT for to and fro distance

of 115 Km is anticipated. This will generate

additional traffic on road.

1.18 New road, rail, air, waterborne or other

transport infrastructure including new or

altered routes and stations, ports, airports

etc?

No Not applicable.

1.19 Closure or diversion of existing transport

routes or infrastructure leading to changes

in traffic movements?

No Existing Road Network shall be used for

transportation of coal.

1.20 New or diverted transmission lines or

pipelines? No Not applicable as the proposal is for change in

mode of coal transportation.

1.21 Impoundment, damming, culverting,

realignment or other changes to the

hydrology of watercourses or aquifers?

No Not applicable as the proposal is for change in

mode of coal transportation.

1.22 Stream crossings? No Not applicable.

1.23 Abstraction or transfers of water from No Not applicable.

Page 7: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 7

ground or surface waters?

1.24 Changes in water bodies or the land

surface affecting drainage or run-off? No Not applicable.

The proposal is for change in mode of coal

transportation.

1.25 Transport of personnel or materials for

construction, operation or

decommissioning?

No Not applicable as the proposal is for change in

mode of coal transportation and infrastructure

required for transport of coal i.e. road, is

already existing.

Movement of workers and other personnel to

the operation site takes place through the

existing networks only.

1.26 Long-term dismantling or

decommissioning or restoration works? No Not applicable.

1.27 Ongoing activity during decommissioning

which could have an impact on the

environment?

No Not applicable as the proposal is for change in

mode of coal transportation through an existing

road network.

1.28 Influx of people to an area in either

temporarily or permanently? Yes There may be influx of a small number of

personnel as Drivers, Cleaners, Helpers

engaged in coal transportation by road as

approx. 2074 truck trips (to and fro) are

anticipated for full capacity (2x800 MW).

One Driver and a helper shall be associated

with each truck/dumper and it will be a moving

population.

1.29 Introduction of alien species? No --

1.30 Loss of native species or genetic

diversity? No --

1.31 Any other actions? No --

Page 8: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 8

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials

or energy, especially any resources which are non-renewable or in short supply):

Sl.

No. Information/checklist confirmation Yes/No

Details thereof (with approximate quantities

/rates, wherever possible) with source of

information data

2.1 Land especially undeveloped or

agricultural land (ha)

No The activity is for transportation of coal by

road, through NH49/200, already in place.

Therefore, no additional use of land either

agricultural or barren is envisaged.

2.2 Water (expected source & competing

users) unit: KLD No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

2.3 Minerals (MT) Yes The coal requirement for Lara STPP, Stage-I,

is about 8 MTPA (at 90% PLF) which will be

met from TLCMP from November, 2019.

M/s Coal India Ltd. (CIL) has in-principle

decided to allocate coal from MCL and Korea

Rewa Field of SECL in its meeting for grant of

Bridge Linkage held on 29.04.2016. The same

has been communicated vide Office

Memorandum (OM) no. CIL/S&M/Power/174

dated 09.05.2016. Further the same Bridge

Linkage was approved by Ministry of Coal and

communicated to CIL vide Letter dated:

02.06.2016.

2.4 Construction material – stone,

aggregates, sand / soil (expected source

– MT)

No Not applicable as the proposal is for change in

mode of coal transportation and change in

coal source.

2.5 Forests and timber (source – MT) No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel (MT),

energy (MW)

No For requirement and source of coal please

refer Para 2.3 above.

2.7 Any other natural resources (use

appropriate standard units) No --

Page 9: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 9

3. Use, storage, transport, handling or production of substances or materials, which could be harmful

to human health or the environment or raise concerns about actual or perceived risks to human

health.

Sl.

No. Information/Checklist confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

3.1 Use of substances or materials, which

are hazardous (as per MSIHC rules) to

human health or the environment (flora,

fauna, and water supplies)

No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

3.2 Changes in occurrence of disease or

affect disease vectors (e.g. insect or

water borne diseases)

No ---

3.3 Affect the welfare of people e.g. by

changing living conditions? No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

However, construction of Lara STPP, Stage-I has

already provided employment potential under

unskilled, semi-skilled and skilled categories.

Further, it will also improve the power supply

position in Chhattisgarh and nearby states, which

is vital for economic growth as well as improving

the quality of life. The improved power supply will

reduce the dependence of general public and

commercial establishments on DG Sets and water

pump for irrigation in rural area.

3.4 Vulnerable groups of people who could

be affected by the project e.g. hospital

patients, children, the elderly etc.

No --

3.5 Any other causes No --

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl.

No. Information/Checklist confirmation Yes/ No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

4.1 Spoil, overburden or mine wastes No --

4.2 Municipal waste (domestic and or

commercial wastes) No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

However, the municipal wastes that will be

generated at Lara STPP shall be disposed off in

Page 10: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 10

environmentally safe manner.

4.3 Hazardous wastes (as per Hazardous

Waste Management Rules) No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

However, the hazardous waste that will be

generated at Lara STPP shall be disposed off in

environmentally safe manner.

4.4 Other industrial process wastes No -

4.5 Surplus product No -

4.6 Sewage sludge or other sludge from

effluent treatment No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

4.7 Construction or demolition wastes No -

4.8 Redundant machinery or equipment No -

4.9 Contaminated soils or other materials No -

4.10 Agricultural wastes No -

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl.

No. Information / Checklist confirmation Yes / No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

5.1 Emissions from combustion of fossil

fuels from stationary or mobile sources. Yes Emissions due combustion of diesel in trucks/

dumpers are anticipated. Also, the change in

mode of coal transportation by road is only for a

limited period.

5.2 Emissions from production processes. No The emissions from production processes are not

likely to change due to change in mode of coal

transportation.

The GCV and Sulphur (S) content of coal from

TLCMP was 3500 kcal/Kg and 0.5% (max.)

respectively on the basis of which EC was

granted. The GCV and S content of coal for

Lakhanpur block are in the same range (typical

GCV: 3420 kcal/Kg & S Content: 0.44%), hence

there will not be significant difference in air quality

predicted in EIA due to change in source of coal.

5.3 Emissions from materials handling

including storage or transport. Yes Fugitive dust emission from Coal handling,

transportation by trucks/ dumpers and storage

areas are anticipated. However, adequate

Page 11: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 11

Sl.

No. Information / Checklist confirmation Yes / No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

mitigation measures shall be adopted to minimize

the impacts.

Guidelines on Ash Transportation by MoEF & CC

have been referred and applicable precautions

like covering of truck/ dumpers with tarpaulin,

GPS monitoring of truck movement etc. has been

envisaged.

Further, during transportation of coal by road

through truck/ dumpers, the specified norms/

guidelines prescribed by State Pollution Control

Board shall also be followed keeping the view of

transportation in environmentally sound manner.

5.4 Emissions from construction activities

including plant and equipment. No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

5.5 Dust or odors from handling of

materials including construction

materials, sewage and waste.

Yes Fugitive dust is anticipated during handling of coal

in trucks/ dumpers. Adequate mitigation measures

such as sprinkling of water on haul roads,

tarpaulin cover for trucks/ dumpers, limiting of

speed to 40 Km/hr etc. shall be adopted to

minimize the impacts.

5.6 Emissions form incineration of waste. No -

5.7 Emissions from burning of waste in

open air (e.g. slash materials,

construction debris).

No -

5.8 Emissions from any other sources. No -

6. Generation of Noise and Vibration, and Emissions of Light and Heat

Sl.

No. Information / Checklist confirmation Yes / No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

6.1 From operation of equipment e.g.

engines, ventilation plant, crushers. Yes

6.2 From industrial or similar processes. Yes

6.3 From construction or demolition. Yes

Apart from noise generation from main plant,

there will be a minimal increment in the decibel

level due transportation of coal by road. However,

the arrangement is for a limited period of time.

6.4 From blasting or drilling No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

Page 12: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 12

Sl.

No. Information / Checklist confirmation Yes / No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

6.5 From construction or operational traffic. Yes Noise, vibration & heat get generated in course of

operation of vehicles including machineries.

These will be maintained within acceptable limits.

6.6 From lighting or cooling systems No -

6.7 From any other sources. No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,

surface waters, groundwater, coastal waters or the sea:

Sl.

No. Information / Checklist confirmation Yes / No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

7.1 From handling, storage, use or spillage

of hazardous materials. No Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

7.2 From discharge of sewage or other

effluents to water or the land (expected

mode and place of discharge)

No Not applicable as the proposal is for change of

coal source and change in mode of coal

transportation.

7.3 By disposition of pollutants emitted to

air into the land or into water. Yes

7.4 From any other sources. No -

7.5 Is there a risk of long term buildup of

pollutants in the environment from

these sources?

No -

8. Risk of accidents during construction or operation of the Project, which could affect human health or

the environment.

Sl.

No. Information / Checklist confirmation Yes /

No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

8.1 From explosions, spillages, fires etc.

from storage, handling, use or production

of hazardous substances.

Yes Not applicable as the proposal is for change in

mode of coal transportation and change in coal

source.

8.2 From any other causes No

8.3 Could the project be affected by natural

disasters causing environmental damage

(e.g. floods, earthquakes, landslides,

No Not applicable as the proposal is for change of

coal source and mode of coal transportation.

Page 13: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 13

Sl.

No. Information / Checklist confirmation Yes /

No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

cloudburst etc.)? The project site is not susceptible to floods,

landslides or cloud bursts. Further, the project site

is located in Earthquake Zone–I of India. However,

adequate care has already been taken during

design and construction to avoid any disaster like

earth quake.

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned

activities in the locality

Sl.

No. Information / Checklist confirmation Yes /

No. Details thereof (with approximate quantities /

rates, wherever possible) with source of

information data.

9.1 Lead to development of supporting,

facilities, ancillary development or

development stimulated by the project

which could have impact on the

environment e.g. Supporting

infrastructure (roads, power supply,

waste or waste water treatment etc.).

• Housing development

• Extractive industries

• Supply industries

• Others

No

Not applicable.

9.2

Lead to after-use of the site, which could

have an impact on the environment. No Not applicable.

9.3 Set a precedent for later developments. No --

9.4 Have cumulative effects due to proximity

to other existing or planned projects with

similar effects.

Yes There may be a slight increment in the baseline

ambient air quality due to vehicular movement for

transportation of coal, and will be for a limited

period of time. The impacts shall be minimized by

adopting adequate mitigation measures.

Page 14: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

Updated Form-I for Amendment of Environmental Clearance for

Lara STPP, Stage-I (2x800 MW), NTPC Limited

Page No. 14

(II) ENVIRONMENTAL SENSITIVITY

S. No. Areas Name/ Identity

Aerial distance (within 15 km.)

from proposed project location

boundary

1 Areas protected under international conventions,

national or local legislation for their ecological,

landscape, cultural or other related value

No No

2 Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses or

other water bodies, coastal zone, biospheres,

mountains, forests

Yes Mahanadi river and a small part of

Hirakund Reservoir exist at about

10 Km from the project site in

South-West and South-East

directions respectively. Gajmar

and Hargan Reserve Forests exist

at about 8-9 Km in North-East

direction.

3 Areas used by protected, important or sensitive

species of flora or fauna for breeding, nesting,

foraging, resting, over wintering, migration

No --

4 Inland, coastal, marine or underground waters Yes Mahanadi river and a small part of

Hirakund Reservoir exist at about

10 Km from the project site in

South-West and South-East

directions respectively.

5 State, National boundaries Yes The boundary between

Chhattisgarh and Orissa exist at

about 10 Km from the project site.

6 Routes or facilities used by the public for accessto

recreation or other tourist, pilgrim areas No --

7 Defence installations No --

8 Densely populated or built-up area No --

9 Areas occupied by sensitive man-made land uses

(hospitals, schools, places of worship, community

facilities)

No --

10 Areas containing important, high quality or scarce

resources (ground water resources, surface

resources, forestry, agriculture, fisheries, tourism,

minerals)

No --

11 Areas already subjected to pollution or

environmental damage. (those where existing

legal environmental standards are exceeded)

No

Page 15: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 16: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800

- ---ANNEXURE-3---

-- - -------

---

aITTc, fi { c.fi I {

ch 1 <-I c>i I J.i :41 c>i <-I

chl <-I c>i I fc:I zj :4 c.fi cliT c.fi I <-1'1 c>i <-I

qovernment of India

:Ministry of Coa[

Office of tlie Coa[ Contro[fer

1, c.fi13Rl<>l � @c, chl<>lc.filc-11 - 700 0011, Counci{Jfouse Street, 1(o[k,ata - 700 001

To

� /Ph: 033 22489612 to 16; Fax: 033 22482459;

i I No. CC/MC BA/POLICY/BRIDGE LINKAGE/2016-17

t-�/ E-mail: [email protected]

R;c1iRnc-1 /Dated: 02.06.2016

General Manager (S&M),

Coal India Ltd., Coal Bhawan, Premise No.-04 MAR, Plot No. - AF-III, Action Area- I A, Newtown, Rajarhat, Kolkata - 700 156.

Sir,

Sub:- Coal quantification of the power plants granted Bridge Linkage.

Ref:- (i) MOC's O.M. No. 23021/3/2015-CPD dated 08.02.2016.

(ii) Minutes of the special meeting of the SLC(LT) held on 18.03.2016 vide No. 23014/2/2016-

CPD dated 11.04.2016.(iii) Letter No. FU-35/2014-IPC dated 15.01.2015 of Ministry of Power.(iv) CIL's letter No. CIL/S&M/Power/185 dated 16.05.2016 and another letter no. CIL/ S&M /

Power/188 dated 17.05.2016 followed by Corrigendum vide letter No. CIL/S&M/Power/207dated 27.05.2016.

In reference to the above, I am directed to state that Coal India Ltd. has sent offer of coal supply under Bridge Linkage to different power plants. But for each power plant they have offered a range of Grade of Coal. As such for each unit of a power plant, 'Agreed requirement of Coal' i.e., 90% of 'Normative Requirement' have been calculated for each grade of coal (within the offered range of grade of coal) separately considering supply of total quantity of coal of that pa1ticular grade only and not that all the quantities mentioned against each grade of coal for a particular unit of a plant are to be supplied. For example, in SI. No. 1, in case of Unit 8 of Koradi TPP, the Agreed Requirement of Coal has been calculated as 1.624709 MT if G8 grade coal supplied OR l .730678 MT if G9 grade coal supplied OR 1.851379 MT ifGlO grade coal is supplied and not that 1.624709 MT of G8 grade+ 1.730678 of G9 grade+ 1.851379 MT of GlO grade coal is to be supplied. Accordingly yearly quantities under bridge linkage have been calculated for all the cases.

Therefore, based on the above mentioned letters of CIL, Ministry of Power and minutes of the special meeting of SLC(LT) held on 18.03.2016 the statement for quantification of "Bridge Linkage" is enclosed herewith

as Annexure - I, for your kind perusal and necessary action please.

Enclo: As above. Yours faithfully,

. �V\. \1,D\ b \f . (fr I (jt

OSD (Project) CCO(HQ),KOLKATA

Copy to:

1. Joint Secretary (Coal), Ministry of Coal, Shastri Bhawan, New Delhi - 110 001.2. Chairman, NTPC, Scope Complex, Lodhi Road, New Delhi.3. Managing Director, U.P. Rajya Vidyut Utpadan Nigam Ltd., 8111 Floor, Shakti Bhawan Extn.,

Ashok Marg., Lucknow - 226001.4. Managing Director, Odisha Power Generation Corporation Ltd., Zone-A, i

11 Floor, F01tuneTowers, Chandrasekharpur, Bhubaneswar-751023, Odisha.

5. CMD, Mahagenco, Prakashgad, Plot No. G-9, Bandra (East), Mumbai-400032.6. Shri Pilli Ravi Kumar, Under Secretary to the Govt. of India, Ministry of Coal, Shastri Bhawan,

New Delhi- 110 001.

Page 17: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 18: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 19: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 20: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 21: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 22: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 23: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 24: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 25: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 26: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 27: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800
Page 28: Annexure-Updated Form 1environmentclearance.nic.in/.../12122016MLNIQ3ZFAnnexure-Update… · Updated Form-I for Amendment of Environmental Clearance for Lara STPP, Stage-I (2x800