annexure state-wise report of primary health centres 2011-2012 - karuna … · 2015-09-24 · 12...
TRANSCRIPT
![Page 1: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/1.jpg)
Annexure
State-wise Report of Primary Health Centres
2011-2012
![Page 2: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/2.jpg)
Karnataka
Anegundi
Name of the PHC : Anegundi
Taluk : Gangavathi
District : Koppal
Population Covered : 26210
No. of Sub-Centres : 5
Staff : 23
Date of Taking over : 20.05.2005
Sl.
No
Before taking over After taking over
1 LAND Lot of weeds and
inadequately
maintained.
No Fencing
Total area is 1 acre.
Cleaned-up.
KT has started a demo garden and
nursery for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair
works and Irregular
maintenance.
Cleaned-up and renovated the
building.
Citizen Charter displayed.
Sign-boards written.
MO quarters and Nurse Quarters
were renovated & occupied by our
staff.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings and were
unoccupied
Cleaned-up the building.
Our ANMs occupied the Building
Only 3 sub centers with building.
We are looking for 2 sub centre
building location & construction
of the proposed Sub-center
building upon receipt of the funds.
4 EQUIPMENTS Supply irregular.
Maintenance poor
Computer, printer and tape
recorder (for IEC activities)
supplied from KT.
Email services are being provided
at the PHC
Some of the essential equipments
were procured from DHO also.
We have supplied equipments for
![Page 3: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/3.jpg)
preparation of traditional
medicine.
Village Resource Centers were
started in collaboration with
ISRO.
Tele conference and Tele –ECG
facilities are available in the PHC.
1 baby warmer is available
The lab equipments , birthing kits
& IUD kits were also supplied
from KT
5 COLD CHAIN
EQIPMENT
Not Maintained Functional
6 FURNITURE Inadequate Office furniture supplied from
KT (table & chair etc)
7 STAFF Many vacant posts and
poor attendance.
KT has filled up all the staffs.
All the staffs are staying in the
head quarters and rendering 24 hrs
services.
ADDITIONAL
STAFF
Not available PMOA and Arogyamitra
appointed by Karuna Trust
8 TRAININGS Infrequent KT has trained the PHC staff on
the following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
Participatory Rural Appraisal
Bio-waste Management
VRCs in Collaboration with ISRO
9 MEDICINES &
REGENTS
Irregular supply KT supplies additional if required.
The lab regents (not available
from DHO store, were also
supplied from KT.
Refrigerator is purchased from
ARS
10 WATER &
ELECTRICITY
Poor and irregular
supply.
New water connection taken from
the Gram panchayat.
Minor electrical repair work for all
the buildings were taken up
![Page 4: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/4.jpg)
12 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC
according to KPCB standards and
obtained the KPCB certificate.
13 AMBULANCE Not available KT has provided an ambulance
through CSR from JSW Jindal
14 NEW INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES
& PRA
PROGRAM
IEC activities were organized in all the sub-center areas
through a special Van.
The PRA programmes were also conducted at the village
levels.
b TRADITIONAL
MEDICINE
PROGRAM
We have integrated the use of traditional medicine in to
Primary Health care.
Sub-Centres with Population
Sl.
No Name of SC
Distanc
e from
PHC
Build
ing
(Y/N)
No.
of
villa
ges Population
Eligibl
e
Coupl
e
No.
of
AS
HA
No
of
Ang
anw
adi
No
of
V
HS
C
No
of
SH
G
Male Female
1 Anegundi 0 YES 5 1991 20158 623 2 7 3 26
2 Sanapura 10 YES 5 2071 1991 609 1 7 5 10
3 Mallapura 6 NO 3 3019 2483 825 5 8 4 15
4
Basavandurag
a 4 YES 5 1288 1059 352 1 5 2 8
5 Vadarahatti 20 NO 4 5170 4980 1522 9 12 1 30
Total 40 22 13539 30671 3931 18 39 15 89
Staff Pattern
Sanctione
d Available
Sanctioned Available
![Page 5: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/5.jpg)
Out-patient and In-patient details
IPD OPD EMERGENCY
Male Female Male Female Male Female
April 2011 13 26 461 426 1 0
May 12 21 514 496 1 1
Jun 13 21 648 662 0 0
Jul 14 33 845 869 1 2
Aug 11 24 783 909 0 3
Sep 10 25 851 786 2 0
Oct 13 21 782 742 2 2
Nov 9 15 892 812 1 0
Dec 7 17 747 727 0 0
January 2012 14 15 827 698 1 0
Feb 10 19 798 699 0 1
Mar 14 22 651 601 1 0
TOTAL 140 259 8799 8427 10 9
1 Medical Officer 2 1 9 Jr.H.A. (M) 5 5
2 Pharmacist 1 1 10 Jr.H.A (F) 5 5
3 Staff Nurse 1 1 11 PMOA 0 1
4 Lab. Technician 1 1 12 SDC 0 0
5 FDA/Administrator 1 1 13 Arogyamitra 0 1
6 LHV 0 0 14 Driver 1 1
7 BHEO 1 1 15 Gr. D 3 3
8 Sr. H A 1 1
![Page 6: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/6.jpg)
Details of Laboratory Services
Name of
lab tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Blood for
MP test 430 568 635 728 636 661 565 632 558 523 561 439
Positive
cases (slide
+ RMT) 0 0 3 3 1 0 1 0 0 0 0 0 8
Total PV 2 0 3 1 1 0 1 0 0 0 0 0 8
Total PF 0 0 0 2 0 0 0 0 0 0 0 0 2
Total mixed
type 0 0 0 0 0 0 0 0 0 0 0 0 0
HIV tests 47 1 40 23 16 21 57 79 35 44 50 31 444
Positive 3 0 0 0 0 0 1 0 0 0 0 0 4
Blood sugar 13 14 9 7 13 16 16 4 13 0 6 17 128
Widal 13 14 9 17 17 13 20 26 12 12 25 16 194
VDRL 22 6 9 9 3 6 21 32 6 4 14 35 167
Pregnancy
test 18 21 17 21 18 17 17 22 11 14 18 14 208
Hb% in PHC 27 36 23 18 24 41 46 36 29 18 24 64 386
TLC 0 0 0 3 1 0 0 0 0 0 0 0 4
DLC 0 0 0 3 1 0 0 0 0 0 0 0 4
ESR 1 0 1 4 3 1 1 2 0 1 0 0 14
Urine RE 19 26 16 7 17 29 32 8 12 6 19 40 231
Blood
grouping 23 29 9 13 6 13 28 43 0 9 8 40 221
Rapid test
for HIV 16 0 0 0 0 0 0 0 0 0 0 0 16
CT BT Time 0 0 0 0 0 0 21 14 0 0 0 9 44
Others 0 0 0 0 0 0 0 0 0 0 0 0 0
![Page 7: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/7.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009
-10
2010
-11
2011-
2012
1 POPULATION 2074
4
24368 2495
0
26054 2707
1
2599
2
26210
2 TOTAL ANC
REGISTRATION
S
598 592 538 675 695 659 661
3 EARLY ANC
REGISTRATION
S <12 WEEKS
231 259 250 574 585 544 591
% 39 44 46 85 84 83 89
4 TT COVERAGE
ANC
458 505 449 609 642 653 703
5 TOTAL
DELIVERIES
380 461 307 355 508 549 547
6 INSTITUTION
DELIVERIES
198 168 171 262 461 514 510
7 %
INSTITUTIONA
L DELIVERIES
52 36 56 74 91 94 93
Vital Indicators
1 MATERNAL
DEATHS
0 1 1 0 1 0 0
2 TOTAL LIVE
BIRTHS
378 453 281 466 491 534 540
3 IMR 21.05 13.02 48.88 25.75 32.5
87
16.85
39
16.66
![Page 8: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/8.jpg)
![Page 9: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/9.jpg)
Aralagudu
Name of the PHC : Aralagudu
Taluk : Sagara
District : Shimoga
Population Covered : 2999
No. of Sub-Centres : 3
Staff : 7
Date of Taking over : 15.10.2004
Sl.
No
Before taking over After taking over
1 LAND There were a lot of weeds
and the land was not
properly maintained
There was no fencing
around the plot
The Total area of 2 acres was
cleared of weeds
Fencing was done around the PHC
with a gate
KT has started a demo garden and
nursery for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
The building was in need
of re-painting
Other repair work was
pending
No regular maintenance of
building and staff quarters
Cleaned up & renovated the
building.
Rooms were identified to serve as
labour ward and Laboratory and
were renovated
Laboratory facilities were started
The PHC building was freshly
painted
All services were displayed in the
PHC in the form of a Citizen’s
Charter
Name sign boards were put up at
strategic points
3 SUB-CENTER
BUILDINGS
The sub-centre buildings
were vacant and poorly
maintained
Cleaned up & re-painted the
building
ANMs are staying in the SC
Building
4 EQUIPMENT Were not being serviced
regularly and supply of
essential equipment was
irregular
Computer, printer and tape recorder
(for IEC activities) have been
supplied from KT
Email services are being provided
at the PHC
Some essential equipment was
procured from the DHO
KT has supplied equipment for
preparation of Traditional Medicine
KT has equipped the entire lab with
![Page 10: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/10.jpg)
necessary equipment with grants
from the Rotary Club, Shimoga
KT has renovated the entire labour
room with grants from the Rotary
Club, Shimoga
The lab equipments , birthing kits
& IUD kits were also supplied from
KT
5 FURNITURE Furniture was inadequate All necessary office furniture was
supplied from KT (tables, chairs,
etc.)
6 REGULAR STAFF Staff attrition rate was
high
Large number of vacancies
Poor staff attendance
KT has filled up all staff positions
All staff are staying at headquarters
and rendering 24x7 healthcare
services
7 TRAINING
PROGRAMS
Training programs were
held infrequently KT has provided periodic training
to PHC staff on the following
subjects:
RCH and MCH Services
HIV/AIDS
IEC
PHC Management
Plan and Budget – Accounts
Capacity Building
Mental Health
Traditional Medicine
PRA
Bio-Waste Management
8 MEDICINES & RE-
AGENTS
Irregular supply of both
essential medicines and re-
agents
KT has supplied essential
medicines over & above those
supplied by the government
The lab re-agents were also
supplied from KT
9 WATER &
ELECTRICITY
Poor and irregular supply New water connection taken from
the Gram Panchayat
Minor electrical repair work for all
the buildings were taken up &
completed
10 WASTE
MANAGEMENT
No implementation of
waste management KT has implemented proper waste
management in the PHC according
to KPCB standards & obtained a
KPCB certificate
11 AMBULANCE Not available An ambulance was provided to
the PHC from Matching grants
from Rotary club, Shimoga
12 ADDITIONAL Not available KT has appointed one Arogya
![Page 11: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/11.jpg)
STAFF mitra for treatment of minor
ailments through Traditional
Medicine programme
13 NEW INNOVATIONS BY KARUNA TRUST
A
IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle, we organized IEC activities in
all the sub-center areas
The PRA programme was also conducted at the village levels
B TRADITIONAL
MEDICINE
PROGRAM
We have integrated the use of traditional medicine into primary
healthcare
Sub-Centres with Population
Sl.
No
.
Name of
SC
Dista
nce
from
PHC
Build
ing
(Y/N)
No. of
villag
es Population
Eligi
ble
Cou
ple
No.
of
ASH
A
No of
Angan
wadi
No
of
VHS
C
No
of
SH
G
Mal
e
Fema
le
I Aralagudu 0 yes 16 137 1 2 2 1
Ii
Mandavall
i 5 yes 11 145 0 2 2 4
Iii Bidaruru 8 yes 18 225 0 3 3 8
Total 45 507 1 7 7 13
Staff pattern
Sl
No.
Name of the
Staff Designation Qualification Sanctioned Working Vacant
1 Dr.Suresh.B.M M.O M.B.B.S 1 Yes No
2 Yogaradhya.R Pharmacist D. Pharmacy 1 Yes No
3 Somappa.M Jr.H.W-Male Diploma 1 Yes No
4 Gowramma.G.S
Jr.H.W-
Female ANM 1 Yes No
5 Vedavathi.M
Jr.H.W-
Female ANM 1 Yes No
6 Bhagyamm.C
Jr.H.W-
Female ANM 1 Yes No
7 Saraswathi.V.N Group-D SSlC 1 Yes No
![Page 12: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/12.jpg)
Out-patient and In-patient details
IPD
OPD Emergency
Male Female children Male Female Children Male Female Children
Apr-11 4 9 0 185 198 11 1 1 0
May-11 3 6 0 135 178 18 0 0 0
Jun-11 4 7 0 124 181 9 0 2 1
Jul-11 1 1 0 166 192 18 0 0 1
Aug-11 3 2 0 180 151 13 0 1 0
Sep-11 5 7 0 144 160 13 0 0 0
Oct-11 5 6 0 168 220 18 0 0 0
Nov-11 4 4 0 144 214 26 1 0 0
Dec-11 5 4 0 142 157 16 0 0 0
Jan-12 6 5 0 105 134 16 0 0 0
Feb-12 2 4 0 179 178 15 0 0 0
Mar-12 6 7 0 185 151 18 1 1 0
Total 48 62 0 1857 2114 191 3 5 2
Details of Laboratory Services
Name of
Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Blood for
MP Test 40 48 57 55 53 49 80 61 56 62 70 54 685
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg
test 0 0 0 0 0 0 0 0 0 0 0 0 0
Widal 0 0 0 0 0 0 0 0 0 0 0 0 0
VDRL 0 0 0 0 0 0 0 0 0 0 0 0 0
Pregnancy
Test 5 3 12 7 4 2 5 3 2 8 4 8 63
Hb% in
PHC 4 1 11 5 12 7 9 11 6 8 3 13 90
![Page 13: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/13.jpg)
TLC 0 0 0 0 0 0 0 0 0 0 0 0 0
DLC 0 0 0 0 0 0 0 0 0 0 0 0 0
ESR 0 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood
Groping 0 0 0 0 0 0 0 0 0 0 0 0 0
HIV Test
ICTC 4 2 18 10 8 0 6 2 3 11 4 6 74
Bile salt 0 0 0 0 0 0 0 0 0 0 0 0 0
Bile
pigment 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 53 54 98 77 77 58 100 77 67 89 81 81 912
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 3051 3165 3228 3238 3078 2999
2 TOTAL ANC
REGISTRATIONS
88 23 52 51 45 34 36
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
50 14 30 38 33 29 34
% 56.8% 61% 58% 76% 73% 85% 94%
4 TT COVERAGE
ANC
70 12 63 31 37 21 33
5 TOTAL
DELIVERIES
31 9 43 15 37 17 35
6 INSTITUTION
DELIVERIES
31 6 19 14 37 16 35
7 %
INSTITUTIONAL
DELIVERIES
100% 67% 44% 93% 100% 94% 100%
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 1 0 0
2 TOTAL LIVE
BIRTHS
31 19 41 14 37 17 34
3 IMR 11.2 11.2 11.2 37.89 27.03 0 0
![Page 14: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/14.jpg)
![Page 15: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/15.jpg)
Ashoknagar
Name of the PHC : Ashoknagar
Taluk : Khanapur
District : Belgaum
Population Covered : 16684
No. of Sub-Centres : 5
Staff : 13
Date of Taking over : 01.11.2004
Sl.
No
Before taking over After taking over
1 LAND Lot of weeds and
inadequately maintained.
No Fencing
Total area is 4.12 acres.
Cleaned-up.
KT has started a demo garden and
nursery for Traditional Medicine.
Fencing done.
2 PHC BUILDING
& STAFF
QUARTERS
Many pending repair works
and maintenance was
irregular.
Medical Officer quarter was
dilapidated
Cleaned-up the building.
Painted the building.
Medical Officer Quarter is
renovated & occupied
Citizen Charter was displayed in the
PHC.
Sign boards written.
3 SUB-CENTER
BUILDINGS
Not available Cleaned-up the building.
ANMs are staying in the S/C head
quarters in rented buildings
4 EQUIPMENTS Supply was irregular with
poor maintenance. Computer, printer and tape recorder
(for IEC activities) supplied from
KT.
Email services are being provided at
the PHC
Village Resource Centers were set
up in collaboration with ISRO.
Tele conference and Tele ECG
facilities are available in the PHC.
Some of the essential equipments
were procured from DHO.
Equipment for preparation of
![Page 16: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/16.jpg)
traditional medicines were supplied
by KT
Refrigerator purchased by ARS
New computer provided by
Government
The lab equipments , birthing kits &
IUD kits were also supplied from
KT
5 FURNITURE Furniture was inadequate All necessary office furniture was
supplied from KT (tables, chairs,
etc.)
6 REGULAR
STAFF
Staff attrition rate was high
Large number of vacancies
Poor staff attendance
KT has filled up all staff positions
All staff are staying at headquarters
and rendering 24x7 healthcare
services
7 TRAINING
PROGRAMS
Training programs were held
infrequently KT has provided periodic training
to PHC staff on the following
subjects:
RCH and MCH Services
HIV/AIDS
IEC
PHC Management
Plan and Budget – Accounts
Capacity Building
Mental Health
Traditional Medicine
PRA
Bio-Waste Management
8 MEDICINES &
RE-AGENTS
Irregular supply of both
essential medicines and re-
agents
KT has supplied essential medicines
over & above those supplied by the
government
The lab re-agents were also
supplied from KT
9 WATER &
ELECTRICITY
Poor and irregular supply New water connection taken from
the Gram Panchayat
Minor electrical repair work for all
the buildings were taken up &
completed
10 WASTE
MANAGEMENT
No implementation of waste
management KT has implemented proper waste
management in the PHC according
to KPCB standards & obtained a
KPCB certificate
11 ADDITIONAL
STAFF
Not available KT has appointed one Arogya mitra
& PMOA for treatment of minor
ailments through Traditional
Medicine programme & eye
![Page 17: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/17.jpg)
screening
12 NEW INNOVATIONS BY KARUNA TRUST
A
IEC
ACTIVITIES &
PRA
PROGRAM
With the help of our IEC vehicle, we organized IEC activities in all
the sub-center areas
The PRA programme was also conducted at the village levels
B TRADITIONAL
MEDICINE
PROGRAM
We have integrated the use of traditional medicine into primary
healthcare
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 3 3
Ii Pharmacist 1 1 x Jr. H.A (F) 5 5
Iii Staff Nurse 0 0 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 1 1
Viii Sr. H.A. 0 0
Out-patient and In-patient details
IPD
OPD Emergency
Male Female Children Male Female Male Female
Apr-11 10 21 0 445 498 2 2
May-11 8 12 0 400 440 3 2
Jun-11 2 0 0 390 432 1 2
Jul-11 0 1 0 360 418 1 1
Aug-11 1 2 0 400 326 0 2
Sep-11 0 2 0 490 431 1 0
Oct-11 2 10 0 395 407 2 0
Nov-11 8 5 0 400 420 1 1
Dec-11 13 17 0 451 498 1 2
12-Jan 10 15 0 313 461 0 2
12-Feb 6 20 0 286 442 1 3
![Page 18: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/18.jpg)
12-Mar 4 22 0 433 673 0 3
TOTAL 64 127 0 4763 5446 13 20
Details of Laboratory Services
Name of Lab
Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for MP
Test 336 282 300 305 307 297 299 322 291 344 336 377 3796
Positive Cases
(Slide +RMT) 0 0 0 0 0 0 0 0 0 0 0 0 0
Total PV 1 0 0 0 0 0 0 0 0 0 0 1 2
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood Sugar 0 0 0 0 0 0 0 0 14 9 9 4 36
Widal 1 0 0 1 0 0 0 0 1 6 2 3 14
VDRL 11 1 15 5 9 24 15 14 14 9 17 21 155
Pregnancy Test 9 6 5 6 8 8 9 8 7 9 10 18 103
Hb% in PHC 40 20 33 20 18 47 34 37 49 51 47 63 459
TLC 0 0 0 0 0 0 0 0 5 2 3 7 17
DLC 0 0 0 0 0 0 0 0 5 2 3 7 17
ESR 0 0 0 0 0 0 0 0 2 0 2 7 11
Urine RE 34 13 15 10 11 32 31 27 41 43 44 51 352
Blood Groping 13 3 15 8 11 22 15 18 18 9 18 28 178
HbSAg 0 0 0 0 0 22 2 0 8 9 18 25 84
BILE SALT 2 0 1 0 0 0 2 0 0 1 2 5 13
BILEPIGMENT 2 0 1 0 0 0 2 0 0 1 2 5 13
Water Test For
H2S Method 15 20 10 20 20 20 20 20 20 40 30 45 280
HIV TEST 34 16 14 26 14 52 57 26 36 34 33 31 373
Total 498 361 409 401 398 524 486 472 511 569 576 698 5903
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 14509 14874 15732 1611
6
16365 16934
2 TOTAL ANC
REGISTRATIONS
253 285 290 316 405 372 362
3 EARLY ANC
REGISTRATIONS
140 226 281 214 308 303 272
![Page 19: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/19.jpg)
<12 WEEKS
% 55 79 97 68 76 81 94
4 TT COVERAGE
ANC
264 289 294 315 398 373 410
5 TOTAL
DELIVERIES
247 268 286 279 273 364 370
6 INSTITUTION
DELIVERIES
110 185 226 209 250 350 342
7 % INSTITUTIONAL
DELIVERIES
45% 69% 79% 75% 92% 96% 92%
Vital Indicators
1 MATERNAL
DEATHS
0 0 1 0 1 0 0
2 TOTAL LIVE
BIRTHS
242 263 288 290 270 357 363
3 IMR 24.29 22.39 13.99 7.35 14.81
5
14.00
56
22.03
![Page 20: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/20.jpg)
Begar
Name of the PHC : PHC Begar
Taluk : Shringeri
District : Chikkamagalur
Population Covered : 16812
No. of Sub-Centres : 6
Staff : 20
Date of Taking over : 09.01.2006
Sl.
No
Before taking over After taking over
1 LAND Lot of weeds and
inadequately maintained.
No Fencing
Total area is 3 acres.
Cleaned-up.
Started a demo garden and
nursery for Traditional
Medicine.
2 PHC BUILDING
& STAFF
QUARTERS
Many pending repair works
and maintenance irregular.
Staff quarters were poorly
maintained
Cleaned-up the building.
All the quarters are renovated
and occupied.
Citizen Charter displayed in
the PHC.
Sign- boards written.
![Page 21: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/21.jpg)
3 SUB-CENTER
BUILDINGS
Buildings were poorly
maintained and un-occupied Buildings are cleaned up
ANMs staying in the Building
We have the 6 sub centers with
building.
4 EQUIPMENTS Not being serviced regularly
and supply irregular. Computer, printer and tape
recorder (for IEC activities)
supplied from KT.
Email services are being
provided at the PHC
Some of the essential
equipments were procured
from DHO.
Traditional medicine
preparation equipments are
also supplied.
Refrigerator, invertor & baby
warmer purchased from ARS
The lab equipments , birthing
kits & IUD kits were also
supplied from KTm
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Some Office furniture(table &
chair) have been procured
Reception counter & seating
arrangement in OPD
7 STAFF Many vacancies and poor
attendance. All the Vacant posts have
been filled up.
All the staffs are staying in the
head quarters and they are
rendering the 24 hrs services.
8 TRAININGS Infrequent KT staffs have been trained on
the following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REGENTS
Irregular supply. KT supplies essential
medicines in case of any
shortage.
![Page 22: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/22.jpg)
Birthing kits & IUD kits
supplied from KT
The lab equipments & regents
were also supplied from KT.
10 WATER &
ELECTRICITY
Poor and irregular supply. Water supply available
Some minor electrical repair
work for all the buildings were
taken up
12 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-
waste management in the PHC
according to KPCB standards
and obtained the KPCB
certificate.
13 AMBULANCE Not available AN ambulance is provided by
Rotary club, Shimoga
14 NEW INNOVATIONS BY KARUNA TRUST:
A IEC
ACTIVITIES &
PRA PROGRAM
With the help of a special IEC vehicle we organized IEC
activities in all the sub-center areas.
The PRA programme also conducted in the village levels.
B TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary
Health care.
![Page 23: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/23.jpg)
Sub-center with population
Name of
SC
Distance
from
PHC
Buildin
g (Y/N) Population
Eligibl
e
Couple
No. of
ASHA
No of
Angan
wadi
No of
VHS
C
No of
SHG
Male Female
Begar 0 Yes 992 901 307 0 9 4 2
Kupenmak
ki 2km Yes 791 969 300 0 7 3 2
Holekoppa 7km Yes 819 786 265 0 3 2 2
Kigga 15km Yes 1521 1262 334 0 10 3 3
Gandagatta 13km Yes 834 861 250 2 3 1 1
Harur 30km Yes 865 965 308 0 6 5 2
Kerekatte 40km NO 678 493 189 2 7 5 2
Staff pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 4 4
Ii Pharmacist 1 1 x Jr. H.A (F) 6 6
Iii Staff Nurse 1 1 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 1 1
Vii BHEO 0 0 xv Gr. D 4 4
Viii Sr. H.A. 0 0
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Children Male Female Children Male Female Children
Apr-11 9 9 0 347 304 68 8 9 0
May-11 3 5 0 304 420 97 15 11 0
Jun-11 3 5 0 412 364 96 20 16 0
Jul-11 8 3 1 426 402 112 18 14 0
Aug-11 5 10 0 438 358 102 12 17 0
Sep-11 17 13 0 369 329 77 15 13 0
![Page 24: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/24.jpg)
Oct-11 13 29 1 347 306 104 10 13 0
Nov-11 11 19 1 429 558 125 17 20 0
Dec-11 19 34 0 397 486 199 28 22 0
Jan-12 22 31 13 555 572 119 28 20 0
Feb-12 8 21 1 437 488 137 15 22 0
Mar-12 12 23 7 330 387 91 20 16 0
Total 130 202 24 4791 4974 1327 206 193 0
Details of Laboratory Services
Name of Lab
Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for MP
Test 352 411 423 459 443 461 429 456 323 241 275 271 4552
Total PV 0 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 6 2 3 5 2 10 6 2 4 4 5 6 55
Widal 28 4 4 13 10 14 29 6 11 10 13 0 142
VDRL 6 2 2 4 3 9 6 0 6 4 6 6 54
Pregnancy Test 9 2 3 6 3 1 3 6 5 9 5 5 57
Hb% in PHC 23 37 35 82 53 38 24 16 71 25 15 39 458
TLC 4 3 0 0 0 1 7 0 0 0 0 4 19
DLC 4 3 0 0 0 0 0 0 0 0 0 0 7
ESR 4 3 3 7 1 1 3 1 4 0 0 4 31
Urine RE 16 13 16 19 7 19 21 26 17 13 23 29 219
Blood Groping 7 2 2 3 2 8 4 2 4 4 5 4 47
Water Test For
H2S Method 4 1 0 2 3 5 0 4 1 11 5 12 49
HIV Test
ICTC 13 17 7 18 14 22 15 18 12 10 16 13 175
Bile salt 0 0 0 0 0 0 0 0 0 0 0 0 0
Bile pigment 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 476 500 498 618 541 589 547 537 458 337 368 393 5865
![Page 25: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/25.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010
-11
2011-
2012
1 POPULATION 0 12880 13059 12856 12604 1681
2
12737
2 TOTAL ANC
REGISTRATIONS
0 162 136 142 146 214 162
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
0 112 103 121 129 209 138
% 0 69 76 85 88 97 85
4 TT COVERAGE
ANC
0 153 113 129 125 214 147
5 TOTAL
DELIVERIES
0 108 164 90 118 215 126
6 INSTITUTION
DELIVERIES
0 85 152 82 107 213 126
7 % INSTITUTIONAL
DELIVERIES
0 79 93 91 91 99 100
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 0 2
2 TOTAL LIVE
BIRTHS
0 106 161 92 118 210 214
3 IMR 0 64.81 30.49 97.8 59.32
2
23.8
095
24.19
![Page 26: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/26.jpg)
![Page 27: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/27.jpg)
Beggar’s Colony (NPK)
Name of the PHC: Beggar’s Colony
Taluk: Yelhanka
District: Bangalore Urban
Population Covered: 1010
Staff: 05
Date of taking over: 01-01-2006
Sl.
No
Before taking over After taking over
1 PHC BUILDING
& STAFF
QUARTERS
Many pending repair works
and maintenance irregular.
Cleaned-up the building.
We have one staff quarters building
our staff nurse occupied the
building.
All the services were displayed in
the PHC.
Name boards written.
2 EQUIPMENTS Not being serviced regularly
and supply irregular.
Computer, printer and tape recorder
supplied from KT.
Email services are being provided at
the PHC
Some of the essential equipments
were procured from DHO and
Social Welfare department.
We have done the laboratory
facility.
3 COLD CHAIN
EQIPMENT
Not available We have supplied one Refrigerator
with the help of Social Welfare
department.
4 FURNITURE Inadequate Office furniture supplied from KT
(table & chair)
5 STAFF Irregular and vacancy KT has filled up all the staffs.
All the staffs were staying in the
head quarters and they are rendering
the 24 hrs services.
6 ADDITIONAL
STAFF
Not available KT has posted 1 lab technician.
7 TRAININGS Infrequent KT has given the training to the
PHC staff on the following subjects:
RCH and MCH services.
![Page 28: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/28.jpg)
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Waste Management
8 MEDICINES &
REAGENTS
Irregular supply. KT has also supplied the essential
medicines other than the Govt.
supply.
The lab reagents were also supplied
from KT.
9 WATER &
ELECTRICITY
Poor and irregular supply Running water supply done to the
PHC with the help of Social
Welfare department.
We have done the minor electrical
repair work for all the buildings.
10 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according
to KPCB standards.
11 MENTAL
HEALTH CAMP
Not done We are conducting the mental
health camp in collaboration with
NIMHANS
12 EYE CAMPS Not done We are conducting cataract
operations in collaboration with
Viveka Drusti Eye Hospital.
Staff Position:
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr.H.A. (M) 0 0
Ii Pharmacist 1 1 x Jr.H.A (F) 1 1
Iii Staff Nurse 0 0 xi PMOA 0 0
Iv Lab. Technician 0 0 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 0 0
vii BHEO 0 0 xv Gr. D 0 2
viii Sr. H A 0 0
![Page 29: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/29.jpg)
Outpatient and Inpatient details:
IPD OPD
Male Female Male Female
Apr 05 02 74 73
May 00 00 70 61
Jun 03 01 114 65
Jul 03 01 98 79
Aug 03 02 103 61
Sep 01 01 87 54
Oct 02 01 105 58
Nov 03 00 116 55
Dec 02 01 113 85
Jan 11 01 155 110
Feb 14 06 157 100
Mar 11 06 110 65
TOTAL 58 22 1302 866
Community Mental Health Programme:
Sl.No Month Male Female Total
1. April - 2010 04 06 10
2. May - 2010 16 01 17
3. June - 2010 11 03 14
4. July - 2010 15 05 20
5. August - 2010 11 03 14
6. September - 2010 07 02 9
7. October - 2010 21 06 27
8. November - 2010 04 02 6
9. December - 2010 04 06 10
10. January - 2011 04 04 8
11. February - 2011 00 04 4
12. March - 2011 01 04 5
Total 98 46 144
![Page 30: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/30.jpg)
Sl.No Diagnosis:
1. Psychosis 120
2. Epilepsy 7
3. Neurosis 0
4. Mental Retardation 13
5. Depression 2
6. BPAD 2
Total 144
Laboratory tests:
Sl.No Investigation No of Cases examined
1. Sputum Examination for Tuberculosis 25
2. Blood Smear for Malaria Parasite 113
3. Hemoglobin % Estimation 488
4. Blood Grouping 338
5. Blood Sugar Estimation 808
6. Blood Examination for Typhoid 35
7. Urine Routine Examination 433
8. Pregnancy test 15
9. HIV test 240
Mortality details:
April 2011 01
May 00
Jun 00
Jul 00
Aug 03
Sep 00
Oct 00
Nov 00
Dec 00
Jan 2012 01
Feb 01
Mar 00
![Page 31: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/31.jpg)
Castle rock
Name of the PHC : Castle Rock
Taluk : Joida
District : Uttara Kannada
Population Covered : 9993
No. of Sub-Centres : 5
Staff : 17
Date of Taking over : 01.11.2004
Sl. No Before taking over After taking over
1 LAND Land was full of weeds and not
maintained well The total land area of 2.5 acres was cleaned
up
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Repair work to building was
pending
Irregular maintenance of building
and staff quarters
Cleaned up & re-painted the building
All the services were displayed in the PHC
in the form of a Citizen’s Charter
Name sign boards have been put up at
important entrances in the PHC
3 SUB-CENTER
BUILDINGS
SC building poorly maintained
Building was vacant There is only one SC with the building
Building cleaned up thoroughly
The ANM has been given occupancy space
in the building
4 EQUIPMENT Not being serviced regularly
Supply was irregular Computer, printer and tape recorder (for
IEC activities) supplied from KT
Email services are being provided at the
PHC
Some of the essential equipment was
procured from the DHO
Equipment for preparation of traditional
medicine has been supplied
Village Resource Centres have been set up
in collaboration with ISRO
Tele-conference and Tele-ECG facilities
have been made available in the PHC
The lab equipments , birthing kits & IUD
kits were also supplied from KT
5 COLD CHAIN
EQIPMENT
Not maintained properly KT has made functional the cold chain
equipment for use in the PHC
6 FURNITURE Inadequate KT supplied adequate furniture
7 REGULAR STAFF Many vacancies
Poor attendance All vacant posts have been filled up
All staff are staying at headquarters and
rendering 24x7 health services
8 TRAINING Infrequent PHC staff have been periodically trained
on the following subjects:
RCH and MCH Services
HIV/AIDS
IEC
PHC Management
![Page 32: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/32.jpg)
Plan and Budget – Accounts
Capacity Building
Mental Health
Traditional Medicine
PRA
Bio-Waste Management
Village Resource Centres, that have been
established in Collaboration with ISRO
9 MEDICINES & RE-
AGENTS
Irregular supply KT supplies essential medicines whenever
there is a shortage in supply
The lab re-agents are also supplied from
KT
10 WATER &
ELECTRICITY
Poor and irregular supply Water is available
Minor electrical repair work for all the
buildings were undertaken
12 WASTE
MANAGEMENT
Not implemented KT has implemented bio-waste
management in the PHC according to
KPCB standards and obtained a KPCB
certificate
14 NEW INNOVATIONS:
A IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-centre
areas
PRA program was also conducted at the village level
B HEALTH
INSURANCE
PROGRAM
Health insurance program has been launched in the PHC catchment area and is
running as an ongoing program
C TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into PHCs as part of primary healthcare
Sub-centres with Population
Sl.
No
.
Name of
SC
Distance
from
PHC
Buildi
ng
(Y/N)
No. of
villages Population
Eligibl
e
Couple
No.
of
ASH
A
No of
Angan
wadi
No of
VHSC
No of
SHG
Male
Femal
e
I
Castle
Rock 0 N 4 1148 1065 307 1 5 2 2
Ii Anmod 12 Y 10 1905 1746 576 3 9 9
Iii Tineghat 25 N 7 1017 992 309 3 6 6
Iv Konshet 10 N 8 513 487 148 2 4 2
V
Chandva
di 45 N 7 592 611 181 1 5 2
![Page 33: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/33.jpg)
Staff Pattern Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 3 3
Ii Pharmacist 1 1 x Jr. H.A (F) 5 5
Iii Staff Nurse 1 1 xi PMOA 1 0
Iv Lab. Technician 1 1 xii SDC 1 0
V FDA/Administrator 1 1 xiii Arogyamitra 1 0
Vi LHV 0 0 xiv Driver 1 1
Vii BHEO 1 1 xv Gr. D 2 2
Viii Sr. H.A. 0 0
Details of Laboratory Services
Name of lab
tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb. Mar. Total
Blood for MP
test 179 223 156 173 219 188 198 198 188 209 192 154 2277
Positive cases
(slide + RMT) 0 0 0 0 0 0 0 0 0 0 0 0 0
Total PV 0 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Total mixed type 0 0 0 0 0 0 0 0 0 0 0 0 0
HIV tests 0 0 0 0 0 0 0 0 0 0 0 0 0
Positive 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood sugar 1 12 10 3 8 3 4 6 4 10 6 4 71
Widal 0 0 0 0 0 0 2 1 1 1 5 1 11
VDRL 15 1 0 5 10 36 12 9 11 3 3 3 108
Pregnancy test 6 6 6 9 5 7 7 8 3 4 3 3 67
Hb% in PHC 37 50 26 32 43 63 55 28 30 21 20 29 434
TLC 23 29 13 8 17 17 15 2 1 2 7 14 148
DLC 23 29 13 8 17 17 15 2 1 2 7 14 148
ESR 23 14 13 8 17 17 15 2 1 6 11 18 145
Urine RE 31 46 23 32 42 51 51 28 13 12 11 21 361
Blood grouping 15 1 5 5 2 27 9 8 15 4 2 3 96
Rapid test for
HIV 0 0 0 0 0 0 0 0 0 0 0 0 0
![Page 34: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/34.jpg)
CT BT Time 6 6 3 3 5 8 1 0 0 1 2 4 39
Others 0 0 0 0 0 7 5 7 1 3 2 2 27
STATISTICS:
Sl.
No
Process Indicators 2005
-06
2006-
07
2007
-08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 9302 9302 9497 10078 10073 10216
2 TOTAL ANC
REGISTRATIONS
113 148 221 158 183 175 184
3 EARLY ANC
REGISTRATIONS <12
WEEKS
60 99 118 103 134 146 168
% 53% 67% 53% 65.18% 73% 83% 91%
4 TT COVERAGE ANC 92 132 213 158 169 170 176
5 TOTAL DELIVERIES 107 131 149 143 159 148 215
6 INSTITUTION
DELIVERIES
53 106 115 115 151 131 201
7 % INSTITUTIONAL
DELIVERIES
50% 81% 77% 80% 95 88% 93%
Vital Indicators
1 MATERNAL DEATHS 0 0 0 0 0 0 0
2 TOTAL LIVE
BIRTHS
106 131 146 138 158 145 214
3 IMR 28.4
0
15.27 26.8
5
36.23 12.66 3 14.01
![Page 35: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/35.jpg)
Chandrabanda
Name of the PHC : Chandrabanda
Taluk : Raichur
District : Raichur
Population Covered : 25584
No. of Sub-Centres : 4
Staff : 20
Date of Taking over : 27.01.2006
![Page 36: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/36.jpg)
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained.
No Fencing
Total area is 2 acres.
Cleaned-up.
Fencing done.
KT has started a demo garden and
nursery for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
irregular maintenance.
All the staff quarters were
dilapidated
Cleaned-up the building.
PHC building was painted.
Staff Quarters were renovated &
occupied
Sign-boards have been written.
Citizen Charter have been displayed in
the PHC
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings were vacant
Cleaned-up the building.
ANMs occupied the Building
4 sub centers are located in the
government building.
Two Sub-centers are under minor repair.
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder( for
IEC activities) supplied from KT.
Email services are being provided at the
PHC
Village Resource Center has been set
up in collaboration with ISRO.
Tele conference and Tele- ECG
facilities are available in the PHC.
Some of the essential equipments were
received from DHO.
Equipment for preparation of traditional
medicine has been supplied.
We have procured one baby warming
machine from the DHO
The lab equipments , birthing kits &
IUD kits were also supplied from KT
5 COLD CHAIN
EQIPMENT
Available Available & functional
6 FURNITURE Inadequate Furniture procured.
7 STAFF Many vacancies and poor
attendance.
All vacant posts have been filled up.
All the staffs are staying in the head
quarters and they are rendering the 24
hrs services.
8 TRAININGS Infrequent PHC staff have been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES & Irregular supply. KT supplies the essential medicines and
![Page 37: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/37.jpg)
REAGENTS lab reagent in case of shortage in Govt.
supply.
10 WATER &
ELECTRICITY
The pump set is repaired and got the
running water in the PHC.
Minor electrical repair work was under
taken.
Electric connections in the staff quarters
were also renovated.
12 WASTE
MANAGEMENT
Not implemented Bio-waste management in the PHC is
being implemented according to KPCB
standards and KPCB certificate
obtained.
14 NEW INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-
center areasl.
The PRA programme also conducted in the village levels.
b HEALTH
INSURANCE
PROGRAM
Health insurance program was launched in the PHC catchment area.
c TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-Centres with Population
Sl.
No.
Name of
SC
Distance
from
PHC
Buil
ding
(Y/N
)
No. of
villag
es Population
Eligi
ble
Cou
ple
No.
of
ASH
A
No of
Angan
wadi
No of
VHS
C
N
o
of
S
H
G
Male
Fem
ale
I
Chandraban
da 0 Y 4 2745
286
1 803 6 7 2 7
Ii Kartlatkur 6 N 5 3348
357
4 1080 6 7 2 4
Iii Singnodi 7 Y 6 3071
322
5 997 5 9 4 11
Iv Wadavatti 9 Y 5 3422
358
1 1119 6 8 4 8
Total 20 12586
132
41 3999 23 31 12 30
![Page 38: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/38.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 5 5
Ii Pharmacist 1 1 x Jr. H.A (F) 6 6
Iii Staff Nurse 3 3 xi PMOA 0 0
Iv Lab. Technician 0 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 2 2
Viii Sr. H.A. Yes Yes
Out-patient and In-patient details
IPD
OPD Emergency
Male Female Male Female Male Female
Apr-11 4 21 125 900 2 6
May-11 3 21 135 800 4 8
Jun-11 6 39 132 830 2 6
Jul-11 3 47 130 520 4 7
Aug-11 13 24 165 795 4 8
Sep-11 6 39 206 654 2 8
Oct-11 22 67 348 522 0 7
Nov-11 20 28 320 410 2 9
Dec-11 40 43 443 472 1 4
Jan-12 12 24 472 478 2 5
Feb-12 5 50 250 480 2 6
Mar-12 17 46 323 512 2 3
Total 151 449 3049 7373 27 77
![Page 39: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/39.jpg)
Name of
Lab Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for
MP Test 378 458 473 483 427 420 708 576 512 405 371 334 5545
Total PV 0 0 0 0 0 0 0 0 0 0 1 0 1
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg
test 0 0 0 0 4 13 0 0 0 0 1 0 18
Widal 0 0 0 0 0 0 0 0 0 0 0 8 8
VDRL 6 8 4 4 6 17 26 22 17 0 2 11 123
Pregnancy
Test 5 7 6 7 8 17 13 18 19 15 8 18 141
Hb% in
PHC 0 26 24 24 30 26 37 28 26 16 12 24 273
TLC 0 0 0 0 0 0 0 0 0 0 0 0 0
DLC 0 0 0 0 0 0 0 0 0 0 0 0 0
ESR 0 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 0 0 0 0 0 8 17 15 17 12 6 18 93
Blood
Groping 0 0 0 0 4 17 26 22 19 12 10 18 128
Water
Test For
H2S
Method 0 3 0 2 0 0 4 0 2 2 2 3 18
HIV Test
ICTC 40 19 35 22 35 46 47 37 25 22 19 16 363
Blood
sugar 0 0 0 0 0 0 16 9 5 9 8 11 58
Total 429 521 542 542 514 564 894 727 642 493 440 461 6769
![Page 40: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/40.jpg)
Details of Laboratory Services
Statistics
Sl.
No
Process Indicators 2005
-06
2006
-07
2007-
08
2008
-09
2009
-10
2010
-11
2011-
2012
1 POPULATION 0 2436
7
23480 2348
0
2463
1
2558
4
2 TOTAL ANC
REGISTRATIONS
0 645 620 664 761 676 809
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
0 254 220 415 522 483 600
% 0 39 35 62 68 71 74
4 TT COVERAGE
ANC
0 595 675 715 665 673 804
5 TOTAL
DELIVERIES
0 592 592 618 733 711 782
6 INST2ITUTION
DELIVERIES
0 340 232 392 662 632 742
7 %
INSTITUTIONAL
DELIVERIES
0 57% 39% 63% 90% 89% 95%
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 0 1
2 TOTAL LIVE
BIRTHS
0 534 597 609 716 695 763
3 IMR 0 16.8
9
20.27 36.1
2
32.1
23
30.2
158
18.34
![Page 41: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/41.jpg)
![Page 42: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/42.jpg)
Dindavara
Name of the PHC : Dindavara
Taluk : Hiriyur
District : Chitradurga
No. of Sub-Centres : 3
Staff : 21
Date of Taking over : 02.02.2005
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained.
No Fencing
Total area is 5.5 acres.
Cleaned-up.
Fencing done
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
irregular maintenance .
Cleaned-up the building.
We have painted the building.
We have total 9 staff quarters out of that 2
building are under repair. KT has plan to
renovate them.
All the services were displayed in the PHC.
Name boards written.
3 SUB-CENTER
BUILDINGS
Untidy and dirty
Building were vacant Cleaned-up the building.
ANMs occupied the Building
Only 2 sub center is located in government
building & 1 is under construction
4 EQUIPMENTS Irregular supply Computer, printer and tape recorder (for
IEC activities) supplied from KT.
Email services are being provided at the
PHC
Some of the essential equipments were
procured from DHO.
Equipment for preparation of traditional
medicine has been supplied from KT.
Village Resource Center has been set up in
collaboration with ISRO.
Tele conference and Tele ECG facilities
are made available in the PHC.
The lab equipments , birthing kits & IUD
kits were also supplied from KT
Refrigerator, Solar water heater &
television purchased by ARS
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Furniture available
7 STAFF Many vacancies with poor
attendance. KT has filled up all the vacant posts
All the staffs were staying in the head
quarters and they are rendering the 24 hrs
services.
8 TRAININGS Infrequent KT has given the training to the PHC staff
on the following subjects:
![Page 43: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/43.jpg)
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular supply KT supplies the essential medicines and
Lab reagent in case of shortage.
10 WATER &
ELECTRICITY
Irregular supply The pump set is repaired and got the
running water in the PHC.
Minor electrical repair work was under
taken.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-waste
management in the PHC according to
KPCB standards and obtained the KPCB
certificate
13 NEW INNOVATIONS BY KARUNA TRUST
A IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
areas.
The PRA programme also conducted at the village levels.
B TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-Centres with Population
Sl.
No.
Name of SC Distance
from
PHC
Buildi
ng
(Y/N)
No. of
villages
Population Eligi
ble
Cou
ple
No. of
ASH
A
No
of
Ang
anw
adi
No of
VHS
C
No
of
SHG
Male Female
I Dindavara 0 Y 11 2627 2540 775 5 13 4 12
II
Gowdanahall
i 8 N 5 2349 2453 735 4 7 4 15
III Pilalai 8 Y 14 3223 3263 889 6 12 7 10
IV Total 30 8199 8256 2399 15 32 15 37
![Page 44: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/44.jpg)
Staff Position
Sanctioned Available Sanctioned Available
I Medical Officer 2 2 Ix Jr.H.A. (M) 3 3
II Pharmacist 1 1 X Jr.H.A (F) 4 4
III Staff Nurse 0 0 Xi PMOA 1 1
IV Lab. Technician 1 1 Xii SDC 1 1
V
FDA/Administrat
or 1 1 Xiii
Arogyamitra
0 1
VI LHV 1 1 Xiv Driver 0 0
VI
I
BHEO
1 1 Xv
Gr. D
3 3
VI
II
Sr. H A
1 1
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 22 40 0 270 330 150 25 20 8
May-11 9 14 0 320 380 180 12 15 2
Jun-11 10 18 0 320 300 250 15 13 2
Jul-11 4 15 0 550 600 200 16 13 5
Aug-11 4 10 0 450 480 270 6 5 12
Sep-11 4 12 0 450 420 230 15 23 1
Oct-11 3 15 0 160 180 110 13 15 3
Nov-11 4 16 0 208 180 120 23 12 5
Dec-11 2 7 0 250 280 199 22 13 5
Jan-12 12 4 0 150 150 100 25 21 6
Feb-12 20 4 0 250 280 180 12 12 8
Mar-12 7 28 0 200 250 165 16 19 2
Total 101 183 0 3578 3830 2154 200 181 59
![Page 45: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/45.jpg)
Details of Laboratory Services
Name of Lab
Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for MP
Test 450 643 707 788 788 678 754 747 759 596 501 555 7966
Total PV 0 1 0 0 0 1 2 1 0 0 0 0 5
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 0 0 0 0 0 0 0 0 0 0 0 0 0
Widal 24 26 53 33 0 10 13 12 12 15 7 9 214
VDRL 1 0 0 0 0 0 0 0 0 0 0 0 1
Pregnancy
Test 7 16 7 13 15 9 8 4 15 16 6 10 126
Hb% in PHC 12 16 70 19 42 28 12 13 14 52 6 4 288
TLC 0 0 0 0 0 0 0 0 0 0 0 0 0
DLC 0 0 0 0 0 0 0 0 0 0 0 0 0
ESR 0 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 5 3 59 2 29 10 4 2 3 9 2 2 130
Blood
Groping 1 1 2 0 1 0 3 0 1 3 4 1 17
Water Test
For H2S
Method 0 0 0 0 0 0 0 0 0 0 0 0 0
HIV Test
ICTC 10 0 59 0 29 0 0 26 0 39 0 0 163
Bile salt 0 0 0 0 0 0 0 0 0 0 0 0 0
Bile pigment 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 510 706 957 855 904 736 796 805 804 730 526 581 8910
![Page 46: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/46.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 13791 15045 15045 15359 16658 16233 16777
2 TOTAL ANC
REGISTRATIONS
280 278 376 362 387 329 331
3 EARLY ANC
REGISTRATIONS <12
WEEKS
170 178 123 272 320 297 135
% 61 64 33 75 82 90 41
4 TT COVERAGE ANC 260 253 392 339 384 284 346
5 TOTAL DELIVERIES 252 287 295 280 312 277 339
6 INSTITUTION
DELIVERIES
173 251 210 245 291 277 334
7 % INSTITUTIONAL
DELIVERIES
67 87 71 84 93 100 99
Vital Indicators
1 MATERNAL DEATHS 0 0 0 1 0 1 0
2 TOTAL LIVE
BIRTHS
249 281 294 285 301 273 334
3 IMR 7.94 6.97 35.82 45.61 39.86
7
10.98
9
17.8
![Page 47: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/47.jpg)
![Page 48: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/48.jpg)
Doddakenahalli
Name of the PHC : Doddakenahalli
Taluk : Bangalore East
District : Bangalore Urban
Population Covered : 32336
No. of Sub-Centres : 3
Staff : 5
Date of Taking over : 04.04.2008
Sub-center with population
Sl.
No. Name of SC
Distan
ce
from
PHC
Buildi
ng
(Y/N)
No.
of
villag
es Population
Eligib
le
Coupl
e
No.
of
ASH
A
No of
Angan
wadi
No of
VHS
C
No of
SHG
Male Female
1
Doddakenah
alli yes 5 5232 4670 1485 4 6 3 26
2
Kaikondrahal
li 03km no 4 4480 4203 1280 0 2 12
3 Bellandur 6 no 5 7151 7017 2111 0 5 0 24
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 0 0
Ii Pharmacist 0 0 x Jr. H.A (F) 2 2
Iii Staff Nurse 1 1 xi PMOA 0 0
Iv Lab. Technician 0 1 xii SDC 0 0
V FDA/Administrator 0 0 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 0 1
Viii Sr. H.A. 0 0
![Page 49: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/49.jpg)
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female children Male Female children Male Female Children
Apr-11 0 0 0 145 85 35 0 0 0
May-11 0 0 0 252 139 61 0 0 0
Jun-11 0 0 0 331 174 52 0 0 0
Jul-11 0 0 0 319 145 50 0 0 0
Aug-11 0 0 0 359 223 58 0 0 0
Sep-11 0 0 0 236 131 62 0 0 0
Oct-11 0 0 0 257 151 61 0 0 0
Nov-11 0 0 0 160 122 48 0 0 0
Dec-11 0 0 0 189 135 46 0 0 0
Jan-12 0 0 0 306 160 59 0 0 0
Feb-12 0 0 0 368 203 69 0 0 0
Mar-12 0 0 0 231 176 48 0 0 0
Total 0
0 3153 1844 649
0 0
Details of Laboratory Services
Name of
Lab Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for
MP Test 200 214 179 222 244 236 204 235 231 206 206 242 2619
total pv { } 0
Total PF
passive
Total Mixed
type
HbSAg test 39 46 41 53 56 36 50 50 40 54 55 63 583
Widal 6 4 5 6 8 7 6 5 6 8 4 5 70
VDRL 39 46 41 53 56 36 50 50 40 54 55 63 583
Pregnancy
Test 39 46 41 53 56 36 50 50 40 54 55 63 583
Hb% in
PHC 39 44 52 46 56 44 50 50 40 54 55 63 593
TLC 2 3 5 3 2 3 5 5 3 4 2 3 40
DLC 2 3 5 3 2 3 5 5 3 4 2 3 40
ESR 2 3 5 3 2 3 5 5 3 4 2 3 40
![Page 50: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/50.jpg)
Urine RE 39 46 41 53 56 36 50 50 40 54 55 63 583
Blood
Groping 39 46 41 53 56 36 50 50 40 54 55 63 583
Water Test
For H2S
Method 1 2
HIV Test
ICTC 40 46 41 53 56 36 52 52 44 56 55 65 596
Bile salt 2 1 2 2 3 2 1 13
Bile
pigment 2 1 2 2 3 0 2 1 13
Total
Statistics
Sl. No Process Indicators 2009-10 2010-11 2011-2012
1 POPULATION 32212 32336 32752
2 TOTAL ANC REGISTRATIONS 496 496 616
3 EARLY ANC REGISTRATIONS
<12 WEEKS
371 431 499
% 75 86 81
4 TT COVERAGE ANC 616 507 1205
5 TOTAL DELIVERIES 320 316 465
6 INSTITUTION DELIVERIES 317 315 465
7 % INSTITUTIONAL DELIVERIES 99 100 100
1 MATERNAL DEATHS 0 0 0
2 TOTAL LIVE BIRTHS 319 315 475
3 IMR 6.2696 3.1746 0
![Page 51: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/51.jpg)
Galagihulukoppa
Name of the PHC : Galagi Hulukoppa
Taluk : Kalgatgi
District : Dharwad
Population Covered : 28539
No. of Sub-Centres : 5
Staff : 20
Date of Taking over : 20-6-2005
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained.
No Fencing
Total area is 2 acres.
Cleaned-up.
Fencing done.
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works.
Cleaned-up the building.
Citizen Charter displayed in the PHC.
Name boards written.
Minor repair works undertaken.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Building were vacant
Cleaned-up the building.
Minor renovation done for the sub centers.
ANMs occupied the Building
All the 5 sub centers are located in the
government building.
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder (for
IEC activities) supplied from KT.
Email services are being provided at the
PHC
Some of the essential equipments were
received from DHO.
Equipment for preparation of Traditional
medicine has been supplied from KT.
VRC equipments were installed in
collaboration with ISRO.
Tele conference and Tele- ECG facilities
aremade available in the PHC.
The lab equipments , birthing kits & IUD
kits were also supplied from KT
5 COLD CHAIN
EQIPMENT
Not Maintained. Functional
6 FURNITURE Inadequate Office furniture procured.
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant posts.
All the staffs are staying in the head
quarters and rendering the 24 hrs services.
8 TRAININGS Infrequent KT has trained the PHC staff on the
following subjects:
RCH and MCH services.
HIV/AIDS.
![Page 52: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/52.jpg)
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REGENTS
Irregular Supply KT supplies the essential medicines and lab
reagents in case of delay in govt. supply.
10 WATER &
ELECTRICITY
Poor and Irregular supply Available
Minor electrical repair work has been
under taken for all the buildings.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards and obtained KPCB
certificate.
14 NEW INNOVATIONS BY KARUNA TRUST
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
areas.
The PRA programme also conducted in the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-center with population
Sl.
No Name of SC
Distance
from
PHC
Building
(Y/N)
No. of
villages Population
Eligible
Couple
No. of
ASHA
No of
Angan
wadi
No of
VHS
C
Male
Femal
e
I
Galgi
Hulukoppa 0 NO 2 3286 3112 1021 5 8 2
Ii Muttagi 12 km Yes 4 3023 2784 895 2 7 4
Iii
G
Basvanakoppa 20 km Yes 8 3575 3204 1040 5 11 8
Iv Dumvada 15 km Yes 1 1870 1770 575 2 4 1
V Gambyapur 14 km Yes 4 2935 2655 865 2 7 4
Total 19 14689 13525 4396 16 37 19
![Page 53: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/53.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 2 2 ix Jr. H.A. (M) 3 3
Ii Pharmacist 2 2 x Jr. H.A (F) 5 5
Iii Staff Nurse 1 1 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 0 0
Vi LHV 1 1 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 3 3
Viii Sr. H.A. 1 1
Out-patient and In-patient details
IPD
OPD
Emergency 5 pm 9AM
Male Female children Male Female Children Male Female Children
Apr-11 15 32 0 669 816 524 0 5 1
May-11 19 54 8 1127 1478 922 0 2 1
Jun-11 8 16 0 1024 1191 675 2 2 0
Jul-11 9 4 1 1306 1364 731 1 5 0
Aug-11 7 7 0 1287 1312 635 4 1 0
Sep-11 9 23 3 1190 1282 621 4 3 1
Oct-11 9 35 0 1081 1053 700 4 7 1
Nov-11 14 18 4 1264 1168 941 0 2 0
Dec-11 17 33 2 1255 1318 883 1 3 0
Jan-12 14 25 1 1489 3069 1190 2 5 0
Feb-12 30 54 1 1320 1407 1473 4 9 0
Mar-12 21 31 1 1132 1129 714 2 0 1
Total 172 332 21 13475 16587 10009 24 44 5
![Page 54: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/54.jpg)
Details of Laboratory Services
Name of Lab
Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for
MP Test 570 721 586 605 641 626 602 764 688 744 691 607 7845
Total PV 0 0 0 0 0 0 0 0 0 1 0 0 1
Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 0 17 34 35 25 16 16 7 1 0 0 0 151
Widal 2 2 1 2 6 3 11 14 14 11 12 15 93
VDRL 0 17 34 35 26 18 15 20 15 0 6 16 202
Pregnancy
Test 21 27 37 22 17 23 14 26 22 37 37 13 296
Hb% in
PHC 29 35 47 50 44 27 38 33 34 42 81 73 533
TLC 1 2 1 1 1 4 2 2 3 4 11 4 36
DLC 1 2 1 1 1 4 2 2 3 4 11 4 36
ESR 1 2 2 1 1 3 3 2 3 4 11 4 37
Urine RE 60 54 80 70 64 55 40 83 69 68 85 77 805
Blood
Groping 7 27 34 33 30 173 19 111 89 24 117 32 696
Water Test
For H2S
Method 8 8 4 6 12 15 13 14 13 11 9 10 123
HIV Test
ICTC 0 16 41 34 30 16 17 27 16 23 38 24 282
Bile salt 2 2 0 1 3 4 4 3 3 6 1 2 31
Bile pigment 2 2 0 1 3 4 4 3 3 6 1 2 31
Blood sugar 2 12 10 26 12 13 12 7 22 13 19 20 168
BT 2 2 4 2 3 3 2 2 4 2 1 1 28
CT 2 2 4 2 3 3 2 2 4 2 1 1 28
Blood urea 0 0 0 1 1 0 2 3 3 2 3 3 18
S,
Creatinine 0 3 0 1 1 0 2 3 5 2 3 2 22
S .
Cholesterol 0 0 0 1 0 0 2 1 2 2 3 4 15
R F Test 0 0 0 0 0 0 3 0 2 3 5 3 16
Total 706 953 920 930 924 1010 822 1129 1018 1010 1146 917 11845
![Page 55: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/55.jpg)
Statistics
Sl.
No
Process Indicators 2005
-06
2006
-07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 2521
4
2613
2
26601 27010 27975 28214
2 TOTAL ANC
REGISTRATIONS
471 559 635 703 711 711 691
3 EARLY ANC
REGISTRATIONS <12
WEEKS
202 374 412 574 572 669 633
% 43 67 65 82 80 94 92
4 TT COVERAGE ANC 460 602 587 648 673 648 691
5 TOTAL DELIVERIES 372 128 563 577 622 558 672
6 INSTITUTION DELIVERIES 237 81 421 534 630 520 672
7 % INSTITUTIONAL
DELIVERIES
64 63 75 70 101 93 100
Vital Indicators
1 MATERNAL DEATHS 0 0 1 2 0 0 0
2 TOTAL LIVE BIRTHS 370 367 563 565 621 554 666
3 IMR 8.06 40.3
2
15.99 28.32 32.20
6
28.88
09
24.02
![Page 56: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/56.jpg)
![Page 57: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/57.jpg)
Gumballi
Name of the PHC : Gumballi
Taluk : Yelandur
District : Chamarajanagar
Population Covered : 22,432
No. of Sub-Centres : 5
Staff : 19
Date of Taking over : 17.06.1996
Sl.
No
Before taking over After taking over
1 LAND KT Purchased the Land. Total 28
Acres out of that 2 Acres for PHC
Boundaries identified
Fencing done
2 PHC BUILDING
& STAFF
QUARTERS
No building and staff
quarters New building constructed by KT
Staff Quarters were also
constructed by KT.
3 SUB-CENTER
BUILDINGS
Poorly maintained
Buildings were vacant Cleaned-up the building.
Our ANMs occupied the Building
We have the 3 sub centers with
the building.
Minor repair work done.
We are looking for location &
construction of the proposed 2
Sub-center building upon receipt
of the funds.
4 EQUIPMENTS Inadequate and
supply irregular Computer, printer and tape
recorder supplied from KT.
Email services are being provided
at the PHC
VRC equipments were installed
in collaboration with ISRO.
Tele conference and tele ECG are
doing in the PHC.
Some of the equipments were
purchased from IPP IX (K) funds.
We have installed the X-ray
machine
Solar lights were installed.
The lab equipments , birthing kits
& IUD kits were also supplied
from KT
5 COLD CHAIN Not available The equipments were procured
![Page 58: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/58.jpg)
EQIPMENT from DHO
6 FURNITURE Inadequate Office furniture supplied from
KT (table & chair)
7 STAFF Many vacancies and
poor attendance. KT has filled up all the staffs.
All the staffs were staying in the
head quarters and they are
rendering the 24 hrs services.
8 TRAININGS Infrequent KT has given the training to the
PHC staff on the following
subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
VRCs in Collaboration with
ISRO.
Waste Management
9 MEDICINES &
REGENTS
Irregular supply KT has also supplied the essential
medicines other than the Govt.
supply.
The lab regents were also
supplied from KT.
10 WATER &
ELECTRICITY
No KT has done this facility.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC
according to KPCB standards.
12 Ambulance
Service
No KT has provided the Ambulance
Services.
13
Dental Clinic No KT has provided the Dental
Clinic in the PHC
Mobile Dental Clinic Service for
the Villages.
14 Eye Hospital No KT has constructed the New 20
bedded Eye hospital in the
campus.
It is serving the 5 lacs population
in Chamarajanagar district.
15 NABH
accreditation
No KT has initiated NABH
accreditation process
![Page 59: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/59.jpg)
15 NEW INNOVATIONS BY KARUNA TRUST
A IEC
ACTIVITIES &
PRA PROGRAM
With the help of our IEC vehicle we organized IEC
activities in all the sub-center level.
The PRA programme also conducted in the village levels.
B TRADITIONAL
MEDICINE
PROGRAM
We have implemented the use of traditional medicine in to
Primary Health care the PHC.
The program is going on.
Sub-center with population
Sl.
No
.
Name of
SC
Distance
from
PHC
Buildi
ng
(Y/N)
No. of
villages
Population Eligib
le
Coupl
e
No. of
ASH
A
No
of
Ang
anw
adi
No of
VHSC
Mal
e
Femal
e
I Gumballi 2.km No 3 2937 2738 821 5 7 3
Ii Komranpu
ra 3km Yes 3 2343 2243 701 3 6 3
Iii B R Hills 24km Yes 10 1219 1168 388 1 7 2
Iv Yeragamb
alli 4km Yes 4 2751 2556 754 5 10 2
V Y K Mole 3km No 3 2198 2086 611 5 6 3
Total 23 1144
8 10791 3275 19 36 13
Staff pattern
Sanctioned Available Sanctioned Available
I Medical officer 1 1 ix Jr.H.A.(M) 4 4
ii Pharmacist 1 1 x Jr.H.A.(F) 5 5
iii Staff Nurse 3 3 xi PMOA 0 1
iv Lab Technician 1 1 xii SDC - -
V FDA / Administrator 1 1 xiii Arogyamitra - -
vi LHV - - xiv Driver 1 1
vii BHEO - - xv Gr,D 1 1
viii Sr.HA - -
![Page 60: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/60.jpg)
Outpatient and Inpatient details
IPD
OPD
Emergency
Male Female Children Male Female Children Male Female Children
Apr-11 8 15 - 537 510 203 - - 1
May-11 13 22 - 567 534 140 - - -
Jun-11 7 9 1 630 547 245 - - -
Jul-11 3 7 - 480 451 244 - 1 -
Aug-11 5 14 - 615 561 353 - 4 -
Sep-11 3 15 - 690 511 264 - - -
Oct-11 1 7 - 653 509 234 - - -
Nov-11 - 7 - 684 611 243 - 1 -
Dec-11 5 9 - 585 552 242 - - -
Jan-12 8 13 - 562 537 319 - - -
Feb-12 4 8 - 577 524 148 - - -
Mar-12 8 10 - 520 488 196 1 - -
Total 65 136 1 7100 6335 2831 1 6 1
Details of Laboratory Services
Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for MP
Test 161 182 222 228 207 244 221 214 232 216 153 88 2368
Total PV - - - - - - - - - - - - -
Total PF - - - - - - - - - - - - -
Total Mixed
type - - - - - - - - - - - - -
HbSAg test 14 15 15 13 21 18 27 29 12 19 13 11 207
Widal 4 6 3 4 6 14 21 20 16 19 19 17 149
VDRL 21 25 15 13 17 18 22 23 11 15 11 10 201
Pregnancy Test 10 6 5 6 14 15 7 2 6 11 8 4 94
Hb% in PHC 28 47 36 39 49 58 62 70 52 64 52 45 602
TLC 6 16 11 17 15 19 21 30 31 26 29 25 246
DLC 6 16 11 17 15 19 21 30 31 26 29 25 246
ESR 6 16 11 17 15 21 23 31 31 26 29 25 251
Urine RE 172 213 248 212 231 384 335 431 265 287 289 292 3359
Blood Groping 16 16 18 16 22 79 26 28 45 17 18 14 315
![Page 61: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/61.jpg)
Water Test For
H2S Method 21 14 26 22 14 35 4 4 22 16 22 11 211
HIV Test ICTC - - - - - 5 6 7 16 5 5 - 44
Bile salt 2 6 4 6 5 4 8 4 6 8 4 8 65
Bile pigment 2 6 4 6 5 4 8 4 6 8 4 8 65
Total 469 584 629 616 636 937 812 927 782 763 685 583 8423
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 21165 2116
5
21681 21681 22314 22045 22432
2 TOTAL ANC
REGISTRATIONS
394 401 376 418 373 379 370
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
294 273 195 274 275 304 310
% 74 68 52 66 74 80 84
4 TT COVERAGE
ANC
400 395 376 402 369 335 354
5 TOTAL
DELIVERIES
356 314 297 301 371 306 334
6 INSTITUTION
DELIVERIES
274 240 246 283 366 301 319
7 %
INSTITUTIONAL
DELIVERIES
77 76 83 94 99 98 96
Vital Indicators
1 MATERNAL
DEATHS
0 0 1 1 0 0 0
2 TOTAL LIVE
BIRTHS
354 304 294 298 364 304 328
3 IMR 11.24 28.66 23.57 26.85 30.22 29.60
53
24.39
![Page 62: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/62.jpg)
![Page 63: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/63.jpg)
Hirehal
Name of the PHC : Hirehal
Taluk : Ron
District : Gadag
Population Covered : 24614
No. of Sub-Centres : 4
Staff : 14
Date of Taking over : 15.12.2005
Sl.
No
Before taking over After taking over
1 LAND Lot of weeds and
inadequately maintained.
No Fencing
Total area is 1 acre.
Cleaned-up.
Compound wall constructed with
the help of ZP/DHO.
Started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING
& STAFF
QUARTERS
No building maintenance,
untidy and dirty.
Cleaned-up the building.
Citizen Charter displayed in the
PHC.
Name boards written.
Provision for doctor’s stay made in
the PHC campus.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Building were vacant
Cleaned-up the building.
ANMs occupied the Building
Out of 4 sub centers only 2 Sub
centre has government building.
4 EQUIPMENTS Irregular supply and poor
maintenance
Computer, printer and tape recorder
(for IEC activities) supplied from
KT.
Email services are being provided at
the PHC
![Page 64: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/64.jpg)
Some of the essential equipments
were procured from DHO.
Equipments for preparation of
Traditional medicine have been
supplied by KT.
Tele conference and Tele- ECG
facilities are made available in the
PHC.
The lab equipments , birthing kits &
IUD kits were also supplied from
KT
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Office furniture made available
7 STAFF Many vacancies and poor
attendance.
KT has filled up all the vacant
posts.
All the staffs are staying in the head
quarters and rendering the 24 hrs
services.
8 TRAININGS Infrequent PHC staff has been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular supply KT supplies the essential medicines
and lab reagent if there is any delay
in Govt. supply.
10 WATER &
ELECTRICITY
Poor and irregular supply Available
Minor electrical repair work was
undertaken.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according
to KPCB standards and obtained the
KPCB certificate.
13 AMBULANCE Not available An ambulance was provided
through Matching grant from
Rotary club
![Page 65: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/65.jpg)
14 NEW INNOVATIONS BY KARUNA TRUST
A IEC
ACTIVITIES &
PRA PROGRAM
With the help of our IEC vehicle we organized IEC activities in all
the sub-center areas.
PRA programme also conducted in the village levels.
C TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health
care.
Sub-center with population
Sl.
No.
Name of
SC
Distance
from
PHC
Build
ing
(Y/N)
No. of
villages Population
No.
of
ASH
A
No of
Angan
wadi
No of
VHS
C
Male Female
I Hirehal O N0 2 2712 2491 5 4 2
Ii kotbala 6 KM yes 3 4350 3550 6 7 3
Iii Mugali 12 KM yes 4 2579 2123 4 5 4
Iv Madalageri 10 KM yes 3 2826 2255 6 5 3
Total 12 12467 10419 21 21 12
Staff pattern
Sanctioned Available Sanctioned Available
I Medical officer 1 1 ix Jr.H.A.(M) 3 3
ii Pharmacist 1 1 x Jr.H.A.(F) 4 4
iii Staff Nurse 0 0 xi PMOA 1 1
iv Lab Technician 1 1 xii SDC - -
V FDA /
Administrator
1 1 xiii Arogyamitra - -
vi LHV - - xiv Driver 0 0
vii BHEO - - xv Gr,D 1 2
viii Sr.HA - -
![Page 66: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/66.jpg)
Outpatient and Inpatient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 12 18 0 340 260 32 2 7 0
May-11 11 18 0 282 319 29 4 5 0
Jun-11 13 25 0 262 342 47 4 4 0
Jul-11 8 27 2 269 320 101 13 16 1
Aug-11 9 20 1 241 304 53 13 14 0
Sep-11 16 39 4 235 335 80 5 5 0
Oct-11 16 39 2 354 421 142 9 10 0
Nov-11 13 27 0 365 448 149 3 6 0
Dec-11 4 13 0 290 440 112 3 5 0
Jan-12 1 15 0 373 403 159 5 15 0
Feb-12 2 17 0 357 459 118 4 6 0
Mar-12 5 14 0 250 347 98 2 2 0
Total 110 272 9 3618 4398 1120 67 95 1
Details of Laboratory Services
Name of
Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec Jan-12 Feb Mar
Blood for
MP Test 503 454 469 480 520 840 522 517 588 540 531 500
Total PV 2 1 1 1 2 2 0 2 1 1 5 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 5 4 6 4 0 5 5 6 2 9 0 25
Widal 8 5 12 30 22 30 35 38 20 20 12 20
VDRL 2 6 15 40 18 25 30 38 18 16 20 25
Pregnancy
Test 15 15 12 12 9 17 12 0 6 10 6 15
Hb% in
PHC 60 55 70 110 90 86 100 90 60 68 60 70
TLC 3 5 6 12 12 8 10 30 10 2 2 4
DLC 3 5 6 12 12 8 10 30 10 2 2 4
ESR 3 5 6 12 12 8 15 5 5 12 5 10
Urine RE 70 60 82 120 110 102 110 110 80 70 65 75
Blood
Groping 50 35 40 62 25 48 55 45 20 40 44 40
![Page 67: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/67.jpg)
Water Test
For H2S
Method 11 12 8 8 17 17 0 14 10 12 14 6
HIV Test
ICTC 51 21 48 82 40 45 56 56 36 55 63 52
Bile salt 15 10 15 12 8 18 15 10 8 12 10 12
Bile pigment 15 10 15 12 8 18 15 10 8 12 10 12
Total 816 703 811 1009 905 1277 990 1001 882 881 849 870
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 0 22740 24470 24614 24093 22717 22985
2 TOTAL ANC
REGISTRATIONS
0 590 446 551 513 557 535
3 EARLY ANC
REGISTRATIONS <12
WEEKS
0 307 330 358 403 448 432
% 0 52 74 65 78 80 81
4 TT COVERAGE ANC 0 460 457 476 578 535 552
5 TOTAL DELIVERIES 0 349 373 420 425 389 455
6 INSTITUTION
DELIVERIES
0 175 212 271 395 383 453
7 % INSTITUTIONAL
DELIVERIES
0 50 57 65 93 98 100
Vital Indicators
1 MATERNAL DEATHS 0 1 1 0 1 0 0
2 TOTAL LIVE BIRTHS 0 326 323 411 414 384 453
3 IMR 0 28.65 16.09 17.03 16.90
8
26.041
7
8.83
![Page 68: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/68.jpg)
![Page 69: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/69.jpg)
Hudem
Name of the PHC : Hudem
Taluk : Kudligi
District : Bellary
Population Covered : 39408
No. of Sub-Centres : 6
Staff : 19
Date of Taking over : 01.02.2005
Sl. No Before taking over After taking over
1 LAND Boundaries of land not clear
Lot of weeds and not adequately
maintained.
No fencing
Total area is 3.4 acres, Compound wall
constructed with the help of ZP funds.
KT has started a demo garden and nursery
for Traditional Medicine and planted about
100 plants of 20 verities in the PHC
campus.
2 PHC BUILDING &
Staff Quarters
Many pending repair works and
maintenance irregular. Window
glasses were broken,
Building has been painted and broken glass
pan of the windows are replaced.
Citizen Charter displayed.
3 SUB-CENTER
BUILDINGS
Poorly maintained and
Buildings were unused and vacant We have the 4 sub centers with the
buildings.
Cleaned-up the building.
ANMs occupied the Building
4 EQUIPMENTS Not being serviced regularly and
supply irregularly. Computer, printer and tape recorder (for
IEC activities) supplied from KT.
Email connectivity is provided at the PHC
Village Resource Centers set up in
collaboration with ISRO.
Tele conference and Tele- ECG facility
available in the PHC.
Some of the essential equipments and
furniture were procured from DHO like
Cots, BP apparatus etc.
Equipments for preparation of traditional
medicines were supplied.
We have supplied centrifuge machine and
other laboratory equipments.
The lab equipments , birthing kits & IUD
kits were also supplied from KT
5 COLD CHAIN
EQUIPMENT
Not maintained. Functional.
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance. All the vacant posts were filled up
All the staffs are staying in the head
![Page 70: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/70.jpg)
quarters and they are rendering the 24 hrs
service.
8 TRAININGS Infrequent PHC staff has been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Mental Health
Traditional medicine
PRA & Village Health Plan
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular supply KT supplies the essential medicines and lab
reagents in case of delay in Govt. supply.
The lab regents were also supplied from
KT.
10 WATER &
ELECTRICITY
Irregular supply Out of ZP and GP funds a separate bore
well and motor connection done for the
water supply to the hospital.
A new transformer has been installed for
the electricity supply to the PHC and pump
house.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-waste
management in the PHC according to
KPCB standards and obtained KPCB
certificate.
13 AMBULANCE Not available An ambulance was provided through
Matching grant from Rotary club
14 NEW INNOVATIONS BY KARUNA TRUST
A IEC ACTIVITIES &
PRA PROGRAM
With the help of our IEC vehicle we organized IEC activities in all the sub-centers
areas.
B TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
![Page 71: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/71.jpg)
Staff pattern
Sanctioned Available Sanctioned Available
i Medical Officer 1 1 ix Jr. H.A. (M) 4 4
ii Pharmacist 1 1 x Jr. H.A (F) 6 6
iii Staff Nurse 2 1 xi PMOA 1 1
iv Lab. Technician 1 1 xii SDC 1 1
v FDA/Administrator xiii Arogyamitra
vi LHV 1 1 xiv Driver
vii BHEO xv Gr. D 1 1
viii Sr. H.A.
Details of Laboratory Services
Name of Lab
Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 570 721 586 605 641 626 494 361 591 564 412 371
Total PV 0 0 0 0 0 0 1 - 2 - - 0
Total PF 0 0 0 0 0 0 0 - - - - 0
Total Mixed
type 0 0 0 0 0 0 0 - - - - 0
HbSAg test 0 17 34 35 25 16 7 9 5 10 5 121
Widal 2 2 1 2 6 3 9 12 8 10 10 6
VDRL 0 17 34 35 26 18 13 14 22 39 26 15
Pregnancy
Test 21 27 37 22 17 25 17 17 9 12 16 9
Hb% in PHC 29 35 47 50 44 27 80 65 76 59 68 62
TLC 1 2 1 1 1 3 - - - - - 1
DLC 1 2 1 1 1 3 - - - - - 1
ESR 1 2 2 1 1 3 2 2 3 5 6 1
Urine RE 60 54 80 70 64 55 96 55 65 65 72 58
Blood Groping 7 27 34 33 30 173 15 14 22 39 26 15
Water Test
For H2S
Method 8 8 7 6 12 15 10 5 11 11 9 8
HIV Test 0 16 41 34 30 16 97 59 79 94 95 66
![Page 72: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/72.jpg)
ICTC
Bile salt 2 2 0 1 3 4 3 2 4 6 4 0
Bile pigment 2 2 0 1 3 4 3 2 4 6 4 0
Total 704 934 905 897 904 991 847 617 901 920 753 734
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 34144 36986 35900 37382 38969 39408
2 TOTAL ANC
REGISTRATIONS
938 959 959 1059 934 1025 1090
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
415 591 591 643 758 758 841
% 44 62 62 61 81 73 77
4 TT COVERAGE
ANC
850 896 896 889 930 1058 1009
5 TOTAL
DELIVERIES
633 682 682 825 822 813 900
6 INSTITUTION
DELIVERIES
270 239 239 601 703 751 872
7 %
INSTITUTIONAL
DELIVERIES
42% 35% 35% 73% 86% 92% 97%
Vital Indicators
1 MATERNAL
DEATHS
1 1 0 1 0 1 2
2 TOTAL LIVE
BIRTHS
636 682 669 819 815 811 898
3 IMR 12.64 14.66 23.46 18.32 13.49
7
11.097
4
4.45
![Page 73: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/73.jpg)
![Page 74: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/74.jpg)
Huvilgola PHC
Name of the PHC : Huvilgola
Taluk : Gadag
District : Gadag
Population Covered : 13,361
No. of Sub-Centres : 3
Staff : 12
Date of Taking over : 16th
October 2008
Sl.
No
Before taking over After taking over
1 LAND Lot of weeds and
inadequately maintained.
Cleaned-up.
Boundaries identified
2 PHC BUILDING
& STAFF
QUARTERS
Many pending repair works
and maintenance irregular.
ANM quarter was dilapidated
Cleaned-up the building.
We have repair of buildings are
under progress .
3 SUB-CENTER
BUILDINGS
One ANMs are residing in the Building
4 EQUIPMENTS Not being serviced regularly
and supply was irregular. Some of the essential equipments
were procured from DHO.
Birthing kits, IUD kits & lab
equipments supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant
posts.
All the staffs are staying in the head
quarters and are rendering the 24
hrs services.
8 TRAININGS Infrequent Planned for training by Karuna
Trust
9 MEDICINES &
REAGENTS
Regular supply Ensured Availability
10 WATER &
ELECTRICITY
Poor and irregular supply. Planned for alternative arrangement
11 WASTE
MANAGEMENT
Not implemented Planned to be implemented in next
year
![Page 75: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/75.jpg)
Sub-Centres with Population
Sl.
No.
Name of
SC
Distance
from PHC
Buildin
g
(Y/N)
No. of
village
s Population
Eligib
le
Coupl
e
No.
of
ASH
A
No of
Anganw
adi
No of
VHSC
Male Female
I Huvilgola 4km Y 2 2477 2618 762 5 5 2
Ii Holekoppa 7km N 3 2502 2600 798 4 5 3
Iii Niralagi 22km Y 3 2073 2151 757 4 5 3
Iv Total 8 7052 7369 2317 13 15 8
Staff pattern
Sanctioned Available Sanctioned Available
I Medical officer 1 1 ix Jr. H.A.(M) 3 3
ii Pharmacist 1 1 x Jr. H.A.(F) 3 3
iii Staff Nurse No No xi PMOA No No
iv Lab Technician 1 1 xii SDC No No
V FDA / Administrator 1 1 xiii Arogyamitra No No
vi LHV No No xiv Driver No No
vii BHEO No No xv Gr, D 1 1
viii Sr. H.A. 1 1
Outpatient and Inpatient details
IPD
OPD
Male Female children Male Female Children
Apr-11 5 10 2 222 255 69
May-11 17 24 1 257 376 84
Jun-11 9 18 0 279 435 94
Jul-11 7 7 2 305 278 107
Aug-11 6 6 2 395 297 131
Sep-11 6 9 3 326 300 98
Oct-11 3 10 1 277 328 92
Nov-11 2 2 0 344 448 124
Dec-11 0 0 0 238 307 60
Jan-12 1 1 0 313 344 93
Feb-12 5 3 0 308 287 82
Mar-12 2 3 0 242 266 71
Total 63 93 11 3506 3921 1105
![Page 76: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/76.jpg)
Details of Laboratory Services Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 276 342 347 442 627 337 439 1176 332 322 360 311
Total PV 1 0 0 1 3 0 1 1 3 0 0 0
Total PF 0 0 0 0 1 0 2 0 0 0 0 0
Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 1 2 0 0 0 0 1 13 24 17 6 22
Widal 21 26 48 30 28 35 37 30 25 24 25 15
VDRL 39 35 61 30 38 32 0 12 18 16 5 18
Pregnancy Test 18 13 20 10 9 15 25 14 17 14 12 18
Hb% in PHC 75 74 227 200 70 90 87 100 78 71 60 83
TLC 7 10 12 12 9 25 0 6 3 4 3 7
DLC 7 10 12 12 9 25 0 6 3 4 3 7
ESR 7 10 12 12 9 25 18 12 10 12 11 9
Urine RE 63 51 84 36 61 90 69 81 56 59 47 93
Blood Groping 36 31 202 164 39 30 32 46 34 16 15 43
Water Test For
H2S Method 5 7 6 5 6 8 5 2 3 8 5 0
HIV Test ICTC 39 29 66 0 36 33 20 49 34 36 0 43
Bile salt 10 10 22 21 25 54 25 35 41 30 30 57
Bile pigment 10 10 22 21 25 54 25 35 41 30 30 57
Total 615 660 1141 996 995 853 786 1618 722 663 612 783
Statistics
Sl.
No
Process Indicators 2009-10 2010-11 2011-
2012
1 POPULATION 13276 13367 13762
2 TOTAL ANC
REGISTRATIONS
359 360 335
3 EARLY ANC
REGISTRATIONS <12 WEEKS
203 292 254
% 57 81 76
4 TT COVERAGE ANC 329 381 317
5 TOTAL DELIVERIES 267 300 361
6 INSTITUTION DELIVERIES 217 288 344
7 % INSTITUTIONAL
DELIVERIES
81 96 95
1 MATERNAL DEATHS 1 2 1
2 TOTAL LIVE BIRTHS 266 293 357
3 IMR 26.316 34.1297 10.94
![Page 77: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/77.jpg)
Idagur
Name of the PHC : Idagur
Taluk : Gowribidanur
District : Chikkaballapur
Population Covered : 27,853
No. of Sub-Centres : 4
Staff : 21
Date of Taking over : 01.10.2004
Sl.
No
Before taking over After taking over
1 LAND Lot of weeds and
inadequately maintained.
No Fencing
Total area is 3 acres.
Cleaned-up.
Fencing done.
KT has started a demo garden and
nursery for Traditional Medicine.
2 PHC BUILDING
& STAFF
QUARTERS
Many pending repairs works
and maintenance was
irregular.
Medical Officer quarter was
dilapidated
Cleaned-up the building.
Building was painted.
MO Quarter is renovated &
occupied
Name boards have been written in
the each of the section.
Citizen Charter displayed in the
PHC.
2 Staff quarters were newly
constructed with the help MP
Grants.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings were vacant
Cleaned-up the building.
ANMs occupied the Building
4 EQUIPMENTS Not being serviced regularly
and supply irregular. Computer, printer and tape recorder
(for IEC activities) supplied from
KT.
Email services are being provided at
the PHC
Tele conference and Tele- ECG are
doing in the PHC.
Some of the essential equipments
were procured from DHO.
Equipment for preparation of
![Page 78: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/78.jpg)
Traditional medicines were supplied
from KT
Lab equipments, birthing kits &
IUD kits supplied by KT
5 COLD CHAIN
EQIPMENT
Not properly maintained Functional & properly maintained
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance All the vacant posts are filled
All the staffs are staying in the head
quarters and they are rendering the
24 hrs services.
8 TRAININGS Infrequent The PHC staffs have been trained
on the following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Inadequate &Irregular supply KT has also supplies the essential
medicines &lab reagent in case of
delay in Govt. supply.
10 WATER &
ELECTRICITY
Poor and irregular supply The pump set is repaired and got the
running water in the PHC.
Minor electrical repair work for all
the buildings were taken up.
12 WASTE
MANAGEMENT
Not implemented Implemented the Bio-waste
management in the PHC according
to KPCB standards and obtained the
13 NEW INNOVATIONS BY KARUNA TRUST:
A IEC
ACTIVITIES &
PRA PROGRAM
With the help of our IEC vehicle we organized IEC activities in all
the sub-center areas.
The PRA programme also conducted at the village levels.
B TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into Primary Health care.
![Page 79: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/79.jpg)
Sub-center with population
Sl.
No. Name of SC
Distanc
e from
PHC
Buildin
g (Y/N)
No.
of
villag
es Population
Eligibl
e
Coupl
e
No.
of
ASH
A
No of
Angan
wadi
No
of
VH
SC
No
of
SH
G
Male
Femal
e
I Iduguru 0 Yes 5 3517 3381 1040 6 7 5 8
Ii Hampasandra 7 Yes 6 3353 3222 992 6 10 6 6
Iii Nagasandra 9 Yes 4 3277 3149 970 5 6 4 9
Iv Kalludi 13 Yes 6 4520 4343 1324 5 6 3 4
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 2 2 ix Jr. H.A. (M) 4 4
Ii Pharmacist 1 1 x Jr. H.A (F) 5 5
Iii Staff Nurse 1 1 xi PMOA 1 1
Iv Lab. Technician 1 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 1 0
Vi LHV 0 0 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 3 5
Viii Sr. H.A. 0 0
Outpatient and Inpatient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 11 7 3 314 262 159 16 8 4
May-11 3 6 1 384 321 196 7 14 2
Jun-11 9 8 3 361 301 183 14 4 0
Jul-11 20 19 2 314 262 175 12 14 4
Aug-11 24 22 1 311 278 150 24 29 14
Sep-11 26 24 3 407 245 160 22 28 18
Oct-11 16 8 3 347 369 155 24 20 14
Nov-11 17 9 1 631 451 239 21 13 15
Dec-11 19 18 2 464 406 187 24 18 14
![Page 80: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/80.jpg)
Jan-12 9 8 1 299 337 175 22 23 12
Feb-12 14 7 0 234 201 124 22 18 10
Mar-12 24 23 2 285 212 132 35 25 21
Total 192 159 22 4351 3645 2035 243 214 128
Details of Laboratory Services
Name of Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP Test 570 705 695 670 685 491 446 490 404 453 536 512
Total PV 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 1 1 0 0 0 0 0
Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 4 12 7 8 9 9 15 10 10 5 9 9
Widal 6 0 2 19 16 16 9 19 10 6 3 6
VDRL 10 12 9 12 9 9 13 9 10 5 9 8
Pregnancy Test 0 0 0 0 0 0 0 0 0 2 2 5
Hb% in PHC 35 29 68 117 25 30 79 27 21 23 26 28
TLC 0 3 1 0 0 0 0 0 4 0 0 0
DLC 0 3 1 0 0 0 0 0 4 0 0 0
ESR 0 0 0 0 0 0 0 0 4 0 0 0
Urine RE 27 4 27 10 19 19 24 12 15 7 11 14
Blood Groping 9 12 6 8 9 9 13 10 10 5 9 9
Water Test For
H2S Method 0 0 0 0 0 0 0 0 0 0 0 0
HIV Test ICTC 4 18 17 51 16 11 32 16 27 19 9 7
Bile salt 0 0 0 0 0 0 1 0 0 0 0 0
Bile pigment 0 0 0 0 0 0 1 0 0 0 0 0
Total 665 798 833 895 788 595 634 593 519 525 614 598
Statistics:
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 2802
7
37001 37001 34138 27750 28762
2 TOTAL ANC
REGISTRATIONS
588 655 593 774 472 452
3 EARLY ANC 366 352 344 435 298 376
![Page 81: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/81.jpg)
REGISTRATIONS <12
WEEKS
% 62 54 58 58 63 83
4 TT COVERAGE ANC 476 534 499 653 452 424
5 TOTAL DELIVERIES 360 423 454 539 290 345
6 INSTITUTION
DELIVERIES
252 337 422 512 282 345
7 % INSTITUTIONAL
DELIVERIES
70 80 93 94 97 100
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 2 1 1
2 TOTAL LIVE
BIRTHS
340 407 422 524 290 340
3 IMR 25 9.46 28.63 13.36 31.034 11.76
47
![Page 82: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/82.jpg)
![Page 83: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/83.jpg)
Kallusadarahalli
Name of the PHC : Kallusadarahalli
Taluk : Arsikere
District : Hassan
Population Covered : 26912
No. of Sub-Centres : 7
Staff : 17
Date of Taking over : 10.01.2006
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained.
No Fencing
Total area is 6.14 acres.
Cleaned-up.
Fencing done.
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
No building maintenance Cleaned-up the building.
Citizen Charter displayed in the PHC.
Name boards written.
All staff including MO stays in
headquarters.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Building were vacant
Cleaned-up the building.
ANMs are staying the Building
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder
supplied from KT.
Email services are being provided at the
PHC
Some of the essential equipments were
procured from DHO.
Equipment for preparation of traditional
medicine.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained. Functional
6 FURNITURE Inadequate Adequately available
7 STAFF Many vacancies and poor
attendance. All the vacant posts were filled up.
All the staffs were staying in the head
quarters and they are rendering the 24 hrs
services.
8 TRAININGS Infrequent The PHC staffs have been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
![Page 84: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/84.jpg)
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular Supply KT supplies the essential medicines and lab
reagent in case of delay in Govt. supply.
The lab reagents were also supplied from
KT.
10 WATER &
ELECTRICITY
Poor and irregular supply Minor electrical repair work done for all
the buildings. Water supply regular
11 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB Standards and obtained KPCB
certificate.
12 NEW INNOVATION BY KARUNA TRUST
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
areas.
The PRA programme also conducted at the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-center with population
Sl.
No. Name of SC
Distance
from
PHC
Buildi
ng
(Y/N)
No.
of
villa
ges Population
Eligible
Couple
No.
of
ASH
A
No of
Anga
nwadi
No of
VHS
C
No
of
SH
G
I Kallusadarahalli 0 Y 5 2303 2361 716 5 5 5 15
Ii Shane ere 9 Kim Y 9 1921 1987 588 4 7 3 15
Iii Kuruvanka 14 Kim Y 10 2071 2149 602 4 10 4 8
Iv Maratgere 9 Kim Y 10 2444 2505 738 4 8 4 16
V Purlehalli 16 Km Y 9 2367 2492 745 5 8 4 18
Staff pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 5 5
Ii Pharmacist 1 1 x Jr. H.A (F) 6 6
Iii Staff Nurse 0 0 xi PMOA 1 1
Iv Lab. Technician 1 1 xii SDC 1 1
V FDA/Administrator 0 0 xiii Arogyamitra 0 0
Vi LHV 1 1 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 1 1
Viii Sr. H.A. 0 0
![Page 85: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/85.jpg)
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 22 33 0 403 258 86 0 0 0
May-11 39 51 0 490 495 135 0 0 0
Jun-11 41 36 1 284 259 92 0 1 0
Jul-11 18 11 0 210 198 63 0 0 1
Aug-11 5 2 0 188 184 49 1 0 0
Sep-11 1 2 1 263 250 75 0 0 0
Oct-11 62 83 0 328 280 124 0 0 0
Nov-11 47 42 0 324 280 114 0 0 0
Dec-11 51 40 0 294 258 131 0 0 0
Jan-12 4 13 0 280 265 107 0 0 0
Feb-12 0 0 0 239 232 96 1 0 0
Mar-12 0 0 0 295 257 90 1 0 0
Total 290 313 2 3598 3216 1162 3 1 1
Details of Laboratory Services
Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 980 918 921 1003 995 926 1038 1070 903 817 785 839
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 0 0 0 0 0 0 0 0 0 0 0 4
Widal 0 0 0 0 0 1 4 6 0 1 1 1
VDRL 0 4 1 2 0 0 0 0 0 0 0 0
Pregnancy Test 15 12 6 5 6 5 6 13 2 2 2 2
Hb% in PHC 31 34 28 32 27 25 14 22 13 20 23 22
TLC 3 6 2 0 0 0 0 0 0 0 0 0
DLC 3 6 2 0 0 0 0 0 0 0 0 0
ESR 3 6 2 0 0 0 1 0 0 0 0 0
Urine RE 31 34 28 32 27 30 35 22 5 23 11 23
![Page 86: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/86.jpg)
Blood Groping 0 4 1 3 2 2 0 4 0 1 1 2
Water Test For
H2S Method 61 55 55 44 61 48 57 55 59 56 44 53
HIV Test ICTC 29 15 14 12 21 24 5 17 17 10 20 20
Bile salt 6 2 2 2 4 1 5 8 2 6 3 6
Bile pigment
Total
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 0 2484
0
25044 25219 26486 27028 22600
2 TOTAL ANC
REGISTRATIONS
0 264 327 385 435 418 313
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
0 260 311 319 375 358 242
% 0 98 95 83 86 85 77
4 TT COVERAGE
ANC
0 332 331 322 388 397 507
5 TOTAL
DELIVERIES
0 213 279 267 373 421 347
6 INSTITUTION
DELIVERIES
0 121 137 256 365 413 347
7 %
INSTITUTIONAL
DELIVERIES
0 57 49 97 98 98 100
Vital Indicators
1 MATERNAL
DEATHS
0 0 1 0 0 0 0
2 TOTAL LIVE
BIRTHS
0 213 279 267 370 406 347
3 IMR 0 37.56 18.12 11.24 13.514 4.9261
1
14.4
![Page 87: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/87.jpg)
![Page 88: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/88.jpg)
Kammasandra
Name of the PHC : Kammasandra
Taluk : Doddaballapur
District : Bangalore
Population Covered : 3666
No. of Sub-Centres : 1
Staff : 6
Date of Taking over : 01.06.2003
Sl. No Before taking over After taking over
1 LAND No Land
New land purchased with the help of local
donor
Total area is 1 acres.
Cleaned-up.
Landscaping done.
Fencing done.
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
No buildings.
New PHC building and staff quarters were
constructed with the help of local donor.
Citizen Charter displayed in the PHC.
Name boards written.
KT has constructed compound wall and
provided gate.
3 SUB-CENTER
BUILDINGS
No building. One quarter has been constructed for ANM
in Kammasandra with the help of local
donor.
4 EQUIPMENTS Inadequate Computer, printer and tape recorder (for
IEC activities) supplied from KT.
Some of the essential equipments were
procured from DHO.
We have supplied equipments for
preparation of herbal medicinal..
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
No We have purchased one refrigerator for
this purpose.
6 FURNITURE Inadequate Furniture supplied from KT (table &
chair) with the help of a donors
7 STAFF Irregular and vacancy KT has filled up all the staffs.
All the staffs were staying in the head
quarters and they are rendering the 24 hrs
services.
8 TRAININGS Infrequent KT has given the training to the PHC staff
on the following subjects:
RCH and MCH services.
![Page 89: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/89.jpg)
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Waste Management
VRCs in Collaboration with ISRO
9 MEDICINES &
REAGENTS
Irregular supply KT has also supplied the essential
medicines other than the Govt. supply.
The lab reagents were also supplied from
KT.
10 WATER &
ELECTRICITY
Not available New water and electrical connection taken
for the PHC.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards.
13 NEW INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
level.
The PRA programme also conducted in the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
We have implemented the use of traditional medicine in to Primary Health care
the PHC.
The program is going on.
Sub-center with population
Sl.
No. Name of SC
Dista
nce
from
PHC
Build
ing
(Y/N)
No.
of
villag
es Population
Eligi
ble
Cou
ple
No.
of
ASH
A
No
of
Ang
anw
adi
No of
VHS
C
No of
SHG
Male Female
I Kannamagala 8KM NO 12 1884 1864 368 4 8 7 6
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 Ix Jr.H.A. (M) 0 0
Ii Pharmacist 1 1 X Jr.H.A (F) 1 1
iii Staff Nurse 1 1 Xi PMOA 0 0
Iv Lab. Technician 0 0 Xii SDC 1 1
V FDA/Administrator 1 1 Xiii Arogyamitra 0 0
vi LHV 0 0 Xiv Driver 0 0
![Page 90: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/90.jpg)
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 4 6 0 259 269 94 0 0 0
May-11 7 8 0 291 277 75 0 0 0
Jun-11 5 2 1 280 280 67 0 0 0
Jul-11 3 1 0 276 265 73 0 0 0
Aug-11 4 3 2 241 224 80 1 0
Sep-11 9 3 2 277 231 66 0 0 0
Oct-11 6 5 1 232 220 84 0 0 0
Nov-11 4 1 0 211 212 58 0 1 0
Dec-11 3 2 0 222 216 71 1 0 0
Jan-12 8 9 0 307 296 79 0 0 0
Feb-12 10 14 0 242 231 59 0 0 0
Mar-12 15 8 0 270 263 40 1 0 0
Total 78 62 6 3108 2984 846 3 1 0
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 0 3252 3409 3839 4096 3666 3748
2 TOTAL ANC
REGISTRATIONS
0 18 23 58 86 73 73
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
1 14 19 58 48 39 53
% 0 78 83 100 55 53 73
4 TT COVERAGE
ANC
0 18 25 38 51 90 61
5 TOTAL
DELIVERIES
0 10 9 43 60 71 54
6 INSTITUTION
DELIVERIES
0 9 9 43 60 69 54
7 % INSTITUTIONAL
DELIVERIES
0 90 100 100 100 97 100
Vital Indicators
1 MATERNAL 0 0 0 0 0 0 0
![Page 91: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/91.jpg)
DEATHS
2 TOTAL LIVE
BIRTHS
0 10 9 43 60 71 55
3 IMR 0 0 0 0 0 0 0
![Page 92: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/92.jpg)
Kannura
Name of the PHC : Kannur
Taluk : Bijapur
District : Bijapur
Population Covered : 57148
No. of Sub-Centres : 11
Staff : 25
Date of Taking over : 20.05.2005
Sl. No Before taking over After taking over
1 LAND No boundaries.
Lot of weeds and inadequately
maintained.
No Fencing
Total area is 5 acres.
Cleaned-up.
Boundaries identified
Land scalping done.
Planted few trees in the campus.
Fencing done
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
maintenance irregular.
All the staff quarters were
dilapidated
Cleaned-up the building.
We have repainted the building.
Staff Quarters were renovated & occupied.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings were vacant
Cleaned-up the buildings.
ANMs occupied the Building
Minor repair work taken up in the S/C also.
4 EQUIPMENTS Not maintained properly and supply
was irregular. Computer, printer and tape recorder (for
IEC activities) supplied from KT.
Email services are being provided at the
PHC
VRC equipments were installed in
collaboration with ISRO.
Tele conference and Tele- ECG facilities
are made available in the PHC.
Some of the essential equipments were
procured from DHO.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained. Available and functional
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant posts.
All the staffs are staying in the head
quarters and are rendering the 24 hrs
services.
8 TRAININGS Infrequent PHC staff has been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
![Page 93: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/93.jpg)
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
VRC equipments installed in Collaboration
with ISRO.
Bio-waste Management
9 MEDICINES &
REGENTS
Irregular supply. KT supplies the essential medicines other
lab. Reagents in case of delay in the Govt.
supply.
10 WATER &
ELECTRICITY
Poor and irregular supply.
Minor electrical repair work undertaken.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-waste
management in the PHC according to
KPCB standards and obtained KPCB
certificate.
12 AMBULANCE Not available An ambulance was provided by rotary club
14 INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area.
The PRA programme also conducted in the village levels.
Sub-center with population
Sl.
No. Name of SC
Dista
nce
from
PHC
Buildi
ng
(Y/N)
No.
of
villag
es Population
Eligi
ble
Coup
le
No.
of
ASH
A
No of
Anga
nwad
i
No
of
VHS
C
No
of
SH
G
Male Female
I Kannur HQ Yes 3 6408 6158 1947 3 11 2 3
Ii Tidagundi 7km Yes 2 2113 2032 642 1 5 2 2
Iii Dommanala 14km Yes 3 1687 1623 513 1 4 1 2
Iv Gunaki 15km Yes 3 2731 2624 825 3 8 2 1
V Minchanala 18km Yes 2 2731 2625 830 3 5 1 1
Vi Makhanapura 6km No 3 3089 2968 920 1 7 2 2
vii Siddapur 8km Yes 1 2453 2358 710 0 7 1 1
viii Arakeri 16km Yes 4 2584 2483 780 2 8 1 3
ix Bhutanala 20km No 2 2493 2004 759 3 5 0 1
X Jalageri 25km Yes 2 2527 2428 752 3 6 1 2
XI Yatnala 36km Yes 2 1546 1487 485 0 3 1 1
Total 27 30362 28790 9163 20 69 14 19
![Page 94: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/94.jpg)
Staff Pattern:
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr.H.A. (M) 6 6
ii Pharmacist 1 1 x Jr.H.A (F) 11 11
iii Staff Nurse 1 1 xi PMOA 0 0
iv Lab. Technician 0 1 xii SDC 0 0
v FDA/Administrator 1 1 xiii Arogyamitra 0 0
vi LHV 1 1 xiv Driver 0 0
vii BHEO 0 0 xv Gr. D 2 2
viii Sr. H A 1 1
Outpatient and Inpatient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 15 49 0 559 573 185 0 5 1
May-11 37 75 5 690 658 222 1 6 0
Jun-11 27 92 3 736 753 283 0 6 0
Jul-11 12 72 3 984 1025 187 0 1 0
Aug-11 15 80 5 832 986 150 0 6 0
Sep-11 18 62 0 1047 1036 193 2 2 0
Oct-11 7 57 0 647 725 248 2 8 0
Nov-11 8 46 0 688 755 283 0 4 0
Dec-11 4 42 0 778 866 195 0 0 0
Jan-12 13 40 0 952 993 315 0 0 0
Feb-12 5 54 0 755 868 208 0 1 0
Mar-12 12 35 3 841 731 221 3 11 1
Total 173 704 19 9509 9969 2690 8 50 2
Details of Laboratory Services
Name of
Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for
MP Test 785 773 732 810 1071 953 768 791 718 729 553 505
Total PV 26 18 8 6 4 2 3 2 2 0 2 0
Total PF 0 0 0 0 1 3 1 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0
![Page 95: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/95.jpg)
Mixed type
HbSAg test 29 27 46 33 25 36 41 42 30 20 38 26
Widal 2 2 7 2 12 1 5 5 8 12 8 11
VDRL 29 27 46 33 23 35 38 41 31 30 35 26
Pregnancy
Test 36 43 50 37 33 35 29 31 26 29 23 37
Hb% in
PHC 45 39 62 53 38 48 54 64 41 48 48 53
TLC 0 0 6 0 0 0 0 6 0 0 0 1
DLC 0 0 6 0 0 0 0 6 0 0 0 1
ESR 1 0 7 2 2 0 4 7 0 0 0 1
Urine RE 33 35 56 34 22 35 41 43 32 30 40 29
Blood
Groping 31 30 55 35 29 36 45 45 28 36 40 31
Water Test
For H2S
Method 36 21 22 48 52 48 37 30 34 36 16 10
HIV Test
ICTC 160 90 191 240 108 129 175 191 119 149 151 141
Bile salt 0 0 0 0 1 1 0 0 0 0 0 0
Bile
pigment 0 0 0 0 1 1 0 0 0 0 0 0
Total 1213 1105 1294 1333 1422 1363 1241 1304 1069 1119 954 872
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
2012
1 POPULATION 49317 53237 53237 53442 55255 55582 57148
2 TOTAL ANC
REGISTRATION
S
1151 1625 1438 1429 1566 1580 1838
3 EARLY ANC
REGISTRATION
S <12 WEEKS
562 1480 665 853 945 880 968
% 49 91 46 60 60 55 53
4 TT COVERAGE
ANC
928 1328 1086 950 1925 1623 1912
5 TOTAL
DELIVERIES
857 843 1096 1139 1228 1157 1374
6 INSTITUTION
DELIVERIES
360 272 584 690 1146 1155 1293
7 % 42 32 53 61 93 100 94
![Page 96: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/96.jpg)
INSTITUTIONAL
DELIVERIES
Vital Indicators
1 MATERNAL
DEATHS
0 1 0 0 1 0 0
2 TOTAL LIVE
BIRTHS
0 835 1096 1125 1216 1146 1370
3 IMR 12.84 22.54 20.99 24.89 21.38
2
16.579
4
13.43
![Page 97: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/97.jpg)
Kohinoor
Name of the PHC : Kohinoor
Taluk : Basavakalyana
District : Bidar
Population Covered : 14816
No. of Sub-Centres : 3
Staff : 20
Date of Taking over : 15.11.2005
Sl. No Before taking over After taking over
1 LAND No boundaries.
Lot of weeds and not adequately
maintained.
Total area is 120 x 20 feet.
Cleaned-up.
Boundaries identified
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
maintenance irregular.
All the staff quarters were
dilapidated
Cleaned-up the building.
Buildings were repainted.
Staff Quarters were renovated & occupied.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings were vacant
Cleaned-up the building.
ANMs occupied the Buildings
Minor repair work done.
4 EQUIPMENTS Not being serviced regularly and
supply was irregular. Computer, printer and tape recorder(for
IEC activities) supplied from KT.
Email services are being provided at the
PHC
VRC equipments were installed in
collaboration with ISRO.
Tele conference and Tele- ECGs are done
at the PHC.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Adequate
7 STAFF Many vacancies and poor
attendance.
All the vacant posts are filled up.
All the staffs were staying in the head
quarters and they are rendering the 24 hrs
services.
8 TRAININGS Infrequent KT has given the training to the PHC staff
on the following subjects:
RCH and MCH services.
HIV/AIDS.
![Page 98: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/98.jpg)
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
VRCs in Collaboration with ISRO.
Bio-waste Management
9 MEDICINES &
REGENTS
Irregular supply KT has also supplies the essential
medicines and lab reagents.
10 WATER &
ELECTRICITY
Poor and irregular supply Minor electrical repair work was taken up
in all the buildings.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards and obtained the KPCB
certificate.
12 AMBULANACE Not available Population Foundation of India provided
an ambulance
13 NEW INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area.
The PRA programme also conducted in the village levels.
Sub-center with population
Sl.
No
.
Name of
SC
Distanc
e from
PHC
Buil
ding
(Y/N
)
No.
of
villag
es Population
Eligib
le
Coupl
e
No.
of
ASH
A
No of
Angan
wadi
No of
VHSC
No of
SHG
Male Female
1
Kohinoor
1st 0 No 1 1762 1704 548 5 4 1 21
2
Kohinoor
2nd 5 No 4 2145 2067 644 3 4 2 10
3 Batgera 8 yes 5 2345 2122 641 5 5 2 14
Total 10 6252 5893 1833 13 13 5 45
![Page 99: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/99.jpg)
Staff pattern
Sanctioned Available Sanctioned Available
I Medical Officer 2 2 ix Jr.H.A. (M) 2 2
Ii Pharmacist 1 1 x Jr.H.A (F) 3 3
Iii Staff Nurse 4 3 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 1 1
V FDA/Administrator 0 0 xiii Arogyamitra 0 0
Vi LHV 1 1 xiv Driver 1 1
vii BHEO 0 0 xv Gr. D 4 4
viii Sr. H A 1 1
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female children Male Female Male Female
Apr-11 19 34 1 422 578 10 16
May-11 19 29 0 363 432 9 11
Jun-11 18 20 4 525 798 12 17
Jul-11 22 20 2 500 622 14 16
Aug-11 5 37 0 392 615 12 20
Sep-11 9 51 0 455 653 10 26
Oct-11 8 48 0 424 540 5 7
Nov-11 10 38 10 545 505 8 30
Dec-11 11 41 0 568 1000 6 9
Jan-12 4 38 2 444 503 9 19
Feb.12 10 49 3 424 611 7 19
Mar.12 12 55 5 398 502 14 18
Total 147 460 27 5460 7359 116 208
![Page 100: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/100.jpg)
Laboratory Services Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 174 177 297 196 173 171 188 165 222 195 196 160
Total PV 0 0 0 0 1 1 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 1
HbSAg test 2 1 0 3 0 2 1 2 3 0 0 1
Widal 8 6 3 0 2 1 6 5 12 0 0 0
VDRL 4 3 2 1 0 2 0 2 1 5 2 0
Pregnancy Test 4 6 3 5 8 7 2 0 4 10 12 11
Hb% in PHC 12 8 14 18 16 12 17 9 15 25 25 13
TLC 0 0 0 0 0 0 0 0 0 0 0 0
DLC 0 0 0 0 0 0 0 0 0 0 0 0
ESR 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 7 3 5 6 4 8 2 4 5 7 4 3
Blood Groping 6 3 4 5 7 2 8 6 0 0 0 0
Water Test For
H2S Method 3 4 9 17 5 6 4 3 0 2 5 2
HIV Test ICTC 18 11 28 25 26 18 7 23 20 17 37 30
Bile salt 2 4 3 5 6 4 1 2 3 5 3 3
Bile pigment 2 4 3 5 6 4 1 2 3 5 3 3
Total 242 230 371 286 254 238 237 223 288 271 287 227
![Page 101: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/101.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 28629 29630 3196
0
32605 15914 14110 12145
2 TOTAL ANC
REGISTRATIONS
0 659 659 770 750 338 361
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
0 315 315 505 420 234 268
% 0 48 48 66 56 69 74
4 TT COVERAGE
ANC
0 659 620 749 578 236 249
5 TOTAL
DELIVERIES
292 580 580 682 599 407 523
6 INSTITUTION
DELIVERIES
0 150 146 487 581 399 518
7 %
INSTITUTIONAL
DELIVERIES
0 26 25 71 97 98 99
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 0 0
2 TOTAL LIVE
BIRTHS
0 580 570 671 591 400 505
3 IMR 0 6.9 6. 17 8.4602 4.9 9.9
![Page 102: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/102.jpg)
Mallapura
Name of the PHC : Mallapura
Taluk : Jagalur
District : Davangere
Population Covered : 29328
No. of Sub-Centres : 6
Staff : 22
Date of Taking over : 20-06-2005
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained.
No Fencing
Total area is 4 acres.
Cleaned-up.
Fencing done
KT has started a demo garden and
nursery for Traditional Medicine.
2 PHC BUILDING
& STAFF
QUARTERS
Many pending repair works and
maintenance irregular.
Cleaned-up the building.
Repainted the building.
All the quarters were occupied by our
staff.
Citizen Charter displayed in the PHC.
Name boards written.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings were vacant
Cleaned-up the buildings.
ANMs occupied the Buildings.
We have 6 sub centers with building.
![Page 103: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/103.jpg)
4 EQUIPMENTS Not being serviced regularly and
supply irregular.
Computer, printer and tape recorder(for
IEC activities) supplied from KT.
Email services are being provided at
the PHC
Some of the essential equipments were
procured from DHO.
Equipments for preparation of
Traditional medicines were supplied.
Village Resource Center equipments
were installed in collaboration with
ISRO.
Tele conference and Tele- ECG
facilities are made available in the
PHC.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance.
KT has filled up all the vacant posts.
All the staffs are staying in the head
quarters and are rendering the 24 hrs
services.
8 TRAININGS Infrequent PHC staffs are trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular supply KT also supplies the essential
medicines other lab reagents in case
shortage.
10 WATER &
ELECTRICITY
Poor and irregular supply Minor electrical repair work for all the
buildings were taken up.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards and obtained KPCB
certificate.
13 NEW INNOVATIONS BY KARUNA TRUST
![Page 104: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/104.jpg)
A IEC ACTIVITIES
& PRA
PROGRAM
With the help of our IEC vehicle we organized IEC activities in all the
sub-center area.
The PRA programme also conducted in the village levels.
B TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-center with population
Sl.
No. Name of SC
Distanc
e from
PHC
Build
ing
(Y/N)
No.
of
villag
es Population
Eligib
le
Coupl
e
No.
of
AS
HA
No of
Anga
nwadi
No
of
VHS
C
No
of
SHG
Male Female
I Mallapura 0 Yes 4 1173 1211 366 3 3 3 9
Ii
Chikamalanahol
le 3km Yes 6 1944 2231 601 4 8 4 25
Iii
Heremalanaholl
e 8km yes 6 2126 2169 721 4 6 5 27
Iv Huchovanahalli 12km yes 6 2882 2800 973 3 7 5 22
V Hanamathapura 28km yes 8 3481 3524 1347 6 9 5 29
Vi Anabura 32km Yes 9 2991 3009 905 5 9 5 31
Total 39
1459
7 14944 4913 25 42 27 143
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 Ix Jr. H.A. (M) 2 2
Ii Pharmacist 1 1 X Jr. H.A (F) 6 6
Iii Staff Nurse 1 1 Xi PMOA 0 0
Iv Lab. Technician 1 1 Xii SDC 0 0
V FDA/Administrator 1 0 Xiii Arogyamitra 0 1
Vi LHV 1 1 Xiv Driver 1 0
![Page 105: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/105.jpg)
Vii BHEO 0 0 Xv Gr. D 3 3
Viii Sr. H.A. 1 1
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Male Female Male Female
Apr-11 21 19 449 542 0 3
May-11 11 10 525 372 2 1
Jun-11 8 14 540 451 0 0
Jul-11 24 32 468 560 0 5
Aug-11 6 18 615 536 1 6
Sep-11 12 8 496 738 2 0
Oct-11 11 32 416 563 0 2
Nov-11 10 22 555 596 4 0
Dec-11 12 13 445 400 2 3
Jan-12 6 16 715 544 0 0
Feb-12 6 19 565 603 0 2
Mar-12 14 9 286 413 1 5
Total 141 212 6075 6318 12 27
Details of Laboratory Services
Name of Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP Test 466 653 740 605 823 564 696 373 500 557 419 375
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0
Hbs aeg test 0 0 0 2 1 2 1 0 0 4 2 3
Widal 0 0 0 0 0 0 0 0 0 0 5 2
VDRL 3 4 9 6 13 9 20 0 9 8 10 10
Pregnancy Test 21 42 34 20 11 14 27 20 49 15 47 26
Hb% in PHC 0 0 0 0 0 0 0 0 14 15 13 15
TLC 0 0 0 0 0 0 0 0 14 15 13 15
DLC 0 0 0 0 0 0 0 0 14 15 13 15
ESR 13 43 35 42 12 23 30 19 51 49 46 21
Urine RE 0 0 0 0 1 0 0 0 0 0 2 4
Blood Groping 29 24 27 0 0 0 32 20 21 26 18 0
![Page 106: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/106.jpg)
Water Test For
H2S Method 12 12 16 8 15 10 5 12 21 20 20 0
HIV Test ICTC 0 0 0 2 2 0 0 0 3 5 8 3
Bile salt 0 0 0 0 0 0 0 0 6 4 6 0
Bile pigment 0 0 0 0 0 0 0 0 6 4 6 0
Total 544 778 861 685 878 622 811 444 708 737 628 489
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-12
1 POPULATION 25737 26766 26966 27529 28548 29223 29323
2 TOTAL ANC
REGISTRATIONS
625 715 626 540 488 537 688
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
290 344 380 437 354 423 577
% 46 48 61 81 72 78 84
4 TT COVERAGE
ANC
580 628 618 685 531 564 566
5 TOTAL
DELIVERIES
463 546 542 524 458 421 501
6 INSTITUTION
DELIVERIES
271 380 431 365 399 399 472
7 %
INSTITUTIONAL
DELIVERIES
59 70 80 68 87 95 94
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 1 1 0 1
2 TOTAL LIVE
BIRTHS
460 546 542 471 458 421 500
![Page 107: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/107.jpg)
3 IMR 8.64 3.66 9.23 19.23 26.201 28.503
6
16.00
![Page 108: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/108.jpg)
Nandikeshwara
Name of the PHC : Nandikeshwara
Taluk : Badami
District : Bagalkot
Population Covered : 20908
No. of Sub-Centres : 3
Staff : 16
Date of Taking over : 25.01.2006
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained. Total area is 3 acres.
Cleaned-up.
KT has started a demo garden and nursery
for Traditional Medicine.
We have planted 211 plants in the PHC
campus with the help of Forest department
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
maintenance irregular.
All the staff quarters were
dilapidated
Cleaned-up the building.
We have repainted the building.
Staff Quarters were renovated & occupied
Citizen charter has been displayed.
Sign boards have been written for each of
the sections.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Building was vacant
Cleaned-up the building.
ANM occupied the Building
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder (For
IEC activities ) supplied from KT.
Email services are being provided at the
PHC
Village Resource Center equipments were
installed in collaboration with ISRO.
Tele conference and Tele- ECG facilities
are made available in the PHC.
Some of the essential equipments were
received from DHO.
Equipments for preparation of traditional
medicine has been supplied by KT.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Non Functional.
Minor repair Functional.
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance. All the vacant posts have been filled up.
All the staffs are staying in the head
quarters and they are rendering the 24 hrs
services.
![Page 109: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/109.jpg)
8 TRAININGS Infrequent The PHC staff have been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REGENTS
Irregular supply. KT supplies the essential medicines &other
lab reagents in case of delay in Govt.
supply.
10 WATER &
ELECTRICITY
Not available / Under repair The pump set is repaired and got the
running water in the PHC.
Minor electrical repair work for all the
buildings were taken up.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-waste
management in the PHC as per the KPCB
standard and obtained certificate from the
board.
13 INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area.
The PRA programme also conducted in the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care..
Sub-center with population
Sl.
N
o Name of SC
Distan
ce
from
PHC
Buildi
ng
(Y/N)
No.
of
villag
es Population
Eligi
ble
Cou
ple
No.
of
ASH
A
No of
Angan
wadi
No of
VHS
C
Male
Femal
e
1 Nandikeshwara 0 NO 4 4494 4345 1326 7 10 3
2 Kutkankeri 14 km yes 4 2908 2931 876 5 7 3
3 Adagal 11 km yes 3 3146 3084 935 4 6 2
Total 0 11 10548 10360 3137 16 23 8
![Page 110: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/110.jpg)
Staff pattern
Sanctioned Available Sanctioned Available
I
Medical
Officer 1 1
Ix
Jr.H.A. (M) 3 3
Ii Pharmacist 1 1 X Jr.H.A (F) 3 3
Iii Staff Nurse 3 3 Xi PMOA 0 1
Iv
Lab.
Technician 1 1
Xii
SDC 0 0
V
FDA/Administ
rator 1 1
Xii
i
Arogyamitra 0 1
Vi
LHV 1 1
Xi
v
Driver 0 0
vii BHEO 0 0 Xv Gr. D 2 2
viii Sr. H A 1 1
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Children Male Female Children Male Female
Apr-11 3 18 1 304 469 135 1 3
May-11 12 36 1 3 86 666 135 8 13
Jun-11 18 53 6 466 973 224 6 6
Jul-11 5 19 3 747 543 123 5 3
Aug-11 2 12 0 747 543 123 5 5
Sep-11 5 23 2 459 718 84 6 5
Oct-11 6 25 3 330 660 112 0 0
Nov-11 8 19 1 384 536 130 1 4
Dec-11 5 17 0 279 665 171 2 1
Jan-12 7 16 3 317 775 164 4 0
Feb-12 6 16 0 310 505 105 4 1
Mar-12 6 19 1 382 441 97 1 0
Total 83 273 21 5111 7494 1603 43 41
![Page 111: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/111.jpg)
Details of Laboratory Services
Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 254 318 511 529 533 489 519 558 530 635 517 495
Total PV 0 0 0 5 4 0 1 0 0 0 2 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
Blood Sugar 0 0 0 0 0 0 0 0 0 0 0 0
Widal 3 3 5 3 0 5 4 7 3 3 6 2
VDRL 0 0 0 0 0 0 0 0 0 0 0 0
Pregnancy Test 11 8 12 5 4 11 3 8 6 7 6 10
Hb% in PHC 61 21 45 29 40 35 25 28 22 41 29 44
TLC 1 0 0 3 1 0 0 0 0 0 0 0
DLC 1 0 0 3 1 0 0 0 0 0 0 0
ESR 1 0 0 3 1 0 0 1 0 5 1 0
Urine RE 62 45 76 78 29 30 34 26 18 39 23 32
Blood Groping 2 2 5 0 1 0 0 0 0 0 0 0
HIV TEST 21 25 31 29 27 4 23 33 21 39 33 33
Water Test For
H2S Method 9 6 3 7 6 4 8 4 8 10 10 7
Grant Total 426 428 688 694 647 578 617 665 608 779 627 623
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 0 19280 19280 19431 20217 20217 21944
2 TOTAL ANC
REGISTRATIONS
0 583 469 463 552 567 650
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
0 268 304 357 452 397 456
% 0 46 65 77 81 70 70
4 TT COVERAGE
ANC
0 558 500 467 552 514 632
5 TOTAL 0 388 431 435 502 421 520
![Page 112: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/112.jpg)
DELIVERIES
6 INSTITUTION
DELIVERIES
0 172 272 284 430 381 511
7 %
INSTITUTIONAL
DELIVERIES
0 44% 63% 65% 86% 90% 98%
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 1 0
2 TOTAL LIVE
BIRTHS
0 385 431 418 495 413 498
3 IMR 0 12.89 25.52 28.71 14.141 26.63
44
12.00
![Page 113: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/113.jpg)
Pattanayakanahalli
Name of the PHC : Pattanayakanahalli
Taluk : Sira
District : Tumkur
Population Covered : 38416
No. of Sub-Centres : 11
Staff : 35
Date of Taking over : 04.07.2005
Sl.No Before taking over After taking over
1 LAND Lot of weeds and t inadequately
maintained.
No Fencing
Total area is 4 acres.
Cleaned-up.
Fencing done.
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
maintenance irregular.
Medical Officer quarters was
dilapidated
Cleaned-up the building.
We have repainted the building.
MO Quarter was renovated & occupied
Name boards have been written in the each
of the section.
Citizen Charter was displayed in the PHC.
New 2 Staff quarters were constructed with
the help of local donor.
Operation Theater was renovated through
local MLA funds.
Rain water harvesting work is under
process with the help of local NGO.
![Page 114: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/114.jpg)
3 SUB-CENTER
BUILDINGS
Buildings were vacant and poorly
maintained. Cleaned-up the building.
ANMs occupied the Building
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder (for
IEC activities ) supplied from KT.
Email services are being provided at the
PHC
Village Resource center equipments were
installed in collaboration with ISRO.
Tele conference and Tele- ECG facilities
are made available in the PHC.
Some of the essential equipments were
procured from DHO.
Equipments for preparation of herbal
medicinal have been supplied by KT.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Some of the chairs received from the
Swasahaya Sangha’s as donation.
Some of the furniture and equipments
received from Helpage India and Viveka
Drusti Eye Hospital, Bangalore.
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant posts .All
the staffs are staying in the head quarters
and are rendering the 24 hrs services.
8 TRAININGS Irregular The PHC staffs have been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REGENTS
Irregular supply KT supplies the essential medicines &
other lab reagent if there is shortage in
Govt. supply. L
Free medicines were received from Micro
Labs and supplied.
10 WATER &
ELECTRICITY
Poor and irregular supply The pump set is repaired and got the
running water in the PHC through
Grampanchyath.
We have done the minor electrical repair
work for all the buildings.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards obtained the certificate
from the board.
12 AMBULANACE Not available An ambulance was provided by Rotary
club
![Page 115: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/115.jpg)
13 INNOVATIONS BY KARUNA TRUST
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area.
The PRA programme also conducted in the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-center with population
Sl
.
N
o
Name of
SC
Distan
ce
from
PHC
Build
ing
(Y/N)
No.
of
villa
ges Population
Eligi
ble
Cou
ple
No.
of
ASH
A
No
of
Ang
anw
adi
No
of
VH
SC
No
of
SH
G
Male
Fem
ale
I P N Halli 0 km N0 2 2047 2080 607 4 5 1 12
Ii Nadur 1 km NO 4 1350 1292 396 3 4 2 15
Iii
kereyagal
ahalli 8 km NO 4 1150 1124 341 3 5 0 16
Iv
H
gollahalli 8 km YES 5 1550 1547 464 2 5 1 14
V
thogarigu
nnte 10 km NO 3 1368 1374 411 2 4 1 13
V
i
Bandkunt
te 14 km NO 4 1850 1814 549 3 5 1 11
vi
i gowdgere 24 km YES 6 1840 1730 541 4 7 4 14
vi
ii
changava
ra 15 km YES 8 2070 2046 612 4 8 1 12
ix
bevinahal
li 20km YES 4 2130 2002 610 4 7 4 17
ii
x Hemdore 8km NO 5 2100 2060 618 4 7 2 10
x
Veergana
halli 6 km NO 4 1795 1770 534 4 4 1 9
![Page 116: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/116.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 3 3 ix Jr.H.A. (M) 7 7
Ii Pharmacist 1 1 x Jr.H.A (F) 11 11
Iii Staff Nurse 3 3 xi PMOA 0 1
Iv Lab. Technician 2 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 0 0
Vi LHV 1 1 xiv Driver 1 1
vii BHEO 1 1 xv Gr. D 3 3
viii Sr. H A 1 1
Details of Laboratory Services
Name of
Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for
MP Test 798 762 904 842 951 965 922 900 1032 945 849 807
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
Hbs aeg test 0 0 0 0 0 0 0 16 35 50 50 23
Widal 0 0 0 0 0 0 0 1 6 4 6 3
VDRL 0 4 51 43 48 46 33 57 37 35 43 0
Pregnancy
Test 40 10 30 32 49 23 38 26 35 40 43 43
Hb% in
PHC 100 104 123 137 130 123 121 110 126 125 140 127
TLC 0 0 0 0 0 0 0 0 0 0 0 0
DLC 0 0 0 0 0 0 0 0 0 0 0 0
ESR 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 280 380 318 330 387 326 450 390 305 370 335 355
Blood
Groping 0 0 41 24 29 28 22 39 23 37 38 23
Water Test
For H2S
Method 0 0 0 0 0 9 8 9 5 7 6 12
HIV Test
ICTC 0 0 0 0 0 7 6 5 7 2 4 3
Bile salt 6 3 3 2 4 7 6 5 7 2 4 3
Bile
pigment 6 3 3 2 4 0 0 0 0 0 0 0
![Page 117: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/117.jpg)
Total 1230 1266 1473 1412 1602 1534 1606 1558 1618 1617 1518 1399
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-12
1 POPULATION 38080 38931 39374 39630 39820 35801
2 TOTAL ANC
REGISTRATION
S
749 751 713 849 837 662 731
3 EARLY ANC
REGISTRATION
S <12 WEEKS
435 505 471 594 627 628 651
% 58 67 66 70 74 94 89
4 TT COVERAGE
ANC
784 753 713 758 442 729 697
5 TOTAL
DELIVERIES
615 623 604 676 690 635 659
6 INSTITUTION
DELIVERIES
371 464 484 615 646 635 659
7 %
INSTITUTIONAL
DELIVERIES
60 74 80 91 94 100 100
Vital Indicators
1 MATERNAL
DEATHS
0 1 0 0 1 1 0
2 TOTAL LIVE
BIRTHS
613 622 600 672 684 630 651
3 IMR 27.64 27.29 16.56 16.37 17.544 23.809
5
10.75
![Page 118: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/118.jpg)
![Page 119: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/119.jpg)
Sreemangala
Name of the PHC : Sreemangala
Taluk : Virajpet
District : Kodagu
Population Covered : 8883
No. of Sub-Centres : 14
Staff : 22
Sl. No Before taking over After taking over
1 LAND Lot of weeds and inadequately
maintained.
No Fencing
Total area is 4 acres.
Cleaned-up.
Fencing done.
KT has started a demo garden and nursery
for Traditional Medicine.
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
maintenance irregular.
Cleaned-up the building.
Repainted the building.
Citizen Charter has been displayed in the
PHC.
Name boards written.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Building were vacant Cleaned-up the building.
ANMs occupied the Building
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder ( for
IEC activities ) supplied from KT.
Email services are being provided at the
PHC
Some of the essential equipments were
procured from DHO.
Equipments for preparation of herbal
medicine has been supplied by KT.
Village Resource Center equipments were
installed in collaboration with ISRO.
Tele conference and Tele- ECG facilities
are made available in the PHC.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained. Functional
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant posts.
All the staffs are staying in the head
quarters and are rendering the 24 hrs
services.
8 TRAININGS Infrequent The PHC staff have been trained on the
following subjects:
![Page 120: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/120.jpg)
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-w3aste Management
9 MEDICINES &
REAGENTS
Irregular supply KT supplies the essential medicines &
other lab reagents in case of any delay in
Govt. supply.
10 WATER &
ELECTRICITY
Poor and Irregular supply We have done some minor electrical repair
work for all the buildings.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-waste
management in the PHC according to
KPCB standards and obtained the
certificate from the Board.
12 AMBULANACE Not available KT provided an ambulance
14 NEW INNOVATIONS BY KARUNA TRUST
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area..
The PRA programme also conducted in the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-Centres with Population
Sl.
N o. Name of SC
Dist
ance
fro
m
PH
C
Buil
ding
(Y/
N)
No.
of
villa
ges Population
Elig
ible
Cou
ple
No.
of
ASH
A
No of
Angan
wadi
No of
VHS
C
No
of
SHG
Male Female
I
SRIMANGA
LA 0 Y 3 795 919 206 3 3 1 3
Ii KURCHI 10 Y 4 1204 1138 512 1 4 1 4
Iii NALKERI 10 Y 4 1214 1132 334 2 4 2 2
Iv KOTHUR 18 Y 3 965 918 289 1 3 1 2
![Page 121: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/121.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 2 2
Ii Pharmacist 1 1 x Jr. H.A (F) 4 4
Iii Staff Nurse 1 1 xi PMOA 0 1
Iv Lab. Technician 1 1 xii SDC - -
V FDA/Administrator 1 1 xiii Arogyamitra - -
Vi LHV 1 1 xiv Driver - -
Vii BHEO 0 0 xv Gr. D 4 4
Viii Sr. H.A. 1 1 Cook 1 1
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female children Male Female Children Male Female Children
Apr-11 20 34 0 330 363 115 4 3 0
May-
11 18 20 0 387 418 128 3 7 0
Jun-11 4 17 1 364 331 158 7 2 0
Jul-11 8 19 1 519 403 256 8 5 0
Aug-
11 14 26 0 635 624 244 5 10 0
Sep-11 11 21 0 515 418 219 4 5 0
Oct-11 12 15 0 469 510 157 4 6 0
Nov-
11 17 31 0 523 476 152 6 4 0
Dec-11 8 18 0 345 285 170 5 5 0
Jan-12 6 17 0 666 524 160 4 9 0
Feb-12 6 19 0 570 403 173 6 10 0
Mar-12 8 31 0 366 450 137 6 2 0
Total 132 268 2 5689 5205 2069 62 68 0
![Page 122: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/122.jpg)
Details of Laboratory Services
Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 135 132 146 185 207 255 201 152 176 201 176 156
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 0 1 1 0 4 0 0 0 6 8 12 14
Widal 3 1 3 1 3 6 3 2 11 20 8 6
VDRL 5 11 7 10 7 4 14 6 7 12 14 15
Pregnancy
Test 13 10 7 21 33 21 11 10 15 12 10 10
Hb% in PHC 43 34 38 77 111 118 166 95 84 119 75 81
TLC 7 0 4 8 4 0 0 0 1 0 0 0
DLC 7 0 4 8 4 0 0 0 1 0 0 0
ESR 1 0 0 3 1 0 0 0 0 0 0 0
Urine RE 38 24 28 46 63 75 78 39 37 52 48 42
Blood
Groping 8 18 14 20 18 11 31 7 9 10 14 15
Water Test
For H2S
Method 31 21 13 22 9 18 20 15 20 29 13 20
HIV Test
ICTC 61 42 70 88 76 63 72 52 65 81 52 56
Bile salt 0 2 0 4 2 4 0 2 1 2 3 2
Bile pigment 0 2 0 4 2 4 0 2 1 2 3 2
Total 352 298 335 497 544 579 596 382 434 548 428 419
![Page 123: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/123.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 0 8647 8613 7460 8883 8353 8883
2 TOTAL ANC
REGISTRATION
S
0 167 154 142 132 155 166
3 EARLY ANC
REGISTRATION
S <12 WEEKS
0 120 154 109 95 132 147
% 0 72 100 77 71 85 89
4 TT COVERAGE
ANC
0 145 113 129 134 151 157
5 TOTAL
DELIVERIES
0 94 95 111 96 131 154
6 INSTITUTION
DELIVERIES
0 63 53 104 96 130 154
7 %
INSTITUTIONAL
DELIVERIES
0% 67% 56% 94% 100% 99% 100%
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 1 2 0 0
2 TOTAL LIVE
BIRTHS
0 94 95 107 96 129 150
3 IMR 0 53.19 63.16 25 20.833 38.759
7
20.00
![Page 124: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/124.jpg)
Sri Rama Ranga Pura (S.R.R. Pura)
Name of the PHC : S.R.R. Pura
Taluk : Hospet
District : Bellary
Population Covered : 22,543
No. of Sub-Centres : 4
Date of Taking over : 01.02.2005
![Page 125: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/125.jpg)
Sl.No Before taking over After taking over
1 LAND Boundaries of land not clear
Lots of weeds and not adequately
maintained.
Total area is 2.5 acres.
Cleaned-up.
Land scaping done.
KT has started a demo garden and nursery
for Traditional Medicine.
We have planted trees in the PHC campus.
Fencing done
2 PHC BUILDING &
STAFF QUARTERS
No building maintenance, window
glasses were broken, all the doors
were damaged, untidy and dirty.
All the staff quarters were
dilapidated and many pending
repair works, maintenance
irregular.
We have painted the building.
We have fixed the glasses for all the
windows.
All the doors were repaired.
Cleaned-up the building.
Staff Quarters were renovated.
3 SUB-CENTER
BUILDINGS
Poorly maintained.
Buildings were vacant. We have the 4 sub centers with the
building.
Cleaned up the building.
Our ANMs occupied the Building
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder
supplied from KT.
Email services are being provided at the
PHC
Some of the essential equipments were
procured from DHO.
We have supplied medicinal preparation
equipments.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Non Functional
Under repair Repaired, now it is functional.
6 FURNITURE Inadequate Office furniture supplied from KT (table
& chair)
7 STAFF Many vacancies and poor
attendance. KT has filled up all the staffs.
All the staffs are staying in the head
quarters and they are rendering the 24 hrs
services.
8 TRAININGS Infrequent KT has given the training to the PHC staff
on the following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Mental Health
Traditional medicine
PRA
VRCs in Collaboration with ISRO.
Waste Management
9 MEDICINES &
REGENTS
Irregular supply KT has also supplied the essential
medicines other than the Govt. supply.
The lab regents were also supplied from
KT.
10 WATER &
ELECTRICITY
Poor and irregular. The water supply connection is given by
the Gram Panchyath.
![Page 126: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/126.jpg)
We have done the minor electrical repair
work & got the new connection for all the
buildings.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards.
12 AMBULANACE Not available KT provided the ambulance
14 INNOVATIONS BY KARUNA TRUST
A IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
level.
The PRA programme also conducted in the village level.
B TRADITIONAL
MEDICINE
PROGRAM
We have implemented the use of traditional medicine in to Primary Health care
the PHC.
The program is going on.
Sub-center with population
Sl.
No
Name of
SC
Dista
nce
from
PHC
Buil
ding
(Y/N
)
No. of
villages Population
Eligi
ble
Coup
le
No.
of
ASH
A
No
of
Ang
anw
adi
No
of
V
H
SC
No
of
SH
G
Male
Femal
e
I
S.R.R.PUR
A 0 YES 1 1698 1662 595 2 4 1 2
Ii
SUGGEN
AHALLI 3 YES 4 3018 2901 1032 2 7 4 3
Iii JOWCK 9 YES 6 3820 3460 1284 5 9 5 5
Iv
DEVALAP
URA 12 YES 2 3385 3126 1253 4 7 2 3
Total 13 11921 11149 4164 13 27 12 13
![Page 127: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/127.jpg)
Staff Pattern:
Sl.
No. Sanctioned Available
Sl.
No. Sanctioned Available
I
Medical
Officer 1 1 Ix
Driver
0 0
Ii Pharmacist 1 1 X Gr. D 2 2
Iii
Staff Nurse
0 0 Xi
Lab
Technician 1 1
Iv
Jr. H.A. (M)
2 2 Xii
FDA/
Admin. 0 0
V
Jr. H.A (F)
4 4
Xii
i
LHV
1 1
Vi PMOA 0 1 Xiv BHEO 0 0
Vii SDC 1 1 Xv Sr. H.A. 0 0
Vii
i
Arogyamitra
0 0
Outpatient and Inpatient Details:
IPD
OPD
Emergency
Male Female Male Female Male Female
Apr-11 28 34 960 940 1 3
May-11 20 34 700 794 3 3
Jun-11 32 26 750 604 5 5
Jul-11 15 24 620 806 2 2
Aug-11 8 20 708 357 1 0
Sep-11 27 32 508 952 4 3
Oct-11 17 41 565 510 4 3
Nov-11 17 34 515 450 4 1
Dec-11 13 12 680 466 4 3
Jan-12 9 12 625 465 5 2
Feb-12 5 19 726 590 1 1
Mar-12 13 24 420 320 1 1
Total 204 312 7777 7254 34 27
![Page 128: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/128.jpg)
Details of Laboratory Services:
Name of
Lab Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for
MP Test 425 433 588 472 478 418 396 414 411 388 396 415
Total PV 0 1 1 0 1 0 1 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total
Mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
Blood
Sugar 38 34 25 0 0 0 0 17 17 26 33 18
Widal 6 10 9 10 5 21 0 6 6 8 14 9
VDRL 31 20 0 0 0 0 0 8 17 16 10 50
Pregnancy
Test 16 17 15 9 13 19 14 8 18 11 15 13
Hb% in
PHC 97 87 125 109 70 140 87 85 82 118 90 115
TLC 0 4 6 4 6 6 5 7 4 7 4 4
DLC 0 4 6 4 6 6 5 7 4 7 4 4
ESR 6 4 6 4 6 6 5 7 4 7 4 4
Urine RE 83 78 118 109 72 145 74 76 75 431 275 366
Blood
Groping 34 29 31 29 28 48 0 21 31 39 20 51
HIV
TEST 13 65 168 58 52 110 34 85 76 91 34 40
Water
Test For
H2S 5 2 12 5 5 8 6 8 7 8 0
11
HbSAg 29 24 11 3 3 0 0 9 17 23 24 52
BT 0 5 6 3 4 3 8 10 8 10 4 3
CT 0 5 6 3 4 3 8 10 8 10 4 3
BS& BP
(urine test) 10 6 11 7 5 12 10 12 6 20 14 6
Grant
Total 793 828 1144 829 758 945 653 790 791 1220 945 1164
![Page 129: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/129.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 19680 21668 21168 21265 23143 23070
2 TOTAL ANC
REGISTRATIONS
540 695 723 739 666 698 631
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
268 296 401 505 486 514 487
% 48 43 55 68 73 74 77
4 TT COVERAGE
ANC
504 686 699 701 694 616 679
5 TOTAL
DELIVERIES
381 542 598 715 541 590 620
6 INSTITUTION
DELIVERIES
160 295 468 488 441 509 549
7 %
INSTITUTIONAL
DELIVERIES
42 54 78 68 82 86 89
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 1 1
2 TOTAL LIVE
BIRTHS
375 533 584 701 527 571 620
3 IMR 23.62 7.38 16.72 11.41 15.18 13.4128 24.19
![Page 130: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/130.jpg)
Sugganahalli
Name of the PHC : Sugganahalli
Taluk : Magadi
District : Ramanagara
Population Covered : 15043
No. of Sub-Centres : 4
Staff : 14
Date of Taking over : 01.06.2003 Sl. No Before taking over After taking over
1 LAND No boundaries
Lot of weeds and inadequately
maintained.
Total area is 20 Guntas.
Cleaned-up.
Boundaries identified
Planted few trees in the campus.
Compound constructed around the PHC
2 PHC BUILDING &
STAFF QUARTERS
Many pending repair works and
maintenance irregular.
Head quarter ANM quarter was
dilapidated
Cleaned-up the building.
We have repainted the building.
ANM Quarter was renovated & occupied.
3 SUB-CENTER
BUILDINGS
No One New sub center building is constructed
with the help of the Gram-panchyat and the
process facilitated by KT.
ANMs are residing in the Building
4 EQUIPMENTS Not being serviced regularly and
supply was irregular. Computer, printer and a tape recorder
(For the IEC activities) were supplied from
KT.
Email services are being provided at the
PHC
Village Resource Center equipments were
installed in collaboration with ISRO.
Tele-conference and Tele- ECG facilities
are made available in the PHC.
Some of the essential equipments were
procured from DHO.
Equipments for preparation of herbal
medicine was supplied by KT.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not maintained Functional
6 FURNITURE Inadequate Available
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant posts.
All the staffs are staying in the head
quarters and are rendering the 24 hrs
services.
8 TRAININGS Infrequent The PHC staff on the following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
![Page 131: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/131.jpg)
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular supply KT supplies the essential medicines &
other lab reagent in case of delay in Govt.
supply.
10 WATER &
ELECTRICITY
Poor and irregular supply. We have done the minor electrical repair
work for all the buildings with the help of
Local donor.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the Bio-waste
management in the PHC according to
KPCB standards and obtained the
certificate from the board.
12 AMBULANACE Not available An ambulance is provided by Rotary club
Vehicle shed constructed with the help of
Gram Panchayat
12 NEW INNOVATIONS BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area.
The PRA programme also conducted in the village levels.
b TRADITIONAL
MEDICINE
PROGRAM
Traditional medicine has been integrated into the Primary Health care.
Sub-center with population
Sl
.
N
o.
Name of
SC
Dista
nce
from
PHC
Buildi
ng
(Y/N)
No.
of
villag
es Population
Eligi
ble
Coup
le
No. of
ASHA
No of
Angan
wadi
No
of
VHS
C
No
of
SH
G
Male Female
I
Sugganahall
i 0 Y 8 2004 2044 460 4 6 3 27
Ii Chikkahalli 8 N 11 1780 1792 449 3 7 3 22
Iii Hulikal 8 Y 15 2476 2535 619 5 7 5 30
Iv
Chikkamask
al 9 N 9 1495 1584 418 2 6 5 21
Total 43 7755 7955 1946 14 26 16
10
0
![Page 132: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/132.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 2 2
Ii Pharmacist 1 1 x Jr. H.A (F) 5 5
Iii Staff Nurse 0 0 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 1 1
V FDA/Administrator 0 0 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 1 3
Viii Sr. H.A. 0 0
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Children Male Female Children Male Female Children
Apr-11 21 31 0 526 637 63 4 7 1
May-11 20 48 0 635 702 109 6 8 2
Jun-11 28 38 0 652 752 226 5 10 1
Jul-11 11 26 0 660 660 57 4 9 2
Aug-11 11 23 0 678 751 120 4 7 0
Sep-11 3 10 0 644 554 59 2 4 2
Oct-11 6 11 0 434 484 96 3 4 2
Nov-11 5 12 0 604 681 67 5 8 0
Dec-11 7 20 0 515 453 89 4 6 0
Jan-12 9 9 0 468 410 122 2 4 0
Feb-12 20 13 0 507 304 119 3 2 0
Mar-12 5 9 0 331 323 62 1 2 0
Total 146 250 0 6654 6711 1189 43 71 10
![Page 133: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/133.jpg)
Details of Laboratory Services
Name of lab
tests
Apr-
11 May June Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
test 276 248 202 258 250 252 158 195 204 215 278 200
Positive cases
(slide + RMT) 0 0 0 0 0 0 0 0 0 0 0 0
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
Total mixed
type 0 0 0 0 0 0 0 0 0 0 0 0
HIV tests 37 43 10 38 48 25 17 48 12 28 51 20
Positive 0 0 0 1 0 0 1 0 0 0 1 0
Blood sugar 33 52 63 5 17 44 18 30 40 32 41 30
Widal 8 9 17 17 19 26 13 12 11 0 0 0
VDRL 18 22 27 0 7 20 7 25 4 7 0 0
Pregnancy test 22 22 26 21 23 11 22 27 19 6 10 32
Hb% in PHC 37 42 61 34 63 49 25 60 24 34 51 23
TLC 3 6 3 11 7 0 0 0 6 6 19 1
DLC 0 0 0 0 0 0 0 0 0 0 0 0
ESR 0 1 19 6 2 5 0 1 1 5 4 1
Urine RE 16 45 69 43 52 44 14 45 20 26 49 11
Blood grouping 14 23 35 14 25 20 6 28 7 18 15 5
Rapid test for
HIV 0 0 0 0 0 0 0 0 0 0 0 0
CT BT Time 0 0 0 0 1 0 0 0 0 0 0 0
Others 0 0 0 0 0 0 7 18 0 0 0 0
![Page 134: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/134.jpg)
Statistics
Sl.
No
Process
Indicators
2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 14168 14441 14441 14446 14335 15043
2 TOTAL ANC
REGISTRATIO
NS
258 249 265 291 252 244 240
3 EARLY ANC
REGISTRATIO
NS <12 WEEKS
213 228 252 263 207 217 211
% 82 92 95 90 82 88 88
4 TT COVERAGE
ANC
237 241 260 284 235 218 221
5 TOTAL
DELIVERIES
205 198 206 221 235 239 240
6 INSTITUTION
DELIVERIES
171 172 194 218 235 236 239
7 %
INSTITUTIONA
L DELIVERIES
83 87 94 98 100 99 100
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 0 0
2 TOTAL LIVE
BIRTHS
205 199 206 221 239 233 240
3 IMR 29.27 15.15 4.85 4.52 12.552 8.5836
9
20.83
![Page 135: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/135.jpg)
Thithimathi
Name of the PHC : Thithimathi
Taluk : Virajpet
District : Kodagu
Population Covered : 14783
No. of Sub-Centres : 6
Staff : 19
Date of Taking over : 17.07.1996
![Page 136: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/136.jpg)
BEFORE AFTER
1 Building
The dilapidated PHC-hospital building,
medical officers quarters, staff nurse quarters,
Devarapura and Majjigehalla Sub-centres.
These were in a very bad condition and no one
can’t stay in these buildings. There is no
electrification and water supply.
Vivekananda Foundation soon after taking
over the PHC at Thithimathi immediately
set to improvise the infrastructure repair
of buildings, drinking water facilities,
electricity etc at the PHC. The
Foundation has spent Rs. 6 lakhs for the
renovation of PHC building, staff quarters
and Sub-centers. This has been possible
with the generous donation from local
well-wishers.
Initially, arrangement for drinking water
supply was made by V.F. Later on
Devarapura GP ran it for a short period of
time. Now the BCK (SKANDA Group)
has taken the responsibilities of ensuring
safe drinking water to the PHC.
The BCK (SKANDA Group) Thithimathi
is maintaining the cleanliness of the
hospital premises and the garden
regularly.
In the year 2001-02, the staff quarters
were renovated and additional toilets were
constructed with the help of funds from
IPP-IX (World Bank assisted).
A new MCH building was constructed by
spending about Rs 6,00,000/- (rupees six
lacs). The Coorg Foundation, Pollybetta
and the SKANDA GROUP, Thithimathi,
![Page 137: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/137.jpg)
provided the fund.
2 Hospital:
Labour Room was renovated and
equipped by V.F soon after taking over.
Doppler Ultra Sound (to monitor FHS)
was a new addition to the Labour room in
the year 2001.
Operation Theatre was constructed and
equipped to do Tubectomy, Laproscopic
Sterilization and Cataract operation with
IOL insertion.
Medical Officer and Staff Nurses are
staying in HQ and available all the 24 hrs
to conduct deliveries and to attend to other
medical emergencies.
Essential drugs and Psychotropic drugs
are made available through out the year by
the Foundation.
The expenditure for supplying diet to the
in-patient is born by the SKANDA Group
of Thithimathi.
The PHC Laboratory has been declared as
Microscopy center by the RNTCP and
required renovation work was done by
them.
The Medical Officer’s quarter was
renovated by spending an amount of
Rs1,00,000/- (Rupees one laces) only of
which an amount of Rs30, 000/-(Rupees
thirty thousand) only was released by the
Health Department.
![Page 138: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/138.jpg)
3 Staff:
The Thithimathi PHC had 23 staff that did not
want to shift. There appeared to be some
unofficial promote to continue them or give
them centres of their choice. After persuasion
and discussions, the matter was solved.
Some of the staff that were unwilling to go to
other areas and wanted to continue tried to
create confusion that Govt PHC is being
privatised, etc. But soon such records were set
to rest.
We have recruited new dedicated service
minded qualified staff and posted to the
PHC. Some of volunteer from
Ramakrishna Ashrama, Mysore were
helped in all these process.
4 Equipments and Instruments:
The equipments and furniture were in bad
condition and some were condemned. They are
all in un useable condition.
All the then existing equipments and
instruments available at the PHC were
handed over to us. We took only the
functioning equipment and refused the
discarded ones. The discarded equipment
was sent back to the District office. Some
of the new equipments and furniture were
procured.
5 Documents:
There was a problem when the local staffs
were unwilling to hand over the documents.
We had to create new health records for
the PHC. And this happened only through
our frequent visit to DHO office at
Madikeri to find and get the information
(Statistics)
6 Specialist Services:
There were no specialist services in the PHC Regular Laproscopic and Tubectomy
camps are being held by qualified surgeon
Regular Dental Clinics are run by Dental
![Page 139: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/139.jpg)
House Surgeons posted by the JSS Dental
College, Mysore
Cataract Surgeries are conducted monthly
at the PHC and cases of Extra Capsular
Extraction with IOL insertion are done
free of cost. cases have been operated
successfully so far in the PHC.
A Reputed Psychiatrist from NIMHANS
is conducting Mental Health Camp every
month in the PHC.
7 Sickle Cell Anemia Screening Programme:
There was no facility of Laboratory in the PHC Tribal people suffer from a genetic
disease called Sickle Cell Anemia. Our
Laboratory is well equipped to diagnose
Sickle Cell Anemia by Turbidity test and
Electrophoresis.
8 Mental Health Programme:
To avail these services the patients needs to be
visiting to Mysore or Bangalore.
Dr.Kishore Kumar from NIMHANS,
Bangalore conducts regular mental health
camp on every 2nd
Sunday. He has trained
all the staff of the PHC so that they can
identify and follow-up the mental health
related cases. They have been told about
the myths and facts of mental illnesses.
Medical officer is given necessary
training, which is reflected in increased
diagnosis and treatment in general OPD.
At present we have around 1500
psychiatric patients. This camp is popular
not only in PHC area but also through out
![Page 140: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/140.jpg)
the Coorg district. Patient’s case profile is
computerized and proper case sheet is
maintained sub-center wise.
9 Blindness Control Programme:
To avail these services the patients needs to be
visiting to Mysore or Bangalore.
The field staff in all the villages conducts
regular screening for cataract cases. Extra
Capsular Cataract Extraction with IOL
insertion is done free of cost to all the
patients. Dr.Mahesh from Mysore and
Dr.Vijaya Rao from Bangalore conduct
surgery at the PHC every month.
10 Community Dental Health Programme
To avail these services the patients needs to be
visiting to Mysore or Bangalore.
The PHC is equipped with a dental clinic
open every day catering to the dental
needs of the population in the PHC area.
Dental house surgeons posted from JSS
Dental College as part of their rural
postings conduct the clinic regularly.
11 Ambulance Services:
There was no vehicle in the PHC including
Ambulance.
A fully equipped ambulance is available
at the PHC for various medical
emergencies, Immunization, Blindness
Control Program and Family Welfare
programmes. It also provides round-the-
clock service for the patients.
12 Interns Training Programme:
There was no such facility.
Interns are posted regularly from JSS
Medical College, Mysore and MMC
Mysore on rotation basis as part of rural
postings. They take active part in hospital
work, immunization programme and
![Page 141: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/141.jpg)
health education in schools. Besides
Primary health care, they get exposure to
community based specialized clinics on
Tuberculosis, Leprosy, Epilepsy, Mental
health, Laproscopic tubal ligation and IOL
surgeries for cataract etc.
13 Tribal ANM’s project:
One of the key innovations by KT/VF has
been the initiation of the Tribal ANM
project. Eravas, Jenukurubas,
Bettakurubas, Maley Kudiyas have been
the predominant tribes living in the area.
The project involved training the tribal
girls to improve the access of health
services to these tribal populations. Under
the IPP (IX), Tribal girls educated up to
standard VII were selected and were
trained for a period of 1year in areas of
immunisation, ANC/PNC, family
planning, reporting of communicable
diseases and referrals, health education,
school health and Anganawadi health
check-ups and the National Health
Programmes. They were later employed at
the PHC’s Thithimathi.
14
DE-ADDICTION CENTRE FOR LIFE
STYLE CHANGE
A New De-Addiction Center for Life style
change has been started with the help of
SKANDA group and the technical support
were given by Dr.K.V.Kishore Kumar
from NIMHANS, Bangalore
![Page 142: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/142.jpg)
Constraints of partnerships:
Unnecessary bureaucratic
constraints interfered with the handing
over of the PHC’s and later the smooth
running of these institutions.
Reluctance of such efforts with
private practitioners in the Taluk
head quarters.
The Governmental staffs at Thithimathi
were averse to abstain from their
positions at the PHC.
There were significant payment
delays at the District health office.
There also existed a delay in grant
approval and staff approvals, which
affected the functioning of the
institutions.
The support given to the NGO run
PHC’s towards the equipment,
medicines, training and other support
when compared to the other PHC’s run
by the Government were grossly
inadequate.
There were even efforts made towards
the withdrawal of PHC’s from the
NGO’s through resolution passed by
ZP by vested interests.
Huge financial implications as the
sharing between the Govt: NGO for the
finances were in reality 75:25 in stark
contrast to the 90:10 as agreed in the
![Page 143: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/143.jpg)
terms of the partnerships.
Prejudice and problematic practices
included numerous hindrances in
functioning due to undue interference
of the District health authorities, which
were over come in due course. A
classic example has been the force on
targets without realisation of the
CNAA. Practices by the DH authorities
prevented essential medicines to be
stored in the RCH refrigerator.
15 Mobile Health Clinic for Virajpete Taluk by
Ministry of Tribal Affairs, GOI, New Delhi
No such services earlier.
Sub-Centres with Population
Sl.
No.
Name of
SC
Distan
ce
from
PHC
Buil
ding
(Y/N
)
No.
of
villag
es Population
Eligi
ble
Coup
le
No.
of
ASH
A
No
of
Ang
anw
adi
No
of
VHS
C
No
of
SH
G
Male
Fema
le
1
Thithimathi
A Nil Y 7 918 853 280 2 3 1 2
2
Thithimathi
B 3 KM N 7 1061 1120 308 2 7 1 3
3 Matthigodu 3 Km Y 10 1023 1010 326 3 8 1 5
4 Devarapura 5 KM Y 9 959 1088 311 2 5 1 5
5 Hebbale 7 KM Y 9 1011 1001 319 3 5 1 7
6 Atthuru 9 KM N 5 1743 1743 436 4 7 1 8
Total 47 6715 6815 1980 16 35 6 30
![Page 144: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/144.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 1 1
Ii Pharmacist 1 1 x Jr. H.A (F) 6 5
Iii Staff Nurse 1 1 xi PMOA 1 1
Iv Lab. Technician 1 1 xii SDC 0 0
V FDA/Administrator 1 1 xiii Arogyamitra 1 1
Vi LHV 1 1 xiv Driver 0 0
Vii BHEO 1 1 xv Gr. D 4 4
Viii Sr. H.A. 0 0 Cook 1 1
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Male Female Children Male Female Children
Apr-11 11 7 200 222 354 2 3 0
May-11 18 25 313 278 220 1 1 1
Jun-11 10 26 284 281 377 1 1 0
Jul-11 3 7 346 370 178 1 0 0
Aug-11 3 11 300 325 415 2 3 1
Sep-11 6 13 410 426 139 1 1 0
Oct-11 13 22 338 344 312 3 3 0
Nov-11 3 9 218 202 271 5 4 2
Dec-11 3 23 262 198 92 4 4 3
Jan-12 1 10 380 280 220 3 2 0
Feb-12 12 16 235 223 407 0 0 0
Mar-12 5 6 99 101 251 15 26 6
Total 88 175 3385 3250 3236 38 48 13
![Page 145: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/145.jpg)
Details of Laboratory Services
Name of
Lab Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for
MP Test 153 148 204 264 253 170 187 194 190 200 155 169
Total PV Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Total PF Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Total Mixed
type Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
HbSAg test 32 17 30 19 21 41 38 38 24 21 18 17
Widal 3 1 0 1 2 4 2 0 0 2 1 2
VDRL 10 8 20 11 14 26 22 17 11 13 10 10
Pregnancy
Test 18 7 10 15 19 11 20 6 2 6 10 13
Hb% in PHC 74 69 84 52 59 69 74 72 64 55 44 50
TLC 20 14 9 8 9 19 14 22 13 12 8 8
DLC 20 14 9 8 9 19 14 22 13 12 8 8
ESR 20 15 10 8 9 19 14 22 13 9 8 8
Urine RE 61 39 64 26 36 63 47 43 38 25 51 37
Blood
Groping 27 16 24 22 18 20 14 23 23 89 10 16
Water Test
For H2S
Method 28 28 26 20 26 41 37 40 46 45 39 38
HIV Test
ICTC Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Bile salt 18 14 10 1 9 17 17 21 13 8 9 10
Bile pigment 18 14 10 1 9 17 17 21 13 8 9 10
Total 502 404 510 456 493 536 517 541 463 505 380 396
![Page 146: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/146.jpg)
Statistics
Sl.
No
Process
Indicators
2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 9337 13614 13784 13730 14783 13585
2 TOTAL ANC
REGISTRATI
ONS
206 310 287 326 341 279 249
3 EARLY ANC
REGISTRATI
ONS <12
WEEKS
162 175 175 257 286 279 238
% 78 56 61 79 83 100 96
4 TT
COVERAGE
ANC
190 249 270 272 294 279 246
5 TOTAL
DELIVERIES
214 200 197 202 257 237 228
6 INSTITUTION
DELIVERIES
170 171 185 197 257 237 228
7 %
INSTITUTION
AL
DELIVERIES
79 86 94 98 100 100 100
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 0 0
2 TOTAL LIVE
BIRTHS
213 199 198 201 255 237 226
3 IMR 0 20 14.13 0 11.765 16.8776 8.84
![Page 147: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/147.jpg)
V.K. Salgara
Name of the PHC : V K Salgara
Taluk : Alanda
District : Gulbarga
Population Covered : 17554
No. of Sub-Centres : 3
Staff : 17
Date of Taking over : 08.05.2005
Sl. No Before taking over After taking over
1 LAND No boundaries
Lot of weeds and inadequately
maintained.
No Fencing
Total area is 4 acres.
Cleaned-up.
Boundaries identified
Planted few trees in the campus.
Fencing work undertaken & completed
2 PHC BUILDING &
STAFF QUARTERS
No building maintenance, untidy
and dirty.
Cleaned-up the building.
We have repainted the building.
3 SUB-CENTER
BUILDINGS
Untidy and dirty
Building was vacant Cleaned-up the building.
ANM occupied the Building
Minor repair work done.
4 EQUIPMENTS Not being serviced regularly and
supply irregular. Computer, printer and tape recorder (for
IEC activities ) were supplied from KT.
Email services are being provided at the
PHC
New telephone connection is taken.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Non functional / under repair Functional
6 FURNITURE Inadequate
7 STAFF Many vacancies and poor
attendance. KT has filled up all the vacant posts.
All the staffs are staying in the head
quarters and are rendering the 24 hrs
services.
8 TRAININGS Infrequent The PHC staffs have been trained on the
following subjects:
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Bio-waste Management
9 MEDICINES &
REAGENTS
Irregular supply KT supplies the essential medicines &
other lab reagents in case of delay in govt.
![Page 148: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/148.jpg)
supply.
10 WATER &
ELECTRICITY
Poor and irregular supply We have done the minor electrical repair
work for all the buildings.
12 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards and obtained the
certificate fro the Board.
13 NEW INNOVATIONS BY KARUNA TRUST
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
area.
The PRA programme also conducted in the village levels.
Sub-Centres with Population
Sl.
No
Name of
SC
Dista
nce
from
PHC
Buil
ding
(Y/N
)
No. of
village
s Population
No.
of
ASH
A
No of
Anga
nwadi
No
of
V
HS
C
No of
SHG
Male Female
1 V.K.Salgara
Y 2 3116 2540 4 6 1 7
2 Belamagi 10km Y 5 3345 3063 4 7 2 8
3
Kamalanaga
r 11 km
Rent
ed 4 2965 2556 7 8 4 9
Total 11 9426 8159 15 21 7 24
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 3 3
Ii Pharmacist 1 1 x Jr. H.A (F) 3 3
Iii Staff Nurse 1 1 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 0 0
V
FDA/Administrator
1 1
xii
i
Arogyamitr
a 0 0
Vi LHV 1 1 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 2 2
Vii
i
Sr. H.A.
1 1
![Page 149: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/149.jpg)
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Male Female Male Female
Apr-11 26 58 344 701 4 9
May-11 27 70 370 695 2 6
Jun-11 21 28 470 787 7 10
Jul-11 22 17 515 891 3 2
Aug-11 9 23 714 924 5 6
Sep-11 11 55 714 986 7 5
Oct-11 7 39 517 798 8 7
Nov-11 9 17 740 1027 5 4
Dec-11 6 11 546 822 6 4
Jan-12 7 19 961 1251 3 10
Feb-12 5 23 842 1206 3 4
Mar-12 22 65 899 1186 5 6
Total 172 485 7632 11274 58 73
Details of Laboratory Services
Name of Lab
Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for MP
Test 285 313 305 703 357 337 290 337 302 298 292 298
Total PV 1 1 2 1 1 0 0 0 0 0 0 0
Total PF 1 1 2 1 1 0 0 0 0 0 0 0
Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg test 0 18 19 15 37 15 12 15 22 12 14 20
Widal 0 15 35 32 28 42 33 16 10 6 6 15
VDRL 25 28 12 34 24 25 60 18 28 20 10 21
Pregnancy Test 13 18 20 26 23 26 20 20 24 25 33 23
Hb% in PHC 53 54 41 81 58 83 50 59 54 58 42 32
TLC 4 8 6 7 5 10 8 5 0 0 0 0
DLC 4 8 6 7 5 10 8 5 0 0 0 0
ESR 4 8 6 7 5 10 8 5 0 0 0 0
Urine RE 47 45 48 62 52 58 60 72 84 77 45 35
Blood Groping 22 30 15 38 18 0 12 15 22 15 14 13
Water Test For
H2S Method 50 42 12 49 33 72 31 29 43 30 28 30
![Page 150: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/150.jpg)
HIV Test ICTC 7 12 8 10 20 21 0 3 31 23 14 21
Bile salt 20 27 23 18 10 30 24 15 18 15 12 13
Bile pigment 20 27 23 18 10 30 24 15 18 15 12 13
Total 558 657 583 1109 687 769 596 629 656 594 521 536
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 0 15827 16056 16680 18670 17584
2 TOTAL ANC
REGISTRATION
S
450 405 402 427 485 396 404
3 EARLY ANC
REGISTRATION
S <12 WEEKS
0 176 177 258 348 314 351
% 0 43 44 60 71 79 87
4 TT COVERAGE
ANC
0 455 446 410 395 357 447
5 TOTAL
DELIVERIES
0 239 582 354 392 383 392
6 INSTITUTION
DELIVERIES
0 136 236 295 368 360 384
7 %
INSTITUTIONA
L DELIVERIES
0 56% 50% 67% 94% 94% 98%
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 1 0 0
2 TOTAL LIVE
BIRTHS
0 238 279 344 385 377 387
3 IMR 0 46.03 23.01 37.79 25.974 15.915
1
10.41
![Page 151: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/151.jpg)
![Page 152: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/152.jpg)
Yemalur
Name of the PHC : Yemalur
Taluk : Bangalore East
District : Bangalore Urban
Population Covered : 25880
No. of Sub-Centres : 2
Staff : 7
Date of Taking over : 01.06.2004
Sl. No Before taking over After taking over
1 LAND No Land.
New land purchased with the help of local
donors
Total area is 1 acres.
Cleaned-up.
Landscaping done.
Fencing done
2 PHC BUILDING &
STAFF QUARTERS
No building KT has constructed the new PHC building
with the help of local donors.
One staff quarters also constructed in the
PHC building.
All the services were displayed in the PHC.
Name boards written.
3 SUB-CENTER
BUILDINGS
No Building KT has constructed one quarters for the
ANM in the PHC Building.
4 EQUIPMENTS Inadequate Computer, printer and tape recorder
supplied from KT.
Email services are being provided at the
PHC
Some of the essential equipments were
procured from DHO.
Tele ECG is doing in the PHC.
Lab equipments, birthing kits & IUD kits
supplied by KT
5 COLD CHAIN
EQIPMENT
Not available KT has received one refrigerator from a
donor.
6 FURNITURE Inadequate Office furniture supplied from KT (table
& chair)
Some of the equipments were received
from youth club and NGOs.
7 STAFF Newly shifted PHC KT has filled up all the staffs.
All the staffs were staying in the head
quarters and they are rendering the 24 hrs
services.
8 TRAININGS Infrequent KT has given the training to the PHC staff
on the following subjects:
![Page 153: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/153.jpg)
RCH and MCH services.
HIV/AIDS.
IEC
PHC Management
Plan and budget –Accounts
Capacity building
Mental Health
Traditional medicine
PRA
Waste Management
VRCs in Collaboration with ISRO
9 MEDICINES &
REAGENTS
Poor supply KT has also supplied the essential
medicines other than the Govt. supply.
The lab reagents were also supplied from
KT.
10 WATER &
ELECTRICITY
Not available New water and electrical connection taken.
11 WASTE
MANAGEMENT
Not implemented KT has implemented the waste
management in the PHC according to
KPCB standards.
12 NEW INNOVATION BY KARUNA TRUST:
a IEC ACTIVITIES &
PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center
level.
The PRA programme also conducted in the village levels.
b FREE EYE CAMPS Free cataract eye camps were conducted with the help of Sri. Viveka Drusti Eye
Hospital and HelpAge India.
Sub-Centres with Population
Sl.
No.
Name of
SC
Dista
nce
from
PHC
Buil
ding
(Y/N
)
No. of
villages Population
Eligi
ble
Cou
ple
No.
of
ASH
A
No of
Angan
wadi
No of
VHS
C
No
of
SHG
Male Female
1 Yemalur 0 Y 2 3165 2900 1012 0 3 0 10
2
Marathaha
lli 3kgm N 2 10137 9681 3128 0 2 0 8
Total 13302 12581 4140 0 5 0 18
![Page 154: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/154.jpg)
Staff Pattern
Sanctioned Available Sanctioned Available
I Medical Officer 1 1 ix Jr. H.A. (M) 1 1
Ii Pharmacist 1 1 x Jr. H.A (F) 2 2
Iii Staff Nurse 0 0 xi PMOA 0 0
Iv Lab. Technician 1 1 xii SDC 0 0
V FDA/Administrator 0 0 xiii Arogyamitra 0 0
Vi LHV 0 0 xiv Driver 0 0
Vii BHEO 0 0 xv Gr. D 1 1
Viii Sr. H.A. 0 0
Out-patient and In-patient details
IPD
OPD
Emergency
Male Female Children Male Female Children Male Female Children
Apr-11 0 0 0 91 54 30 1 2 0
May-11 0 0 0 67 48 52 0 0 0
Jun-11 0 0 0 96 104 68 0 0 0
Jul-11 0 0 0 126 82 48 0 0 0
Aug-11 0 1 0 123 212 68 0 1 0
Sep-11 0 0 0 131 182 29 0 0 0
Oct-11 0 0 0 132 101 69 0 0 0
Nov-11 0 0 0 174 162 31 0 2 0
Dec-11 0 4 0 63 54 61 1 1 0
Jan-12 0 0 0 102 97 18 0 1 0
Feb-12 0 2 0 103 98 54 1 1 0
Mar-12 0 2 0 108 82 40 0 0 1
Total 0 9 0 1316 1276 568 3 8 1
![Page 155: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/155.jpg)
Details of Laboratory Services
Name of
Lab Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar
Blood for
MP Test 163 170 205 172 203 226 288 250 271 257 261 257
Total PV 0 0 0 0 0 0 0 0 0 0 0 0
Total PF 0 0 0 0 0 0 0 0 0 0 0 0
HbSAg 0 0 0 0 0 0 0 0 0 0 0 0
Blood sugar 8 12 14 10 11 7 6 12 10 12 13 18
Widal 1 0 0 5 5 3 0 2 2 0 0 3
VDRL 1 4 0 2 5 3 0 2 2 0 1 0
Pregnancy
test 10 8 3 5 12 7 6 8 12 18 15 12
Hb% in PHC 16 10 10 14 14 8 22 25 24 23 20 26
TLC 0 0 0 0 0 0 0 0 0 0 0 0
DLC 0 0 0 0 0 0 0 0 0 0 0 0
ESR 2 1 2 3 0 1 3 4 1 1 0 2
Urine RE 10 6 8 10 12 6 19 22 21 20 18 21
Blood
Groping 2 5 3 4 0 6 3 10 3 4 2 3
Water Test
For H2S
Method 1 2 0 2 0 3 0 2 2 0 1 2
HIV Test
ICTC 6 8 10 8 15 8 11 3 10 8 8 11
Bile salt 2 1 3 2 4 1 2 3 1 3 2 3
Bile pigment 2 1 2 2 4 1 2 3 1 3 2 3
Total 224 228 260 239 285 280 362 346 360 349 343 361
![Page 156: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/156.jpg)
Statistics
Sl.
No
Process Indicators 2005-
06
2006-
07
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
1 POPULATION 4985 4485 5864 5820 19525 25495 25880
2 TOTAL ANC
REGISTRATIONS
125 90 165 344 341 431 490
3 EARLY ANC
REGISTRATIONS
<12 WEEKS
61 57 71 200 202 296 368
% 49 63 43 58 59 68 75
4 TT COVERAGE
ANC
125 54 152 307 453 373 441
5 TOTAL
DELIVERIES
111 27 65 252 343 406 497
6 INSTITUTION
DELIVERIES
110 27 65 251 341 403 497
7 %
INSTITUTIONAL
DELIVERIES
99% 100% 100% 99% 99% 99% 100%
Vital Indicators
1 MATERNAL
DEATHS
0 0 0 0 0 1 1
2 TOTAL LIVE
BIRTHS
111 27 65 252 343 405 499
3 IMR 0 0 0 0 0 0 2
![Page 157: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/157.jpg)
Arunachal Pradesh PHCs
Anpum
Name of the PHC : Anpum
District : L/Dibang Valley
Population Covered : 7224
No. of Sub-Centres : 3
Staff : 22
Sub-Centres with Population
Name
of SC
Distance
from PHC
Motorable/on
foot
Village
s
Populat
ion
Male Female No. of
ASHA
Eligibl
e
Coupl
e
Keba 11 km Motorable 4 1721 857 864 5 161
Pagla
m
17 km Motorable 4 1678 847 831 5 173
Bizari 16 Km Morotable 8 2003 1039 964 3 252
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 5
Staff Nurse 0 ANM at Sub Centres 5
Pharmacist 1 Health Assistant 2
Lab Technician 1 Ambulance Driver 1
Others (G-D) 5 Total 22
![Page 158: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/158.jpg)
Out-patient and In-patient details
Months OPD IPD Inpatient at
midnight
April ‘11 876 36 36
May’11 1127 90 90
June’11 1114 99 99
July’11 1057 35 35
Aug’11 989 96 96
Sep’11 1120 61 61
Oct’11 780 38 38
Nov’11 532 32 32
Dec’11 446 17 17
Jan’12 492 15 15
Feb’12 603 20 26
March’12 831 19 19
TOTAL 9967 558 564
Details of Laboratory Services
Name of
lab tests
Apr
11
Ma
y
Jun
Jul
Au
g
Sep
Oct
Nov
De
c
Ja
n
12
Fe
b
M
ar
Total
Blood for
MP test
0 140 251 199 314 265 252 172 92 84 15
2
20
9
2130
RMT done 76 62 4 3 6 0 0 0 0 0 0 0 151
Positive
cases
(slide +
RMT)
19 39 73 62 68 71 42 46 17 11 16 31 495
Total PV 3 9 14 10 10 12 10 11 4 1 5 9 98
Total PF 12 22 48 43 48 49 20 20 7 4 8 19 300
Total
mixed type
4 8 11 9 10 10 12 15 6 6 3 3 97
Blood
sugar
0 12 28 6 8 10 10 11 0 10 0 5 100
Widal test 0 68 113 62 195 170 105 53 25 9 21 35 856
VDRL test 0 8 22 9 21 17 12 12 12 17 20 9 159
Pregnancy
test
49 33 43 33 35 49 15 44 30 35 36 38 440
Hb% in
PHC 124 75 90 73 142 106 88 73 88 11
8
11
7
13
4
1228
![Page 159: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/159.jpg)
Hb% in SC 106 46 58 52 85 54 52 81 70 84 96 16
6
950
TLC 0 1 5 8 25 13 12 6 5 2 5 4 86
DLC 0 1 5 8 25 13 12 6 5 2 5 4 86
ESR 0 1 5 8 26 13 13 6 5 2 5 4 88
Urine RE 0 7 12 9 37 12 9 6 4 5 2 6 109
Stool RE 0 1 6 3 35 10 10 9 5 4 3 5 91
Blood
grouping
0 11 28 19 55 10 13 11 10 10 20 25 212
Sputum 1 1 5 3 23 8 5 4 2 2 2 4 60
Wet mount
test
0 0 0 2 22 16 9 13 10 18 20 9 119
Bameng
Name of the PHC : Bameng
District : East Kameng
Population Covered : 6979
No. of Sub-Centres : 4
Staff : 25
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Motorable/on
foot Villages Population Male Female
No. of
ASHA
Eligible
Couple
Lada 57 km On foot 20 1481 752 729 6 229
Paksa
camp 27 Km On foot 7 518 232 266 3 73
Marjingla 32 Km Motorable 4 696 347 349 4 147
Pakke 15 Km Motorable 8 872 440 432 7 137
![Page 160: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/160.jpg)
Staff pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 5
Staff Nurse 0 ANM at Sub
Centres
4
Pharmacist 1 Health Assistant 2
Lab Technician 1 Ambulance Driver 1
Others (G-D) 9 Total 25
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 912 15 21
May’11 873 15 20
June’11 917 24 14
July’11 953 37 42
Aug’11 1061 36 23
Sep’11 759 27
Oct’11 822 9 16
Nov’11 520 13 0
Dec’11 488 1 5
Jan’12 789 3 6
Feb’12 831 1 1
March’12 697 12 9
TOTAL 9622 193 157
Details of Laboratory Services
Name of lab
tests
Ap
r
11
Ma
y
11
Ju
n
11
Jul
y
11
Aug
11
Sep
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Fe
b
12
Ma
r
12
Tota
l
Blood for MP
test
35 81 43 51 41 35 96 21 6 26 33 14 482
RMT done 25 1 0 31 32 38 4 2 2 10 10 2 157
Positive cases
(slide + RMT)
16 20 13 15 10 12 24 4 0 1 6 1 122
Total PV 6 18 10 13 9 7 9 3 0 1 4 1 81
Total PF 9 2 3 2 1 5 12 0 0 0 2 0 36
Total mixed
type
1 0 0 0 0 0 3 1 0 0 0 0 5
Blood sugar 0 3 1 2 0 0 0 0 0 1 0 0 7
![Page 161: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/161.jpg)
Widal 23 23 9 42 22 36 40 9 0 11 11 13 239
VDRL 4 4 0 3 3 4 3 3 0 0 5 1 30
Pregnancy test 8 5 4 4 5 17 12 14 3 14 7 93
Hb% in PHC 37 22 12 16 13 31 22 23 22 4 33 23 258
Hb% in SC 17 19 8 16 15 10 14 17 18 6 21 13 174
TLC 0 10 0 1 0 0 0 0 0 0 3 0 14
DLC 0 10 0 1 0 0 0 3 0 0 7 10 31
ESR 0 10 0 1 0 0 0 1 0 0 7 1 20
Urine RE 1 0 0 2 2 0 3 1 0 0 0 0 9
Stool RE 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood grouping 4 4 0 4 4 0 0 0 0 1 3 1 21
Etalin
Name of the PHC : Etalin
District : Dibang Valley
Population Covered : 2402
No. of Sub-Centres : 2
Staff : 28
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Motorable/on
foot
Villag
es
Popu
lation
Mal
e
Fe
mal
e
No. of
ASHA
Eligibl
e
Coupl
e
Anelih 55 Km Half Motorable 14 492 254 238 8 63
Arzoo 35 Km Motorable 20 757 473 284 8 82
![Page 162: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/162.jpg)
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 5
Staff Nurse 0 ANM at Sub
Centres
6
Pharmacist 1 Health Assistant 3
Lab
Technician
1 Ambulance Driver 1
Others (G-D) 9 Total 28
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 752 18 236
May’11 779 19 146
June’11 795 16 144
July’11 824 32 154
Aug’11 62 12 239
Sep’11 872 28 151
Oct’11 817 16 178
Nov’11 465 15 168
Dec’11 563 9 90
Jan’12 452 11 100
Feb’12 480 9 80
March’12 616 14 88
TOTAL 7477 199 1774
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Ju
n
11
July
11
A
ug
11
Se
p
11
Oc
t
11
Nov
11
De
c
11
Ja
n
12
Fe
b
12
M
ar
12
Total
Blood for MP test 112 85 77 185 62 18
5
10
0
102 94 77 62 71 1212
RMT done 30 41 41 54 66 25 24 18 7 13 13 14 346
Positive cases
(slide + RMT)
46 32 16 64 16 35 25 30 14 12 10 13 313
Total PV 19 23 11 28 10 16 7 13 2 7 5 5 146
Total PF 18 19 3 28 6 12 12 13 9 1 4 5 130
Total mixed type 9 0 2 8 0 7 6 4 3 4 1 4 48
Blood sugar 11 13 3 5 1 6 3 12 9 6 5 4 78
Widal 29 36 11 102 27 78 80 24 32 19 26 31 495
VDRL 10 8 0 7 7 12 2 4 7 4 5 5 71
![Page 163: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/163.jpg)
Pregnancy test 12 10 4 10 26 13 3 6 18 4 17 12 135
Hb% in PHC 59 101 20 92 54 96 87 74 93 75 42 65 858
Hb% in SC 10 24 7 28 24 15 27 20 35 32 12 20 254
TLC 26 30 6 54 25 65 51 42 36 18 24 29 406
DLC 26 30 6 54 25 65 51 42 36 18 24 29 406
ESR 26 30 6 54 25 65 51 42 36 18 24 29 406
Urine RE 16 22 5 22 16 15 07 15 11 5 10 7 151
Stool RE 13 0 0 0 0 0 0 1 0 0 1 2 17
Blood grouping 8 20 2 30 18 15 3 4 13 8 6 15 142
Sputum 11 2 2 5 1 3 1 0 2 2 0 2 31
Wet mount test 0 3 2 1 2 9 2 1 4 4 3 1 32
Jeying
Name of the PHC : Jeying
District : Upper Siang
Population Covered : 3278
No. of Sub-Centres : 3
Staff : 20
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Motorable/on
foot
Villag
es
Popu
lation
Mal
e
Fe
mal
e
No. of
ASHA
Eligibl
e
Coupl
e
Bine 50 Km Motorable 2 277 151 126 1 29
Sibuk 55 Km Motorabe 2 900 462 438 2 90
Pongging 22 Km Foot 1 212 108 104 1 9
![Page 164: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/164.jpg)
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 4
Staff Nurse 0 ANM at Sub Centres 4
Pharmacist 1 Health Assistant 2
Lab Technician 1 Ambulance Driver 1
Others (G-D) 6 Total 20
Radiographer 0
Out-patient and In-patient details
Months OPD IPD Emergency
April 11 191 3 85
May 11 162 13 62
June 11 367 23 66
July 11 303 36 91
August 11 372 36 109
Sept 11 351 17 68
Oct 11 382 17 87
Nov 11 233 11 83
Dec 11 232 12 54
Jan 12 161 7 36
Feb 12 306 8 100
March 12 192 1 65
TOTAL 3252 184 906
![Page 165: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/165.jpg)
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Ju
n
11
Jul
y
11
Au
g
11
Se
p
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Feb
12
Ma
r
12
Total
Blood for MP test 19 25 44 46 69 56 45 41 33 58 56 40 532
RMT done 17 15 42 57 35 36 20 9 15 7 6 5 264
Positive cases
(slide + RMT)
4 8 8 34 18 14 12 2 3 2 5 2 112
Total PV 0 4 0 2 2 7 3 0 1 1 1 2 23
Total PF 2 4 8 27 15 5 7 2 1 1 4 0 76
Total mixed type 2 0 0 5 1 2 2 0 1 0 0 0 13
Blood sugar 0 0 0 0 0 0 0 0 0 0 0 2 2
Widal 0 3 8 25 17 7 10 2 1 4 13 6 96
VDRL 0 3 4 3 1 2 0 0 0 2 2 1 18
Pregnancy test 1 4 5 10 3 8 7 7 0 0 11 10 66
Hb% in PHC 35 27 57 73 56 54 45 41 35 56 47 26 552
Hb% in SC 6 4 19 22 4 31 8 5 0 0 0 6 105
TLC 0 0 0 0 2 0 1 0 0 0 2 1 6
DLC 7 15 7 25 10 2 3 2 0 5 3 2 81
ESR 0 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 0 1 0 2 0 2 1 1 0 2 1 2 12
Stool RE 50 0 0 0 0 0 0 2 0 0 0 0 52
Blood grouping 0 0 0 0 0 2 52 2 0 3 1 1 61
Sputum 0 0 0 0 0 0 0 0 1 1 0 0 2
Wet mount test 0 0 0 0 0 0 0 0 0 2 1 1 4
![Page 166: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/166.jpg)
Khimiyong
Name of the PHC : Khimiyong
District : Changlang
Population Covered : 3829
No. of Sub-Centres : 2
Staff : 21
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Motorable/on
foot
Villag
es
Popu
lation
Mal
e
Fe
mal
e
No. of
ASHA
Eligibl
e
Coupl
e
Yanam 20 km Motorable 5 941 485 456 4 66
Jongji Havi 21 km Motorable 5 1217 598 619 5 122
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 3
Staff Nurse 1 ANM at Sub
Centres
4
Pharmacist 1 Health Assistant 2
Lab Technician 1 Ambulance Driver 1
Others (G-D) 6 Total 21
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 526 2 26
May’11 683 12 7
June’11 792 1 37
July’11 679 7 33
Aug’11 845 4 14
Sep’11 756 5 10
Oct’11 701 2 37
Nov’11 583 0 12
Dec’11 458 2 14
Jan’12 334 1 13
Feb’12 376 0 10
March’12 450 2 19
TOTAL 7183 38 232
![Page 167: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/167.jpg)
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Ju
n
11
Jul
y
11
Aug
11
Sep
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Fe
b
12
Ma
r
12
Tota
l
Blood for MP test 28 40 37 55 21 34 0 0 0 2 6 12 235
RMT done 19 26 20 46 44 17 0 8 10 7 9 12 218
Positive cases
(slide + RMT)
12 34 18 26 18 9 0 0 1 3 4 2 127
Total PV 6 19 9 18 14 5 0 0 1 0 2 2 76
Total PF 6 15 9 6 4 4 0 0 0 3 1 0 48
Total mixed type 0 0 0 2 0 0 0 0 0 0 1 0 3
Blood sugar 0 0 0 0 10 6 0 0 0 0 0 0 16
Widal 9 10 9 27 20 2 0 0 0 2 2 2 83
VDRL 4 5 2 3 10 5 2 4 0 1 9 3 48
Pregnancy test 8 6 3 4 13 13 6 10 11 7 10 3 94
Hb% in PHC 34 19 17 22 40 31 16 8 11 8 17 7 230
Hb% in SC 28 13 13 15 30 25 12 3 5 7 89 5 245
TLC 0 0 0 0 10 6 2 4 8 1 9 3 43
DLC 0 0 0 0 10 6 2 4 8 1 2 3 36
ESR 0 0 0 0 10 0 0 0 0 0 2 0 12
Urine RE 0 0 3 1 1 0 0 0 0 0 0 0 5
Stool RE 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood grouping 4 5 5 4 10 6 3 4 8 1 9 4 63
Sputum 0 0 0 0 0 1 0 0 0 0 1 0 2
Wet mount test 0 0 0 0 7 6 3 0 0 1 9 4 30
Mengio
Name of the PHC : Mengio
District : Papum Pare
Population Covered : 4386
No. of Sub-Centres : 3
Staff : 21
![Page 168: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/168.jpg)
Sub-Centres with Population
Name of
SC
Distanc
e from
PHC
Motorable/
on foot
Village
s
Popul
ation
Mal
e
Fe
ma
le
No.
of
ASH
A
Eligi
ble
Coup
le
Kamrung 14 km motorable 11 740 335 405 11 88
Nyopang 55 Km On foot 7 815 344 421 7 122
Pilla 65 Km On foot 4 334 150 185 4 44
Staff Pattern
Category Category
Doctor 2 ANM at PHC 5
Staff Nurse 1 ANM at Sub Centres 3
Pharmacist 1 Health Assistant 2
Lab Technician 1 Ambulance Driver 1
Others (G-D) 5 Total 21
Out-patient and In-patient details
Months OPD IPD Emergenc
y
April ‘11 482 9 0
May’11 459 3 0
June’11 569 25 0
July’11 665 33 1
Aug’11 617 10 10
Sep’11 481 10 9
Oct’11 262 3 3
Nov’11 317 6 55
Dec’11 333 1 62
Jan’12 298 4 84
Feb’12 294 8 47
March’12 342 14 60
TOTAL 5119 126 331
![Page 169: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/169.jpg)
Details of Laboratory Services
Name of lab
tests
Ap
r
11
Ma
11
Ju
n
11
Jul
y
11
Aug
11
Sep
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Fe
b
12
Ma
r
12
Tota
l
Blood for MP
test
35 81 43 51 41 35 96 21 6 26 33 14 482
RMT done 25 1 0 31 32 38 4 2 2 10 10 2 157
Positive cases
(slide + RMT)
16 20 13 15 10 12 24 4 0 1 6 1 122
Total PV 6 18 10 13 9 7 9 3 0 1 4 1 81
Total PF 9 2 3 2 1 5 12 0 0 0 2 0 36
Total mixed type 1 0 0 0 0 0 3 1 0 0 0 0 5
Blood sugar 0 3 1 2 0 0 0 0 0 1 0 0 7
Widal 23 23 9 42 22 36 40 9 0 11 11 13 239
VDRL 4 4 0 3 3 4 3 3 0 0 5 1 30
Pregnancy test 8 5 4 4 5 17 12 14 3 14 7 93
Hb% in PHC 37 22 12 16 13 31 22 23 22 4 33 23 258
Hb% in SC 17 19 8 16 15 10 14 17 18 6 21 13 174
TLC 0 10 0 1 0 0 0 0 0 0 3 0 14
DLC 0 10 0 1 0 0 0 3 0 0 7 10 31
ESR 0 10 0 1 0 0 0 1 0 0 7 1 20
Urine RE 1 0 0 2 2 0 3 1 0 0 0 0 9
Stool RE 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood grouping 4 4 0 4 4 0 0 0 0 1 3 1 21
Sangram
Name of the PHC : Sangram
District : Kurung Kumey
Population Covered : 6320
No. of Sub-Centres : 3
Staff : 25
![Page 170: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/170.jpg)
Sub-Centres with Population
Name of SC Distance
from
PHC
Motorable/on
foot
vill
age
s
Popu
latio
n
Male Femal
e
No. of
ASHA
Eligible
Couple
Pagba 16 Km Motorable 6 608 298 310 5 73
Leel 14 Km Motorable 13 1515 710 789 13 201
O' Point 6 Km Motorable 6 1162 566 598 6 156
Staff Pattern
Category Nos. Category Nos.
Doctor 1 ANM at PHC 4
Staff Nurse ANM at Sub Centres 6
Pharmacist 1 Health Assistant 1
Lab Technician 1 Ambulance Driver 1
Others (G-D) 9 Total 25
Radiographer 1
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 1062 47 53
May’11 1150 41 66
June’11 1299 44 64
July’11 1488 87 30
Aug’11 1415 50 47
Sep’11 1551 98 45
Oct’11 682 19 14
Nov’11 962 25 28
Dec’11 655 12 30
Jan’12 801 22 25
Feb’12 705 18 113
March’12 910 36 91
TOTAL 12680 499 606
![Page 171: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/171.jpg)
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Jun
11
Jul
y
11
Au
g
11
Sep
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Fe
b
12
M
ar
12
Tota
l
Blood for MP test 2 116 105 73 118 216 47 84 22 1 24 75 883
RMT done 21
1
32 26 123 30 0 0 0 9 19 26 29 505
Positive cases
(slide + RMT)
52 21 21 24 12 14 0 2 0 1 8 5 160
Total PV 16 15 15 12 5 13 0 2 0 1 4 1 84
Total PF 23 3 4 10 7 1 0 0 0 0 4 3 55
Total mixed type 13 3 2 2 0 0 0 0 0 0 0 1 21
Blood sugar 12 4 0 4 15 31 0 0 2 2 11 1 82
Widal 89 38 38 137 102 0 0 0 2 9 46 10
6
567
VDRL 1 8 15 6 20 1 3 7 1 0 7 11 80
Pregnancy test 13 14 24 19 29 18 8 28 11 30 10 18 222
Hb% in PHC 38 52 82 113 102 153 44 67 49 56 62 73 891
Hb% in SC 26 30 56 86 30 65 34 44 42 36 44 33 526
TLC 8 6 9 13 14 53 5 12 6 0 19 40 185
DLC 8 6 9 16 14 53 5 12 6 0 19 40 188
ESR 0 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 0 12 12 4 18 12 0 8 2 0 8 10 86
Stool RE 0 0 3 0 0 0 0 0 0 0 3 2 8
Blood grouping 5 17 15 9 56 14 0 11 2 5 5 24 163
Sputum 5 3 5 1 14 2 7 6 2 0 1 3 49
Wet mount test 0 0 0 0 0 9 1 0 3 0 1 0 14
![Page 172: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/172.jpg)
Wakka
Name of the PHC : Wakka
District : Tirap
Population Covered : 11770
No. of Sub-Centres : 2
Staff : 21
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Motorable/on
foot
Villag
es
Popul
ation
Mal
e
Fema
le
No. of
ASHA
Eligibl
e
Coupl
e
Nginu 26 Km Motorable 5 5293 2721 2572 6 665
Khanu 24 Km Motorable 3 2256 1104 1152 4 267
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 4
Staff Nurse 2 ANM at Sub
Centres
4
Pharmacist 1 Health Assistant 2
Lab
Technician
1 Ambulance Driver 1
Others (G-D) 8 Total 21
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 1486 10 5
May’11 1483 6 6
June’11 2016 20 5
July’11 2321 24 10
Aug’11 2077 23 3
Sep’11 2499 40 8
Oct’11 1784 30 6
Nov’11 982 10 2
![Page 173: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/173.jpg)
Dec’11 1101 8 3
Jan’12 862 10 9
Feb’12 963 4 14
March’12 1162 12 10
TOTAL 18736 197 81
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Ju
n
11
Ju
ly
11
Au
g
11
Se
p
11
Oc
t
11
No
v
11
Dec
11
Ja
n
12
Fe
b
12
Ma
r
12
Tota
l
Blood for MP test 0 1 19 30 33 49 63 22 8 2 7 1 235
RMT done 33 52 32 45 64 86 12 0 0 1 3 2 330
Positive cases
(slide + RMT)
7 5 2 3 2 10 7 1 0 0 0 0 37
Total PV 0 3 2 2 2 10 6 1 0 0 0 0 26
Total PF 5 2 0 1 0 0 1 0 0 0 0 0 9
Total mixed type 2 0 0 0 0 0 0 0 0 0 0 0 2
Blood sugar 0 0 0 0 0 0 0 0 0 0 2 0 2
Widal 0 22 28 53 82 50 0 0 0 1 5 1 242
VDRL 0 7 12 28 5 7 11 2 4 0 0 0 76
Pregnancy test 34 15 18 43 14 26 10 6 8 20 19 15 228
Hb% in PHC 34 43 60 62 75 68 36 10 28 21 22 19 478
Hb% in SC 24 22 11 17 4 22 7 2 7 12 2 13 143
TLC 0 0 0 0 2 1 34 0 3 3 1 0 44
DLC 0 1 11 0 7 3 4 0 4 3 1 0 34
ESR 0 5 12 4 15 14 4 0 4 1 0 0 59
Urine RE 0 4 26 82 70 57 29 4 27 7 20 5 331
Stool RE 0 0 0 1 1 2 1 0 0 0 0 0 5
Blood grouping 0 18 15 44 29 8 14 3 19 6 13 5 174
Sputum 0 4 12 9 2 7 3 5 7 0 1 2 52
Wet mount test 2 0 0 8 5 5 5 7 5 5 2 5 49
![Page 174: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/174.jpg)
Walong
Name of the PHC : Walong
District : Anjaw
Population Covered : 2167
No. of Sub-Centres : 2
Staff : 17
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Motorable/on
foot
Villag
es
Popu
lation
Mal
e
Fe
mal
e
No. of
ASHA
Eligibl
e
Coupl
e
Yasong 21 Km Motorable 10 518 256 262 8 62
Kibithoo 85 Km Motorable 10 1180 425 755 6 137
Staff Pattern
Category Nos. Category Nos.
Doctor 1 ANM at PHC 4
Staff Nurse 0 ANM at Sub
Centres
4
Pharmacist 1 Health Assistant 0
Lab Technician 1 Ambulance Driver 1
Others (G-D) 5 Total 17
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 596 4 5
May’11 596 17 5
June’11 586 6 5
July’11 791 20 5
Aug’11 951 25 10
Sep’11 638 12 17
Oct’11 534 3 5
Nov’11 418 10 2
Dec’11 368 12 2
Jan’12 382 6 4
![Page 175: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/175.jpg)
Feb’12 423 6 2
March’1
2
417 4 1
TOTAL 6700 125 63
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Jun
11
Jul
y
11
Au
g
11
Se
p
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Fe
b
12
Ma
r
12
Tota
l
Blood for MP test 1 43 31 10 20 17 6 13 18 11 35 29 234
RMT done 15 22 28 64 11 3 9 1 0 1 1 0 155
Positive cases
(slide + RMT)
6 9 8 21 2 0 1 0 0 0 0 0 47
Total PV 1 2 2 11 1 0 1 0 0 0 0 0 18
Total PF 2 7 6 7 1 0 0 0 0 0 0 0 23
Total mixed type 3 0 0 3 0 0 0 0 0 0 0 0 6
Blood sugar 2 7 6 1 7 3 1 2 2 1 8 5 45
Widal 7 21 20 25 40 11 6 11 7 9 19 25 201
VDRL 3 5 4 7 5 2 2 7 3 0 6 4 48
Pregnancy test 13 10 13 8 21 9 5 17 10 12 9 4 131
Hb% in PHC 12 26 18 17 34 10 11 19 10 5 38 30 230
Hb% in SC 6 7 8 13 8 2 1 3 0 3 1 0 52
TLC 0 4 1 0 14 6 4 12 5 0 13 8 67
DLC 1 7 4 1 20 7 5 12 5 0 13 8 83
ESR 1 3 5 1 19 3 0 1 0 0 1 1 35
Urine RE 2 7 10 11 22 5 4 3 2 1 2 6 75
Stool RE 0 0 0 0 0 0 0 0 0 0 1 1 2
Blood grouping 4 9 6 12 45 81 3 9 3 3 8 6 189
Sputum 0 0 1 0 3 1 0 1 1 0 2 3 12
Wet mount test 3 4 4 7 0 0 2 7 3 0 5 0 35
![Page 176: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/176.jpg)
Tuting
Name of the PHC : Tuting
District : Upper Saing
Population Covered : 8643
No. of Sub-Centres : 5
Staff : 23
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 3
Staff Nurse 0 ANM at Sub
Centres
4
Pharmacist 1 Health Assistant 4
Lab Technician 1 Ambulance Driver 1
Others (G-D) 7 Total 23
Out-patient and In-patient details
Months OPD IPD Emergen
cy
April ‘11 1270 26 30
May’11 1264 8 40
June’11 1678 33 26
July’11 1633 19 73
Aug’11 1617 19 86
Sep’11 1178 20 83
Oct’11 1055 22 53
Nov’11 927 10 50
Dec’11 902 7 40
Jan’12 981 6 28
Feb’12 754 9 20
March’12 1032 35 15
TOTAL 14291 214 544
![Page 177: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/177.jpg)
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Ju
n
11
Ju
ly
11
Au
g
11
Sep
11
Oct
11
No
v
11
De
c
11
Ja
n
12
Feb
12
Ma
r
12
Total
Blood for MP test 63 109 494 30
9
320 140 113 60 32 77 51 0 1768
RMT done 25 96 167 19
2
120 0 19 13 18 39 38 29 756
Positive cases
(slide + RMT)
2 31 41 68 74 13 12 11 8 15 11 7 293
Total PV 1 13 22 29 32 7 6 7 6 7 2 5 137
Total PF 1 17 14 24 29 5 5 0 0 5 6 0 106
Total mixed type 0 1 5 15 13 1 1 4 2 3 3 2 50
Blood sugar 0 4 9 6 5 6 5 0 2 4 7 0 48
Widal 18 9 46 40 85 63 44 26 22 34 19 0 406
VDRL 8 13 17 9 17 19 8 5 7 11 18 0 132
Pregnancy test 3 13 15 18 16 15 14 9 15 16 31 15 180
Hb% in PHC 11 28 37 30 26 23 11 9 14 28 21 0 238
Hb% in SC 2 5 7 4 7 2 2 2 4 0 9 7 51
TLC 1 6 12 9 5 2 3 1 0 1 1 0 41
DLC 1 6 13 10 6 2 3 1 0 1 1 0 44
ESR 2 10 13 10 5 2 2 1 0 1 1 0 47
Urine RE 1 4 13 10 4 2 1 1 1 0 5 0 42
Stool RE 0 0 0 0 0 0 0 0 1 0 0 0 1
Blood grouping 4 4 28 20 20 10 4 0 7 12 17 0 126
Sputum test 6 12 15 10 14 13 5 0 4 16 4 0 99
Wet mount test 0 0 0 0 0 0 0 0 0 0 0 0 0
![Page 178: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/178.jpg)
Deomali
Name of the PHC : Deomali
District : Tirap
Population Covered :14309
Staff :23
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 3
Staff Nurse 0 ANM at Sub
Centres
4
Pharmacist 1 Health Assistant 4
Lab
Technician
1 Ambulance Driver 1
Others (G-D) 7 Total 23
Out-patient and In-patient details
Months OPD IPD Emergency
Aug’11 1730 46 265
Sep’11 1745 47 229
Oct’11 1447 14 268
Nov’11 1009 20 305
Dec’11 1227 9 264
Jan’12 768 9 75
Feb’12 652 0 48
March’1
2
954 1 34
TOTAL 9532 146 1488
![Page 179: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/179.jpg)
Details of Laboratory Services
Name of lab tests Aug
11
Sep
11
Oct
11
Nov
11
Dec
11
Jan
12
Feb
12
Mar
12
Tot
al
Blood for MP test 90 157 48 84 61 57 0 9 506
RMT done 187 94 58 47 38 16 35 82 557
Positive cases
(slide + RMT)
97 37 6 13 12 16 2 16 199
Total PV 20 7 0 9 5 4 1 7 53
Total PF 65 28 6 4 7 12 1 7 130
Total mixed type 12 2 0 0 0 0 0 2 16
Blood sugar 4 0 2 2 2 3 0 0 13
Widal 0 370 83 98 109 78 15 72 825
VDRL 0 8 7 10 22 6 4 26 83
Pregnancy test 21 16 14 19 14 11 7 23 125
Hb% 20 39 29 46 72 46 17 60 329
TLC 0 0 37 19 10 12 4 41 123
DLC 0 0 37 19 10 12 4 41 123
ESR 0 0 39 6 10 12 4 41 112
Urine RE 4 51 52 20 36 11 8 55 237
Stool RE 0 0 0 0 0 0 0 2 2
Blood grouping 0 23 22 24 37 3 9 41 159
![Page 180: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/180.jpg)
Meghalaya PHCs
Mawlong
Name of the PHC : Mawlong
District : East Khasi Hills
Population Covered : 3689
No. of Sub-Centres : 2
Staff : 17
Date of Taking over : 02.03.2009
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 3
Staff Nurse 2 ANM at Sub
Centres
2
Pharmacist 1 Health Assistant 0
Lab Technician 1 Ambulance Driver 1
Others (G-D) 5 Total 17
Out-patient and In-patient details
Months OPD IPD Emergenc
y
April ‘11 853 14 24
May’11 931 19 30
June’11 982 20 26
July’11 1014 15 28
Aug’11 853 12 33
Sep’11 786 12 36
Oct’11 1070 14 36
Nov’11 1288 28 43
Dec’11 1052 10 16
![Page 181: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/181.jpg)
Jan’12 1150 12 148
Feb’12 1041 20 145
March’1
2
1009 18 206
TOTAL 12029 194 771
Details of Laboratory Services
Name of lab tests Ap
r
11
Ma
y
11
Jun
11
Jul
11
Au
g
11
Sep
11
Oc
t
11
Nov
11
De
c
11
Ja
n
12
Feb
12
Ma
r
12
Tota
l
Blood for MP test 60 112 116 36 85 125 62 154 73 92 102 107 1124
Positive cases 5 4 5 2 7 4 3 10 4 1 3 2 50
Total PV cases 2 0 2 0 0 1 1 3 1 0 2 0 12
Total PF cases 3 4 3 2 5 2 2 6 3 0 1 2 33
Total mixed 0 0 0 0 2 1 0 1 0 1 0 0 5
RMT Done 13 22 24 14 43 42 27 51 48 27 23 28 362
PV cases 1 0 1 0 0 1 1 2 1 0 1 0 8
PF cases 3 2 2 2 2 1 1 4 2 0 1 1 21
Mixed cases 0 0 0 0 2 1 0 1 0 1 0 0 5
Blood sugar 0 0 0 0 0 0 0 0 0 3 7 7 17
Widal 36 73 75 15 29 77 38 47 19 32 48 57 546
VDRL 9 20 23 8 9 47 17 14 8 17 19 21 212
Pregnancy test 15 16 5 6 11 10 6 5 5 5 9 11 104
Blood grouping 6 6 3 4 7 25 4 4 5 6 9 8 87
Hb% 45 26 18 13 12 94 57 78 71 10
2
107 114 737
TLC 42 26 17 13 10 66 38 72 54 32 27 30 427
DLC 42 25 17 13 10 65 38 72 54 32 27 30 425
ESR 43 42 46 13 20 72 39 76 54 35 31 34 505
Urine RE 20 37 31 11 19 48 17 41 25 31 23 26 329
Sputum 25 30 46 26 30 26 16 46 29 21 16 37 348
Stool RE 0 1 0 0 0 0 0 0 6 8 7 7 29
Wet mouth test 0 0 0 0 0 0 0 0 1 5 7 7 20
![Page 182: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/182.jpg)
Mawsahew
Name of the PHC : Mawsahew
District : East Khasi Hills
Population Covered : 3297
No. of Sub-Centres : 3
Staff : 22
Date of Taking over : 03.03.2009
Sub-Centres with Population
Name of
SCs
Distanc
e from
PHC
Motorabl
e/on foot
Trekking
hrs from
PHC
vill
age
s
Popu
lation
Mal
e
Fe
mal
e
No.
of
ASH
A
No of
school
s
Wakhaliar 3 Motorable - 4 762 367 395 4 91
Rumnong 25 On foot 3.5 hours 8 470 250 220 2 47
Mawphu 40 On foot 7 hours 5 1188 562 626 3 154
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 2
Staff Nurse 2 ANM at Sub Centres 6
Pharmacist 1 Health Educator 1
Lab Technician 1 Ambulance Driver 1
Others (G-D) 6 Total 22
![Page 183: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/183.jpg)
Out-patient and In-patient details
Months OPD IPD Emergency
April ‘11 996 14 42
May’11 849 27 57
June’11 706 26 42
July’11 903 33 40
Aug’11 846 29 45
Sep’11 837 24 50
Oct’11 680 17 30
Nov’11 584 9 28
Dec’11 559 4 25
Jan’12 681 8 25
Feb’12 718 8 20
March’12 899 25 40
TOTAL 9258 221 444
![Page 184: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/184.jpg)
Details of Laboratory Services
Name of lab tests Ap
r
11
M
ay
11
Ju
n
11
Jul
11
Aug
11
Se
p
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Fe
b
12
M
ar
12
Total
Blood for MP test
Slide+RMT
27 44 34 124 68 94 1 21 51 14 0 23 501
Total Positive cases 0 1 0 0 0 0 1 2 0 0 0 0 4
Total PV cases 0 1 0 0 0 0 0 0 0 0 0 0 1
Total PF cases 0 0 0 0 0 0 1 0 0 0 0 0 1
Total mixed 0 0 0 0 0 0 0 2 0 0 0 0 2
Blood sugar 0 0 0 0 0 0 0 0 0 0 0 0 0
Widal 7 16 10 26 35 32 3 5 3 7 6 24 174
VDRL 8 8 3 13 14 13 0 2 3 8 6 8 86
Pregnancy test 12 6 5 6 12 6 2 4 2 4 15 3 77
Blood grouping 5 6 2 14 14 13 5 4 0 5 10 7 85
Hb% 10
0
97 45 88 100 70 21 20 29 26 40 60 698
Hb test done in SC 4 3 2 3 1 2 3 1 0 0 0 0 19
TLC 11 14 9 13 12 16 4 6 1 1 6 16 109
DLC 7 8 8 10 9 12 4 6 1 1 6 16 88
ESR 8 7 6 8 10 12 4 3 1 1 6 15 85
Urine RE 19 12 8 21 15 21 6 11 19 13 21 15 181
Sputum 7 11 0 4 12 7 0 1 0 1 0 0 43
Stool RE 2 0 0 2 0 0 0 1 0 0 0 0 5
![Page 185: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/185.jpg)
Umtrai
Name of the PHC : Umtrai
District : Ri Bhoi
Population Covered : 4361
No. of Sub-Centres : 1
Date of Taking over : 01.09.2009
Out-patient and In-patient details
Months OPD IPD Emergenc
y
April ‘11 675 3 0
May’11 637 22 8
June’11 681 17 6
July’11 774 44 20
Aug’11 640 13 2
Sep’11 462 16 5
Oct’11 621 15 1
Nov’11 337 6 5
Dec’11 510 12 15
Jan’12 504 16 30
Feb’12 570 29 29
March’1
2
773 39 20
TOTAL 7184 232 141
![Page 186: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/186.jpg)
Details of Laboratory Services
Name of lab tests Ap
r
11
M
ay
11
Jun
11
Jul
11
Au
g
11
Se
p
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Feb
12
Ma
r
12
Tota
l
Blood for MP test 40 72 109 109 81 77 68 46 41 47 45 108 843
Total Positive
cases
2 11 13 14 5 5 1 2 0 1 2 2 58
Total PV cases 1 1 0 2 0 0 0 0 0 0 0 0 4
Total PF cases 1 10 13 12 5 5 1 2 0 1 2 2 54
Total mixed 0 0 0 0 0 0 0 0 0 0 0 0 0
Blood sugar 18 21 31 12 18 13 12 5 18 7 9 10 174
Widal 5 5 14 15 8 8 7 5 5 5 8 11 96
VDRL 16 7 11 10 8 11 16 3 12 4 6 6 110
Pregnancy test 9 8 10 14 9 10 6 6 6 10 7 12 107
Blood grouping 17 7 10 3 18 12 12 3 12 4 7 7 112
Hb% 56 54 80 71 57 55 50 49 45 57 77 62 713
Hb done in SC 0 0 0 0 0 0 0 0 0
TLC 12 17 31 26 14 18 20 15 15 17 29 24 238
DLC 12 17 31 26 14 18 20 15 15 17 29 24 238
ESR 6 7 16 23 14 16 20 15 21 17 31 24 210
Urine RE 26 26 32 15 15 13 14 17 21 7 18 17 221
Sputum 0 0 0 0 0 0 0 0 0 0 0 0 0
Stool RE 9 5 13 12 5 5 5 3 4 4 5 7 77
![Page 187: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/187.jpg)
Aradonga
Name of the PHC : Aradonga
District : West Khasi Hills
Population Covered : 12041
No. of Sub-Centres : 2
Date of Taking over : 01.06.2011
Sub-Centres with Population
Name of SC Distanc
e from
PHC
Motorable/
on foot
Villa
ges
Populat
ion
Male Female No. of
ASHA
Eligibl
e
Couple
Mallangoko
na
22 KM Motorable 16 3137 1579 1558 15 950
Tyanghor 18 KM Tracking 16 3028 1565 1463 16 1120
Out-patient and In-patient details
Months OPD IPD Emergency
June’11 343 56 15
July’11 540 150 72
Aug’11 357 58 41
Sep’11 618 22 25
Oct’11 651 28 69
Nov’11 630 30 17
Dec’11 553 25
Jan’12 520 22 30
Feb’12 573 40 35
March’12 846 35 66
TOTAL 5631 466 239
Details of Laboratory Services
![Page 188: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/188.jpg)
Name of lab tests Ju
n
10
Jul
10
Au
g
10
Sep
10
Oct
10
Nov
10
Dec
09
Ja
n
10
Feb
10
Mar
10
Total
Blood for MP test 0 0 0 0 0 25 92 80 165 203 566
Total Positive cases 0 0 0 0 0 2 0 16 12 26 56
Total PV cases 0 0 0 0 0 0 0 0 0 1 1
Total PF cases 0 0 0 0 0 2 20 16 12 25 75
Total mixed 0 0 0 0 0 0 0 0 0 0 0
RMT Done 85 288 99 130 120 86 0 30 48 130 1016
PV cases 19 16 50 3 4 0 0 1 0 1 94
PF cases 21 95 49 70 64 38 0 29 48 25 439
Mixed cases 0 8 4 6 6 6 0 0 0 0 30
Total Positive cases
(slide + RMT)
40 119 103 79 74 46 20 46 60 52 639
Blood sugar 0 5 1 0 1 0 0 0 163 0 170
Widal 0 24 11 3 10 0 4 4 9 15 80
VDRL 0 0 0 0 0 0 16 29 36 24 105
Pregnancy test 7 8 10 11 22 12 0 25 29 20 144
Blood grouping 0 1 12 13 1 9 0 24 32 22 114
Hb% 0 25 23 53 73 80 102 78 106 155 695
TLC 0 0 0 0 0 0 0 6 3 3 12
DLC 0 0 0 0 0 0 0 6 3 3 12
ESR 1 0 0 0 0 0 0 8 15 18 42
Urine RE 10 12 0 11 18 7 0 25 23 17 123
![Page 189: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/189.jpg)
Warmawsaw
Name of the PHC : Warmawsaw
District : Ri Bhoi
Population Covered : 7201
No. of Sub-Centres : 1
Staff : 16
Date of Taking over : 01.06.2011
Staff Pattern
Category Nos. Category Nos.
Doctor 2 ANM at PHC 2
Staff Nurse 2 ANM at Sub Centres 2
Pharmacist 1 Accountant 1
Lab Technician 1 Ambulance Driver 1
Others (G-D) 5 Total 16
Out-patient and In-patient details
Months OPD IPD Inpatient
at
midnight
Minor
OT
Injection Casualty/E
mergency
Referra
l
June 2011 322 07 03 06 143 9 05
July 2011 577 28 07 12 143 9 05
August 11 674 36 06 10 232 17 Nil
Sept 11 524 23 05 5 300 19 02
Oct 11 570 26 16 5 500 52 0
Nov 11 411 14 8 4 396 32 0
Dec 11 375 23 26 14 103 35 0
Jan 12 431 24 10 5 39 19 0
Feb 12 346 18 7 5 19 15 0
March 12 506 13 7 2 145 59 0
TOTAL 4736 212 95 68 2020 266 12
![Page 190: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/190.jpg)
Details of Laboratory Services
Name of lab tests Jun
11
Jul
11
Au
g
11
Sep
11
Oct
11
Nov
11
Dec
11
Ja
n
12
Fe
b
12
Mar
12
Total
Blood for MP test 150 253 347 157 300 156 211 41 35 82 1732
Total Positive cases 15 30 31 14 34 21 10 4 1 1 161
Total PV cases 5 13 17 4 8 0 0 0 0 0 47
Total PF cases 10 17 0 0 26 21 10 4 1 1 90
Total mixed 0 0 0 0 0 0 0 0 0 0 0
RMT Done 0 6 35 19 40 42 10 16 5 1 174
Widal 11 13 33 65 25 23 28 8 6 20 232
VDRL 03 2 6 16 0 0 2 1 0 14 44
Pregnancy test 03 2 12 06 9 9 10 11 4 9 75
Blood grouping 0 0 4 12 1 2 3 4 0 11 37
Hb% 18 37 25 41 42 29 39 37 26 58 352
TLC 0 1 4 19 2 5 4 4 4 32 75
DLC 0 1 4 19 4 5 4 4 4 32 77
ESR 0 1 4 27 3 5 4 4 4 32 84
Urine RE 0 0 1 17 12 7 11 8 3 18 77
Sputum 0 0 0 28 0 0 0 0 0 0 28
Stool RE 0 0 0 06 0 0 1 0 3 13 25
Wet mount Test 0 0 0 0 1 1 1 1 0 0 4
![Page 191: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/191.jpg)
Jirang
Name of the PHC : Jirang
District : Ri Bhoi
Population Covered : 6443
No. of Sub-Centres : 0
Date of Taking over : 01.06.2011
Out-patient and In-patient details
Months OPD IPD Emergency
June 11 603 0 0
July11 673 0 0
Aug 11 447 0 0
Sep 11 417 0 4
Oct 11 1022 20 14
Nov 11 402 20 4
Dec 11 344 6 0
Jan 12 226 5 13
Feb 12 309 11 0
Mar 12 367 9 10
TOTAL 4810 71 41
Details of Laboratory Services
Name of lab tests Jun
11
Jul
11
Aug
11
Sep
11
Oct
11
Nov
11
Dec
11
Ja
n
12
Fe
b
12
M
ar
12
Total
Blood for MP test 0 46 19 30 54 58 96 76 76 69 524
Total Positive cases 0 19 12 08 8 4 6 1 3 3 64
Total PV cases 0 4 6 05 0 0 2 0 0 1 18
Total PF cases Nil 12 5 2 8 4 4 1 3 2 41
Total mixed Nil 3 1 1 0 0 0 0 0 0 5
RMT Done Nil 46 27 30 32 18 25 20 12 12 222
![Page 192: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/192.jpg)
PV cases Nil 4 6 5 0 0 2 0 0 1 18
PF cases Nil 13 5 2 8 4 4 1 3 2 42
Mixed cases Nil 2 1 2 0 0 0 0 0 0 5
Total positive cases
(slide + RMT)
0 38 24 17 16 8 12 2 6 6 129
Blood sugar Nil 0 - 0 0 0 0 0 0 0 0
Widal 0 0 0 0 6 5 24 14 18 12 79
VDRL 0 0 0 0 0 3 4 5 8 4 24
Pregnancy test 0 0 0 0 2 4 4 7 7 8 32
Blood grouping 0 2 3 0 5 2 2 0 8 4 26
Hb% 0 2 0 0 56 66 101 84 92 82 483
TLC 0 0 0 0 2 3 12 12 16 12 57
DLC 0 0 0 0 4 6 7 10 8 6 41
ESR 0 0 0 0 0 4 5 6 6 5 26
Urine RE 0 0 0 0 2 4 7 5 11 14 43
![Page 193: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/193.jpg)
Manipur PHCs
Tousem
Name of the PHC : Tousem
District : Tamenglong
Population Covered : 15962
No. of Sub-Centres : 4
Staff : 20
Sub-Centres with Population
Name of
SC
Distance
from
PHC
Road
condition
No of
village
s
Popul
ation
Building Labour
room
Eligibl
e
Coupl
e
Aben 24 km Motorable 13 3924 Govt. Yes 521
Atengba 290 km Partial
Motorable
10 4473 Dilapidated
Govt. building
Nil 670
Namtiram 240 km Motorable 6 1565 No Govt.
building
Nil 264
Taningjan 270 km Partial
Motorable
8 3108 No Govt.
building
Nil 498
Staff Pattern
Category
Doctor 2
Staff Nurse 2
Pharmacist 1
Lab Technician 1
Others (G-D) 4
![Page 194: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/194.jpg)
Out-patient and In-patient details
Months OPD IPD Emergenc
y
May’11 248 6 Nil
June’11 313 2 Nil
July’11 246 14 Nil
Aug’11 257 14 Nil
Sep’11 225 18 1
Oct’11 280 4 Nil
Nov’11 274 7 1
Dec’11 435 0 0
Jan’12 503 15 9
Feb 12 366 0 3
Mar 12 431 6 4
TOTAL 3578 101 18
ANM at PHC 2
ANM at Sub
Centres
7
Ambulance
Driver
1
Total 20
![Page 195: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/195.jpg)
Details of Laboratory Services
Name of lab tests Ma
y
11
Ju
n
11
Jul
y
11
Au
g
11
Sep
11
Oct
11
Nov
11
De
c
11
Ja
n
12
Fe
b
12
Ma
r
12
Total
Blood for MP test 4 10 6 1 15 9 10 8 11 4 8 86
RMT done 4 10 31 28 24 6 5 18 11 9 8 154
Positive cases
(slide + RMT)
0 0 6 5 6 2 0 0 1 2 2 24
Total PV 0 0 1 3 3 2 0 0 0 0 0 9
Total PF 0 0 5 2 3 0 0 0 1 2 2 15
Total mixed type 0 0 0 0 0 0 0 0 0 0 0 0
Blood sugar 0 0 9 1 1 1 2 0 0 0 1 15
Widal 0 2 22 18 16 6 0 3 4 1 6 77
VDRL 0 0 0 5 0 8 0 7 7 3 2 32
Pregnancy test 8 2 6 3 9 8 2 15 7 4 9 73
Hb% in PHC 8 2 6 4 15 8 2 13 10 3 4 75
Urine RE 0 2 2 1 9 9 2 0 8 0 2 35
Stool RE 0 0 0 0 0 0 0 12 0 0 0 12
Blood grouping 8 2 9 4 4 4 2 7 9 3 3 55
![Page 196: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/196.jpg)
Borobekra
Name of the PHC : Borobekra
District : Imphal East
Population Covered : 9072
No. of Sub-Centres : 3
Staff : 15
Date of Taking over : 01.05.2011
Sub-Centres with Population
Name of
SC
Distance
from PHC
Motorable
/on foot
Popul
ation
Eligible
couple
Building Labour
room
No of
staff
posted
Bhutankhal 3 km Motorable 2122 367 Rented Nil 2 ANMs
Jagradhor 4 km Motorable 1433 212 Rented Nil 2 ANMs
Durgapur 7 km Motorable 3432 631 Govt.
building
Nil 2 ANMs
Staff Pattern
Category
Doctor 2
Staff Nurse 2
Pharmacist 1
Lab Technician 1
Others (G-D) 2
ANM at PHC 1
ANM at Sub
Centres
5
Ambulance Driver 1
Total 15
![Page 197: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/197.jpg)
Out-patient and In-patient details
Months OPD IPD Emergency
May’11 230 0 11
June’11 557 Nil 27
July’11 612 20 34
Aug’11 652 Nil 32
Sep’11 687 15 Nil
Oct’11 564 5 23
Nov’11 659 6 12
Dec’11 454 2 5
Jan’12 316 7 11
Feb 12 440 4 8
March 12 672 6 42
TOTAL 5843 65 205
Details of Laboratory Services
Name of lab tests Ma
y
11
Ju
n
11
Jul
y
11
Au
g
11
Se
p
11
Oc
t
11
No
v
11
De
c
11
Ja
n
12
Feb
12
Mar
12
Tota
l
Blood for MP test 0 1 0 12 4 0 0 27 20 18 20 102
RMT done 0 48 90 83 18 28 13 12 10 14 20 336
Positive cases
(slide + RMT)
0 7 11 7 3 28 8 2 0 0 0 66
Total PV 0 0 4 4 3 12 3 2 0 0 0 29
Total PF 0 7 7 2 0 16 5 0 0 0 0 37
Total mixed type 0 0 0 1 0 0 0 0 0 0 0 1
Blood sugar 0 20 2 3 0 5 0 0 15 3 0 48
Widal 0 17 38 31 15 4 3 14 20 22 29 193
VDRL 0 3 4 3 0 0 0 2 3 4 4 23
Pregnancy test 0 1 0 3 18 7 15 12 15 26 27 124
Hb% in PHC 0 44 17 45 20 14 16 33 15 25 17 246
Hb% in SC 0 0 13 0 0 0 0 5 4 0 00 9
TLC 0 0 0 0 0 0 0 5 1 0 0 6
![Page 198: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/198.jpg)
Patpuihmun
Name of the PHC : Patpuihmun
District : Churachandpur
No. of Sub-Centres : 7
Staff : 15
Sub-Centres with Population
Name of SC Distance
from PHC
Motorable/on
foot
Building Labour
room
Elect
ricity
Phailientangpunjee 95 km Motorable Nil Nil Yes
Buangmun 82 km Motorable Nil Nil Yes
Shivapurikhal 70 km Motorable Govt. Building Nil Yes
Chingmun 115 km 10 km trekking Nil Nil Nil
L. Kharkhuplien 35 km Trekking Nil Nil Nil
Kangreng 30 km Trekking Nil Nil Nil
Ngampabung 25 km Trekking Nil Nil Nil
Staff Pattern
Category
Doctor 1
Staff Nurse 3
Pharmacist 1
Lab Technician 1
Others (G-D) 3
ANM at PHC 4
ANM at Sub Centres 2
DLC 0 0 0 0 0 0 0 5 1 0 0 6
ESR 0 7 0 0 0 0 0 9 1 0 0 10
Urine RE 0 0 0 0 0 0 0 12 2 1 0 15
Blood grouping 0 0 48 0 0 0 1 18 9 15 8 99
![Page 199: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/199.jpg)
Health Assistant 0
Ambulance Driver 0
Total 15
Out-patient and In-patient details
Months OPD IPD Emergency
Oct’11 395 5 10
Nov’11 252 4 5
Dec’11 237 6 4
Jan’12 210 16 75
Feb 12 76 9 14
Mar 12 97 0 0
TOTAL 1267 40 108
Details of Laboratory Services
Name of lab tests Oct
11
Nov
11
Dec
11
Jan
12
Feb
12
Mar
12
Total
Blood for MP test 0 0 0 0 15 0 15
RMT done 17 14 11 13 0 12 67
Positive cases
(slide + RMT)
0 0 0 0 15 0 15
Blood sugar 5 0 0 0 0 0 5
Widal 2 2 7 0 5 0 16
VDRL 0 0 0 0 2 0 2
Pregnancy test 4 7 2 4 0 3 20
Hb% in PHC 10 13 5 3 0 0 31
Blood grouping 5 5 0 0 0 0 10
![Page 200: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/200.jpg)
Orissa PHCs
Ganjam District
Alasu
Name of the PHC : Alasu
Taluk : Jagannathprasad
District : Ganjam
Population Covered : 20690
No. of Sub-Centres : 3
Staff : 7
Date of Taking over : 17.10.09
Sub-Centres with Population
Sl.
No
Name of
SC
Distance
from PHC
Building
(Y/N)
No. of
villages
Pop
ulati
on
Eligible
Couple
No. of
ASHA
No of
AW
W
No
of
VH
SC
No
of
SH
G
Male Female
I ALASU 1 KM NO 18 3388 2687 1098 5 9 1 24
Ii KADUA 3 KM NO 18 4344 2905 1248 6 12 1 25
Iii RAUTI 5 KM NO 12 4179 3187 1320 8 12 1 22
Staff Pattern
Sl.No Designation Sanctioned Available
i Medical
Officer
1 1
ii Pharmacist 1 1
iii ANM 1 1
iv Lab.
Technician
1 1
v PHC
Coordinator
1 1
vi AYUSH 1 1
vii Attendant 1 1
![Page 201: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/201.jpg)
Out-patient and In-patient details
OPD
Male Female
April 2010 287 245
May 416 314
Jun 428 343
Jul 556 379
Aug 470 382
Sep 549 374
Oct 689 568
Nov 743 615
Dec 719 582
January 2011 512 582
Feb 649 533
Mar 879 619
TOTAL 6897 5536
Details of Laboratory Services
Name of lab
tests
Apr
‘10 May June Jul Aug Sep Oct Nov Dec
Jan
‘11 Feb Mar
Total
Blood for
MP test
53 77 74 76 88 78 88 84 79 89 82 98 966
Positive
cases (slide +
RMT)
2 3 2 3 4 7 8 7 3 3 4 3 49
Total PV 0 0 0 1 0 0 0 1 0 0 0 0 2
Total PF 2 3 2 2 4 7 8 6 3 3 4 3 47
Blood sugar 6 5 6 17
Hb% in PHC 45 60 49 60 69 80 61 47 70 78 72 65 756
TLC 51 52 50 50 70 75 63 45 78 82 65 72 753
DLC 51 52 50 50 70 75 63 45 78 82 65 72 753
ESR 0 0 0 0 0 0 0 0 0 0 0 0 0
Urine RE 48 59 60 56 60 86 50 40 80 75 68 80 762
CT BT Time 5 4 3 7 8 7 0 0 10 12 13 14 83
![Page 202: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/202.jpg)
Manitara
Name of the PHC : Manitara
Taluk : Buguda
District : Ganjam
Population Covered : 21644
No. of Sub-Centres : 3
Staff : 6
Date of Taking Over : 04.10.2008
Sub-Centres with Population
Sl.
No
.
Name of SC Distan
ce
from
PHC
Buildin
g (Y/N)
No. of
village
s
Population Eligib
le
Coupl
e
No.
of
ASH
A
No
of
Ang
anw
adi
No
of
VHS
C
No
of
SH
G
Male Femal
e
I Manitara SC 0 Y 7 3637 3310 1293 8 9 1 16
Ii Kanakuturu 7 Y 4 3161 3179 985 6 8 1 16
Iii Golabandha 14 Y 6 3147 3147 1100 4 11 1 22
Staff Pattern
Designation Sanctioned Available
i Medical Officer 1 1
ii Pharmacist 1 1
iii ANM 1 1
iv Lab. Technician 1 1
v PHC Coordinator 1 1
vii Attendant 1 1
![Page 203: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/203.jpg)
Out-patient and In-patient details
IPD OPD
Male Female Male Female
April 2010 0 1 218 237
May 1 1 231 251
Jun 2 1 488 358
Jul 0 0 697 600
Aug 2 0 240 346
Sep 2 1 486 690
Oct 2 1 654 400
Nov 0 1 499 531
Dec 1 1 697 756
January 2011 1 0 698 620
Feb 1 0 773 699
Mar 0 1 596 876
TOTAL 9 8 6277 6364
Details of Laboratory Services
Name of
lab tests
Apr
‘10 May June Jul Aug Sep Oct Nov Dec
Jan
‘11 Feb Mar
Total
Blood for
MP test 48 42 43 87 53 40 45 40 25 54 18 44 539
Positive
cases
(slide +
RMT)
Total PV 7 0 0 2 1 0 10
Total PF 7 7 1 1 0 2 1 3 1 0 2 4 29
Total
mixed type
HIV tests
Positive
Blood
sugar 7 3 10 4 2 8 6 12 7 7 14 15 95
![Page 204: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/204.jpg)
Widal 0 0 0 0 0 0 0 0 0 0 0 0 0
VDRL 2 1 3 0 2 0 0 0 0 19 0 0 27
Pregnancy
test 6 5 9 5 4 10 10 12 12 10 21 16 120
Hb% in
PHC 26 25 45 32 32 30 33 30 30 38 42 40 403
TLC 18 13 18 6 8 20 18 14 14 22 19 28 198
DLC 20 19 20 15 15 18 21 20 20 25 25 25 243
ESR 7 6 15 3 2 10 9 10 10 12 13 15 112
Urine RE 8 5 10 4 2 10 6 12 12 7 15 14 105
Blood
grouping 7 4 46 10 8 8 4 12 12 15 22 19 167
Rapid test
for HIV 0 0 0 0 0 0
CT BT
Time 2 0 0 2 2 2 1 0 9
Others 2 2 2 3 8 10 5 5 37
Rahada
Name of the PHC : Rahada
Taluk : Khallikote
District : Ganjam
Population Covered : 28864
No. of Sub-Centres : 4
Staff : 6
Date of Taking over : 01.10.2008
![Page 205: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/205.jpg)
Sub-Centres with Population
Sl.
No. Name of SC
Dista
nce
from
PHC
Build
ing
(Y/N)
No. of
village
s Population
Eligibl
e
Coupl
e
No.
of
ASH
A
No of
Anga
nwadi
No
of
VHS
C
No of
SHG
Male Female
I Angargaon 4 Y 13 5545 5342 1783 8 13 1 2
Ii Sandhamula 1 N 7 2755 2338 850 4 6 1 1
Iii Sankuda 6 Y 4 2546 2620 872 5 6 1 2
Iv Talasara 3 Y 9 3968 3750 1225 5 8 1 2
Staff Pattern
Sanctioned Available
i Medical
Officer
1 1
ii Pharmacist 1 1
iii Staff Nurse 1 1
iv Lab.
Technician
1 1
v PHC
Coordinator
1 1
vii Attendant 1 1
Out-patient and In-patient details
IPD OPD EMERGENCY
Male Female Male Female Male Female
April 2010 2 1 524 602 1 1
May 9 8 566 597 0 1
Jun 18 22 599 681 1 0
Jul 21 18 1020 968 1 1
Aug 14 17 751 902 1 2
Sep 8 6 745 805 1 0
Oct 5 7 740 632 1 1
Nov 7 9 643 650 0 1
Dec 6 8 650 750 1 2
January 2011 8 11 980 1003 1 0
Feb 7 11 994 888 1 1
Mar 8 10 920 1006 1 2
TOTAL 113 128 9132 9484 10 12
![Page 206: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/206.jpg)
Details of Laboratory Services
Name of lab
tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb. Mar. Total
Blood for Mp
test 43 61 40 119 85 79 50 35 42 38 50 41
Total PV 2 7 1 1 2 2 0 0 0 0 0 0
Total PF 1 1 60 14 7 6 2 3 4 3 3 0
Blood sugar 2 3 3 3
Widal 10 15 7 11 4 0
Hb% in PHC 8 12 21 32 13 21 6 11 19 14 14 11 182
TLC 54 68 76 115 57 65 46 77 57 60 61 55 791
DLC 54 68 76 116 58 65 46 77 57 61 61 55 794
ESR 19 27 32 34 11 19 15 29 18 18 17 18 257
Urine RE 16 20 31 34 16 18 29 22 28 35 26 275
Others(BS/BP) 6 16 8 10 2 10 2 10 4 2 6 6 82
Goudagotha
Name of the PHC : Goudagotha
Taluk : Surada
District : Ganjam
Population Covered : 15279
No. of Sub-Centres : 2
Staff : 7
Date of Taking over : 12.09.2008
Sub-Centres with Population
Sl.
No. Name of SC
Dista
nce
from
PHC
Build
ing
(Y/N)
No. of
village
s
Popu
latio
n
Eligibl
e
Couple
No.
of
ASH
A
No
of
Ang
anw
adi
No
of
VH
SC
No
of
SHG
Male Female
I Goudagotha 0 Y 43 4400 4500 1530 7 11 19 59
Ii Merikote 18 Y 33 3427 3301 1450 7 10 13 38
![Page 207: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/207.jpg)
Staff Pattern
Sanctioned Available
i Medical
Officer
1 1
ii Pharmacist 1 1
iii ANM 1 1
iv Lab.
Technician
1 1
v PHC
Coordinator
1 1
vi AYUSH 1 1
vii Attendant 1 1
Out-patient and In-patient details
IPD OPD EMERGENCY
Male Female Male Female Male Female
April 2010 17 10 379 335 2 0
May 10 15 325 350 1 2
Jun 5 17 290 313 1 0
Jul 13 12 450 476 0 1
Aug 8 7 380 365 1 1
Sep 0 0 465 420 2 2
Oct 0 0 529 445 1 1
Nov 0 0 585 442 2 1
Dec 0 0 485 538 1 1
January 2011 0 0 642 565 1 0
Feb 0 0 492 484 1 0
Mar 5 8 539 409 1 1
TOTAL 58 69 5561 5142 14 10
![Page 208: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/208.jpg)
Details of Laboratory Services
Name of lab
tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb. Mar. Total
Blood for
MP test 210 212 126 140 152 64 130 76 109 94 100 82 1495
Positive
cases (slide +
RDK) 4 14 10 5 11 3 7 3 6 8 10 5 86
Total PV 1 2 2 1 2 0 1 0 1 2 0 0 12
Total PF 3 12 8 4 9 3 6 3 5 6 10 5 74
Pregnancy
test 7 4 3 5 4 5 5 5 5 6 4 53
Hb% in PHC 28 22 24 22 90 30 27 18 23 21 23 18 346
TLC 12 5 15 8 5 2 6 4 8 6 8 5 84
DLC 25 18 20 18 85 8 16 14 22 20 22 15 283
ESR 8 8 8 5 4 4 5 5 8 12 9 5 81
Urine RE 32 28 25 31 20 26 27 17 17 27 17 15 282
Blood
grouping 5 5 6 0 13 0 6 35
CT BT Time 5 3 2 2 3 5 0 7 7 6 40
Others Stool 4 5 4 3 0 0 4 4 4 7 4 5 44
![Page 209: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/209.jpg)
Baranga
Name of the PHC : Baranga
Taluk : Patrapur
District : Ganjam
Population Covered : 24871
No. of Sub-Centres : 5
Staff : 6
Date of Taking over : 01.10.2008
District: Kandhmal
Lankagarh Name of the PHC : Lankagarh Taluk : Tumudibandha District : Kandhamal Population Covered : 7500 No. of Sub-Centres : 1 Staff : 3
Staff Pattern
Sl.No Designation Sanctioned Available
i Medical Officer 1 0
ii Pharmacist 1 0
iii ANM 1 0
iv Lab. Technician 1 0
v PHC Coordinator 1 1
vi AYUSH 1 1
vii Attendant 1 1
![Page 210: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/210.jpg)
Out-patient details
OPD Diarrhea & dehydration
cases
Jan 12 265 4
Feb 12 452 31
Mar 12 608 15
Khamankholo
Name of the PHC : Khamankholo Taluk : Barakhama District : Kandhamal Population Covered : 7842 No. of Sub-Centres : 2 Staff : 4
Staff Pattern
Sl.No Designation Sanctioned Available
i Medical Officer 1 0
ii Pharmacist 1 1
iii ANM 1 0
iv Lab. Technician 1 0
v PHC Coordinator 1 1
vi AYUSH 1 1
vii Attendant 1 1
![Page 211: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/211.jpg)
Out-patient details
OPD
Jan 12 302
Feb 12 607
Mar 12 511
Sudra
Name of the PHC : Sudra Taluk : Barakhama District : Kandhamal Population Covered : 6580 No. of Sub-Centres : 1 Staff : 4
Staff Pattern
Sl.No Designation Sanctioned Available
i Medical Officer 1 0
ii Pharmacist 1 1
iii ANM 1 0
iv Lab. Technician 1 0
v PHC Coordinator 1 1
vi AYUSH 1 1
vii Attendant 1 1
![Page 212: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/212.jpg)
Out-patient details
OPD Diarrhea & dehydration
cases
Jan 12 676 4
Feb 12 716 12
Mar 12 886 13
Sindhrigaon
Name of the PHC : Sindhrigaon Taluk : Barakhama District : Kandhamal Population Covered : 8907 No. of Sub-Centres : 2 Staff : 6
Staff Pattern
Sl.No Designation Sanctioned Available
i Medical Officer 1 1
ii Pharmacist 1 1
iii ANM 1 0
iv Lab. Technician 1 1
v PHC Coordinator 1 1
vi AYUSH 1 1
vii Attendant 1 1
![Page 213: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/213.jpg)
Out-patient details
OPD Diarrhea & dehydration
cases
Jan 12 143
Feb 12 1003 125
Mar 12 1177 60
Sunagaon
Name of the PHC : Sunagaon Taluk : Tumudibandha District : Kandhamal Population Covered : 5949 No. of Sub-Centres : 2 Staff : 4
Staff Pattern
Sl.No Designation Sanctioned Available
i Medical Officer 1 0
ii Pharmacist 1 1
iii ANM 1 0
iv Lab. Technician 1 0
v PHC Coordinator 1 1
vi AYUSH 1 1
vii Attendant 1 1
![Page 214: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/214.jpg)
Out-patient details
OPD Diarrhea & dehydration
cases
Jan 12 114 14
Feb 12 501 52
Mar 12 781 60
Andhra Pradesh PHCs
Gadiguda
Name of the PHC: Gadiguda
Taluk : Utanoor
Name of
Lab Test
Apr-
11 May Jun Jul Aug Sep Oct Nov Dec
Jan-
12 Feb Mar Total
Blood for
MP Test 139 150 268 330 150 420 404 200 255 170 119 200 2805
Total PV 0
Total PF 2 1 3
Total
Mixed type 0
Hbs ag test 18 21 21 24 19 21 19 19 12 18 15 15 222
Widal 3 3 2 8
VDRL 4 1 5
Pregnancy
Test 18 21 17 24 19 21 19 19 12 18 15 15 218
TLC 13 16 18 22 20 20 21 20 11 15 15 15 206
DLC 0
ESR 0
Urine RE 18 21 21 24 19 21 19 19 12 18 15 15 222
Blood
Groping 10 7 9 9 7 8 8 8 8 8 7 89
Water Test
For H2S
Method 0
HIV Test
ICTC 3 3 4 3 4 4 3 24
Bile salt 0
Bile
pigment 0
Total 223 239 345 433 241 515 496 288 314 251 190 267 3802
![Page 215: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/215.jpg)
District : Adilabad
Sub-Center with population
Sl.
No
.
Name of
SC
Distan
ce
from
PHC
Building
(Y/N)
No. of
village
s
Population Eligib
le
Coupl
e
No. of
ASH
A
No of
Angana
wadi
No
of
VHS
C
No
of
SH
G Mal
e
Femal
e
I Gadhiguda Yes 16
7000 7240 12530
2 10 2 10
Ii Mediguda 7 Kms
Under
Construc
tion 13 2 10 2 9
Iii Paraswada
12
Kms
Under
Construc
tion 17 2 9 2 11
National Health Programmes
Sl
No. Programs April May June July Aug Sep Oct Nov Dec Jan Feb. Mar. Total
MALARIA
No of fever
cases identified 139 150 268 330 150 420 404 220 255 160 119 200 2815
No. of blood
smear slides 139 150 268 330 150 420 404 220 255 160 119 200 2815
Slides sent to
PHC 100 100 200 230 100 320 300 120 200 100 80 150 2000
No.of Positive
cases 2 1 3
Of malaria 2 1 3
Tuberculosis: 0
No.of cases
Registered from
beginning 1 2 2 5
No.of newly
detected cases
this year 1 2 2 5
No.of newly
detected cases
during month 1 2 2 5
No.of cases on
treatment 1 2 2 5
HIV / AIDS: 0
![Page 216: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/216.jpg)
No. of
awareness
programs
conducted 4 3 2 2 4 5 5 3 3 4 2 2 39
No. of cases
suspected and
referred 2 4 1 3 2 3 2 1 18
No. of cases
confirmed 1 1
Lingapura
Name of the PHC: Lingapura
Taluk : Utnoor
District : Adilabad
Sub-Center with population
Sl
.
N
o.
Name of
SC
Distanc
e from
PHC
Building
(Y/N)
No. of
village
s
Population Eligib
le
Coup
le
No
. of
AS
H
A
No of
Angan
awadi
No
of
VHS
C
No of
SHG Mal
e
Femal
e
I Lingapur No 16
6000 6302 1076
5 8 2 10
Ii Kothapally 8 Kms
Old
Building 10 1 7 2 8
Ii
i
Gumnoor
(B) 7 Kms
Under
Construc
tion 14 2 5 1 5
![Page 217: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/217.jpg)
Laboratory details
Name of Lab
Test Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
Blood for MP
Test 255 200 175 120 130 457 546 430 375 255 184 250 3377
Total PV 1 1 2
Total PF 1 4 9 2 2 18
Total Mixed
type 0
Hbs ag test 13 16 16 15 14 13 20 14 13 20 19 23 196
Widal 5 3 8 3 4 5 6 4 38
VDRL 6 2 4 2 4 3 2 23
Pregnancy Test 13 16 16 15 14 13 20 14 13 20 19 23 196
Hb% in PHC 10 12 12 9 11 11 12 9 11 11 12 12 132
TLC 13 16 13 11 14 9 14 13 14 21 17 20 175
DLC 0
ESR 0
Urine RE 13 16 13 8 14 13 20 14 13 20 19 23 186
Blood Groping 13 10 10 7 6 5 11 9 11 12 12 11 117
Water Test For
H2S Method 0
HIV Test ICTC 8 6 6 4 4 5 3 4 8 6 5 59
Bile salt 0
Bile pigment 0
Total 338 298 261 190 212 530 670 510 462 378 297 373 4519
National Health Programmes
Sl
No. Programs
Ap
r May Jun July Aug Sep Oct Nov Dec Jan Feb. Mar. Total
MALARIA
No of fever
cases identified 255 200 175 120 130 457 546 430 375 255 184 250 3377
No. of blood
smear slides 255 200 175 120 130 457 546 430 375 255 184 250 3377
Slides sent to
PHC 200 150 80 80 70 300 446 330 300 200 100 190 2446
No.of Positive
cases 1 4 10 2 17
Of malaria 1 4 10 2 17
Tuberculosis: 0
![Page 218: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC](https://reader034.vdocuments.site/reader034/viewer/2022042110/5e8b597fb91e4f062d3e6b91/html5/thumbnails/218.jpg)
No.of cases
Registered from
beginning 2 2 4
No.of newly
detected cases
this year 2 2 4
No.of newly
detected cases
during month 2 2 4
No.of cases on
treatment 2 2 4
HIV / AIDS: 0
No. of
awareness
programs
conducted 3 4 6 3 4 5 3 2 2 32
No. of cases