annexure state-wise report of primary health centres 2011-2012 - karuna … · 2015-09-24 · 12...

218
Annexure State-wise Report of Primary Health Centres 2011-2012

Upload: others

Post on 28-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Annexure

State-wise Report of Primary Health Centres

2011-2012

Page 2: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Karnataka

Anegundi

Name of the PHC : Anegundi

Taluk : Gangavathi

District : Koppal

Population Covered : 26210

No. of Sub-Centres : 5

Staff : 23

Date of Taking over : 20.05.2005

Sl.

No

Before taking over After taking over

1 LAND Lot of weeds and

inadequately

maintained.

No Fencing

Total area is 1 acre.

Cleaned-up.

KT has started a demo garden and

nursery for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair

works and Irregular

maintenance.

Cleaned-up and renovated the

building.

Citizen Charter displayed.

Sign-boards written.

MO quarters and Nurse Quarters

were renovated & occupied by our

staff.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings and were

unoccupied

Cleaned-up the building.

Our ANMs occupied the Building

Only 3 sub centers with building.

We are looking for 2 sub centre

building location & construction

of the proposed Sub-center

building upon receipt of the funds.

4 EQUIPMENTS Supply irregular.

Maintenance poor

Computer, printer and tape

recorder (for IEC activities)

supplied from KT.

Email services are being provided

at the PHC

Some of the essential equipments

were procured from DHO also.

We have supplied equipments for

Page 3: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

preparation of traditional

medicine.

Village Resource Centers were

started in collaboration with

ISRO.

Tele conference and Tele –ECG

facilities are available in the PHC.

1 baby warmer is available

The lab equipments , birthing kits

& IUD kits were also supplied

from KT

5 COLD CHAIN

EQIPMENT

Not Maintained Functional

6 FURNITURE Inadequate Office furniture supplied from

KT (table & chair etc)

7 STAFF Many vacant posts and

poor attendance.

KT has filled up all the staffs.

All the staffs are staying in the

head quarters and rendering 24 hrs

services.

ADDITIONAL

STAFF

Not available PMOA and Arogyamitra

appointed by Karuna Trust

8 TRAININGS Infrequent KT has trained the PHC staff on

the following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

Participatory Rural Appraisal

Bio-waste Management

VRCs in Collaboration with ISRO

9 MEDICINES &

REGENTS

Irregular supply KT supplies additional if required.

The lab regents (not available

from DHO store, were also

supplied from KT.

Refrigerator is purchased from

ARS

10 WATER &

ELECTRICITY

Poor and irregular

supply.

New water connection taken from

the Gram panchayat.

Minor electrical repair work for all

the buildings were taken up

Page 4: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

12 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC

according to KPCB standards and

obtained the KPCB certificate.

13 AMBULANCE Not available KT has provided an ambulance

through CSR from JSW Jindal

14 NEW INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES

& PRA

PROGRAM

IEC activities were organized in all the sub-center areas

through a special Van.

The PRA programmes were also conducted at the village

levels.

b TRADITIONAL

MEDICINE

PROGRAM

We have integrated the use of traditional medicine in to

Primary Health care.

Sub-Centres with Population

Sl.

No Name of SC

Distanc

e from

PHC

Build

ing

(Y/N)

No.

of

villa

ges Population

Eligibl

e

Coupl

e

No.

of

AS

HA

No

of

Ang

anw

adi

No

of

V

HS

C

No

of

SH

G

Male Female

1 Anegundi 0 YES 5 1991 20158 623 2 7 3 26

2 Sanapura 10 YES 5 2071 1991 609 1 7 5 10

3 Mallapura 6 NO 3 3019 2483 825 5 8 4 15

4

Basavandurag

a 4 YES 5 1288 1059 352 1 5 2 8

5 Vadarahatti 20 NO 4 5170 4980 1522 9 12 1 30

Total 40 22 13539 30671 3931 18 39 15 89

Staff Pattern

Sanctione

d Available

Sanctioned Available

Page 5: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD OPD EMERGENCY

Male Female Male Female Male Female

April 2011 13 26 461 426 1 0

May 12 21 514 496 1 1

Jun 13 21 648 662 0 0

Jul 14 33 845 869 1 2

Aug 11 24 783 909 0 3

Sep 10 25 851 786 2 0

Oct 13 21 782 742 2 2

Nov 9 15 892 812 1 0

Dec 7 17 747 727 0 0

January 2012 14 15 827 698 1 0

Feb 10 19 798 699 0 1

Mar 14 22 651 601 1 0

TOTAL 140 259 8799 8427 10 9

1 Medical Officer 2 1 9 Jr.H.A. (M) 5 5

2 Pharmacist 1 1 10 Jr.H.A (F) 5 5

3 Staff Nurse 1 1 11 PMOA 0 1

4 Lab. Technician 1 1 12 SDC 0 0

5 FDA/Administrator 1 1 13 Arogyamitra 0 1

6 LHV 0 0 14 Driver 1 1

7 BHEO 1 1 15 Gr. D 3 3

8 Sr. H A 1 1

Page 6: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of

lab tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Blood for

MP test 430 568 635 728 636 661 565 632 558 523 561 439

Positive

cases (slide

+ RMT) 0 0 3 3 1 0 1 0 0 0 0 0 8

Total PV 2 0 3 1 1 0 1 0 0 0 0 0 8

Total PF 0 0 0 2 0 0 0 0 0 0 0 0 2

Total mixed

type 0 0 0 0 0 0 0 0 0 0 0 0 0

HIV tests 47 1 40 23 16 21 57 79 35 44 50 31 444

Positive 3 0 0 0 0 0 1 0 0 0 0 0 4

Blood sugar 13 14 9 7 13 16 16 4 13 0 6 17 128

Widal 13 14 9 17 17 13 20 26 12 12 25 16 194

VDRL 22 6 9 9 3 6 21 32 6 4 14 35 167

Pregnancy

test 18 21 17 21 18 17 17 22 11 14 18 14 208

Hb% in PHC 27 36 23 18 24 41 46 36 29 18 24 64 386

TLC 0 0 0 3 1 0 0 0 0 0 0 0 4

DLC 0 0 0 3 1 0 0 0 0 0 0 0 4

ESR 1 0 1 4 3 1 1 2 0 1 0 0 14

Urine RE 19 26 16 7 17 29 32 8 12 6 19 40 231

Blood

grouping 23 29 9 13 6 13 28 43 0 9 8 40 221

Rapid test

for HIV 16 0 0 0 0 0 0 0 0 0 0 0 16

CT BT Time 0 0 0 0 0 0 21 14 0 0 0 9 44

Others 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 7: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009

-10

2010

-11

2011-

2012

1 POPULATION 2074

4

24368 2495

0

26054 2707

1

2599

2

26210

2 TOTAL ANC

REGISTRATION

S

598 592 538 675 695 659 661

3 EARLY ANC

REGISTRATION

S <12 WEEKS

231 259 250 574 585 544 591

% 39 44 46 85 84 83 89

4 TT COVERAGE

ANC

458 505 449 609 642 653 703

5 TOTAL

DELIVERIES

380 461 307 355 508 549 547

6 INSTITUTION

DELIVERIES

198 168 171 262 461 514 510

7 %

INSTITUTIONA

L DELIVERIES

52 36 56 74 91 94 93

Vital Indicators

1 MATERNAL

DEATHS

0 1 1 0 1 0 0

2 TOTAL LIVE

BIRTHS

378 453 281 466 491 534 540

3 IMR 21.05 13.02 48.88 25.75 32.5

87

16.85

39

16.66

Page 8: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 9: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Aralagudu

Name of the PHC : Aralagudu

Taluk : Sagara

District : Shimoga

Population Covered : 2999

No. of Sub-Centres : 3

Staff : 7

Date of Taking over : 15.10.2004

Sl.

No

Before taking over After taking over

1 LAND There were a lot of weeds

and the land was not

properly maintained

There was no fencing

around the plot

The Total area of 2 acres was

cleared of weeds

Fencing was done around the PHC

with a gate

KT has started a demo garden and

nursery for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

The building was in need

of re-painting

Other repair work was

pending

No regular maintenance of

building and staff quarters

Cleaned up & renovated the

building.

Rooms were identified to serve as

labour ward and Laboratory and

were renovated

Laboratory facilities were started

The PHC building was freshly

painted

All services were displayed in the

PHC in the form of a Citizen’s

Charter

Name sign boards were put up at

strategic points

3 SUB-CENTER

BUILDINGS

The sub-centre buildings

were vacant and poorly

maintained

Cleaned up & re-painted the

building

ANMs are staying in the SC

Building

4 EQUIPMENT Were not being serviced

regularly and supply of

essential equipment was

irregular

Computer, printer and tape recorder

(for IEC activities) have been

supplied from KT

Email services are being provided

at the PHC

Some essential equipment was

procured from the DHO

KT has supplied equipment for

preparation of Traditional Medicine

KT has equipped the entire lab with

Page 10: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

necessary equipment with grants

from the Rotary Club, Shimoga

KT has renovated the entire labour

room with grants from the Rotary

Club, Shimoga

The lab equipments , birthing kits

& IUD kits were also supplied from

KT

5 FURNITURE Furniture was inadequate All necessary office furniture was

supplied from KT (tables, chairs,

etc.)

6 REGULAR STAFF Staff attrition rate was

high

Large number of vacancies

Poor staff attendance

KT has filled up all staff positions

All staff are staying at headquarters

and rendering 24x7 healthcare

services

7 TRAINING

PROGRAMS

Training programs were

held infrequently KT has provided periodic training

to PHC staff on the following

subjects:

RCH and MCH Services

HIV/AIDS

IEC

PHC Management

Plan and Budget – Accounts

Capacity Building

Mental Health

Traditional Medicine

PRA

Bio-Waste Management

8 MEDICINES & RE-

AGENTS

Irregular supply of both

essential medicines and re-

agents

KT has supplied essential

medicines over & above those

supplied by the government

The lab re-agents were also

supplied from KT

9 WATER &

ELECTRICITY

Poor and irregular supply New water connection taken from

the Gram Panchayat

Minor electrical repair work for all

the buildings were taken up &

completed

10 WASTE

MANAGEMENT

No implementation of

waste management KT has implemented proper waste

management in the PHC according

to KPCB standards & obtained a

KPCB certificate

11 AMBULANCE Not available An ambulance was provided to

the PHC from Matching grants

from Rotary club, Shimoga

12 ADDITIONAL Not available KT has appointed one Arogya

Page 11: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

STAFF mitra for treatment of minor

ailments through Traditional

Medicine programme

13 NEW INNOVATIONS BY KARUNA TRUST

A

IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle, we organized IEC activities in

all the sub-center areas

The PRA programme was also conducted at the village levels

B TRADITIONAL

MEDICINE

PROGRAM

We have integrated the use of traditional medicine into primary

healthcare

Sub-Centres with Population

Sl.

No

.

Name of

SC

Dista

nce

from

PHC

Build

ing

(Y/N)

No. of

villag

es Population

Eligi

ble

Cou

ple

No.

of

ASH

A

No of

Angan

wadi

No

of

VHS

C

No

of

SH

G

Mal

e

Fema

le

I Aralagudu 0 yes 16 137 1 2 2 1

Ii

Mandavall

i 5 yes 11 145 0 2 2 4

Iii Bidaruru 8 yes 18 225 0 3 3 8

Total 45 507 1 7 7 13

Staff pattern

Sl

No.

Name of the

Staff Designation Qualification Sanctioned Working Vacant

1 Dr.Suresh.B.M M.O M.B.B.S 1 Yes No

2 Yogaradhya.R Pharmacist D. Pharmacy 1 Yes No

3 Somappa.M Jr.H.W-Male Diploma 1 Yes No

4 Gowramma.G.S

Jr.H.W-

Female ANM 1 Yes No

5 Vedavathi.M

Jr.H.W-

Female ANM 1 Yes No

6 Bhagyamm.C

Jr.H.W-

Female ANM 1 Yes No

7 Saraswathi.V.N Group-D SSlC 1 Yes No

Page 12: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD

OPD Emergency

Male Female children Male Female Children Male Female Children

Apr-11 4 9 0 185 198 11 1 1 0

May-11 3 6 0 135 178 18 0 0 0

Jun-11 4 7 0 124 181 9 0 2 1

Jul-11 1 1 0 166 192 18 0 0 1

Aug-11 3 2 0 180 151 13 0 1 0

Sep-11 5 7 0 144 160 13 0 0 0

Oct-11 5 6 0 168 220 18 0 0 0

Nov-11 4 4 0 144 214 26 1 0 0

Dec-11 5 4 0 142 157 16 0 0 0

Jan-12 6 5 0 105 134 16 0 0 0

Feb-12 2 4 0 179 178 15 0 0 0

Mar-12 6 7 0 185 151 18 1 1 0

Total 48 62 0 1857 2114 191 3 5 2

Details of Laboratory Services

Name of

Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Blood for

MP Test 40 48 57 55 53 49 80 61 56 62 70 54 685

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Total

Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg

test 0 0 0 0 0 0 0 0 0 0 0 0 0

Widal 0 0 0 0 0 0 0 0 0 0 0 0 0

VDRL 0 0 0 0 0 0 0 0 0 0 0 0 0

Pregnancy

Test 5 3 12 7 4 2 5 3 2 8 4 8 63

Hb% in

PHC 4 1 11 5 12 7 9 11 6 8 3 13 90

Page 13: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

TLC 0 0 0 0 0 0 0 0 0 0 0 0 0

DLC 0 0 0 0 0 0 0 0 0 0 0 0 0

ESR 0 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood

Groping 0 0 0 0 0 0 0 0 0 0 0 0 0

HIV Test

ICTC 4 2 18 10 8 0 6 2 3 11 4 6 74

Bile salt 0 0 0 0 0 0 0 0 0 0 0 0 0

Bile

pigment 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 53 54 98 77 77 58 100 77 67 89 81 81 912

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 3051 3165 3228 3238 3078 2999

2 TOTAL ANC

REGISTRATIONS

88 23 52 51 45 34 36

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

50 14 30 38 33 29 34

% 56.8% 61% 58% 76% 73% 85% 94%

4 TT COVERAGE

ANC

70 12 63 31 37 21 33

5 TOTAL

DELIVERIES

31 9 43 15 37 17 35

6 INSTITUTION

DELIVERIES

31 6 19 14 37 16 35

7 %

INSTITUTIONAL

DELIVERIES

100% 67% 44% 93% 100% 94% 100%

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 1 0 0

2 TOTAL LIVE

BIRTHS

31 19 41 14 37 17 34

3 IMR 11.2 11.2 11.2 37.89 27.03 0 0

Page 14: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 15: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Ashoknagar

Name of the PHC : Ashoknagar

Taluk : Khanapur

District : Belgaum

Population Covered : 16684

No. of Sub-Centres : 5

Staff : 13

Date of Taking over : 01.11.2004

Sl.

No

Before taking over After taking over

1 LAND Lot of weeds and

inadequately maintained.

No Fencing

Total area is 4.12 acres.

Cleaned-up.

KT has started a demo garden and

nursery for Traditional Medicine.

Fencing done.

2 PHC BUILDING

& STAFF

QUARTERS

Many pending repair works

and maintenance was

irregular.

Medical Officer quarter was

dilapidated

Cleaned-up the building.

Painted the building.

Medical Officer Quarter is

renovated & occupied

Citizen Charter was displayed in the

PHC.

Sign boards written.

3 SUB-CENTER

BUILDINGS

Not available Cleaned-up the building.

ANMs are staying in the S/C head

quarters in rented buildings

4 EQUIPMENTS Supply was irregular with

poor maintenance. Computer, printer and tape recorder

(for IEC activities) supplied from

KT.

Email services are being provided at

the PHC

Village Resource Centers were set

up in collaboration with ISRO.

Tele conference and Tele ECG

facilities are available in the PHC.

Some of the essential equipments

were procured from DHO.

Equipment for preparation of

Page 16: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

traditional medicines were supplied

by KT

Refrigerator purchased by ARS

New computer provided by

Government

The lab equipments , birthing kits &

IUD kits were also supplied from

KT

5 FURNITURE Furniture was inadequate All necessary office furniture was

supplied from KT (tables, chairs,

etc.)

6 REGULAR

STAFF

Staff attrition rate was high

Large number of vacancies

Poor staff attendance

KT has filled up all staff positions

All staff are staying at headquarters

and rendering 24x7 healthcare

services

7 TRAINING

PROGRAMS

Training programs were held

infrequently KT has provided periodic training

to PHC staff on the following

subjects:

RCH and MCH Services

HIV/AIDS

IEC

PHC Management

Plan and Budget – Accounts

Capacity Building

Mental Health

Traditional Medicine

PRA

Bio-Waste Management

8 MEDICINES &

RE-AGENTS

Irregular supply of both

essential medicines and re-

agents

KT has supplied essential medicines

over & above those supplied by the

government

The lab re-agents were also

supplied from KT

9 WATER &

ELECTRICITY

Poor and irregular supply New water connection taken from

the Gram Panchayat

Minor electrical repair work for all

the buildings were taken up &

completed

10 WASTE

MANAGEMENT

No implementation of waste

management KT has implemented proper waste

management in the PHC according

to KPCB standards & obtained a

KPCB certificate

11 ADDITIONAL

STAFF

Not available KT has appointed one Arogya mitra

& PMOA for treatment of minor

ailments through Traditional

Medicine programme & eye

Page 17: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

screening

12 NEW INNOVATIONS BY KARUNA TRUST

A

IEC

ACTIVITIES &

PRA

PROGRAM

With the help of our IEC vehicle, we organized IEC activities in all

the sub-center areas

The PRA programme was also conducted at the village levels

B TRADITIONAL

MEDICINE

PROGRAM

We have integrated the use of traditional medicine into primary

healthcare

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 3 3

Ii Pharmacist 1 1 x Jr. H.A (F) 5 5

Iii Staff Nurse 0 0 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 1 1

Viii Sr. H.A. 0 0

Out-patient and In-patient details

IPD

OPD Emergency

Male Female Children Male Female Male Female

Apr-11 10 21 0 445 498 2 2

May-11 8 12 0 400 440 3 2

Jun-11 2 0 0 390 432 1 2

Jul-11 0 1 0 360 418 1 1

Aug-11 1 2 0 400 326 0 2

Sep-11 0 2 0 490 431 1 0

Oct-11 2 10 0 395 407 2 0

Nov-11 8 5 0 400 420 1 1

Dec-11 13 17 0 451 498 1 2

12-Jan 10 15 0 313 461 0 2

12-Feb 6 20 0 286 442 1 3

Page 18: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

12-Mar 4 22 0 433 673 0 3

TOTAL 64 127 0 4763 5446 13 20

Details of Laboratory Services

Name of Lab

Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for MP

Test 336 282 300 305 307 297 299 322 291 344 336 377 3796

Positive Cases

(Slide +RMT) 0 0 0 0 0 0 0 0 0 0 0 0 0

Total PV 1 0 0 0 0 0 0 0 0 0 0 1 2

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood Sugar 0 0 0 0 0 0 0 0 14 9 9 4 36

Widal 1 0 0 1 0 0 0 0 1 6 2 3 14

VDRL 11 1 15 5 9 24 15 14 14 9 17 21 155

Pregnancy Test 9 6 5 6 8 8 9 8 7 9 10 18 103

Hb% in PHC 40 20 33 20 18 47 34 37 49 51 47 63 459

TLC 0 0 0 0 0 0 0 0 5 2 3 7 17

DLC 0 0 0 0 0 0 0 0 5 2 3 7 17

ESR 0 0 0 0 0 0 0 0 2 0 2 7 11

Urine RE 34 13 15 10 11 32 31 27 41 43 44 51 352

Blood Groping 13 3 15 8 11 22 15 18 18 9 18 28 178

HbSAg 0 0 0 0 0 22 2 0 8 9 18 25 84

BILE SALT 2 0 1 0 0 0 2 0 0 1 2 5 13

BILEPIGMENT 2 0 1 0 0 0 2 0 0 1 2 5 13

Water Test For

H2S Method 15 20 10 20 20 20 20 20 20 40 30 45 280

HIV TEST 34 16 14 26 14 52 57 26 36 34 33 31 373

Total 498 361 409 401 398 524 486 472 511 569 576 698 5903

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 14509 14874 15732 1611

6

16365 16934

2 TOTAL ANC

REGISTRATIONS

253 285 290 316 405 372 362

3 EARLY ANC

REGISTRATIONS

140 226 281 214 308 303 272

Page 19: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

<12 WEEKS

% 55 79 97 68 76 81 94

4 TT COVERAGE

ANC

264 289 294 315 398 373 410

5 TOTAL

DELIVERIES

247 268 286 279 273 364 370

6 INSTITUTION

DELIVERIES

110 185 226 209 250 350 342

7 % INSTITUTIONAL

DELIVERIES

45% 69% 79% 75% 92% 96% 92%

Vital Indicators

1 MATERNAL

DEATHS

0 0 1 0 1 0 0

2 TOTAL LIVE

BIRTHS

242 263 288 290 270 357 363

3 IMR 24.29 22.39 13.99 7.35 14.81

5

14.00

56

22.03

Page 20: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Begar

Name of the PHC : PHC Begar

Taluk : Shringeri

District : Chikkamagalur

Population Covered : 16812

No. of Sub-Centres : 6

Staff : 20

Date of Taking over : 09.01.2006

Sl.

No

Before taking over After taking over

1 LAND Lot of weeds and

inadequately maintained.

No Fencing

Total area is 3 acres.

Cleaned-up.

Started a demo garden and

nursery for Traditional

Medicine.

2 PHC BUILDING

& STAFF

QUARTERS

Many pending repair works

and maintenance irregular.

Staff quarters were poorly

maintained

Cleaned-up the building.

All the quarters are renovated

and occupied.

Citizen Charter displayed in

the PHC.

Sign- boards written.

Page 21: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

3 SUB-CENTER

BUILDINGS

Buildings were poorly

maintained and un-occupied Buildings are cleaned up

ANMs staying in the Building

We have the 6 sub centers with

building.

4 EQUIPMENTS Not being serviced regularly

and supply irregular. Computer, printer and tape

recorder (for IEC activities)

supplied from KT.

Email services are being

provided at the PHC

Some of the essential

equipments were procured

from DHO.

Traditional medicine

preparation equipments are

also supplied.

Refrigerator, invertor & baby

warmer purchased from ARS

The lab equipments , birthing

kits & IUD kits were also

supplied from KTm

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Some Office furniture(table &

chair) have been procured

Reception counter & seating

arrangement in OPD

7 STAFF Many vacancies and poor

attendance. All the Vacant posts have

been filled up.

All the staffs are staying in the

head quarters and they are

rendering the 24 hrs services.

8 TRAININGS Infrequent KT staffs have been trained on

the following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REGENTS

Irregular supply. KT supplies essential

medicines in case of any

shortage.

Page 22: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Birthing kits & IUD kits

supplied from KT

The lab equipments & regents

were also supplied from KT.

10 WATER &

ELECTRICITY

Poor and irregular supply. Water supply available

Some minor electrical repair

work for all the buildings were

taken up

12 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-

waste management in the PHC

according to KPCB standards

and obtained the KPCB

certificate.

13 AMBULANCE Not available AN ambulance is provided by

Rotary club, Shimoga

14 NEW INNOVATIONS BY KARUNA TRUST:

A IEC

ACTIVITIES &

PRA PROGRAM

With the help of a special IEC vehicle we organized IEC

activities in all the sub-center areas.

The PRA programme also conducted in the village levels.

B TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary

Health care.

Page 23: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sub-center with population

Name of

SC

Distance

from

PHC

Buildin

g (Y/N) Population

Eligibl

e

Couple

No. of

ASHA

No of

Angan

wadi

No of

VHS

C

No of

SHG

Male Female

Begar 0 Yes 992 901 307 0 9 4 2

Kupenmak

ki 2km Yes 791 969 300 0 7 3 2

Holekoppa 7km Yes 819 786 265 0 3 2 2

Kigga 15km Yes 1521 1262 334 0 10 3 3

Gandagatta 13km Yes 834 861 250 2 3 1 1

Harur 30km Yes 865 965 308 0 6 5 2

Kerekatte 40km NO 678 493 189 2 7 5 2

Staff pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 4 4

Ii Pharmacist 1 1 x Jr. H.A (F) 6 6

Iii Staff Nurse 1 1 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 1 1

Vii BHEO 0 0 xv Gr. D 4 4

Viii Sr. H.A. 0 0

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Children Male Female Children Male Female Children

Apr-11 9 9 0 347 304 68 8 9 0

May-11 3 5 0 304 420 97 15 11 0

Jun-11 3 5 0 412 364 96 20 16 0

Jul-11 8 3 1 426 402 112 18 14 0

Aug-11 5 10 0 438 358 102 12 17 0

Sep-11 17 13 0 369 329 77 15 13 0

Page 24: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Oct-11 13 29 1 347 306 104 10 13 0

Nov-11 11 19 1 429 558 125 17 20 0

Dec-11 19 34 0 397 486 199 28 22 0

Jan-12 22 31 13 555 572 119 28 20 0

Feb-12 8 21 1 437 488 137 15 22 0

Mar-12 12 23 7 330 387 91 20 16 0

Total 130 202 24 4791 4974 1327 206 193 0

Details of Laboratory Services

Name of Lab

Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for MP

Test 352 411 423 459 443 461 429 456 323 241 275 271 4552

Total PV 0 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 6 2 3 5 2 10 6 2 4 4 5 6 55

Widal 28 4 4 13 10 14 29 6 11 10 13 0 142

VDRL 6 2 2 4 3 9 6 0 6 4 6 6 54

Pregnancy Test 9 2 3 6 3 1 3 6 5 9 5 5 57

Hb% in PHC 23 37 35 82 53 38 24 16 71 25 15 39 458

TLC 4 3 0 0 0 1 7 0 0 0 0 4 19

DLC 4 3 0 0 0 0 0 0 0 0 0 0 7

ESR 4 3 3 7 1 1 3 1 4 0 0 4 31

Urine RE 16 13 16 19 7 19 21 26 17 13 23 29 219

Blood Groping 7 2 2 3 2 8 4 2 4 4 5 4 47

Water Test For

H2S Method 4 1 0 2 3 5 0 4 1 11 5 12 49

HIV Test

ICTC 13 17 7 18 14 22 15 18 12 10 16 13 175

Bile salt 0 0 0 0 0 0 0 0 0 0 0 0 0

Bile pigment 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 476 500 498 618 541 589 547 537 458 337 368 393 5865

Page 25: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010

-11

2011-

2012

1 POPULATION 0 12880 13059 12856 12604 1681

2

12737

2 TOTAL ANC

REGISTRATIONS

0 162 136 142 146 214 162

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

0 112 103 121 129 209 138

% 0 69 76 85 88 97 85

4 TT COVERAGE

ANC

0 153 113 129 125 214 147

5 TOTAL

DELIVERIES

0 108 164 90 118 215 126

6 INSTITUTION

DELIVERIES

0 85 152 82 107 213 126

7 % INSTITUTIONAL

DELIVERIES

0 79 93 91 91 99 100

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 0 2

2 TOTAL LIVE

BIRTHS

0 106 161 92 118 210 214

3 IMR 0 64.81 30.49 97.8 59.32

2

23.8

095

24.19

Page 26: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 27: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Beggar’s Colony (NPK)

Name of the PHC: Beggar’s Colony

Taluk: Yelhanka

District: Bangalore Urban

Population Covered: 1010

Staff: 05

Date of taking over: 01-01-2006

Sl.

No

Before taking over After taking over

1 PHC BUILDING

& STAFF

QUARTERS

Many pending repair works

and maintenance irregular.

Cleaned-up the building.

We have one staff quarters building

our staff nurse occupied the

building.

All the services were displayed in

the PHC.

Name boards written.

2 EQUIPMENTS Not being serviced regularly

and supply irregular.

Computer, printer and tape recorder

supplied from KT.

Email services are being provided at

the PHC

Some of the essential equipments

were procured from DHO and

Social Welfare department.

We have done the laboratory

facility.

3 COLD CHAIN

EQIPMENT

Not available We have supplied one Refrigerator

with the help of Social Welfare

department.

4 FURNITURE Inadequate Office furniture supplied from KT

(table & chair)

5 STAFF Irregular and vacancy KT has filled up all the staffs.

All the staffs were staying in the

head quarters and they are rendering

the 24 hrs services.

6 ADDITIONAL

STAFF

Not available KT has posted 1 lab technician.

7 TRAININGS Infrequent KT has given the training to the

PHC staff on the following subjects:

RCH and MCH services.

Page 28: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Waste Management

8 MEDICINES &

REAGENTS

Irregular supply. KT has also supplied the essential

medicines other than the Govt.

supply.

The lab reagents were also supplied

from KT.

9 WATER &

ELECTRICITY

Poor and irregular supply Running water supply done to the

PHC with the help of Social

Welfare department.

We have done the minor electrical

repair work for all the buildings.

10 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according

to KPCB standards.

11 MENTAL

HEALTH CAMP

Not done We are conducting the mental

health camp in collaboration with

NIMHANS

12 EYE CAMPS Not done We are conducting cataract

operations in collaboration with

Viveka Drusti Eye Hospital.

Staff Position:

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr.H.A. (M) 0 0

Ii Pharmacist 1 1 x Jr.H.A (F) 1 1

Iii Staff Nurse 0 0 xi PMOA 0 0

Iv Lab. Technician 0 0 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 0 0

vii BHEO 0 0 xv Gr. D 0 2

viii Sr. H A 0 0

Page 29: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Outpatient and Inpatient details:

IPD OPD

Male Female Male Female

Apr 05 02 74 73

May 00 00 70 61

Jun 03 01 114 65

Jul 03 01 98 79

Aug 03 02 103 61

Sep 01 01 87 54

Oct 02 01 105 58

Nov 03 00 116 55

Dec 02 01 113 85

Jan 11 01 155 110

Feb 14 06 157 100

Mar 11 06 110 65

TOTAL 58 22 1302 866

Community Mental Health Programme:

Sl.No Month Male Female Total

1. April - 2010 04 06 10

2. May - 2010 16 01 17

3. June - 2010 11 03 14

4. July - 2010 15 05 20

5. August - 2010 11 03 14

6. September - 2010 07 02 9

7. October - 2010 21 06 27

8. November - 2010 04 02 6

9. December - 2010 04 06 10

10. January - 2011 04 04 8

11. February - 2011 00 04 4

12. March - 2011 01 04 5

Total 98 46 144

Page 30: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sl.No Diagnosis:

1. Psychosis 120

2. Epilepsy 7

3. Neurosis 0

4. Mental Retardation 13

5. Depression 2

6. BPAD 2

Total 144

Laboratory tests:

Sl.No Investigation No of Cases examined

1. Sputum Examination for Tuberculosis 25

2. Blood Smear for Malaria Parasite 113

3. Hemoglobin % Estimation 488

4. Blood Grouping 338

5. Blood Sugar Estimation 808

6. Blood Examination for Typhoid 35

7. Urine Routine Examination 433

8. Pregnancy test 15

9. HIV test 240

Mortality details:

April 2011 01

May 00

Jun 00

Jul 00

Aug 03

Sep 00

Oct 00

Nov 00

Dec 00

Jan 2012 01

Feb 01

Mar 00

Page 31: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Castle rock

Name of the PHC : Castle Rock

Taluk : Joida

District : Uttara Kannada

Population Covered : 9993

No. of Sub-Centres : 5

Staff : 17

Date of Taking over : 01.11.2004

Sl. No Before taking over After taking over

1 LAND Land was full of weeds and not

maintained well The total land area of 2.5 acres was cleaned

up

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Repair work to building was

pending

Irregular maintenance of building

and staff quarters

Cleaned up & re-painted the building

All the services were displayed in the PHC

in the form of a Citizen’s Charter

Name sign boards have been put up at

important entrances in the PHC

3 SUB-CENTER

BUILDINGS

SC building poorly maintained

Building was vacant There is only one SC with the building

Building cleaned up thoroughly

The ANM has been given occupancy space

in the building

4 EQUIPMENT Not being serviced regularly

Supply was irregular Computer, printer and tape recorder (for

IEC activities) supplied from KT

Email services are being provided at the

PHC

Some of the essential equipment was

procured from the DHO

Equipment for preparation of traditional

medicine has been supplied

Village Resource Centres have been set up

in collaboration with ISRO

Tele-conference and Tele-ECG facilities

have been made available in the PHC

The lab equipments , birthing kits & IUD

kits were also supplied from KT

5 COLD CHAIN

EQIPMENT

Not maintained properly KT has made functional the cold chain

equipment for use in the PHC

6 FURNITURE Inadequate KT supplied adequate furniture

7 REGULAR STAFF Many vacancies

Poor attendance All vacant posts have been filled up

All staff are staying at headquarters and

rendering 24x7 health services

8 TRAINING Infrequent PHC staff have been periodically trained

on the following subjects:

RCH and MCH Services

HIV/AIDS

IEC

PHC Management

Page 32: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Plan and Budget – Accounts

Capacity Building

Mental Health

Traditional Medicine

PRA

Bio-Waste Management

Village Resource Centres, that have been

established in Collaboration with ISRO

9 MEDICINES & RE-

AGENTS

Irregular supply KT supplies essential medicines whenever

there is a shortage in supply

The lab re-agents are also supplied from

KT

10 WATER &

ELECTRICITY

Poor and irregular supply Water is available

Minor electrical repair work for all the

buildings were undertaken

12 WASTE

MANAGEMENT

Not implemented KT has implemented bio-waste

management in the PHC according to

KPCB standards and obtained a KPCB

certificate

14 NEW INNOVATIONS:

A IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-centre

areas

PRA program was also conducted at the village level

B HEALTH

INSURANCE

PROGRAM

Health insurance program has been launched in the PHC catchment area and is

running as an ongoing program

C TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into PHCs as part of primary healthcare

Sub-centres with Population

Sl.

No

.

Name of

SC

Distance

from

PHC

Buildi

ng

(Y/N)

No. of

villages Population

Eligibl

e

Couple

No.

of

ASH

A

No of

Angan

wadi

No of

VHSC

No of

SHG

Male

Femal

e

I

Castle

Rock 0 N 4 1148 1065 307 1 5 2 2

Ii Anmod 12 Y 10 1905 1746 576 3 9 9

Iii Tineghat 25 N 7 1017 992 309 3 6 6

Iv Konshet 10 N 8 513 487 148 2 4 2

V

Chandva

di 45 N 7 592 611 181 1 5 2

Page 33: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 3 3

Ii Pharmacist 1 1 x Jr. H.A (F) 5 5

Iii Staff Nurse 1 1 xi PMOA 1 0

Iv Lab. Technician 1 1 xii SDC 1 0

V FDA/Administrator 1 1 xiii Arogyamitra 1 0

Vi LHV 0 0 xiv Driver 1 1

Vii BHEO 1 1 xv Gr. D 2 2

Viii Sr. H.A. 0 0

Details of Laboratory Services

Name of lab

tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb. Mar. Total

Blood for MP

test 179 223 156 173 219 188 198 198 188 209 192 154 2277

Positive cases

(slide + RMT) 0 0 0 0 0 0 0 0 0 0 0 0 0

Total PV 0 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Total mixed type 0 0 0 0 0 0 0 0 0 0 0 0 0

HIV tests 0 0 0 0 0 0 0 0 0 0 0 0 0

Positive 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood sugar 1 12 10 3 8 3 4 6 4 10 6 4 71

Widal 0 0 0 0 0 0 2 1 1 1 5 1 11

VDRL 15 1 0 5 10 36 12 9 11 3 3 3 108

Pregnancy test 6 6 6 9 5 7 7 8 3 4 3 3 67

Hb% in PHC 37 50 26 32 43 63 55 28 30 21 20 29 434

TLC 23 29 13 8 17 17 15 2 1 2 7 14 148

DLC 23 29 13 8 17 17 15 2 1 2 7 14 148

ESR 23 14 13 8 17 17 15 2 1 6 11 18 145

Urine RE 31 46 23 32 42 51 51 28 13 12 11 21 361

Blood grouping 15 1 5 5 2 27 9 8 15 4 2 3 96

Rapid test for

HIV 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 34: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

CT BT Time 6 6 3 3 5 8 1 0 0 1 2 4 39

Others 0 0 0 0 0 7 5 7 1 3 2 2 27

STATISTICS:

Sl.

No

Process Indicators 2005

-06

2006-

07

2007

-08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 9302 9302 9497 10078 10073 10216

2 TOTAL ANC

REGISTRATIONS

113 148 221 158 183 175 184

3 EARLY ANC

REGISTRATIONS <12

WEEKS

60 99 118 103 134 146 168

% 53% 67% 53% 65.18% 73% 83% 91%

4 TT COVERAGE ANC 92 132 213 158 169 170 176

5 TOTAL DELIVERIES 107 131 149 143 159 148 215

6 INSTITUTION

DELIVERIES

53 106 115 115 151 131 201

7 % INSTITUTIONAL

DELIVERIES

50% 81% 77% 80% 95 88% 93%

Vital Indicators

1 MATERNAL DEATHS 0 0 0 0 0 0 0

2 TOTAL LIVE

BIRTHS

106 131 146 138 158 145 214

3 IMR 28.4

0

15.27 26.8

5

36.23 12.66 3 14.01

Page 35: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Chandrabanda

Name of the PHC : Chandrabanda

Taluk : Raichur

District : Raichur

Population Covered : 25584

No. of Sub-Centres : 4

Staff : 20

Date of Taking over : 27.01.2006

Page 36: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained.

No Fencing

Total area is 2 acres.

Cleaned-up.

Fencing done.

KT has started a demo garden and

nursery for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

irregular maintenance.

All the staff quarters were

dilapidated

Cleaned-up the building.

PHC building was painted.

Staff Quarters were renovated &

occupied

Sign-boards have been written.

Citizen Charter have been displayed in

the PHC

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings were vacant

Cleaned-up the building.

ANMs occupied the Building

4 sub centers are located in the

government building.

Two Sub-centers are under minor repair.

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder( for

IEC activities) supplied from KT.

Email services are being provided at the

PHC

Village Resource Center has been set

up in collaboration with ISRO.

Tele conference and Tele- ECG

facilities are available in the PHC.

Some of the essential equipments were

received from DHO.

Equipment for preparation of traditional

medicine has been supplied.

We have procured one baby warming

machine from the DHO

The lab equipments , birthing kits &

IUD kits were also supplied from KT

5 COLD CHAIN

EQIPMENT

Available Available & functional

6 FURNITURE Inadequate Furniture procured.

7 STAFF Many vacancies and poor

attendance.

All vacant posts have been filled up.

All the staffs are staying in the head

quarters and they are rendering the 24

hrs services.

8 TRAININGS Infrequent PHC staff have been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES & Irregular supply. KT supplies the essential medicines and

Page 37: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

REAGENTS lab reagent in case of shortage in Govt.

supply.

10 WATER &

ELECTRICITY

The pump set is repaired and got the

running water in the PHC.

Minor electrical repair work was under

taken.

Electric connections in the staff quarters

were also renovated.

12 WASTE

MANAGEMENT

Not implemented Bio-waste management in the PHC is

being implemented according to KPCB

standards and KPCB certificate

obtained.

14 NEW INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-

center areasl.

The PRA programme also conducted in the village levels.

b HEALTH

INSURANCE

PROGRAM

Health insurance program was launched in the PHC catchment area.

c TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-Centres with Population

Sl.

No.

Name of

SC

Distance

from

PHC

Buil

ding

(Y/N

)

No. of

villag

es Population

Eligi

ble

Cou

ple

No.

of

ASH

A

No of

Angan

wadi

No of

VHS

C

N

o

of

S

H

G

Male

Fem

ale

I

Chandraban

da 0 Y 4 2745

286

1 803 6 7 2 7

Ii Kartlatkur 6 N 5 3348

357

4 1080 6 7 2 4

Iii Singnodi 7 Y 6 3071

322

5 997 5 9 4 11

Iv Wadavatti 9 Y 5 3422

358

1 1119 6 8 4 8

Total 20 12586

132

41 3999 23 31 12 30

Page 38: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 5 5

Ii Pharmacist 1 1 x Jr. H.A (F) 6 6

Iii Staff Nurse 3 3 xi PMOA 0 0

Iv Lab. Technician 0 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 2 2

Viii Sr. H.A. Yes Yes

Out-patient and In-patient details

IPD

OPD Emergency

Male Female Male Female Male Female

Apr-11 4 21 125 900 2 6

May-11 3 21 135 800 4 8

Jun-11 6 39 132 830 2 6

Jul-11 3 47 130 520 4 7

Aug-11 13 24 165 795 4 8

Sep-11 6 39 206 654 2 8

Oct-11 22 67 348 522 0 7

Nov-11 20 28 320 410 2 9

Dec-11 40 43 443 472 1 4

Jan-12 12 24 472 478 2 5

Feb-12 5 50 250 480 2 6

Mar-12 17 46 323 512 2 3

Total 151 449 3049 7373 27 77

Page 39: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Name of

Lab Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for

MP Test 378 458 473 483 427 420 708 576 512 405 371 334 5545

Total PV 0 0 0 0 0 0 0 0 0 0 1 0 1

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Total

Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg

test 0 0 0 0 4 13 0 0 0 0 1 0 18

Widal 0 0 0 0 0 0 0 0 0 0 0 8 8

VDRL 6 8 4 4 6 17 26 22 17 0 2 11 123

Pregnancy

Test 5 7 6 7 8 17 13 18 19 15 8 18 141

Hb% in

PHC 0 26 24 24 30 26 37 28 26 16 12 24 273

TLC 0 0 0 0 0 0 0 0 0 0 0 0 0

DLC 0 0 0 0 0 0 0 0 0 0 0 0 0

ESR 0 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 0 0 0 0 0 8 17 15 17 12 6 18 93

Blood

Groping 0 0 0 0 4 17 26 22 19 12 10 18 128

Water

Test For

H2S

Method 0 3 0 2 0 0 4 0 2 2 2 3 18

HIV Test

ICTC 40 19 35 22 35 46 47 37 25 22 19 16 363

Blood

sugar 0 0 0 0 0 0 16 9 5 9 8 11 58

Total 429 521 542 542 514 564 894 727 642 493 440 461 6769

Page 40: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Statistics

Sl.

No

Process Indicators 2005

-06

2006

-07

2007-

08

2008

-09

2009

-10

2010

-11

2011-

2012

1 POPULATION 0 2436

7

23480 2348

0

2463

1

2558

4

2 TOTAL ANC

REGISTRATIONS

0 645 620 664 761 676 809

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

0 254 220 415 522 483 600

% 0 39 35 62 68 71 74

4 TT COVERAGE

ANC

0 595 675 715 665 673 804

5 TOTAL

DELIVERIES

0 592 592 618 733 711 782

6 INST2ITUTION

DELIVERIES

0 340 232 392 662 632 742

7 %

INSTITUTIONAL

DELIVERIES

0 57% 39% 63% 90% 89% 95%

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 0 1

2 TOTAL LIVE

BIRTHS

0 534 597 609 716 695 763

3 IMR 0 16.8

9

20.27 36.1

2

32.1

23

30.2

158

18.34

Page 41: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 42: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Dindavara

Name of the PHC : Dindavara

Taluk : Hiriyur

District : Chitradurga

No. of Sub-Centres : 3

Staff : 21

Date of Taking over : 02.02.2005

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained.

No Fencing

Total area is 5.5 acres.

Cleaned-up.

Fencing done

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

irregular maintenance .

Cleaned-up the building.

We have painted the building.

We have total 9 staff quarters out of that 2

building are under repair. KT has plan to

renovate them.

All the services were displayed in the PHC.

Name boards written.

3 SUB-CENTER

BUILDINGS

Untidy and dirty

Building were vacant Cleaned-up the building.

ANMs occupied the Building

Only 2 sub center is located in government

building & 1 is under construction

4 EQUIPMENTS Irregular supply Computer, printer and tape recorder (for

IEC activities) supplied from KT.

Email services are being provided at the

PHC

Some of the essential equipments were

procured from DHO.

Equipment for preparation of traditional

medicine has been supplied from KT.

Village Resource Center has been set up in

collaboration with ISRO.

Tele conference and Tele ECG facilities

are made available in the PHC.

The lab equipments , birthing kits & IUD

kits were also supplied from KT

Refrigerator, Solar water heater &

television purchased by ARS

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Furniture available

7 STAFF Many vacancies with poor

attendance. KT has filled up all the vacant posts

All the staffs were staying in the head

quarters and they are rendering the 24 hrs

services.

8 TRAININGS Infrequent KT has given the training to the PHC staff

on the following subjects:

Page 43: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular supply KT supplies the essential medicines and

Lab reagent in case of shortage.

10 WATER &

ELECTRICITY

Irregular supply The pump set is repaired and got the

running water in the PHC.

Minor electrical repair work was under

taken.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-waste

management in the PHC according to

KPCB standards and obtained the KPCB

certificate

13 NEW INNOVATIONS BY KARUNA TRUST

A IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

areas.

The PRA programme also conducted at the village levels.

B TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-Centres with Population

Sl.

No.

Name of SC Distance

from

PHC

Buildi

ng

(Y/N)

No. of

villages

Population Eligi

ble

Cou

ple

No. of

ASH

A

No

of

Ang

anw

adi

No of

VHS

C

No

of

SHG

Male Female

I Dindavara 0 Y 11 2627 2540 775 5 13 4 12

II

Gowdanahall

i 8 N 5 2349 2453 735 4 7 4 15

III Pilalai 8 Y 14 3223 3263 889 6 12 7 10

IV Total 30 8199 8256 2399 15 32 15 37

Page 44: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Position

Sanctioned Available Sanctioned Available

I Medical Officer 2 2 Ix Jr.H.A. (M) 3 3

II Pharmacist 1 1 X Jr.H.A (F) 4 4

III Staff Nurse 0 0 Xi PMOA 1 1

IV Lab. Technician 1 1 Xii SDC 1 1

V

FDA/Administrat

or 1 1 Xiii

Arogyamitra

0 1

VI LHV 1 1 Xiv Driver 0 0

VI

I

BHEO

1 1 Xv

Gr. D

3 3

VI

II

Sr. H A

1 1

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 22 40 0 270 330 150 25 20 8

May-11 9 14 0 320 380 180 12 15 2

Jun-11 10 18 0 320 300 250 15 13 2

Jul-11 4 15 0 550 600 200 16 13 5

Aug-11 4 10 0 450 480 270 6 5 12

Sep-11 4 12 0 450 420 230 15 23 1

Oct-11 3 15 0 160 180 110 13 15 3

Nov-11 4 16 0 208 180 120 23 12 5

Dec-11 2 7 0 250 280 199 22 13 5

Jan-12 12 4 0 150 150 100 25 21 6

Feb-12 20 4 0 250 280 180 12 12 8

Mar-12 7 28 0 200 250 165 16 19 2

Total 101 183 0 3578 3830 2154 200 181 59

Page 45: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of Lab

Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for MP

Test 450 643 707 788 788 678 754 747 759 596 501 555 7966

Total PV 0 1 0 0 0 1 2 1 0 0 0 0 5

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 0 0 0 0 0 0 0 0 0 0 0 0 0

Widal 24 26 53 33 0 10 13 12 12 15 7 9 214

VDRL 1 0 0 0 0 0 0 0 0 0 0 0 1

Pregnancy

Test 7 16 7 13 15 9 8 4 15 16 6 10 126

Hb% in PHC 12 16 70 19 42 28 12 13 14 52 6 4 288

TLC 0 0 0 0 0 0 0 0 0 0 0 0 0

DLC 0 0 0 0 0 0 0 0 0 0 0 0 0

ESR 0 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 5 3 59 2 29 10 4 2 3 9 2 2 130

Blood

Groping 1 1 2 0 1 0 3 0 1 3 4 1 17

Water Test

For H2S

Method 0 0 0 0 0 0 0 0 0 0 0 0 0

HIV Test

ICTC 10 0 59 0 29 0 0 26 0 39 0 0 163

Bile salt 0 0 0 0 0 0 0 0 0 0 0 0 0

Bile pigment 0 0 0 0 0 0 0 0 0 0 0 0 0

Total 510 706 957 855 904 736 796 805 804 730 526 581 8910

Page 46: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 13791 15045 15045 15359 16658 16233 16777

2 TOTAL ANC

REGISTRATIONS

280 278 376 362 387 329 331

3 EARLY ANC

REGISTRATIONS <12

WEEKS

170 178 123 272 320 297 135

% 61 64 33 75 82 90 41

4 TT COVERAGE ANC 260 253 392 339 384 284 346

5 TOTAL DELIVERIES 252 287 295 280 312 277 339

6 INSTITUTION

DELIVERIES

173 251 210 245 291 277 334

7 % INSTITUTIONAL

DELIVERIES

67 87 71 84 93 100 99

Vital Indicators

1 MATERNAL DEATHS 0 0 0 1 0 1 0

2 TOTAL LIVE

BIRTHS

249 281 294 285 301 273 334

3 IMR 7.94 6.97 35.82 45.61 39.86

7

10.98

9

17.8

Page 47: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 48: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Doddakenahalli

Name of the PHC : Doddakenahalli

Taluk : Bangalore East

District : Bangalore Urban

Population Covered : 32336

No. of Sub-Centres : 3

Staff : 5

Date of Taking over : 04.04.2008

Sub-center with population

Sl.

No. Name of SC

Distan

ce

from

PHC

Buildi

ng

(Y/N)

No.

of

villag

es Population

Eligib

le

Coupl

e

No.

of

ASH

A

No of

Angan

wadi

No of

VHS

C

No of

SHG

Male Female

1

Doddakenah

alli yes 5 5232 4670 1485 4 6 3 26

2

Kaikondrahal

li 03km no 4 4480 4203 1280 0 2 12

3 Bellandur 6 no 5 7151 7017 2111 0 5 0 24

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 0 0

Ii Pharmacist 0 0 x Jr. H.A (F) 2 2

Iii Staff Nurse 1 1 xi PMOA 0 0

Iv Lab. Technician 0 1 xii SDC 0 0

V FDA/Administrator 0 0 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 0 1

Viii Sr. H.A. 0 0

Page 49: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female children Male Female children Male Female Children

Apr-11 0 0 0 145 85 35 0 0 0

May-11 0 0 0 252 139 61 0 0 0

Jun-11 0 0 0 331 174 52 0 0 0

Jul-11 0 0 0 319 145 50 0 0 0

Aug-11 0 0 0 359 223 58 0 0 0

Sep-11 0 0 0 236 131 62 0 0 0

Oct-11 0 0 0 257 151 61 0 0 0

Nov-11 0 0 0 160 122 48 0 0 0

Dec-11 0 0 0 189 135 46 0 0 0

Jan-12 0 0 0 306 160 59 0 0 0

Feb-12 0 0 0 368 203 69 0 0 0

Mar-12 0 0 0 231 176 48 0 0 0

Total 0

0 3153 1844 649

0 0

Details of Laboratory Services

Name of

Lab Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for

MP Test 200 214 179 222 244 236 204 235 231 206 206 242 2619

total pv { } 0

Total PF

passive

Total Mixed

type

HbSAg test 39 46 41 53 56 36 50 50 40 54 55 63 583

Widal 6 4 5 6 8 7 6 5 6 8 4 5 70

VDRL 39 46 41 53 56 36 50 50 40 54 55 63 583

Pregnancy

Test 39 46 41 53 56 36 50 50 40 54 55 63 583

Hb% in

PHC 39 44 52 46 56 44 50 50 40 54 55 63 593

TLC 2 3 5 3 2 3 5 5 3 4 2 3 40

DLC 2 3 5 3 2 3 5 5 3 4 2 3 40

ESR 2 3 5 3 2 3 5 5 3 4 2 3 40

Page 50: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Urine RE 39 46 41 53 56 36 50 50 40 54 55 63 583

Blood

Groping 39 46 41 53 56 36 50 50 40 54 55 63 583

Water Test

For H2S

Method 1 2

HIV Test

ICTC 40 46 41 53 56 36 52 52 44 56 55 65 596

Bile salt 2 1 2 2 3 2 1 13

Bile

pigment 2 1 2 2 3 0 2 1 13

Total

Statistics

Sl. No Process Indicators 2009-10 2010-11 2011-2012

1 POPULATION 32212 32336 32752

2 TOTAL ANC REGISTRATIONS 496 496 616

3 EARLY ANC REGISTRATIONS

<12 WEEKS

371 431 499

% 75 86 81

4 TT COVERAGE ANC 616 507 1205

5 TOTAL DELIVERIES 320 316 465

6 INSTITUTION DELIVERIES 317 315 465

7 % INSTITUTIONAL DELIVERIES 99 100 100

1 MATERNAL DEATHS 0 0 0

2 TOTAL LIVE BIRTHS 319 315 475

3 IMR 6.2696 3.1746 0

Page 51: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Galagihulukoppa

Name of the PHC : Galagi Hulukoppa

Taluk : Kalgatgi

District : Dharwad

Population Covered : 28539

No. of Sub-Centres : 5

Staff : 20

Date of Taking over : 20-6-2005

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained.

No Fencing

Total area is 2 acres.

Cleaned-up.

Fencing done.

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works.

Cleaned-up the building.

Citizen Charter displayed in the PHC.

Name boards written.

Minor repair works undertaken.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Building were vacant

Cleaned-up the building.

Minor renovation done for the sub centers.

ANMs occupied the Building

All the 5 sub centers are located in the

government building.

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder (for

IEC activities) supplied from KT.

Email services are being provided at the

PHC

Some of the essential equipments were

received from DHO.

Equipment for preparation of Traditional

medicine has been supplied from KT.

VRC equipments were installed in

collaboration with ISRO.

Tele conference and Tele- ECG facilities

aremade available in the PHC.

The lab equipments , birthing kits & IUD

kits were also supplied from KT

5 COLD CHAIN

EQIPMENT

Not Maintained. Functional

6 FURNITURE Inadequate Office furniture procured.

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant posts.

All the staffs are staying in the head

quarters and rendering the 24 hrs services.

8 TRAININGS Infrequent KT has trained the PHC staff on the

following subjects:

RCH and MCH services.

HIV/AIDS.

Page 52: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REGENTS

Irregular Supply KT supplies the essential medicines and lab

reagents in case of delay in govt. supply.

10 WATER &

ELECTRICITY

Poor and Irregular supply Available

Minor electrical repair work has been

under taken for all the buildings.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards and obtained KPCB

certificate.

14 NEW INNOVATIONS BY KARUNA TRUST

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

areas.

The PRA programme also conducted in the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-center with population

Sl.

No Name of SC

Distance

from

PHC

Building

(Y/N)

No. of

villages Population

Eligible

Couple

No. of

ASHA

No of

Angan

wadi

No of

VHS

C

Male

Femal

e

I

Galgi

Hulukoppa 0 NO 2 3286 3112 1021 5 8 2

Ii Muttagi 12 km Yes 4 3023 2784 895 2 7 4

Iii

G

Basvanakoppa 20 km Yes 8 3575 3204 1040 5 11 8

Iv Dumvada 15 km Yes 1 1870 1770 575 2 4 1

V Gambyapur 14 km Yes 4 2935 2655 865 2 7 4

Total 19 14689 13525 4396 16 37 19

Page 53: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 2 2 ix Jr. H.A. (M) 3 3

Ii Pharmacist 2 2 x Jr. H.A (F) 5 5

Iii Staff Nurse 1 1 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 0 0

Vi LHV 1 1 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 3 3

Viii Sr. H.A. 1 1

Out-patient and In-patient details

IPD

OPD

Emergency 5 pm 9AM

Male Female children Male Female Children Male Female Children

Apr-11 15 32 0 669 816 524 0 5 1

May-11 19 54 8 1127 1478 922 0 2 1

Jun-11 8 16 0 1024 1191 675 2 2 0

Jul-11 9 4 1 1306 1364 731 1 5 0

Aug-11 7 7 0 1287 1312 635 4 1 0

Sep-11 9 23 3 1190 1282 621 4 3 1

Oct-11 9 35 0 1081 1053 700 4 7 1

Nov-11 14 18 4 1264 1168 941 0 2 0

Dec-11 17 33 2 1255 1318 883 1 3 0

Jan-12 14 25 1 1489 3069 1190 2 5 0

Feb-12 30 54 1 1320 1407 1473 4 9 0

Mar-12 21 31 1 1132 1129 714 2 0 1

Total 172 332 21 13475 16587 10009 24 44 5

Page 54: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of Lab

Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for

MP Test 570 721 586 605 641 626 602 764 688 744 691 607 7845

Total PV 0 0 0 0 0 0 0 0 0 1 0 0 1

Total PF 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 0 17 34 35 25 16 16 7 1 0 0 0 151

Widal 2 2 1 2 6 3 11 14 14 11 12 15 93

VDRL 0 17 34 35 26 18 15 20 15 0 6 16 202

Pregnancy

Test 21 27 37 22 17 23 14 26 22 37 37 13 296

Hb% in

PHC 29 35 47 50 44 27 38 33 34 42 81 73 533

TLC 1 2 1 1 1 4 2 2 3 4 11 4 36

DLC 1 2 1 1 1 4 2 2 3 4 11 4 36

ESR 1 2 2 1 1 3 3 2 3 4 11 4 37

Urine RE 60 54 80 70 64 55 40 83 69 68 85 77 805

Blood

Groping 7 27 34 33 30 173 19 111 89 24 117 32 696

Water Test

For H2S

Method 8 8 4 6 12 15 13 14 13 11 9 10 123

HIV Test

ICTC 0 16 41 34 30 16 17 27 16 23 38 24 282

Bile salt 2 2 0 1 3 4 4 3 3 6 1 2 31

Bile pigment 2 2 0 1 3 4 4 3 3 6 1 2 31

Blood sugar 2 12 10 26 12 13 12 7 22 13 19 20 168

BT 2 2 4 2 3 3 2 2 4 2 1 1 28

CT 2 2 4 2 3 3 2 2 4 2 1 1 28

Blood urea 0 0 0 1 1 0 2 3 3 2 3 3 18

S,

Creatinine 0 3 0 1 1 0 2 3 5 2 3 2 22

S .

Cholesterol 0 0 0 1 0 0 2 1 2 2 3 4 15

R F Test 0 0 0 0 0 0 3 0 2 3 5 3 16

Total 706 953 920 930 924 1010 822 1129 1018 1010 1146 917 11845

Page 55: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005

-06

2006

-07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 2521

4

2613

2

26601 27010 27975 28214

2 TOTAL ANC

REGISTRATIONS

471 559 635 703 711 711 691

3 EARLY ANC

REGISTRATIONS <12

WEEKS

202 374 412 574 572 669 633

% 43 67 65 82 80 94 92

4 TT COVERAGE ANC 460 602 587 648 673 648 691

5 TOTAL DELIVERIES 372 128 563 577 622 558 672

6 INSTITUTION DELIVERIES 237 81 421 534 630 520 672

7 % INSTITUTIONAL

DELIVERIES

64 63 75 70 101 93 100

Vital Indicators

1 MATERNAL DEATHS 0 0 1 2 0 0 0

2 TOTAL LIVE BIRTHS 370 367 563 565 621 554 666

3 IMR 8.06 40.3

2

15.99 28.32 32.20

6

28.88

09

24.02

Page 56: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 57: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Gumballi

Name of the PHC : Gumballi

Taluk : Yelandur

District : Chamarajanagar

Population Covered : 22,432

No. of Sub-Centres : 5

Staff : 19

Date of Taking over : 17.06.1996

Sl.

No

Before taking over After taking over

1 LAND KT Purchased the Land. Total 28

Acres out of that 2 Acres for PHC

Boundaries identified

Fencing done

2 PHC BUILDING

& STAFF

QUARTERS

No building and staff

quarters New building constructed by KT

Staff Quarters were also

constructed by KT.

3 SUB-CENTER

BUILDINGS

Poorly maintained

Buildings were vacant Cleaned-up the building.

Our ANMs occupied the Building

We have the 3 sub centers with

the building.

Minor repair work done.

We are looking for location &

construction of the proposed 2

Sub-center building upon receipt

of the funds.

4 EQUIPMENTS Inadequate and

supply irregular Computer, printer and tape

recorder supplied from KT.

Email services are being provided

at the PHC

VRC equipments were installed

in collaboration with ISRO.

Tele conference and tele ECG are

doing in the PHC.

Some of the equipments were

purchased from IPP IX (K) funds.

We have installed the X-ray

machine

Solar lights were installed.

The lab equipments , birthing kits

& IUD kits were also supplied

from KT

5 COLD CHAIN Not available The equipments were procured

Page 58: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

EQIPMENT from DHO

6 FURNITURE Inadequate Office furniture supplied from

KT (table & chair)

7 STAFF Many vacancies and

poor attendance. KT has filled up all the staffs.

All the staffs were staying in the

head quarters and they are

rendering the 24 hrs services.

8 TRAININGS Infrequent KT has given the training to the

PHC staff on the following

subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

VRCs in Collaboration with

ISRO.

Waste Management

9 MEDICINES &

REGENTS

Irregular supply KT has also supplied the essential

medicines other than the Govt.

supply.

The lab regents were also

supplied from KT.

10 WATER &

ELECTRICITY

No KT has done this facility.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC

according to KPCB standards.

12 Ambulance

Service

No KT has provided the Ambulance

Services.

13

Dental Clinic No KT has provided the Dental

Clinic in the PHC

Mobile Dental Clinic Service for

the Villages.

14 Eye Hospital No KT has constructed the New 20

bedded Eye hospital in the

campus.

It is serving the 5 lacs population

in Chamarajanagar district.

15 NABH

accreditation

No KT has initiated NABH

accreditation process

Page 59: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

15 NEW INNOVATIONS BY KARUNA TRUST

A IEC

ACTIVITIES &

PRA PROGRAM

With the help of our IEC vehicle we organized IEC

activities in all the sub-center level.

The PRA programme also conducted in the village levels.

B TRADITIONAL

MEDICINE

PROGRAM

We have implemented the use of traditional medicine in to

Primary Health care the PHC.

The program is going on.

Sub-center with population

Sl.

No

.

Name of

SC

Distance

from

PHC

Buildi

ng

(Y/N)

No. of

villages

Population Eligib

le

Coupl

e

No. of

ASH

A

No

of

Ang

anw

adi

No of

VHSC

Mal

e

Femal

e

I Gumballi 2.km No 3 2937 2738 821 5 7 3

Ii Komranpu

ra 3km Yes 3 2343 2243 701 3 6 3

Iii B R Hills 24km Yes 10 1219 1168 388 1 7 2

Iv Yeragamb

alli 4km Yes 4 2751 2556 754 5 10 2

V Y K Mole 3km No 3 2198 2086 611 5 6 3

Total 23 1144

8 10791 3275 19 36 13

Staff pattern

Sanctioned Available Sanctioned Available

I Medical officer 1 1 ix Jr.H.A.(M) 4 4

ii Pharmacist 1 1 x Jr.H.A.(F) 5 5

iii Staff Nurse 3 3 xi PMOA 0 1

iv Lab Technician 1 1 xii SDC - -

V FDA / Administrator 1 1 xiii Arogyamitra - -

vi LHV - - xiv Driver 1 1

vii BHEO - - xv Gr,D 1 1

viii Sr.HA - -

Page 60: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Outpatient and Inpatient details

IPD

OPD

Emergency

Male Female Children Male Female Children Male Female Children

Apr-11 8 15 - 537 510 203 - - 1

May-11 13 22 - 567 534 140 - - -

Jun-11 7 9 1 630 547 245 - - -

Jul-11 3 7 - 480 451 244 - 1 -

Aug-11 5 14 - 615 561 353 - 4 -

Sep-11 3 15 - 690 511 264 - - -

Oct-11 1 7 - 653 509 234 - - -

Nov-11 - 7 - 684 611 243 - 1 -

Dec-11 5 9 - 585 552 242 - - -

Jan-12 8 13 - 562 537 319 - - -

Feb-12 4 8 - 577 524 148 - - -

Mar-12 8 10 - 520 488 196 1 - -

Total 65 136 1 7100 6335 2831 1 6 1

Details of Laboratory Services

Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for MP

Test 161 182 222 228 207 244 221 214 232 216 153 88 2368

Total PV - - - - - - - - - - - - -

Total PF - - - - - - - - - - - - -

Total Mixed

type - - - - - - - - - - - - -

HbSAg test 14 15 15 13 21 18 27 29 12 19 13 11 207

Widal 4 6 3 4 6 14 21 20 16 19 19 17 149

VDRL 21 25 15 13 17 18 22 23 11 15 11 10 201

Pregnancy Test 10 6 5 6 14 15 7 2 6 11 8 4 94

Hb% in PHC 28 47 36 39 49 58 62 70 52 64 52 45 602

TLC 6 16 11 17 15 19 21 30 31 26 29 25 246

DLC 6 16 11 17 15 19 21 30 31 26 29 25 246

ESR 6 16 11 17 15 21 23 31 31 26 29 25 251

Urine RE 172 213 248 212 231 384 335 431 265 287 289 292 3359

Blood Groping 16 16 18 16 22 79 26 28 45 17 18 14 315

Page 61: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Water Test For

H2S Method 21 14 26 22 14 35 4 4 22 16 22 11 211

HIV Test ICTC - - - - - 5 6 7 16 5 5 - 44

Bile salt 2 6 4 6 5 4 8 4 6 8 4 8 65

Bile pigment 2 6 4 6 5 4 8 4 6 8 4 8 65

Total 469 584 629 616 636 937 812 927 782 763 685 583 8423

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 21165 2116

5

21681 21681 22314 22045 22432

2 TOTAL ANC

REGISTRATIONS

394 401 376 418 373 379 370

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

294 273 195 274 275 304 310

% 74 68 52 66 74 80 84

4 TT COVERAGE

ANC

400 395 376 402 369 335 354

5 TOTAL

DELIVERIES

356 314 297 301 371 306 334

6 INSTITUTION

DELIVERIES

274 240 246 283 366 301 319

7 %

INSTITUTIONAL

DELIVERIES

77 76 83 94 99 98 96

Vital Indicators

1 MATERNAL

DEATHS

0 0 1 1 0 0 0

2 TOTAL LIVE

BIRTHS

354 304 294 298 364 304 328

3 IMR 11.24 28.66 23.57 26.85 30.22 29.60

53

24.39

Page 62: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 63: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Hirehal

Name of the PHC : Hirehal

Taluk : Ron

District : Gadag

Population Covered : 24614

No. of Sub-Centres : 4

Staff : 14

Date of Taking over : 15.12.2005

Sl.

No

Before taking over After taking over

1 LAND Lot of weeds and

inadequately maintained.

No Fencing

Total area is 1 acre.

Cleaned-up.

Compound wall constructed with

the help of ZP/DHO.

Started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING

& STAFF

QUARTERS

No building maintenance,

untidy and dirty.

Cleaned-up the building.

Citizen Charter displayed in the

PHC.

Name boards written.

Provision for doctor’s stay made in

the PHC campus.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Building were vacant

Cleaned-up the building.

ANMs occupied the Building

Out of 4 sub centers only 2 Sub

centre has government building.

4 EQUIPMENTS Irregular supply and poor

maintenance

Computer, printer and tape recorder

(for IEC activities) supplied from

KT.

Email services are being provided at

the PHC

Page 64: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Some of the essential equipments

were procured from DHO.

Equipments for preparation of

Traditional medicine have been

supplied by KT.

Tele conference and Tele- ECG

facilities are made available in the

PHC.

The lab equipments , birthing kits &

IUD kits were also supplied from

KT

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Office furniture made available

7 STAFF Many vacancies and poor

attendance.

KT has filled up all the vacant

posts.

All the staffs are staying in the head

quarters and rendering the 24 hrs

services.

8 TRAININGS Infrequent PHC staff has been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular supply KT supplies the essential medicines

and lab reagent if there is any delay

in Govt. supply.

10 WATER &

ELECTRICITY

Poor and irregular supply Available

Minor electrical repair work was

undertaken.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according

to KPCB standards and obtained the

KPCB certificate.

13 AMBULANCE Not available An ambulance was provided

through Matching grant from

Rotary club

Page 65: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

14 NEW INNOVATIONS BY KARUNA TRUST

A IEC

ACTIVITIES &

PRA PROGRAM

With the help of our IEC vehicle we organized IEC activities in all

the sub-center areas.

PRA programme also conducted in the village levels.

C TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health

care.

Sub-center with population

Sl.

No.

Name of

SC

Distance

from

PHC

Build

ing

(Y/N)

No. of

villages Population

No.

of

ASH

A

No of

Angan

wadi

No of

VHS

C

Male Female

I Hirehal O N0 2 2712 2491 5 4 2

Ii kotbala 6 KM yes 3 4350 3550 6 7 3

Iii Mugali 12 KM yes 4 2579 2123 4 5 4

Iv Madalageri 10 KM yes 3 2826 2255 6 5 3

Total 12 12467 10419 21 21 12

Staff pattern

Sanctioned Available Sanctioned Available

I Medical officer 1 1 ix Jr.H.A.(M) 3 3

ii Pharmacist 1 1 x Jr.H.A.(F) 4 4

iii Staff Nurse 0 0 xi PMOA 1 1

iv Lab Technician 1 1 xii SDC - -

V FDA /

Administrator

1 1 xiii Arogyamitra - -

vi LHV - - xiv Driver 0 0

vii BHEO - - xv Gr,D 1 2

viii Sr.HA - -

Page 66: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Outpatient and Inpatient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 12 18 0 340 260 32 2 7 0

May-11 11 18 0 282 319 29 4 5 0

Jun-11 13 25 0 262 342 47 4 4 0

Jul-11 8 27 2 269 320 101 13 16 1

Aug-11 9 20 1 241 304 53 13 14 0

Sep-11 16 39 4 235 335 80 5 5 0

Oct-11 16 39 2 354 421 142 9 10 0

Nov-11 13 27 0 365 448 149 3 6 0

Dec-11 4 13 0 290 440 112 3 5 0

Jan-12 1 15 0 373 403 159 5 15 0

Feb-12 2 17 0 357 459 118 4 6 0

Mar-12 5 14 0 250 347 98 2 2 0

Total 110 272 9 3618 4398 1120 67 95 1

Details of Laboratory Services

Name of

Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec Jan-12 Feb Mar

Blood for

MP Test 503 454 469 480 520 840 522 517 588 540 531 500

Total PV 2 1 1 1 2 2 0 2 1 1 5 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 5 4 6 4 0 5 5 6 2 9 0 25

Widal 8 5 12 30 22 30 35 38 20 20 12 20

VDRL 2 6 15 40 18 25 30 38 18 16 20 25

Pregnancy

Test 15 15 12 12 9 17 12 0 6 10 6 15

Hb% in

PHC 60 55 70 110 90 86 100 90 60 68 60 70

TLC 3 5 6 12 12 8 10 30 10 2 2 4

DLC 3 5 6 12 12 8 10 30 10 2 2 4

ESR 3 5 6 12 12 8 15 5 5 12 5 10

Urine RE 70 60 82 120 110 102 110 110 80 70 65 75

Blood

Groping 50 35 40 62 25 48 55 45 20 40 44 40

Page 67: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Water Test

For H2S

Method 11 12 8 8 17 17 0 14 10 12 14 6

HIV Test

ICTC 51 21 48 82 40 45 56 56 36 55 63 52

Bile salt 15 10 15 12 8 18 15 10 8 12 10 12

Bile pigment 15 10 15 12 8 18 15 10 8 12 10 12

Total 816 703 811 1009 905 1277 990 1001 882 881 849 870

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 0 22740 24470 24614 24093 22717 22985

2 TOTAL ANC

REGISTRATIONS

0 590 446 551 513 557 535

3 EARLY ANC

REGISTRATIONS <12

WEEKS

0 307 330 358 403 448 432

% 0 52 74 65 78 80 81

4 TT COVERAGE ANC 0 460 457 476 578 535 552

5 TOTAL DELIVERIES 0 349 373 420 425 389 455

6 INSTITUTION

DELIVERIES

0 175 212 271 395 383 453

7 % INSTITUTIONAL

DELIVERIES

0 50 57 65 93 98 100

Vital Indicators

1 MATERNAL DEATHS 0 1 1 0 1 0 0

2 TOTAL LIVE BIRTHS 0 326 323 411 414 384 453

3 IMR 0 28.65 16.09 17.03 16.90

8

26.041

7

8.83

Page 68: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 69: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Hudem

Name of the PHC : Hudem

Taluk : Kudligi

District : Bellary

Population Covered : 39408

No. of Sub-Centres : 6

Staff : 19

Date of Taking over : 01.02.2005

Sl. No Before taking over After taking over

1 LAND Boundaries of land not clear

Lot of weeds and not adequately

maintained.

No fencing

Total area is 3.4 acres, Compound wall

constructed with the help of ZP funds.

KT has started a demo garden and nursery

for Traditional Medicine and planted about

100 plants of 20 verities in the PHC

campus.

2 PHC BUILDING &

Staff Quarters

Many pending repair works and

maintenance irregular. Window

glasses were broken,

Building has been painted and broken glass

pan of the windows are replaced.

Citizen Charter displayed.

3 SUB-CENTER

BUILDINGS

Poorly maintained and

Buildings were unused and vacant We have the 4 sub centers with the

buildings.

Cleaned-up the building.

ANMs occupied the Building

4 EQUIPMENTS Not being serviced regularly and

supply irregularly. Computer, printer and tape recorder (for

IEC activities) supplied from KT.

Email connectivity is provided at the PHC

Village Resource Centers set up in

collaboration with ISRO.

Tele conference and Tele- ECG facility

available in the PHC.

Some of the essential equipments and

furniture were procured from DHO like

Cots, BP apparatus etc.

Equipments for preparation of traditional

medicines were supplied.

We have supplied centrifuge machine and

other laboratory equipments.

The lab equipments , birthing kits & IUD

kits were also supplied from KT

5 COLD CHAIN

EQUIPMENT

Not maintained. Functional.

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance. All the vacant posts were filled up

All the staffs are staying in the head

Page 70: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

quarters and they are rendering the 24 hrs

service.

8 TRAININGS Infrequent PHC staff has been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Mental Health

Traditional medicine

PRA & Village Health Plan

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular supply KT supplies the essential medicines and lab

reagents in case of delay in Govt. supply.

The lab regents were also supplied from

KT.

10 WATER &

ELECTRICITY

Irregular supply Out of ZP and GP funds a separate bore

well and motor connection done for the

water supply to the hospital.

A new transformer has been installed for

the electricity supply to the PHC and pump

house.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-waste

management in the PHC according to

KPCB standards and obtained KPCB

certificate.

13 AMBULANCE Not available An ambulance was provided through

Matching grant from Rotary club

14 NEW INNOVATIONS BY KARUNA TRUST

A IEC ACTIVITIES &

PRA PROGRAM

With the help of our IEC vehicle we organized IEC activities in all the sub-centers

areas.

B TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Page 71: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff pattern

Sanctioned Available Sanctioned Available

i Medical Officer 1 1 ix Jr. H.A. (M) 4 4

ii Pharmacist 1 1 x Jr. H.A (F) 6 6

iii Staff Nurse 2 1 xi PMOA 1 1

iv Lab. Technician 1 1 xii SDC 1 1

v FDA/Administrator xiii Arogyamitra

vi LHV 1 1 xiv Driver

vii BHEO xv Gr. D 1 1

viii Sr. H.A.

Details of Laboratory Services

Name of Lab

Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 570 721 586 605 641 626 494 361 591 564 412 371

Total PV 0 0 0 0 0 0 1 - 2 - - 0

Total PF 0 0 0 0 0 0 0 - - - - 0

Total Mixed

type 0 0 0 0 0 0 0 - - - - 0

HbSAg test 0 17 34 35 25 16 7 9 5 10 5 121

Widal 2 2 1 2 6 3 9 12 8 10 10 6

VDRL 0 17 34 35 26 18 13 14 22 39 26 15

Pregnancy

Test 21 27 37 22 17 25 17 17 9 12 16 9

Hb% in PHC 29 35 47 50 44 27 80 65 76 59 68 62

TLC 1 2 1 1 1 3 - - - - - 1

DLC 1 2 1 1 1 3 - - - - - 1

ESR 1 2 2 1 1 3 2 2 3 5 6 1

Urine RE 60 54 80 70 64 55 96 55 65 65 72 58

Blood Groping 7 27 34 33 30 173 15 14 22 39 26 15

Water Test

For H2S

Method 8 8 7 6 12 15 10 5 11 11 9 8

HIV Test 0 16 41 34 30 16 97 59 79 94 95 66

Page 72: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

ICTC

Bile salt 2 2 0 1 3 4 3 2 4 6 4 0

Bile pigment 2 2 0 1 3 4 3 2 4 6 4 0

Total 704 934 905 897 904 991 847 617 901 920 753 734

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 34144 36986 35900 37382 38969 39408

2 TOTAL ANC

REGISTRATIONS

938 959 959 1059 934 1025 1090

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

415 591 591 643 758 758 841

% 44 62 62 61 81 73 77

4 TT COVERAGE

ANC

850 896 896 889 930 1058 1009

5 TOTAL

DELIVERIES

633 682 682 825 822 813 900

6 INSTITUTION

DELIVERIES

270 239 239 601 703 751 872

7 %

INSTITUTIONAL

DELIVERIES

42% 35% 35% 73% 86% 92% 97%

Vital Indicators

1 MATERNAL

DEATHS

1 1 0 1 0 1 2

2 TOTAL LIVE

BIRTHS

636 682 669 819 815 811 898

3 IMR 12.64 14.66 23.46 18.32 13.49

7

11.097

4

4.45

Page 73: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 74: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Huvilgola PHC

Name of the PHC : Huvilgola

Taluk : Gadag

District : Gadag

Population Covered : 13,361

No. of Sub-Centres : 3

Staff : 12

Date of Taking over : 16th

October 2008

Sl.

No

Before taking over After taking over

1 LAND Lot of weeds and

inadequately maintained.

Cleaned-up.

Boundaries identified

2 PHC BUILDING

& STAFF

QUARTERS

Many pending repair works

and maintenance irregular.

ANM quarter was dilapidated

Cleaned-up the building.

We have repair of buildings are

under progress .

3 SUB-CENTER

BUILDINGS

One ANMs are residing in the Building

4 EQUIPMENTS Not being serviced regularly

and supply was irregular. Some of the essential equipments

were procured from DHO.

Birthing kits, IUD kits & lab

equipments supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant

posts.

All the staffs are staying in the head

quarters and are rendering the 24

hrs services.

8 TRAININGS Infrequent Planned for training by Karuna

Trust

9 MEDICINES &

REAGENTS

Regular supply Ensured Availability

10 WATER &

ELECTRICITY

Poor and irregular supply. Planned for alternative arrangement

11 WASTE

MANAGEMENT

Not implemented Planned to be implemented in next

year

Page 75: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sub-Centres with Population

Sl.

No.

Name of

SC

Distance

from PHC

Buildin

g

(Y/N)

No. of

village

s Population

Eligib

le

Coupl

e

No.

of

ASH

A

No of

Anganw

adi

No of

VHSC

Male Female

I Huvilgola 4km Y 2 2477 2618 762 5 5 2

Ii Holekoppa 7km N 3 2502 2600 798 4 5 3

Iii Niralagi 22km Y 3 2073 2151 757 4 5 3

Iv Total 8 7052 7369 2317 13 15 8

Staff pattern

Sanctioned Available Sanctioned Available

I Medical officer 1 1 ix Jr. H.A.(M) 3 3

ii Pharmacist 1 1 x Jr. H.A.(F) 3 3

iii Staff Nurse No No xi PMOA No No

iv Lab Technician 1 1 xii SDC No No

V FDA / Administrator 1 1 xiii Arogyamitra No No

vi LHV No No xiv Driver No No

vii BHEO No No xv Gr, D 1 1

viii Sr. H.A. 1 1

Outpatient and Inpatient details

IPD

OPD

Male Female children Male Female Children

Apr-11 5 10 2 222 255 69

May-11 17 24 1 257 376 84

Jun-11 9 18 0 279 435 94

Jul-11 7 7 2 305 278 107

Aug-11 6 6 2 395 297 131

Sep-11 6 9 3 326 300 98

Oct-11 3 10 1 277 328 92

Nov-11 2 2 0 344 448 124

Dec-11 0 0 0 238 307 60

Jan-12 1 1 0 313 344 93

Feb-12 5 3 0 308 287 82

Mar-12 2 3 0 242 266 71

Total 63 93 11 3506 3921 1105

Page 76: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 276 342 347 442 627 337 439 1176 332 322 360 311

Total PV 1 0 0 1 3 0 1 1 3 0 0 0

Total PF 0 0 0 0 1 0 2 0 0 0 0 0

Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 1 2 0 0 0 0 1 13 24 17 6 22

Widal 21 26 48 30 28 35 37 30 25 24 25 15

VDRL 39 35 61 30 38 32 0 12 18 16 5 18

Pregnancy Test 18 13 20 10 9 15 25 14 17 14 12 18

Hb% in PHC 75 74 227 200 70 90 87 100 78 71 60 83

TLC 7 10 12 12 9 25 0 6 3 4 3 7

DLC 7 10 12 12 9 25 0 6 3 4 3 7

ESR 7 10 12 12 9 25 18 12 10 12 11 9

Urine RE 63 51 84 36 61 90 69 81 56 59 47 93

Blood Groping 36 31 202 164 39 30 32 46 34 16 15 43

Water Test For

H2S Method 5 7 6 5 6 8 5 2 3 8 5 0

HIV Test ICTC 39 29 66 0 36 33 20 49 34 36 0 43

Bile salt 10 10 22 21 25 54 25 35 41 30 30 57

Bile pigment 10 10 22 21 25 54 25 35 41 30 30 57

Total 615 660 1141 996 995 853 786 1618 722 663 612 783

Statistics

Sl.

No

Process Indicators 2009-10 2010-11 2011-

2012

1 POPULATION 13276 13367 13762

2 TOTAL ANC

REGISTRATIONS

359 360 335

3 EARLY ANC

REGISTRATIONS <12 WEEKS

203 292 254

% 57 81 76

4 TT COVERAGE ANC 329 381 317

5 TOTAL DELIVERIES 267 300 361

6 INSTITUTION DELIVERIES 217 288 344

7 % INSTITUTIONAL

DELIVERIES

81 96 95

1 MATERNAL DEATHS 1 2 1

2 TOTAL LIVE BIRTHS 266 293 357

3 IMR 26.316 34.1297 10.94

Page 77: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Idagur

Name of the PHC : Idagur

Taluk : Gowribidanur

District : Chikkaballapur

Population Covered : 27,853

No. of Sub-Centres : 4

Staff : 21

Date of Taking over : 01.10.2004

Sl.

No

Before taking over After taking over

1 LAND Lot of weeds and

inadequately maintained.

No Fencing

Total area is 3 acres.

Cleaned-up.

Fencing done.

KT has started a demo garden and

nursery for Traditional Medicine.

2 PHC BUILDING

& STAFF

QUARTERS

Many pending repairs works

and maintenance was

irregular.

Medical Officer quarter was

dilapidated

Cleaned-up the building.

Building was painted.

MO Quarter is renovated &

occupied

Name boards have been written in

the each of the section.

Citizen Charter displayed in the

PHC.

2 Staff quarters were newly

constructed with the help MP

Grants.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings were vacant

Cleaned-up the building.

ANMs occupied the Building

4 EQUIPMENTS Not being serviced regularly

and supply irregular. Computer, printer and tape recorder

(for IEC activities) supplied from

KT.

Email services are being provided at

the PHC

Tele conference and Tele- ECG are

doing in the PHC.

Some of the essential equipments

were procured from DHO.

Equipment for preparation of

Page 78: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Traditional medicines were supplied

from KT

Lab equipments, birthing kits &

IUD kits supplied by KT

5 COLD CHAIN

EQIPMENT

Not properly maintained Functional & properly maintained

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance All the vacant posts are filled

All the staffs are staying in the head

quarters and they are rendering the

24 hrs services.

8 TRAININGS Infrequent The PHC staffs have been trained

on the following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Inadequate &Irregular supply KT has also supplies the essential

medicines &lab reagent in case of

delay in Govt. supply.

10 WATER &

ELECTRICITY

Poor and irregular supply The pump set is repaired and got the

running water in the PHC.

Minor electrical repair work for all

the buildings were taken up.

12 WASTE

MANAGEMENT

Not implemented Implemented the Bio-waste

management in the PHC according

to KPCB standards and obtained the

13 NEW INNOVATIONS BY KARUNA TRUST:

A IEC

ACTIVITIES &

PRA PROGRAM

With the help of our IEC vehicle we organized IEC activities in all

the sub-center areas.

The PRA programme also conducted at the village levels.

B TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into Primary Health care.

Page 79: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sub-center with population

Sl.

No. Name of SC

Distanc

e from

PHC

Buildin

g (Y/N)

No.

of

villag

es Population

Eligibl

e

Coupl

e

No.

of

ASH

A

No of

Angan

wadi

No

of

VH

SC

No

of

SH

G

Male

Femal

e

I Iduguru 0 Yes 5 3517 3381 1040 6 7 5 8

Ii Hampasandra 7 Yes 6 3353 3222 992 6 10 6 6

Iii Nagasandra 9 Yes 4 3277 3149 970 5 6 4 9

Iv Kalludi 13 Yes 6 4520 4343 1324 5 6 3 4

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 2 2 ix Jr. H.A. (M) 4 4

Ii Pharmacist 1 1 x Jr. H.A (F) 5 5

Iii Staff Nurse 1 1 xi PMOA 1 1

Iv Lab. Technician 1 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 1 0

Vi LHV 0 0 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 3 5

Viii Sr. H.A. 0 0

Outpatient and Inpatient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 11 7 3 314 262 159 16 8 4

May-11 3 6 1 384 321 196 7 14 2

Jun-11 9 8 3 361 301 183 14 4 0

Jul-11 20 19 2 314 262 175 12 14 4

Aug-11 24 22 1 311 278 150 24 29 14

Sep-11 26 24 3 407 245 160 22 28 18

Oct-11 16 8 3 347 369 155 24 20 14

Nov-11 17 9 1 631 451 239 21 13 15

Dec-11 19 18 2 464 406 187 24 18 14

Page 80: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Jan-12 9 8 1 299 337 175 22 23 12

Feb-12 14 7 0 234 201 124 22 18 10

Mar-12 24 23 2 285 212 132 35 25 21

Total 192 159 22 4351 3645 2035 243 214 128

Details of Laboratory Services

Name of Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP Test 570 705 695 670 685 491 446 490 404 453 536 512

Total PV 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 1 1 0 0 0 0 0

Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 4 12 7 8 9 9 15 10 10 5 9 9

Widal 6 0 2 19 16 16 9 19 10 6 3 6

VDRL 10 12 9 12 9 9 13 9 10 5 9 8

Pregnancy Test 0 0 0 0 0 0 0 0 0 2 2 5

Hb% in PHC 35 29 68 117 25 30 79 27 21 23 26 28

TLC 0 3 1 0 0 0 0 0 4 0 0 0

DLC 0 3 1 0 0 0 0 0 4 0 0 0

ESR 0 0 0 0 0 0 0 0 4 0 0 0

Urine RE 27 4 27 10 19 19 24 12 15 7 11 14

Blood Groping 9 12 6 8 9 9 13 10 10 5 9 9

Water Test For

H2S Method 0 0 0 0 0 0 0 0 0 0 0 0

HIV Test ICTC 4 18 17 51 16 11 32 16 27 19 9 7

Bile salt 0 0 0 0 0 0 1 0 0 0 0 0

Bile pigment 0 0 0 0 0 0 1 0 0 0 0 0

Total 665 798 833 895 788 595 634 593 519 525 614 598

Statistics:

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 2802

7

37001 37001 34138 27750 28762

2 TOTAL ANC

REGISTRATIONS

588 655 593 774 472 452

3 EARLY ANC 366 352 344 435 298 376

Page 81: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

REGISTRATIONS <12

WEEKS

% 62 54 58 58 63 83

4 TT COVERAGE ANC 476 534 499 653 452 424

5 TOTAL DELIVERIES 360 423 454 539 290 345

6 INSTITUTION

DELIVERIES

252 337 422 512 282 345

7 % INSTITUTIONAL

DELIVERIES

70 80 93 94 97 100

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 2 1 1

2 TOTAL LIVE

BIRTHS

340 407 422 524 290 340

3 IMR 25 9.46 28.63 13.36 31.034 11.76

47

Page 82: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 83: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Kallusadarahalli

Name of the PHC : Kallusadarahalli

Taluk : Arsikere

District : Hassan

Population Covered : 26912

No. of Sub-Centres : 7

Staff : 17

Date of Taking over : 10.01.2006

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained.

No Fencing

Total area is 6.14 acres.

Cleaned-up.

Fencing done.

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

No building maintenance Cleaned-up the building.

Citizen Charter displayed in the PHC.

Name boards written.

All staff including MO stays in

headquarters.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Building were vacant

Cleaned-up the building.

ANMs are staying the Building

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder

supplied from KT.

Email services are being provided at the

PHC

Some of the essential equipments were

procured from DHO.

Equipment for preparation of traditional

medicine.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained. Functional

6 FURNITURE Inadequate Adequately available

7 STAFF Many vacancies and poor

attendance. All the vacant posts were filled up.

All the staffs were staying in the head

quarters and they are rendering the 24 hrs

services.

8 TRAININGS Infrequent The PHC staffs have been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

Page 84: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular Supply KT supplies the essential medicines and lab

reagent in case of delay in Govt. supply.

The lab reagents were also supplied from

KT.

10 WATER &

ELECTRICITY

Poor and irregular supply Minor electrical repair work done for all

the buildings. Water supply regular

11 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB Standards and obtained KPCB

certificate.

12 NEW INNOVATION BY KARUNA TRUST

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

areas.

The PRA programme also conducted at the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-center with population

Sl.

No. Name of SC

Distance

from

PHC

Buildi

ng

(Y/N)

No.

of

villa

ges Population

Eligible

Couple

No.

of

ASH

A

No of

Anga

nwadi

No of

VHS

C

No

of

SH

G

I Kallusadarahalli 0 Y 5 2303 2361 716 5 5 5 15

Ii Shane ere 9 Kim Y 9 1921 1987 588 4 7 3 15

Iii Kuruvanka 14 Kim Y 10 2071 2149 602 4 10 4 8

Iv Maratgere 9 Kim Y 10 2444 2505 738 4 8 4 16

V Purlehalli 16 Km Y 9 2367 2492 745 5 8 4 18

Staff pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 5 5

Ii Pharmacist 1 1 x Jr. H.A (F) 6 6

Iii Staff Nurse 0 0 xi PMOA 1 1

Iv Lab. Technician 1 1 xii SDC 1 1

V FDA/Administrator 0 0 xiii Arogyamitra 0 0

Vi LHV 1 1 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 1 1

Viii Sr. H.A. 0 0

Page 85: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 22 33 0 403 258 86 0 0 0

May-11 39 51 0 490 495 135 0 0 0

Jun-11 41 36 1 284 259 92 0 1 0

Jul-11 18 11 0 210 198 63 0 0 1

Aug-11 5 2 0 188 184 49 1 0 0

Sep-11 1 2 1 263 250 75 0 0 0

Oct-11 62 83 0 328 280 124 0 0 0

Nov-11 47 42 0 324 280 114 0 0 0

Dec-11 51 40 0 294 258 131 0 0 0

Jan-12 4 13 0 280 265 107 0 0 0

Feb-12 0 0 0 239 232 96 1 0 0

Mar-12 0 0 0 295 257 90 1 0 0

Total 290 313 2 3598 3216 1162 3 1 1

Details of Laboratory Services

Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 980 918 921 1003 995 926 1038 1070 903 817 785 839

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 0 0 0 0 0 0 0 0 0 0 0 4

Widal 0 0 0 0 0 1 4 6 0 1 1 1

VDRL 0 4 1 2 0 0 0 0 0 0 0 0

Pregnancy Test 15 12 6 5 6 5 6 13 2 2 2 2

Hb% in PHC 31 34 28 32 27 25 14 22 13 20 23 22

TLC 3 6 2 0 0 0 0 0 0 0 0 0

DLC 3 6 2 0 0 0 0 0 0 0 0 0

ESR 3 6 2 0 0 0 1 0 0 0 0 0

Urine RE 31 34 28 32 27 30 35 22 5 23 11 23

Page 86: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Blood Groping 0 4 1 3 2 2 0 4 0 1 1 2

Water Test For

H2S Method 61 55 55 44 61 48 57 55 59 56 44 53

HIV Test ICTC 29 15 14 12 21 24 5 17 17 10 20 20

Bile salt 6 2 2 2 4 1 5 8 2 6 3 6

Bile pigment

Total

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 0 2484

0

25044 25219 26486 27028 22600

2 TOTAL ANC

REGISTRATIONS

0 264 327 385 435 418 313

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

0 260 311 319 375 358 242

% 0 98 95 83 86 85 77

4 TT COVERAGE

ANC

0 332 331 322 388 397 507

5 TOTAL

DELIVERIES

0 213 279 267 373 421 347

6 INSTITUTION

DELIVERIES

0 121 137 256 365 413 347

7 %

INSTITUTIONAL

DELIVERIES

0 57 49 97 98 98 100

Vital Indicators

1 MATERNAL

DEATHS

0 0 1 0 0 0 0

2 TOTAL LIVE

BIRTHS

0 213 279 267 370 406 347

3 IMR 0 37.56 18.12 11.24 13.514 4.9261

1

14.4

Page 87: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 88: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Kammasandra

Name of the PHC : Kammasandra

Taluk : Doddaballapur

District : Bangalore

Population Covered : 3666

No. of Sub-Centres : 1

Staff : 6

Date of Taking over : 01.06.2003

Sl. No Before taking over After taking over

1 LAND No Land

New land purchased with the help of local

donor

Total area is 1 acres.

Cleaned-up.

Landscaping done.

Fencing done.

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

No buildings.

New PHC building and staff quarters were

constructed with the help of local donor.

Citizen Charter displayed in the PHC.

Name boards written.

KT has constructed compound wall and

provided gate.

3 SUB-CENTER

BUILDINGS

No building. One quarter has been constructed for ANM

in Kammasandra with the help of local

donor.

4 EQUIPMENTS Inadequate Computer, printer and tape recorder (for

IEC activities) supplied from KT.

Some of the essential equipments were

procured from DHO.

We have supplied equipments for

preparation of herbal medicinal..

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

No We have purchased one refrigerator for

this purpose.

6 FURNITURE Inadequate Furniture supplied from KT (table &

chair) with the help of a donors

7 STAFF Irregular and vacancy KT has filled up all the staffs.

All the staffs were staying in the head

quarters and they are rendering the 24 hrs

services.

8 TRAININGS Infrequent KT has given the training to the PHC staff

on the following subjects:

RCH and MCH services.

Page 89: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Waste Management

VRCs in Collaboration with ISRO

9 MEDICINES &

REAGENTS

Irregular supply KT has also supplied the essential

medicines other than the Govt. supply.

The lab reagents were also supplied from

KT.

10 WATER &

ELECTRICITY

Not available New water and electrical connection taken

for the PHC.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards.

13 NEW INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

level.

The PRA programme also conducted in the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

We have implemented the use of traditional medicine in to Primary Health care

the PHC.

The program is going on.

Sub-center with population

Sl.

No. Name of SC

Dista

nce

from

PHC

Build

ing

(Y/N)

No.

of

villag

es Population

Eligi

ble

Cou

ple

No.

of

ASH

A

No

of

Ang

anw

adi

No of

VHS

C

No of

SHG

Male Female

I Kannamagala 8KM NO 12 1884 1864 368 4 8 7 6

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 Ix Jr.H.A. (M) 0 0

Ii Pharmacist 1 1 X Jr.H.A (F) 1 1

iii Staff Nurse 1 1 Xi PMOA 0 0

Iv Lab. Technician 0 0 Xii SDC 1 1

V FDA/Administrator 1 1 Xiii Arogyamitra 0 0

vi LHV 0 0 Xiv Driver 0 0

Page 90: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 4 6 0 259 269 94 0 0 0

May-11 7 8 0 291 277 75 0 0 0

Jun-11 5 2 1 280 280 67 0 0 0

Jul-11 3 1 0 276 265 73 0 0 0

Aug-11 4 3 2 241 224 80 1 0

Sep-11 9 3 2 277 231 66 0 0 0

Oct-11 6 5 1 232 220 84 0 0 0

Nov-11 4 1 0 211 212 58 0 1 0

Dec-11 3 2 0 222 216 71 1 0 0

Jan-12 8 9 0 307 296 79 0 0 0

Feb-12 10 14 0 242 231 59 0 0 0

Mar-12 15 8 0 270 263 40 1 0 0

Total 78 62 6 3108 2984 846 3 1 0

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 0 3252 3409 3839 4096 3666 3748

2 TOTAL ANC

REGISTRATIONS

0 18 23 58 86 73 73

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

1 14 19 58 48 39 53

% 0 78 83 100 55 53 73

4 TT COVERAGE

ANC

0 18 25 38 51 90 61

5 TOTAL

DELIVERIES

0 10 9 43 60 71 54

6 INSTITUTION

DELIVERIES

0 9 9 43 60 69 54

7 % INSTITUTIONAL

DELIVERIES

0 90 100 100 100 97 100

Vital Indicators

1 MATERNAL 0 0 0 0 0 0 0

Page 91: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

DEATHS

2 TOTAL LIVE

BIRTHS

0 10 9 43 60 71 55

3 IMR 0 0 0 0 0 0 0

Page 92: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Kannura

Name of the PHC : Kannur

Taluk : Bijapur

District : Bijapur

Population Covered : 57148

No. of Sub-Centres : 11

Staff : 25

Date of Taking over : 20.05.2005

Sl. No Before taking over After taking over

1 LAND No boundaries.

Lot of weeds and inadequately

maintained.

No Fencing

Total area is 5 acres.

Cleaned-up.

Boundaries identified

Land scalping done.

Planted few trees in the campus.

Fencing done

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

maintenance irregular.

All the staff quarters were

dilapidated

Cleaned-up the building.

We have repainted the building.

Staff Quarters were renovated & occupied.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings were vacant

Cleaned-up the buildings.

ANMs occupied the Building

Minor repair work taken up in the S/C also.

4 EQUIPMENTS Not maintained properly and supply

was irregular. Computer, printer and tape recorder (for

IEC activities) supplied from KT.

Email services are being provided at the

PHC

VRC equipments were installed in

collaboration with ISRO.

Tele conference and Tele- ECG facilities

are made available in the PHC.

Some of the essential equipments were

procured from DHO.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained. Available and functional

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant posts.

All the staffs are staying in the head

quarters and are rendering the 24 hrs

services.

8 TRAININGS Infrequent PHC staff has been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Page 93: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

VRC equipments installed in Collaboration

with ISRO.

Bio-waste Management

9 MEDICINES &

REGENTS

Irregular supply. KT supplies the essential medicines other

lab. Reagents in case of delay in the Govt.

supply.

10 WATER &

ELECTRICITY

Poor and irregular supply.

Minor electrical repair work undertaken.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-waste

management in the PHC according to

KPCB standards and obtained KPCB

certificate.

12 AMBULANCE Not available An ambulance was provided by rotary club

14 INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area.

The PRA programme also conducted in the village levels.

Sub-center with population

Sl.

No. Name of SC

Dista

nce

from

PHC

Buildi

ng

(Y/N)

No.

of

villag

es Population

Eligi

ble

Coup

le

No.

of

ASH

A

No of

Anga

nwad

i

No

of

VHS

C

No

of

SH

G

Male Female

I Kannur HQ Yes 3 6408 6158 1947 3 11 2 3

Ii Tidagundi 7km Yes 2 2113 2032 642 1 5 2 2

Iii Dommanala 14km Yes 3 1687 1623 513 1 4 1 2

Iv Gunaki 15km Yes 3 2731 2624 825 3 8 2 1

V Minchanala 18km Yes 2 2731 2625 830 3 5 1 1

Vi Makhanapura 6km No 3 3089 2968 920 1 7 2 2

vii Siddapur 8km Yes 1 2453 2358 710 0 7 1 1

viii Arakeri 16km Yes 4 2584 2483 780 2 8 1 3

ix Bhutanala 20km No 2 2493 2004 759 3 5 0 1

X Jalageri 25km Yes 2 2527 2428 752 3 6 1 2

XI Yatnala 36km Yes 2 1546 1487 485 0 3 1 1

Total 27 30362 28790 9163 20 69 14 19

Page 94: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern:

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr.H.A. (M) 6 6

ii Pharmacist 1 1 x Jr.H.A (F) 11 11

iii Staff Nurse 1 1 xi PMOA 0 0

iv Lab. Technician 0 1 xii SDC 0 0

v FDA/Administrator 1 1 xiii Arogyamitra 0 0

vi LHV 1 1 xiv Driver 0 0

vii BHEO 0 0 xv Gr. D 2 2

viii Sr. H A 1 1

Outpatient and Inpatient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 15 49 0 559 573 185 0 5 1

May-11 37 75 5 690 658 222 1 6 0

Jun-11 27 92 3 736 753 283 0 6 0

Jul-11 12 72 3 984 1025 187 0 1 0

Aug-11 15 80 5 832 986 150 0 6 0

Sep-11 18 62 0 1047 1036 193 2 2 0

Oct-11 7 57 0 647 725 248 2 8 0

Nov-11 8 46 0 688 755 283 0 4 0

Dec-11 4 42 0 778 866 195 0 0 0

Jan-12 13 40 0 952 993 315 0 0 0

Feb-12 5 54 0 755 868 208 0 1 0

Mar-12 12 35 3 841 731 221 3 11 1

Total 173 704 19 9509 9969 2690 8 50 2

Details of Laboratory Services

Name of

Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for

MP Test 785 773 732 810 1071 953 768 791 718 729 553 505

Total PV 26 18 8 6 4 2 3 2 2 0 2 0

Total PF 0 0 0 0 1 3 1 0 0 0 0 0

Total 0 0 0 0 0 0 0 0 0 0 0 0

Page 95: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Mixed type

HbSAg test 29 27 46 33 25 36 41 42 30 20 38 26

Widal 2 2 7 2 12 1 5 5 8 12 8 11

VDRL 29 27 46 33 23 35 38 41 31 30 35 26

Pregnancy

Test 36 43 50 37 33 35 29 31 26 29 23 37

Hb% in

PHC 45 39 62 53 38 48 54 64 41 48 48 53

TLC 0 0 6 0 0 0 0 6 0 0 0 1

DLC 0 0 6 0 0 0 0 6 0 0 0 1

ESR 1 0 7 2 2 0 4 7 0 0 0 1

Urine RE 33 35 56 34 22 35 41 43 32 30 40 29

Blood

Groping 31 30 55 35 29 36 45 45 28 36 40 31

Water Test

For H2S

Method 36 21 22 48 52 48 37 30 34 36 16 10

HIV Test

ICTC 160 90 191 240 108 129 175 191 119 149 151 141

Bile salt 0 0 0 0 1 1 0 0 0 0 0 0

Bile

pigment 0 0 0 0 1 1 0 0 0 0 0 0

Total 1213 1105 1294 1333 1422 1363 1241 1304 1069 1119 954 872

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

2012

1 POPULATION 49317 53237 53237 53442 55255 55582 57148

2 TOTAL ANC

REGISTRATION

S

1151 1625 1438 1429 1566 1580 1838

3 EARLY ANC

REGISTRATION

S <12 WEEKS

562 1480 665 853 945 880 968

% 49 91 46 60 60 55 53

4 TT COVERAGE

ANC

928 1328 1086 950 1925 1623 1912

5 TOTAL

DELIVERIES

857 843 1096 1139 1228 1157 1374

6 INSTITUTION

DELIVERIES

360 272 584 690 1146 1155 1293

7 % 42 32 53 61 93 100 94

Page 96: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

INSTITUTIONAL

DELIVERIES

Vital Indicators

1 MATERNAL

DEATHS

0 1 0 0 1 0 0

2 TOTAL LIVE

BIRTHS

0 835 1096 1125 1216 1146 1370

3 IMR 12.84 22.54 20.99 24.89 21.38

2

16.579

4

13.43

Page 97: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Kohinoor

Name of the PHC : Kohinoor

Taluk : Basavakalyana

District : Bidar

Population Covered : 14816

No. of Sub-Centres : 3

Staff : 20

Date of Taking over : 15.11.2005

Sl. No Before taking over After taking over

1 LAND No boundaries.

Lot of weeds and not adequately

maintained.

Total area is 120 x 20 feet.

Cleaned-up.

Boundaries identified

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

maintenance irregular.

All the staff quarters were

dilapidated

Cleaned-up the building.

Buildings were repainted.

Staff Quarters were renovated & occupied.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings were vacant

Cleaned-up the building.

ANMs occupied the Buildings

Minor repair work done.

4 EQUIPMENTS Not being serviced regularly and

supply was irregular. Computer, printer and tape recorder(for

IEC activities) supplied from KT.

Email services are being provided at the

PHC

VRC equipments were installed in

collaboration with ISRO.

Tele conference and Tele- ECGs are done

at the PHC.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Adequate

7 STAFF Many vacancies and poor

attendance.

All the vacant posts are filled up.

All the staffs were staying in the head

quarters and they are rendering the 24 hrs

services.

8 TRAININGS Infrequent KT has given the training to the PHC staff

on the following subjects:

RCH and MCH services.

HIV/AIDS.

Page 98: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

VRCs in Collaboration with ISRO.

Bio-waste Management

9 MEDICINES &

REGENTS

Irregular supply KT has also supplies the essential

medicines and lab reagents.

10 WATER &

ELECTRICITY

Poor and irregular supply Minor electrical repair work was taken up

in all the buildings.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards and obtained the KPCB

certificate.

12 AMBULANACE Not available Population Foundation of India provided

an ambulance

13 NEW INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area.

The PRA programme also conducted in the village levels.

Sub-center with population

Sl.

No

.

Name of

SC

Distanc

e from

PHC

Buil

ding

(Y/N

)

No.

of

villag

es Population

Eligib

le

Coupl

e

No.

of

ASH

A

No of

Angan

wadi

No of

VHSC

No of

SHG

Male Female

1

Kohinoor

1st 0 No 1 1762 1704 548 5 4 1 21

2

Kohinoor

2nd 5 No 4 2145 2067 644 3 4 2 10

3 Batgera 8 yes 5 2345 2122 641 5 5 2 14

Total 10 6252 5893 1833 13 13 5 45

Page 99: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff pattern

Sanctioned Available Sanctioned Available

I Medical Officer 2 2 ix Jr.H.A. (M) 2 2

Ii Pharmacist 1 1 x Jr.H.A (F) 3 3

Iii Staff Nurse 4 3 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 1 1

V FDA/Administrator 0 0 xiii Arogyamitra 0 0

Vi LHV 1 1 xiv Driver 1 1

vii BHEO 0 0 xv Gr. D 4 4

viii Sr. H A 1 1

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female children Male Female Male Female

Apr-11 19 34 1 422 578 10 16

May-11 19 29 0 363 432 9 11

Jun-11 18 20 4 525 798 12 17

Jul-11 22 20 2 500 622 14 16

Aug-11 5 37 0 392 615 12 20

Sep-11 9 51 0 455 653 10 26

Oct-11 8 48 0 424 540 5 7

Nov-11 10 38 10 545 505 8 30

Dec-11 11 41 0 568 1000 6 9

Jan-12 4 38 2 444 503 9 19

Feb.12 10 49 3 424 611 7 19

Mar.12 12 55 5 398 502 14 18

Total 147 460 27 5460 7359 116 208

Page 100: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Laboratory Services Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 174 177 297 196 173 171 188 165 222 195 196 160

Total PV 0 0 0 0 1 1 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 1

HbSAg test 2 1 0 3 0 2 1 2 3 0 0 1

Widal 8 6 3 0 2 1 6 5 12 0 0 0

VDRL 4 3 2 1 0 2 0 2 1 5 2 0

Pregnancy Test 4 6 3 5 8 7 2 0 4 10 12 11

Hb% in PHC 12 8 14 18 16 12 17 9 15 25 25 13

TLC 0 0 0 0 0 0 0 0 0 0 0 0

DLC 0 0 0 0 0 0 0 0 0 0 0 0

ESR 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 7 3 5 6 4 8 2 4 5 7 4 3

Blood Groping 6 3 4 5 7 2 8 6 0 0 0 0

Water Test For

H2S Method 3 4 9 17 5 6 4 3 0 2 5 2

HIV Test ICTC 18 11 28 25 26 18 7 23 20 17 37 30

Bile salt 2 4 3 5 6 4 1 2 3 5 3 3

Bile pigment 2 4 3 5 6 4 1 2 3 5 3 3

Total 242 230 371 286 254 238 237 223 288 271 287 227

Page 101: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 28629 29630 3196

0

32605 15914 14110 12145

2 TOTAL ANC

REGISTRATIONS

0 659 659 770 750 338 361

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

0 315 315 505 420 234 268

% 0 48 48 66 56 69 74

4 TT COVERAGE

ANC

0 659 620 749 578 236 249

5 TOTAL

DELIVERIES

292 580 580 682 599 407 523

6 INSTITUTION

DELIVERIES

0 150 146 487 581 399 518

7 %

INSTITUTIONAL

DELIVERIES

0 26 25 71 97 98 99

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 0 0

2 TOTAL LIVE

BIRTHS

0 580 570 671 591 400 505

3 IMR 0 6.9 6. 17 8.4602 4.9 9.9

Page 102: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Mallapura

Name of the PHC : Mallapura

Taluk : Jagalur

District : Davangere

Population Covered : 29328

No. of Sub-Centres : 6

Staff : 22

Date of Taking over : 20-06-2005

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained.

No Fencing

Total area is 4 acres.

Cleaned-up.

Fencing done

KT has started a demo garden and

nursery for Traditional Medicine.

2 PHC BUILDING

& STAFF

QUARTERS

Many pending repair works and

maintenance irregular.

Cleaned-up the building.

Repainted the building.

All the quarters were occupied by our

staff.

Citizen Charter displayed in the PHC.

Name boards written.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings were vacant

Cleaned-up the buildings.

ANMs occupied the Buildings.

We have 6 sub centers with building.

Page 103: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

4 EQUIPMENTS Not being serviced regularly and

supply irregular.

Computer, printer and tape recorder(for

IEC activities) supplied from KT.

Email services are being provided at

the PHC

Some of the essential equipments were

procured from DHO.

Equipments for preparation of

Traditional medicines were supplied.

Village Resource Center equipments

were installed in collaboration with

ISRO.

Tele conference and Tele- ECG

facilities are made available in the

PHC.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance.

KT has filled up all the vacant posts.

All the staffs are staying in the head

quarters and are rendering the 24 hrs

services.

8 TRAININGS Infrequent PHC staffs are trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular supply KT also supplies the essential

medicines other lab reagents in case

shortage.

10 WATER &

ELECTRICITY

Poor and irregular supply Minor electrical repair work for all the

buildings were taken up.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards and obtained KPCB

certificate.

13 NEW INNOVATIONS BY KARUNA TRUST

Page 104: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

A IEC ACTIVITIES

& PRA

PROGRAM

With the help of our IEC vehicle we organized IEC activities in all the

sub-center area.

The PRA programme also conducted in the village levels.

B TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-center with population

Sl.

No. Name of SC

Distanc

e from

PHC

Build

ing

(Y/N)

No.

of

villag

es Population

Eligib

le

Coupl

e

No.

of

AS

HA

No of

Anga

nwadi

No

of

VHS

C

No

of

SHG

Male Female

I Mallapura 0 Yes 4 1173 1211 366 3 3 3 9

Ii

Chikamalanahol

le 3km Yes 6 1944 2231 601 4 8 4 25

Iii

Heremalanaholl

e 8km yes 6 2126 2169 721 4 6 5 27

Iv Huchovanahalli 12km yes 6 2882 2800 973 3 7 5 22

V Hanamathapura 28km yes 8 3481 3524 1347 6 9 5 29

Vi Anabura 32km Yes 9 2991 3009 905 5 9 5 31

Total 39

1459

7 14944 4913 25 42 27 143

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 Ix Jr. H.A. (M) 2 2

Ii Pharmacist 1 1 X Jr. H.A (F) 6 6

Iii Staff Nurse 1 1 Xi PMOA 0 0

Iv Lab. Technician 1 1 Xii SDC 0 0

V FDA/Administrator 1 0 Xiii Arogyamitra 0 1

Vi LHV 1 1 Xiv Driver 1 0

Page 105: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Vii BHEO 0 0 Xv Gr. D 3 3

Viii Sr. H.A. 1 1

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Male Female Male Female

Apr-11 21 19 449 542 0 3

May-11 11 10 525 372 2 1

Jun-11 8 14 540 451 0 0

Jul-11 24 32 468 560 0 5

Aug-11 6 18 615 536 1 6

Sep-11 12 8 496 738 2 0

Oct-11 11 32 416 563 0 2

Nov-11 10 22 555 596 4 0

Dec-11 12 13 445 400 2 3

Jan-12 6 16 715 544 0 0

Feb-12 6 19 565 603 0 2

Mar-12 14 9 286 413 1 5

Total 141 212 6075 6318 12 27

Details of Laboratory Services

Name of Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP Test 466 653 740 605 823 564 696 373 500 557 419 375

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0

Hbs aeg test 0 0 0 2 1 2 1 0 0 4 2 3

Widal 0 0 0 0 0 0 0 0 0 0 5 2

VDRL 3 4 9 6 13 9 20 0 9 8 10 10

Pregnancy Test 21 42 34 20 11 14 27 20 49 15 47 26

Hb% in PHC 0 0 0 0 0 0 0 0 14 15 13 15

TLC 0 0 0 0 0 0 0 0 14 15 13 15

DLC 0 0 0 0 0 0 0 0 14 15 13 15

ESR 13 43 35 42 12 23 30 19 51 49 46 21

Urine RE 0 0 0 0 1 0 0 0 0 0 2 4

Blood Groping 29 24 27 0 0 0 32 20 21 26 18 0

Page 106: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Water Test For

H2S Method 12 12 16 8 15 10 5 12 21 20 20 0

HIV Test ICTC 0 0 0 2 2 0 0 0 3 5 8 3

Bile salt 0 0 0 0 0 0 0 0 6 4 6 0

Bile pigment 0 0 0 0 0 0 0 0 6 4 6 0

Total 544 778 861 685 878 622 811 444 708 737 628 489

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-12

1 POPULATION 25737 26766 26966 27529 28548 29223 29323

2 TOTAL ANC

REGISTRATIONS

625 715 626 540 488 537 688

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

290 344 380 437 354 423 577

% 46 48 61 81 72 78 84

4 TT COVERAGE

ANC

580 628 618 685 531 564 566

5 TOTAL

DELIVERIES

463 546 542 524 458 421 501

6 INSTITUTION

DELIVERIES

271 380 431 365 399 399 472

7 %

INSTITUTIONAL

DELIVERIES

59 70 80 68 87 95 94

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 1 1 0 1

2 TOTAL LIVE

BIRTHS

460 546 542 471 458 421 500

Page 107: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

3 IMR 8.64 3.66 9.23 19.23 26.201 28.503

6

16.00

Page 108: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Nandikeshwara

Name of the PHC : Nandikeshwara

Taluk : Badami

District : Bagalkot

Population Covered : 20908

No. of Sub-Centres : 3

Staff : 16

Date of Taking over : 25.01.2006

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained. Total area is 3 acres.

Cleaned-up.

KT has started a demo garden and nursery

for Traditional Medicine.

We have planted 211 plants in the PHC

campus with the help of Forest department

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

maintenance irregular.

All the staff quarters were

dilapidated

Cleaned-up the building.

We have repainted the building.

Staff Quarters were renovated & occupied

Citizen charter has been displayed.

Sign boards have been written for each of

the sections.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Building was vacant

Cleaned-up the building.

ANM occupied the Building

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder (For

IEC activities ) supplied from KT.

Email services are being provided at the

PHC

Village Resource Center equipments were

installed in collaboration with ISRO.

Tele conference and Tele- ECG facilities

are made available in the PHC.

Some of the essential equipments were

received from DHO.

Equipments for preparation of traditional

medicine has been supplied by KT.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Non Functional.

Minor repair Functional.

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance. All the vacant posts have been filled up.

All the staffs are staying in the head

quarters and they are rendering the 24 hrs

services.

Page 109: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

8 TRAININGS Infrequent The PHC staff have been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REGENTS

Irregular supply. KT supplies the essential medicines &other

lab reagents in case of delay in Govt.

supply.

10 WATER &

ELECTRICITY

Not available / Under repair The pump set is repaired and got the

running water in the PHC.

Minor electrical repair work for all the

buildings were taken up.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-waste

management in the PHC as per the KPCB

standard and obtained certificate from the

board.

13 INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area.

The PRA programme also conducted in the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care..

Sub-center with population

Sl.

N

o Name of SC

Distan

ce

from

PHC

Buildi

ng

(Y/N)

No.

of

villag

es Population

Eligi

ble

Cou

ple

No.

of

ASH

A

No of

Angan

wadi

No of

VHS

C

Male

Femal

e

1 Nandikeshwara 0 NO 4 4494 4345 1326 7 10 3

2 Kutkankeri 14 km yes 4 2908 2931 876 5 7 3

3 Adagal 11 km yes 3 3146 3084 935 4 6 2

Total 0 11 10548 10360 3137 16 23 8

Page 110: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff pattern

Sanctioned Available Sanctioned Available

I

Medical

Officer 1 1

Ix

Jr.H.A. (M) 3 3

Ii Pharmacist 1 1 X Jr.H.A (F) 3 3

Iii Staff Nurse 3 3 Xi PMOA 0 1

Iv

Lab.

Technician 1 1

Xii

SDC 0 0

V

FDA/Administ

rator 1 1

Xii

i

Arogyamitra 0 1

Vi

LHV 1 1

Xi

v

Driver 0 0

vii BHEO 0 0 Xv Gr. D 2 2

viii Sr. H A 1 1

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Children Male Female Children Male Female

Apr-11 3 18 1 304 469 135 1 3

May-11 12 36 1 3 86 666 135 8 13

Jun-11 18 53 6 466 973 224 6 6

Jul-11 5 19 3 747 543 123 5 3

Aug-11 2 12 0 747 543 123 5 5

Sep-11 5 23 2 459 718 84 6 5

Oct-11 6 25 3 330 660 112 0 0

Nov-11 8 19 1 384 536 130 1 4

Dec-11 5 17 0 279 665 171 2 1

Jan-12 7 16 3 317 775 164 4 0

Feb-12 6 16 0 310 505 105 4 1

Mar-12 6 19 1 382 441 97 1 0

Total 83 273 21 5111 7494 1603 43 41

Page 111: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 254 318 511 529 533 489 519 558 530 635 517 495

Total PV 0 0 0 5 4 0 1 0 0 0 2 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

Blood Sugar 0 0 0 0 0 0 0 0 0 0 0 0

Widal 3 3 5 3 0 5 4 7 3 3 6 2

VDRL 0 0 0 0 0 0 0 0 0 0 0 0

Pregnancy Test 11 8 12 5 4 11 3 8 6 7 6 10

Hb% in PHC 61 21 45 29 40 35 25 28 22 41 29 44

TLC 1 0 0 3 1 0 0 0 0 0 0 0

DLC 1 0 0 3 1 0 0 0 0 0 0 0

ESR 1 0 0 3 1 0 0 1 0 5 1 0

Urine RE 62 45 76 78 29 30 34 26 18 39 23 32

Blood Groping 2 2 5 0 1 0 0 0 0 0 0 0

HIV TEST 21 25 31 29 27 4 23 33 21 39 33 33

Water Test For

H2S Method 9 6 3 7 6 4 8 4 8 10 10 7

Grant Total 426 428 688 694 647 578 617 665 608 779 627 623

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 0 19280 19280 19431 20217 20217 21944

2 TOTAL ANC

REGISTRATIONS

0 583 469 463 552 567 650

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

0 268 304 357 452 397 456

% 0 46 65 77 81 70 70

4 TT COVERAGE

ANC

0 558 500 467 552 514 632

5 TOTAL 0 388 431 435 502 421 520

Page 112: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

DELIVERIES

6 INSTITUTION

DELIVERIES

0 172 272 284 430 381 511

7 %

INSTITUTIONAL

DELIVERIES

0 44% 63% 65% 86% 90% 98%

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 1 0

2 TOTAL LIVE

BIRTHS

0 385 431 418 495 413 498

3 IMR 0 12.89 25.52 28.71 14.141 26.63

44

12.00

Page 113: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Pattanayakanahalli

Name of the PHC : Pattanayakanahalli

Taluk : Sira

District : Tumkur

Population Covered : 38416

No. of Sub-Centres : 11

Staff : 35

Date of Taking over : 04.07.2005

Sl.No Before taking over After taking over

1 LAND Lot of weeds and t inadequately

maintained.

No Fencing

Total area is 4 acres.

Cleaned-up.

Fencing done.

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

maintenance irregular.

Medical Officer quarters was

dilapidated

Cleaned-up the building.

We have repainted the building.

MO Quarter was renovated & occupied

Name boards have been written in the each

of the section.

Citizen Charter was displayed in the PHC.

New 2 Staff quarters were constructed with

the help of local donor.

Operation Theater was renovated through

local MLA funds.

Rain water harvesting work is under

process with the help of local NGO.

Page 114: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

3 SUB-CENTER

BUILDINGS

Buildings were vacant and poorly

maintained. Cleaned-up the building.

ANMs occupied the Building

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder (for

IEC activities ) supplied from KT.

Email services are being provided at the

PHC

Village Resource center equipments were

installed in collaboration with ISRO.

Tele conference and Tele- ECG facilities

are made available in the PHC.

Some of the essential equipments were

procured from DHO.

Equipments for preparation of herbal

medicinal have been supplied by KT.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Some of the chairs received from the

Swasahaya Sangha’s as donation.

Some of the furniture and equipments

received from Helpage India and Viveka

Drusti Eye Hospital, Bangalore.

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant posts .All

the staffs are staying in the head quarters

and are rendering the 24 hrs services.

8 TRAININGS Irregular The PHC staffs have been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REGENTS

Irregular supply KT supplies the essential medicines &

other lab reagent if there is shortage in

Govt. supply. L

Free medicines were received from Micro

Labs and supplied.

10 WATER &

ELECTRICITY

Poor and irregular supply The pump set is repaired and got the

running water in the PHC through

Grampanchyath.

We have done the minor electrical repair

work for all the buildings.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards obtained the certificate

from the board.

12 AMBULANACE Not available An ambulance was provided by Rotary

club

Page 115: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

13 INNOVATIONS BY KARUNA TRUST

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area.

The PRA programme also conducted in the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-center with population

Sl

.

N

o

Name of

SC

Distan

ce

from

PHC

Build

ing

(Y/N)

No.

of

villa

ges Population

Eligi

ble

Cou

ple

No.

of

ASH

A

No

of

Ang

anw

adi

No

of

VH

SC

No

of

SH

G

Male

Fem

ale

I P N Halli 0 km N0 2 2047 2080 607 4 5 1 12

Ii Nadur 1 km NO 4 1350 1292 396 3 4 2 15

Iii

kereyagal

ahalli 8 km NO 4 1150 1124 341 3 5 0 16

Iv

H

gollahalli 8 km YES 5 1550 1547 464 2 5 1 14

V

thogarigu

nnte 10 km NO 3 1368 1374 411 2 4 1 13

V

i

Bandkunt

te 14 km NO 4 1850 1814 549 3 5 1 11

vi

i gowdgere 24 km YES 6 1840 1730 541 4 7 4 14

vi

ii

changava

ra 15 km YES 8 2070 2046 612 4 8 1 12

ix

bevinahal

li 20km YES 4 2130 2002 610 4 7 4 17

ii

x Hemdore 8km NO 5 2100 2060 618 4 7 2 10

x

Veergana

halli 6 km NO 4 1795 1770 534 4 4 1 9

Page 116: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 3 3 ix Jr.H.A. (M) 7 7

Ii Pharmacist 1 1 x Jr.H.A (F) 11 11

Iii Staff Nurse 3 3 xi PMOA 0 1

Iv Lab. Technician 2 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 0 0

Vi LHV 1 1 xiv Driver 1 1

vii BHEO 1 1 xv Gr. D 3 3

viii Sr. H A 1 1

Details of Laboratory Services

Name of

Lab Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for

MP Test 798 762 904 842 951 965 922 900 1032 945 849 807

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

Hbs aeg test 0 0 0 0 0 0 0 16 35 50 50 23

Widal 0 0 0 0 0 0 0 1 6 4 6 3

VDRL 0 4 51 43 48 46 33 57 37 35 43 0

Pregnancy

Test 40 10 30 32 49 23 38 26 35 40 43 43

Hb% in

PHC 100 104 123 137 130 123 121 110 126 125 140 127

TLC 0 0 0 0 0 0 0 0 0 0 0 0

DLC 0 0 0 0 0 0 0 0 0 0 0 0

ESR 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 280 380 318 330 387 326 450 390 305 370 335 355

Blood

Groping 0 0 41 24 29 28 22 39 23 37 38 23

Water Test

For H2S

Method 0 0 0 0 0 9 8 9 5 7 6 12

HIV Test

ICTC 0 0 0 0 0 7 6 5 7 2 4 3

Bile salt 6 3 3 2 4 7 6 5 7 2 4 3

Bile

pigment 6 3 3 2 4 0 0 0 0 0 0 0

Page 117: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Total 1230 1266 1473 1412 1602 1534 1606 1558 1618 1617 1518 1399

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-12

1 POPULATION 38080 38931 39374 39630 39820 35801

2 TOTAL ANC

REGISTRATION

S

749 751 713 849 837 662 731

3 EARLY ANC

REGISTRATION

S <12 WEEKS

435 505 471 594 627 628 651

% 58 67 66 70 74 94 89

4 TT COVERAGE

ANC

784 753 713 758 442 729 697

5 TOTAL

DELIVERIES

615 623 604 676 690 635 659

6 INSTITUTION

DELIVERIES

371 464 484 615 646 635 659

7 %

INSTITUTIONAL

DELIVERIES

60 74 80 91 94 100 100

Vital Indicators

1 MATERNAL

DEATHS

0 1 0 0 1 1 0

2 TOTAL LIVE

BIRTHS

613 622 600 672 684 630 651

3 IMR 27.64 27.29 16.56 16.37 17.544 23.809

5

10.75

Page 118: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 119: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sreemangala

Name of the PHC : Sreemangala

Taluk : Virajpet

District : Kodagu

Population Covered : 8883

No. of Sub-Centres : 14

Staff : 22

Sl. No Before taking over After taking over

1 LAND Lot of weeds and inadequately

maintained.

No Fencing

Total area is 4 acres.

Cleaned-up.

Fencing done.

KT has started a demo garden and nursery

for Traditional Medicine.

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

maintenance irregular.

Cleaned-up the building.

Repainted the building.

Citizen Charter has been displayed in the

PHC.

Name boards written.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Building were vacant Cleaned-up the building.

ANMs occupied the Building

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder ( for

IEC activities ) supplied from KT.

Email services are being provided at the

PHC

Some of the essential equipments were

procured from DHO.

Equipments for preparation of herbal

medicine has been supplied by KT.

Village Resource Center equipments were

installed in collaboration with ISRO.

Tele conference and Tele- ECG facilities

are made available in the PHC.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained. Functional

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant posts.

All the staffs are staying in the head

quarters and are rendering the 24 hrs

services.

8 TRAININGS Infrequent The PHC staff have been trained on the

following subjects:

Page 120: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-w3aste Management

9 MEDICINES &

REAGENTS

Irregular supply KT supplies the essential medicines &

other lab reagents in case of any delay in

Govt. supply.

10 WATER &

ELECTRICITY

Poor and Irregular supply We have done some minor electrical repair

work for all the buildings.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-waste

management in the PHC according to

KPCB standards and obtained the

certificate from the Board.

12 AMBULANACE Not available KT provided an ambulance

14 NEW INNOVATIONS BY KARUNA TRUST

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area..

The PRA programme also conducted in the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-Centres with Population

Sl.

N o. Name of SC

Dist

ance

fro

m

PH

C

Buil

ding

(Y/

N)

No.

of

villa

ges Population

Elig

ible

Cou

ple

No.

of

ASH

A

No of

Angan

wadi

No of

VHS

C

No

of

SHG

Male Female

I

SRIMANGA

LA 0 Y 3 795 919 206 3 3 1 3

Ii KURCHI 10 Y 4 1204 1138 512 1 4 1 4

Iii NALKERI 10 Y 4 1214 1132 334 2 4 2 2

Iv KOTHUR 18 Y 3 965 918 289 1 3 1 2

Page 121: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 2 2

Ii Pharmacist 1 1 x Jr. H.A (F) 4 4

Iii Staff Nurse 1 1 xi PMOA 0 1

Iv Lab. Technician 1 1 xii SDC - -

V FDA/Administrator 1 1 xiii Arogyamitra - -

Vi LHV 1 1 xiv Driver - -

Vii BHEO 0 0 xv Gr. D 4 4

Viii Sr. H.A. 1 1 Cook 1 1

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female children Male Female Children Male Female Children

Apr-11 20 34 0 330 363 115 4 3 0

May-

11 18 20 0 387 418 128 3 7 0

Jun-11 4 17 1 364 331 158 7 2 0

Jul-11 8 19 1 519 403 256 8 5 0

Aug-

11 14 26 0 635 624 244 5 10 0

Sep-11 11 21 0 515 418 219 4 5 0

Oct-11 12 15 0 469 510 157 4 6 0

Nov-

11 17 31 0 523 476 152 6 4 0

Dec-11 8 18 0 345 285 170 5 5 0

Jan-12 6 17 0 666 524 160 4 9 0

Feb-12 6 19 0 570 403 173 6 10 0

Mar-12 8 31 0 366 450 137 6 2 0

Total 132 268 2 5689 5205 2069 62 68 0

Page 122: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 135 132 146 185 207 255 201 152 176 201 176 156

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 0 1 1 0 4 0 0 0 6 8 12 14

Widal 3 1 3 1 3 6 3 2 11 20 8 6

VDRL 5 11 7 10 7 4 14 6 7 12 14 15

Pregnancy

Test 13 10 7 21 33 21 11 10 15 12 10 10

Hb% in PHC 43 34 38 77 111 118 166 95 84 119 75 81

TLC 7 0 4 8 4 0 0 0 1 0 0 0

DLC 7 0 4 8 4 0 0 0 1 0 0 0

ESR 1 0 0 3 1 0 0 0 0 0 0 0

Urine RE 38 24 28 46 63 75 78 39 37 52 48 42

Blood

Groping 8 18 14 20 18 11 31 7 9 10 14 15

Water Test

For H2S

Method 31 21 13 22 9 18 20 15 20 29 13 20

HIV Test

ICTC 61 42 70 88 76 63 72 52 65 81 52 56

Bile salt 0 2 0 4 2 4 0 2 1 2 3 2

Bile pigment 0 2 0 4 2 4 0 2 1 2 3 2

Total 352 298 335 497 544 579 596 382 434 548 428 419

Page 123: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 0 8647 8613 7460 8883 8353 8883

2 TOTAL ANC

REGISTRATION

S

0 167 154 142 132 155 166

3 EARLY ANC

REGISTRATION

S <12 WEEKS

0 120 154 109 95 132 147

% 0 72 100 77 71 85 89

4 TT COVERAGE

ANC

0 145 113 129 134 151 157

5 TOTAL

DELIVERIES

0 94 95 111 96 131 154

6 INSTITUTION

DELIVERIES

0 63 53 104 96 130 154

7 %

INSTITUTIONAL

DELIVERIES

0% 67% 56% 94% 100% 99% 100%

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 1 2 0 0

2 TOTAL LIVE

BIRTHS

0 94 95 107 96 129 150

3 IMR 0 53.19 63.16 25 20.833 38.759

7

20.00

Page 124: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sri Rama Ranga Pura (S.R.R. Pura)

Name of the PHC : S.R.R. Pura

Taluk : Hospet

District : Bellary

Population Covered : 22,543

No. of Sub-Centres : 4

Date of Taking over : 01.02.2005

Page 125: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sl.No Before taking over After taking over

1 LAND Boundaries of land not clear

Lots of weeds and not adequately

maintained.

Total area is 2.5 acres.

Cleaned-up.

Land scaping done.

KT has started a demo garden and nursery

for Traditional Medicine.

We have planted trees in the PHC campus.

Fencing done

2 PHC BUILDING &

STAFF QUARTERS

No building maintenance, window

glasses were broken, all the doors

were damaged, untidy and dirty.

All the staff quarters were

dilapidated and many pending

repair works, maintenance

irregular.

We have painted the building.

We have fixed the glasses for all the

windows.

All the doors were repaired.

Cleaned-up the building.

Staff Quarters were renovated.

3 SUB-CENTER

BUILDINGS

Poorly maintained.

Buildings were vacant. We have the 4 sub centers with the

building.

Cleaned up the building.

Our ANMs occupied the Building

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder

supplied from KT.

Email services are being provided at the

PHC

Some of the essential equipments were

procured from DHO.

We have supplied medicinal preparation

equipments.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Non Functional

Under repair Repaired, now it is functional.

6 FURNITURE Inadequate Office furniture supplied from KT (table

& chair)

7 STAFF Many vacancies and poor

attendance. KT has filled up all the staffs.

All the staffs are staying in the head

quarters and they are rendering the 24 hrs

services.

8 TRAININGS Infrequent KT has given the training to the PHC staff

on the following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Mental Health

Traditional medicine

PRA

VRCs in Collaboration with ISRO.

Waste Management

9 MEDICINES &

REGENTS

Irregular supply KT has also supplied the essential

medicines other than the Govt. supply.

The lab regents were also supplied from

KT.

10 WATER &

ELECTRICITY

Poor and irregular. The water supply connection is given by

the Gram Panchyath.

Page 126: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

We have done the minor electrical repair

work & got the new connection for all the

buildings.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards.

12 AMBULANACE Not available KT provided the ambulance

14 INNOVATIONS BY KARUNA TRUST

A IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

level.

The PRA programme also conducted in the village level.

B TRADITIONAL

MEDICINE

PROGRAM

We have implemented the use of traditional medicine in to Primary Health care

the PHC.

The program is going on.

Sub-center with population

Sl.

No

Name of

SC

Dista

nce

from

PHC

Buil

ding

(Y/N

)

No. of

villages Population

Eligi

ble

Coup

le

No.

of

ASH

A

No

of

Ang

anw

adi

No

of

V

H

SC

No

of

SH

G

Male

Femal

e

I

S.R.R.PUR

A 0 YES 1 1698 1662 595 2 4 1 2

Ii

SUGGEN

AHALLI 3 YES 4 3018 2901 1032 2 7 4 3

Iii JOWCK 9 YES 6 3820 3460 1284 5 9 5 5

Iv

DEVALAP

URA 12 YES 2 3385 3126 1253 4 7 2 3

Total 13 11921 11149 4164 13 27 12 13

Page 127: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern:

Sl.

No. Sanctioned Available

Sl.

No. Sanctioned Available

I

Medical

Officer 1 1 Ix

Driver

0 0

Ii Pharmacist 1 1 X Gr. D 2 2

Iii

Staff Nurse

0 0 Xi

Lab

Technician 1 1

Iv

Jr. H.A. (M)

2 2 Xii

FDA/

Admin. 0 0

V

Jr. H.A (F)

4 4

Xii

i

LHV

1 1

Vi PMOA 0 1 Xiv BHEO 0 0

Vii SDC 1 1 Xv Sr. H.A. 0 0

Vii

i

Arogyamitra

0 0

Outpatient and Inpatient Details:

IPD

OPD

Emergency

Male Female Male Female Male Female

Apr-11 28 34 960 940 1 3

May-11 20 34 700 794 3 3

Jun-11 32 26 750 604 5 5

Jul-11 15 24 620 806 2 2

Aug-11 8 20 708 357 1 0

Sep-11 27 32 508 952 4 3

Oct-11 17 41 565 510 4 3

Nov-11 17 34 515 450 4 1

Dec-11 13 12 680 466 4 3

Jan-12 9 12 625 465 5 2

Feb-12 5 19 726 590 1 1

Mar-12 13 24 420 320 1 1

Total 204 312 7777 7254 34 27

Page 128: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services:

Name of

Lab Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for

MP Test 425 433 588 472 478 418 396 414 411 388 396 415

Total PV 0 1 1 0 1 0 1 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total

Mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

Blood

Sugar 38 34 25 0 0 0 0 17 17 26 33 18

Widal 6 10 9 10 5 21 0 6 6 8 14 9

VDRL 31 20 0 0 0 0 0 8 17 16 10 50

Pregnancy

Test 16 17 15 9 13 19 14 8 18 11 15 13

Hb% in

PHC 97 87 125 109 70 140 87 85 82 118 90 115

TLC 0 4 6 4 6 6 5 7 4 7 4 4

DLC 0 4 6 4 6 6 5 7 4 7 4 4

ESR 6 4 6 4 6 6 5 7 4 7 4 4

Urine RE 83 78 118 109 72 145 74 76 75 431 275 366

Blood

Groping 34 29 31 29 28 48 0 21 31 39 20 51

HIV

TEST 13 65 168 58 52 110 34 85 76 91 34 40

Water

Test For

H2S 5 2 12 5 5 8 6 8 7 8 0

11

HbSAg 29 24 11 3 3 0 0 9 17 23 24 52

BT 0 5 6 3 4 3 8 10 8 10 4 3

CT 0 5 6 3 4 3 8 10 8 10 4 3

BS& BP

(urine test) 10 6 11 7 5 12 10 12 6 20 14 6

Grant

Total 793 828 1144 829 758 945 653 790 791 1220 945 1164

Page 129: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 19680 21668 21168 21265 23143 23070

2 TOTAL ANC

REGISTRATIONS

540 695 723 739 666 698 631

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

268 296 401 505 486 514 487

% 48 43 55 68 73 74 77

4 TT COVERAGE

ANC

504 686 699 701 694 616 679

5 TOTAL

DELIVERIES

381 542 598 715 541 590 620

6 INSTITUTION

DELIVERIES

160 295 468 488 441 509 549

7 %

INSTITUTIONAL

DELIVERIES

42 54 78 68 82 86 89

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 1 1

2 TOTAL LIVE

BIRTHS

375 533 584 701 527 571 620

3 IMR 23.62 7.38 16.72 11.41 15.18 13.4128 24.19

Page 130: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sugganahalli

Name of the PHC : Sugganahalli

Taluk : Magadi

District : Ramanagara

Population Covered : 15043

No. of Sub-Centres : 4

Staff : 14

Date of Taking over : 01.06.2003 Sl. No Before taking over After taking over

1 LAND No boundaries

Lot of weeds and inadequately

maintained.

Total area is 20 Guntas.

Cleaned-up.

Boundaries identified

Planted few trees in the campus.

Compound constructed around the PHC

2 PHC BUILDING &

STAFF QUARTERS

Many pending repair works and

maintenance irregular.

Head quarter ANM quarter was

dilapidated

Cleaned-up the building.

We have repainted the building.

ANM Quarter was renovated & occupied.

3 SUB-CENTER

BUILDINGS

No One New sub center building is constructed

with the help of the Gram-panchyat and the

process facilitated by KT.

ANMs are residing in the Building

4 EQUIPMENTS Not being serviced regularly and

supply was irregular. Computer, printer and a tape recorder

(For the IEC activities) were supplied from

KT.

Email services are being provided at the

PHC

Village Resource Center equipments were

installed in collaboration with ISRO.

Tele-conference and Tele- ECG facilities

are made available in the PHC.

Some of the essential equipments were

procured from DHO.

Equipments for preparation of herbal

medicine was supplied by KT.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not maintained Functional

6 FURNITURE Inadequate Available

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant posts.

All the staffs are staying in the head

quarters and are rendering the 24 hrs

services.

8 TRAININGS Infrequent The PHC staff on the following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

Page 131: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular supply KT supplies the essential medicines &

other lab reagent in case of delay in Govt.

supply.

10 WATER &

ELECTRICITY

Poor and irregular supply. We have done the minor electrical repair

work for all the buildings with the help of

Local donor.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the Bio-waste

management in the PHC according to

KPCB standards and obtained the

certificate from the board.

12 AMBULANACE Not available An ambulance is provided by Rotary club

Vehicle shed constructed with the help of

Gram Panchayat

12 NEW INNOVATIONS BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area.

The PRA programme also conducted in the village levels.

b TRADITIONAL

MEDICINE

PROGRAM

Traditional medicine has been integrated into the Primary Health care.

Sub-center with population

Sl

.

N

o.

Name of

SC

Dista

nce

from

PHC

Buildi

ng

(Y/N)

No.

of

villag

es Population

Eligi

ble

Coup

le

No. of

ASHA

No of

Angan

wadi

No

of

VHS

C

No

of

SH

G

Male Female

I

Sugganahall

i 0 Y 8 2004 2044 460 4 6 3 27

Ii Chikkahalli 8 N 11 1780 1792 449 3 7 3 22

Iii Hulikal 8 Y 15 2476 2535 619 5 7 5 30

Iv

Chikkamask

al 9 N 9 1495 1584 418 2 6 5 21

Total 43 7755 7955 1946 14 26 16

10

0

Page 132: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 2 2

Ii Pharmacist 1 1 x Jr. H.A (F) 5 5

Iii Staff Nurse 0 0 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 1 1

V FDA/Administrator 0 0 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 1 3

Viii Sr. H.A. 0 0

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Children Male Female Children Male Female Children

Apr-11 21 31 0 526 637 63 4 7 1

May-11 20 48 0 635 702 109 6 8 2

Jun-11 28 38 0 652 752 226 5 10 1

Jul-11 11 26 0 660 660 57 4 9 2

Aug-11 11 23 0 678 751 120 4 7 0

Sep-11 3 10 0 644 554 59 2 4 2

Oct-11 6 11 0 434 484 96 3 4 2

Nov-11 5 12 0 604 681 67 5 8 0

Dec-11 7 20 0 515 453 89 4 6 0

Jan-12 9 9 0 468 410 122 2 4 0

Feb-12 20 13 0 507 304 119 3 2 0

Mar-12 5 9 0 331 323 62 1 2 0

Total 146 250 0 6654 6711 1189 43 71 10

Page 133: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab

tests

Apr-

11 May June Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

test 276 248 202 258 250 252 158 195 204 215 278 200

Positive cases

(slide + RMT) 0 0 0 0 0 0 0 0 0 0 0 0

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

Total mixed

type 0 0 0 0 0 0 0 0 0 0 0 0

HIV tests 37 43 10 38 48 25 17 48 12 28 51 20

Positive 0 0 0 1 0 0 1 0 0 0 1 0

Blood sugar 33 52 63 5 17 44 18 30 40 32 41 30

Widal 8 9 17 17 19 26 13 12 11 0 0 0

VDRL 18 22 27 0 7 20 7 25 4 7 0 0

Pregnancy test 22 22 26 21 23 11 22 27 19 6 10 32

Hb% in PHC 37 42 61 34 63 49 25 60 24 34 51 23

TLC 3 6 3 11 7 0 0 0 6 6 19 1

DLC 0 0 0 0 0 0 0 0 0 0 0 0

ESR 0 1 19 6 2 5 0 1 1 5 4 1

Urine RE 16 45 69 43 52 44 14 45 20 26 49 11

Blood grouping 14 23 35 14 25 20 6 28 7 18 15 5

Rapid test for

HIV 0 0 0 0 0 0 0 0 0 0 0 0

CT BT Time 0 0 0 0 1 0 0 0 0 0 0 0

Others 0 0 0 0 0 0 7 18 0 0 0 0

Page 134: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process

Indicators

2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 14168 14441 14441 14446 14335 15043

2 TOTAL ANC

REGISTRATIO

NS

258 249 265 291 252 244 240

3 EARLY ANC

REGISTRATIO

NS <12 WEEKS

213 228 252 263 207 217 211

% 82 92 95 90 82 88 88

4 TT COVERAGE

ANC

237 241 260 284 235 218 221

5 TOTAL

DELIVERIES

205 198 206 221 235 239 240

6 INSTITUTION

DELIVERIES

171 172 194 218 235 236 239

7 %

INSTITUTIONA

L DELIVERIES

83 87 94 98 100 99 100

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 0 0

2 TOTAL LIVE

BIRTHS

205 199 206 221 239 233 240

3 IMR 29.27 15.15 4.85 4.52 12.552 8.5836

9

20.83

Page 135: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Thithimathi

Name of the PHC : Thithimathi

Taluk : Virajpet

District : Kodagu

Population Covered : 14783

No. of Sub-Centres : 6

Staff : 19

Date of Taking over : 17.07.1996

Page 136: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

BEFORE AFTER

1 Building

The dilapidated PHC-hospital building,

medical officers quarters, staff nurse quarters,

Devarapura and Majjigehalla Sub-centres.

These were in a very bad condition and no one

can’t stay in these buildings. There is no

electrification and water supply.

Vivekananda Foundation soon after taking

over the PHC at Thithimathi immediately

set to improvise the infrastructure repair

of buildings, drinking water facilities,

electricity etc at the PHC. The

Foundation has spent Rs. 6 lakhs for the

renovation of PHC building, staff quarters

and Sub-centers. This has been possible

with the generous donation from local

well-wishers.

Initially, arrangement for drinking water

supply was made by V.F. Later on

Devarapura GP ran it for a short period of

time. Now the BCK (SKANDA Group)

has taken the responsibilities of ensuring

safe drinking water to the PHC.

The BCK (SKANDA Group) Thithimathi

is maintaining the cleanliness of the

hospital premises and the garden

regularly.

In the year 2001-02, the staff quarters

were renovated and additional toilets were

constructed with the help of funds from

IPP-IX (World Bank assisted).

A new MCH building was constructed by

spending about Rs 6,00,000/- (rupees six

lacs). The Coorg Foundation, Pollybetta

and the SKANDA GROUP, Thithimathi,

Page 137: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

provided the fund.

2 Hospital:

Labour Room was renovated and

equipped by V.F soon after taking over.

Doppler Ultra Sound (to monitor FHS)

was a new addition to the Labour room in

the year 2001.

Operation Theatre was constructed and

equipped to do Tubectomy, Laproscopic

Sterilization and Cataract operation with

IOL insertion.

Medical Officer and Staff Nurses are

staying in HQ and available all the 24 hrs

to conduct deliveries and to attend to other

medical emergencies.

Essential drugs and Psychotropic drugs

are made available through out the year by

the Foundation.

The expenditure for supplying diet to the

in-patient is born by the SKANDA Group

of Thithimathi.

The PHC Laboratory has been declared as

Microscopy center by the RNTCP and

required renovation work was done by

them.

The Medical Officer’s quarter was

renovated by spending an amount of

Rs1,00,000/- (Rupees one laces) only of

which an amount of Rs30, 000/-(Rupees

thirty thousand) only was released by the

Health Department.

Page 138: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

3 Staff:

The Thithimathi PHC had 23 staff that did not

want to shift. There appeared to be some

unofficial promote to continue them or give

them centres of their choice. After persuasion

and discussions, the matter was solved.

Some of the staff that were unwilling to go to

other areas and wanted to continue tried to

create confusion that Govt PHC is being

privatised, etc. But soon such records were set

to rest.

We have recruited new dedicated service

minded qualified staff and posted to the

PHC. Some of volunteer from

Ramakrishna Ashrama, Mysore were

helped in all these process.

4 Equipments and Instruments:

The equipments and furniture were in bad

condition and some were condemned. They are

all in un useable condition.

All the then existing equipments and

instruments available at the PHC were

handed over to us. We took only the

functioning equipment and refused the

discarded ones. The discarded equipment

was sent back to the District office. Some

of the new equipments and furniture were

procured.

5 Documents:

There was a problem when the local staffs

were unwilling to hand over the documents.

We had to create new health records for

the PHC. And this happened only through

our frequent visit to DHO office at

Madikeri to find and get the information

(Statistics)

6 Specialist Services:

There were no specialist services in the PHC Regular Laproscopic and Tubectomy

camps are being held by qualified surgeon

Regular Dental Clinics are run by Dental

Page 139: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

House Surgeons posted by the JSS Dental

College, Mysore

Cataract Surgeries are conducted monthly

at the PHC and cases of Extra Capsular

Extraction with IOL insertion are done

free of cost. cases have been operated

successfully so far in the PHC.

A Reputed Psychiatrist from NIMHANS

is conducting Mental Health Camp every

month in the PHC.

7 Sickle Cell Anemia Screening Programme:

There was no facility of Laboratory in the PHC Tribal people suffer from a genetic

disease called Sickle Cell Anemia. Our

Laboratory is well equipped to diagnose

Sickle Cell Anemia by Turbidity test and

Electrophoresis.

8 Mental Health Programme:

To avail these services the patients needs to be

visiting to Mysore or Bangalore.

Dr.Kishore Kumar from NIMHANS,

Bangalore conducts regular mental health

camp on every 2nd

Sunday. He has trained

all the staff of the PHC so that they can

identify and follow-up the mental health

related cases. They have been told about

the myths and facts of mental illnesses.

Medical officer is given necessary

training, which is reflected in increased

diagnosis and treatment in general OPD.

At present we have around 1500

psychiatric patients. This camp is popular

not only in PHC area but also through out

Page 140: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

the Coorg district. Patient’s case profile is

computerized and proper case sheet is

maintained sub-center wise.

9 Blindness Control Programme:

To avail these services the patients needs to be

visiting to Mysore or Bangalore.

The field staff in all the villages conducts

regular screening for cataract cases. Extra

Capsular Cataract Extraction with IOL

insertion is done free of cost to all the

patients. Dr.Mahesh from Mysore and

Dr.Vijaya Rao from Bangalore conduct

surgery at the PHC every month.

10 Community Dental Health Programme

To avail these services the patients needs to be

visiting to Mysore or Bangalore.

The PHC is equipped with a dental clinic

open every day catering to the dental

needs of the population in the PHC area.

Dental house surgeons posted from JSS

Dental College as part of their rural

postings conduct the clinic regularly.

11 Ambulance Services:

There was no vehicle in the PHC including

Ambulance.

A fully equipped ambulance is available

at the PHC for various medical

emergencies, Immunization, Blindness

Control Program and Family Welfare

programmes. It also provides round-the-

clock service for the patients.

12 Interns Training Programme:

There was no such facility.

Interns are posted regularly from JSS

Medical College, Mysore and MMC

Mysore on rotation basis as part of rural

postings. They take active part in hospital

work, immunization programme and

Page 141: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

health education in schools. Besides

Primary health care, they get exposure to

community based specialized clinics on

Tuberculosis, Leprosy, Epilepsy, Mental

health, Laproscopic tubal ligation and IOL

surgeries for cataract etc.

13 Tribal ANM’s project:

One of the key innovations by KT/VF has

been the initiation of the Tribal ANM

project. Eravas, Jenukurubas,

Bettakurubas, Maley Kudiyas have been

the predominant tribes living in the area.

The project involved training the tribal

girls to improve the access of health

services to these tribal populations. Under

the IPP (IX), Tribal girls educated up to

standard VII were selected and were

trained for a period of 1year in areas of

immunisation, ANC/PNC, family

planning, reporting of communicable

diseases and referrals, health education,

school health and Anganawadi health

check-ups and the National Health

Programmes. They were later employed at

the PHC’s Thithimathi.

14

DE-ADDICTION CENTRE FOR LIFE

STYLE CHANGE

A New De-Addiction Center for Life style

change has been started with the help of

SKANDA group and the technical support

were given by Dr.K.V.Kishore Kumar

from NIMHANS, Bangalore

Page 142: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Constraints of partnerships:

Unnecessary bureaucratic

constraints interfered with the handing

over of the PHC’s and later the smooth

running of these institutions.

Reluctance of such efforts with

private practitioners in the Taluk

head quarters.

The Governmental staffs at Thithimathi

were averse to abstain from their

positions at the PHC.

There were significant payment

delays at the District health office.

There also existed a delay in grant

approval and staff approvals, which

affected the functioning of the

institutions.

The support given to the NGO run

PHC’s towards the equipment,

medicines, training and other support

when compared to the other PHC’s run

by the Government were grossly

inadequate.

There were even efforts made towards

the withdrawal of PHC’s from the

NGO’s through resolution passed by

ZP by vested interests.

Huge financial implications as the

sharing between the Govt: NGO for the

finances were in reality 75:25 in stark

contrast to the 90:10 as agreed in the

Page 143: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

terms of the partnerships.

Prejudice and problematic practices

included numerous hindrances in

functioning due to undue interference

of the District health authorities, which

were over come in due course. A

classic example has been the force on

targets without realisation of the

CNAA. Practices by the DH authorities

prevented essential medicines to be

stored in the RCH refrigerator.

15 Mobile Health Clinic for Virajpete Taluk by

Ministry of Tribal Affairs, GOI, New Delhi

No such services earlier.

Sub-Centres with Population

Sl.

No.

Name of

SC

Distan

ce

from

PHC

Buil

ding

(Y/N

)

No.

of

villag

es Population

Eligi

ble

Coup

le

No.

of

ASH

A

No

of

Ang

anw

adi

No

of

VHS

C

No

of

SH

G

Male

Fema

le

1

Thithimathi

A Nil Y 7 918 853 280 2 3 1 2

2

Thithimathi

B 3 KM N 7 1061 1120 308 2 7 1 3

3 Matthigodu 3 Km Y 10 1023 1010 326 3 8 1 5

4 Devarapura 5 KM Y 9 959 1088 311 2 5 1 5

5 Hebbale 7 KM Y 9 1011 1001 319 3 5 1 7

6 Atthuru 9 KM N 5 1743 1743 436 4 7 1 8

Total 47 6715 6815 1980 16 35 6 30

Page 144: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 1 1

Ii Pharmacist 1 1 x Jr. H.A (F) 6 5

Iii Staff Nurse 1 1 xi PMOA 1 1

Iv Lab. Technician 1 1 xii SDC 0 0

V FDA/Administrator 1 1 xiii Arogyamitra 1 1

Vi LHV 1 1 xiv Driver 0 0

Vii BHEO 1 1 xv Gr. D 4 4

Viii Sr. H.A. 0 0 Cook 1 1

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Male Female Children Male Female Children

Apr-11 11 7 200 222 354 2 3 0

May-11 18 25 313 278 220 1 1 1

Jun-11 10 26 284 281 377 1 1 0

Jul-11 3 7 346 370 178 1 0 0

Aug-11 3 11 300 325 415 2 3 1

Sep-11 6 13 410 426 139 1 1 0

Oct-11 13 22 338 344 312 3 3 0

Nov-11 3 9 218 202 271 5 4 2

Dec-11 3 23 262 198 92 4 4 3

Jan-12 1 10 380 280 220 3 2 0

Feb-12 12 16 235 223 407 0 0 0

Mar-12 5 6 99 101 251 15 26 6

Total 88 175 3385 3250 3236 38 48 13

Page 145: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of

Lab Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for

MP Test 153 148 204 264 253 170 187 194 190 200 155 169

Total PV Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

Total PF Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

Total Mixed

type Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

HbSAg test 32 17 30 19 21 41 38 38 24 21 18 17

Widal 3 1 0 1 2 4 2 0 0 2 1 2

VDRL 10 8 20 11 14 26 22 17 11 13 10 10

Pregnancy

Test 18 7 10 15 19 11 20 6 2 6 10 13

Hb% in PHC 74 69 84 52 59 69 74 72 64 55 44 50

TLC 20 14 9 8 9 19 14 22 13 12 8 8

DLC 20 14 9 8 9 19 14 22 13 12 8 8

ESR 20 15 10 8 9 19 14 22 13 9 8 8

Urine RE 61 39 64 26 36 63 47 43 38 25 51 37

Blood

Groping 27 16 24 22 18 20 14 23 23 89 10 16

Water Test

For H2S

Method 28 28 26 20 26 41 37 40 46 45 39 38

HIV Test

ICTC Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

Bile salt 18 14 10 1 9 17 17 21 13 8 9 10

Bile pigment 18 14 10 1 9 17 17 21 13 8 9 10

Total 502 404 510 456 493 536 517 541 463 505 380 396

Page 146: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process

Indicators

2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 9337 13614 13784 13730 14783 13585

2 TOTAL ANC

REGISTRATI

ONS

206 310 287 326 341 279 249

3 EARLY ANC

REGISTRATI

ONS <12

WEEKS

162 175 175 257 286 279 238

% 78 56 61 79 83 100 96

4 TT

COVERAGE

ANC

190 249 270 272 294 279 246

5 TOTAL

DELIVERIES

214 200 197 202 257 237 228

6 INSTITUTION

DELIVERIES

170 171 185 197 257 237 228

7 %

INSTITUTION

AL

DELIVERIES

79 86 94 98 100 100 100

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 0 0

2 TOTAL LIVE

BIRTHS

213 199 198 201 255 237 226

3 IMR 0 20 14.13 0 11.765 16.8776 8.84

Page 147: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

V.K. Salgara

Name of the PHC : V K Salgara

Taluk : Alanda

District : Gulbarga

Population Covered : 17554

No. of Sub-Centres : 3

Staff : 17

Date of Taking over : 08.05.2005

Sl. No Before taking over After taking over

1 LAND No boundaries

Lot of weeds and inadequately

maintained.

No Fencing

Total area is 4 acres.

Cleaned-up.

Boundaries identified

Planted few trees in the campus.

Fencing work undertaken & completed

2 PHC BUILDING &

STAFF QUARTERS

No building maintenance, untidy

and dirty.

Cleaned-up the building.

We have repainted the building.

3 SUB-CENTER

BUILDINGS

Untidy and dirty

Building was vacant Cleaned-up the building.

ANM occupied the Building

Minor repair work done.

4 EQUIPMENTS Not being serviced regularly and

supply irregular. Computer, printer and tape recorder (for

IEC activities ) were supplied from KT.

Email services are being provided at the

PHC

New telephone connection is taken.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Non functional / under repair Functional

6 FURNITURE Inadequate

7 STAFF Many vacancies and poor

attendance. KT has filled up all the vacant posts.

All the staffs are staying in the head

quarters and are rendering the 24 hrs

services.

8 TRAININGS Infrequent The PHC staffs have been trained on the

following subjects:

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Bio-waste Management

9 MEDICINES &

REAGENTS

Irregular supply KT supplies the essential medicines &

other lab reagents in case of delay in govt.

Page 148: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

supply.

10 WATER &

ELECTRICITY

Poor and irregular supply We have done the minor electrical repair

work for all the buildings.

12 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards and obtained the

certificate fro the Board.

13 NEW INNOVATIONS BY KARUNA TRUST

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

area.

The PRA programme also conducted in the village levels.

Sub-Centres with Population

Sl.

No

Name of

SC

Dista

nce

from

PHC

Buil

ding

(Y/N

)

No. of

village

s Population

No.

of

ASH

A

No of

Anga

nwadi

No

of

V

HS

C

No of

SHG

Male Female

1 V.K.Salgara

Y 2 3116 2540 4 6 1 7

2 Belamagi 10km Y 5 3345 3063 4 7 2 8

3

Kamalanaga

r 11 km

Rent

ed 4 2965 2556 7 8 4 9

Total 11 9426 8159 15 21 7 24

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 3 3

Ii Pharmacist 1 1 x Jr. H.A (F) 3 3

Iii Staff Nurse 1 1 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 0 0

V

FDA/Administrator

1 1

xii

i

Arogyamitr

a 0 0

Vi LHV 1 1 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 2 2

Vii

i

Sr. H.A.

1 1

Page 149: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Male Female Male Female

Apr-11 26 58 344 701 4 9

May-11 27 70 370 695 2 6

Jun-11 21 28 470 787 7 10

Jul-11 22 17 515 891 3 2

Aug-11 9 23 714 924 5 6

Sep-11 11 55 714 986 7 5

Oct-11 7 39 517 798 8 7

Nov-11 9 17 740 1027 5 4

Dec-11 6 11 546 822 6 4

Jan-12 7 19 961 1251 3 10

Feb-12 5 23 842 1206 3 4

Mar-12 22 65 899 1186 5 6

Total 172 485 7632 11274 58 73

Details of Laboratory Services

Name of Lab

Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for MP

Test 285 313 305 703 357 337 290 337 302 298 292 298

Total PV 1 1 2 1 1 0 0 0 0 0 0 0

Total PF 1 1 2 1 1 0 0 0 0 0 0 0

Total Mixed type 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg test 0 18 19 15 37 15 12 15 22 12 14 20

Widal 0 15 35 32 28 42 33 16 10 6 6 15

VDRL 25 28 12 34 24 25 60 18 28 20 10 21

Pregnancy Test 13 18 20 26 23 26 20 20 24 25 33 23

Hb% in PHC 53 54 41 81 58 83 50 59 54 58 42 32

TLC 4 8 6 7 5 10 8 5 0 0 0 0

DLC 4 8 6 7 5 10 8 5 0 0 0 0

ESR 4 8 6 7 5 10 8 5 0 0 0 0

Urine RE 47 45 48 62 52 58 60 72 84 77 45 35

Blood Groping 22 30 15 38 18 0 12 15 22 15 14 13

Water Test For

H2S Method 50 42 12 49 33 72 31 29 43 30 28 30

Page 150: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

HIV Test ICTC 7 12 8 10 20 21 0 3 31 23 14 21

Bile salt 20 27 23 18 10 30 24 15 18 15 12 13

Bile pigment 20 27 23 18 10 30 24 15 18 15 12 13

Total 558 657 583 1109 687 769 596 629 656 594 521 536

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 0 15827 16056 16680 18670 17584

2 TOTAL ANC

REGISTRATION

S

450 405 402 427 485 396 404

3 EARLY ANC

REGISTRATION

S <12 WEEKS

0 176 177 258 348 314 351

% 0 43 44 60 71 79 87

4 TT COVERAGE

ANC

0 455 446 410 395 357 447

5 TOTAL

DELIVERIES

0 239 582 354 392 383 392

6 INSTITUTION

DELIVERIES

0 136 236 295 368 360 384

7 %

INSTITUTIONA

L DELIVERIES

0 56% 50% 67% 94% 94% 98%

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 1 0 0

2 TOTAL LIVE

BIRTHS

0 238 279 344 385 377 387

3 IMR 0 46.03 23.01 37.79 25.974 15.915

1

10.41

Page 151: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC
Page 152: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Yemalur

Name of the PHC : Yemalur

Taluk : Bangalore East

District : Bangalore Urban

Population Covered : 25880

No. of Sub-Centres : 2

Staff : 7

Date of Taking over : 01.06.2004

Sl. No Before taking over After taking over

1 LAND No Land.

New land purchased with the help of local

donors

Total area is 1 acres.

Cleaned-up.

Landscaping done.

Fencing done

2 PHC BUILDING &

STAFF QUARTERS

No building KT has constructed the new PHC building

with the help of local donors.

One staff quarters also constructed in the

PHC building.

All the services were displayed in the PHC.

Name boards written.

3 SUB-CENTER

BUILDINGS

No Building KT has constructed one quarters for the

ANM in the PHC Building.

4 EQUIPMENTS Inadequate Computer, printer and tape recorder

supplied from KT.

Email services are being provided at the

PHC

Some of the essential equipments were

procured from DHO.

Tele ECG is doing in the PHC.

Lab equipments, birthing kits & IUD kits

supplied by KT

5 COLD CHAIN

EQIPMENT

Not available KT has received one refrigerator from a

donor.

6 FURNITURE Inadequate Office furniture supplied from KT (table

& chair)

Some of the equipments were received

from youth club and NGOs.

7 STAFF Newly shifted PHC KT has filled up all the staffs.

All the staffs were staying in the head

quarters and they are rendering the 24 hrs

services.

8 TRAININGS Infrequent KT has given the training to the PHC staff

on the following subjects:

Page 153: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

RCH and MCH services.

HIV/AIDS.

IEC

PHC Management

Plan and budget –Accounts

Capacity building

Mental Health

Traditional medicine

PRA

Waste Management

VRCs in Collaboration with ISRO

9 MEDICINES &

REAGENTS

Poor supply KT has also supplied the essential

medicines other than the Govt. supply.

The lab reagents were also supplied from

KT.

10 WATER &

ELECTRICITY

Not available New water and electrical connection taken.

11 WASTE

MANAGEMENT

Not implemented KT has implemented the waste

management in the PHC according to

KPCB standards.

12 NEW INNOVATION BY KARUNA TRUST:

a IEC ACTIVITIES &

PRA PROGRAM With the help of our IEC vehicle we organized IEC activities in all the sub-center

level.

The PRA programme also conducted in the village levels.

b FREE EYE CAMPS Free cataract eye camps were conducted with the help of Sri. Viveka Drusti Eye

Hospital and HelpAge India.

Sub-Centres with Population

Sl.

No.

Name of

SC

Dista

nce

from

PHC

Buil

ding

(Y/N

)

No. of

villages Population

Eligi

ble

Cou

ple

No.

of

ASH

A

No of

Angan

wadi

No of

VHS

C

No

of

SHG

Male Female

1 Yemalur 0 Y 2 3165 2900 1012 0 3 0 10

2

Marathaha

lli 3kgm N 2 10137 9681 3128 0 2 0 8

Total 13302 12581 4140 0 5 0 18

Page 154: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available Sanctioned Available

I Medical Officer 1 1 ix Jr. H.A. (M) 1 1

Ii Pharmacist 1 1 x Jr. H.A (F) 2 2

Iii Staff Nurse 0 0 xi PMOA 0 0

Iv Lab. Technician 1 1 xii SDC 0 0

V FDA/Administrator 0 0 xiii Arogyamitra 0 0

Vi LHV 0 0 xiv Driver 0 0

Vii BHEO 0 0 xv Gr. D 1 1

Viii Sr. H.A. 0 0

Out-patient and In-patient details

IPD

OPD

Emergency

Male Female Children Male Female Children Male Female Children

Apr-11 0 0 0 91 54 30 1 2 0

May-11 0 0 0 67 48 52 0 0 0

Jun-11 0 0 0 96 104 68 0 0 0

Jul-11 0 0 0 126 82 48 0 0 0

Aug-11 0 1 0 123 212 68 0 1 0

Sep-11 0 0 0 131 182 29 0 0 0

Oct-11 0 0 0 132 101 69 0 0 0

Nov-11 0 0 0 174 162 31 0 2 0

Dec-11 0 4 0 63 54 61 1 1 0

Jan-12 0 0 0 102 97 18 0 1 0

Feb-12 0 2 0 103 98 54 1 1 0

Mar-12 0 2 0 108 82 40 0 0 1

Total 0 9 0 1316 1276 568 3 8 1

Page 155: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of

Lab Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar

Blood for

MP Test 163 170 205 172 203 226 288 250 271 257 261 257

Total PV 0 0 0 0 0 0 0 0 0 0 0 0

Total PF 0 0 0 0 0 0 0 0 0 0 0 0

HbSAg 0 0 0 0 0 0 0 0 0 0 0 0

Blood sugar 8 12 14 10 11 7 6 12 10 12 13 18

Widal 1 0 0 5 5 3 0 2 2 0 0 3

VDRL 1 4 0 2 5 3 0 2 2 0 1 0

Pregnancy

test 10 8 3 5 12 7 6 8 12 18 15 12

Hb% in PHC 16 10 10 14 14 8 22 25 24 23 20 26

TLC 0 0 0 0 0 0 0 0 0 0 0 0

DLC 0 0 0 0 0 0 0 0 0 0 0 0

ESR 2 1 2 3 0 1 3 4 1 1 0 2

Urine RE 10 6 8 10 12 6 19 22 21 20 18 21

Blood

Groping 2 5 3 4 0 6 3 10 3 4 2 3

Water Test

For H2S

Method 1 2 0 2 0 3 0 2 2 0 1 2

HIV Test

ICTC 6 8 10 8 15 8 11 3 10 8 8 11

Bile salt 2 1 3 2 4 1 2 3 1 3 2 3

Bile pigment 2 1 2 2 4 1 2 3 1 3 2 3

Total 224 228 260 239 285 280 362 346 360 349 343 361

Page 156: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Statistics

Sl.

No

Process Indicators 2005-

06

2006-

07

2007-

08

2008-

09

2009-

10

2010-

11

2011-

12

1 POPULATION 4985 4485 5864 5820 19525 25495 25880

2 TOTAL ANC

REGISTRATIONS

125 90 165 344 341 431 490

3 EARLY ANC

REGISTRATIONS

<12 WEEKS

61 57 71 200 202 296 368

% 49 63 43 58 59 68 75

4 TT COVERAGE

ANC

125 54 152 307 453 373 441

5 TOTAL

DELIVERIES

111 27 65 252 343 406 497

6 INSTITUTION

DELIVERIES

110 27 65 251 341 403 497

7 %

INSTITUTIONAL

DELIVERIES

99% 100% 100% 99% 99% 99% 100%

Vital Indicators

1 MATERNAL

DEATHS

0 0 0 0 0 1 1

2 TOTAL LIVE

BIRTHS

111 27 65 252 343 405 499

3 IMR 0 0 0 0 0 0 2

Page 157: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Arunachal Pradesh PHCs

Anpum

Name of the PHC : Anpum

District : L/Dibang Valley

Population Covered : 7224

No. of Sub-Centres : 3

Staff : 22

Sub-Centres with Population

Name

of SC

Distance

from PHC

Motorable/on

foot

Village

s

Populat

ion

Male Female No. of

ASHA

Eligibl

e

Coupl

e

Keba 11 km Motorable 4 1721 857 864 5 161

Pagla

m

17 km Motorable 4 1678 847 831 5 173

Bizari 16 Km Morotable 8 2003 1039 964 3 252

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 5

Staff Nurse 0 ANM at Sub Centres 5

Pharmacist 1 Health Assistant 2

Lab Technician 1 Ambulance Driver 1

Others (G-D) 5 Total 22

Page 158: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

Months OPD IPD Inpatient at

midnight

April ‘11 876 36 36

May’11 1127 90 90

June’11 1114 99 99

July’11 1057 35 35

Aug’11 989 96 96

Sep’11 1120 61 61

Oct’11 780 38 38

Nov’11 532 32 32

Dec’11 446 17 17

Jan’12 492 15 15

Feb’12 603 20 26

March’12 831 19 19

TOTAL 9967 558 564

Details of Laboratory Services

Name of

lab tests

Apr

11

Ma

y

Jun

Jul

Au

g

Sep

Oct

Nov

De

c

Ja

n

12

Fe

b

M

ar

Total

Blood for

MP test

0 140 251 199 314 265 252 172 92 84 15

2

20

9

2130

RMT done 76 62 4 3 6 0 0 0 0 0 0 0 151

Positive

cases

(slide +

RMT)

19 39 73 62 68 71 42 46 17 11 16 31 495

Total PV 3 9 14 10 10 12 10 11 4 1 5 9 98

Total PF 12 22 48 43 48 49 20 20 7 4 8 19 300

Total

mixed type

4 8 11 9 10 10 12 15 6 6 3 3 97

Blood

sugar

0 12 28 6 8 10 10 11 0 10 0 5 100

Widal test 0 68 113 62 195 170 105 53 25 9 21 35 856

VDRL test 0 8 22 9 21 17 12 12 12 17 20 9 159

Pregnancy

test

49 33 43 33 35 49 15 44 30 35 36 38 440

Hb% in

PHC 124 75 90 73 142 106 88 73 88 11

8

11

7

13

4

1228

Page 159: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Hb% in SC 106 46 58 52 85 54 52 81 70 84 96 16

6

950

TLC 0 1 5 8 25 13 12 6 5 2 5 4 86

DLC 0 1 5 8 25 13 12 6 5 2 5 4 86

ESR 0 1 5 8 26 13 13 6 5 2 5 4 88

Urine RE 0 7 12 9 37 12 9 6 4 5 2 6 109

Stool RE 0 1 6 3 35 10 10 9 5 4 3 5 91

Blood

grouping

0 11 28 19 55 10 13 11 10 10 20 25 212

Sputum 1 1 5 3 23 8 5 4 2 2 2 4 60

Wet mount

test

0 0 0 2 22 16 9 13 10 18 20 9 119

Bameng

Name of the PHC : Bameng

District : East Kameng

Population Covered : 6979

No. of Sub-Centres : 4

Staff : 25

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Motorable/on

foot Villages Population Male Female

No. of

ASHA

Eligible

Couple

Lada 57 km On foot 20 1481 752 729 6 229

Paksa

camp 27 Km On foot 7 518 232 266 3 73

Marjingla 32 Km Motorable 4 696 347 349 4 147

Pakke 15 Km Motorable 8 872 440 432 7 137

Page 160: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 5

Staff Nurse 0 ANM at Sub

Centres

4

Pharmacist 1 Health Assistant 2

Lab Technician 1 Ambulance Driver 1

Others (G-D) 9 Total 25

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 912 15 21

May’11 873 15 20

June’11 917 24 14

July’11 953 37 42

Aug’11 1061 36 23

Sep’11 759 27

Oct’11 822 9 16

Nov’11 520 13 0

Dec’11 488 1 5

Jan’12 789 3 6

Feb’12 831 1 1

March’12 697 12 9

TOTAL 9622 193 157

Details of Laboratory Services

Name of lab

tests

Ap

r

11

Ma

y

11

Ju

n

11

Jul

y

11

Aug

11

Sep

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Fe

b

12

Ma

r

12

Tota

l

Blood for MP

test

35 81 43 51 41 35 96 21 6 26 33 14 482

RMT done 25 1 0 31 32 38 4 2 2 10 10 2 157

Positive cases

(slide + RMT)

16 20 13 15 10 12 24 4 0 1 6 1 122

Total PV 6 18 10 13 9 7 9 3 0 1 4 1 81

Total PF 9 2 3 2 1 5 12 0 0 0 2 0 36

Total mixed

type

1 0 0 0 0 0 3 1 0 0 0 0 5

Blood sugar 0 3 1 2 0 0 0 0 0 1 0 0 7

Page 161: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Widal 23 23 9 42 22 36 40 9 0 11 11 13 239

VDRL 4 4 0 3 3 4 3 3 0 0 5 1 30

Pregnancy test 8 5 4 4 5 17 12 14 3 14 7 93

Hb% in PHC 37 22 12 16 13 31 22 23 22 4 33 23 258

Hb% in SC 17 19 8 16 15 10 14 17 18 6 21 13 174

TLC 0 10 0 1 0 0 0 0 0 0 3 0 14

DLC 0 10 0 1 0 0 0 3 0 0 7 10 31

ESR 0 10 0 1 0 0 0 1 0 0 7 1 20

Urine RE 1 0 0 2 2 0 3 1 0 0 0 0 9

Stool RE 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood grouping 4 4 0 4 4 0 0 0 0 1 3 1 21

Etalin

Name of the PHC : Etalin

District : Dibang Valley

Population Covered : 2402

No. of Sub-Centres : 2

Staff : 28

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Motorable/on

foot

Villag

es

Popu

lation

Mal

e

Fe

mal

e

No. of

ASHA

Eligibl

e

Coupl

e

Anelih 55 Km Half Motorable 14 492 254 238 8 63

Arzoo 35 Km Motorable 20 757 473 284 8 82

Page 162: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 5

Staff Nurse 0 ANM at Sub

Centres

6

Pharmacist 1 Health Assistant 3

Lab

Technician

1 Ambulance Driver 1

Others (G-D) 9 Total 28

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 752 18 236

May’11 779 19 146

June’11 795 16 144

July’11 824 32 154

Aug’11 62 12 239

Sep’11 872 28 151

Oct’11 817 16 178

Nov’11 465 15 168

Dec’11 563 9 90

Jan’12 452 11 100

Feb’12 480 9 80

March’12 616 14 88

TOTAL 7477 199 1774

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Ju

n

11

July

11

A

ug

11

Se

p

11

Oc

t

11

Nov

11

De

c

11

Ja

n

12

Fe

b

12

M

ar

12

Total

Blood for MP test 112 85 77 185 62 18

5

10

0

102 94 77 62 71 1212

RMT done 30 41 41 54 66 25 24 18 7 13 13 14 346

Positive cases

(slide + RMT)

46 32 16 64 16 35 25 30 14 12 10 13 313

Total PV 19 23 11 28 10 16 7 13 2 7 5 5 146

Total PF 18 19 3 28 6 12 12 13 9 1 4 5 130

Total mixed type 9 0 2 8 0 7 6 4 3 4 1 4 48

Blood sugar 11 13 3 5 1 6 3 12 9 6 5 4 78

Widal 29 36 11 102 27 78 80 24 32 19 26 31 495

VDRL 10 8 0 7 7 12 2 4 7 4 5 5 71

Page 163: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Pregnancy test 12 10 4 10 26 13 3 6 18 4 17 12 135

Hb% in PHC 59 101 20 92 54 96 87 74 93 75 42 65 858

Hb% in SC 10 24 7 28 24 15 27 20 35 32 12 20 254

TLC 26 30 6 54 25 65 51 42 36 18 24 29 406

DLC 26 30 6 54 25 65 51 42 36 18 24 29 406

ESR 26 30 6 54 25 65 51 42 36 18 24 29 406

Urine RE 16 22 5 22 16 15 07 15 11 5 10 7 151

Stool RE 13 0 0 0 0 0 0 1 0 0 1 2 17

Blood grouping 8 20 2 30 18 15 3 4 13 8 6 15 142

Sputum 11 2 2 5 1 3 1 0 2 2 0 2 31

Wet mount test 0 3 2 1 2 9 2 1 4 4 3 1 32

Jeying

Name of the PHC : Jeying

District : Upper Siang

Population Covered : 3278

No. of Sub-Centres : 3

Staff : 20

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Motorable/on

foot

Villag

es

Popu

lation

Mal

e

Fe

mal

e

No. of

ASHA

Eligibl

e

Coupl

e

Bine 50 Km Motorable 2 277 151 126 1 29

Sibuk 55 Km Motorabe 2 900 462 438 2 90

Pongging 22 Km Foot 1 212 108 104 1 9

Page 164: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 4

Staff Nurse 0 ANM at Sub Centres 4

Pharmacist 1 Health Assistant 2

Lab Technician 1 Ambulance Driver 1

Others (G-D) 6 Total 20

Radiographer 0

Out-patient and In-patient details

Months OPD IPD Emergency

April 11 191 3 85

May 11 162 13 62

June 11 367 23 66

July 11 303 36 91

August 11 372 36 109

Sept 11 351 17 68

Oct 11 382 17 87

Nov 11 233 11 83

Dec 11 232 12 54

Jan 12 161 7 36

Feb 12 306 8 100

March 12 192 1 65

TOTAL 3252 184 906

Page 165: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Ju

n

11

Jul

y

11

Au

g

11

Se

p

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Feb

12

Ma

r

12

Total

Blood for MP test 19 25 44 46 69 56 45 41 33 58 56 40 532

RMT done 17 15 42 57 35 36 20 9 15 7 6 5 264

Positive cases

(slide + RMT)

4 8 8 34 18 14 12 2 3 2 5 2 112

Total PV 0 4 0 2 2 7 3 0 1 1 1 2 23

Total PF 2 4 8 27 15 5 7 2 1 1 4 0 76

Total mixed type 2 0 0 5 1 2 2 0 1 0 0 0 13

Blood sugar 0 0 0 0 0 0 0 0 0 0 0 2 2

Widal 0 3 8 25 17 7 10 2 1 4 13 6 96

VDRL 0 3 4 3 1 2 0 0 0 2 2 1 18

Pregnancy test 1 4 5 10 3 8 7 7 0 0 11 10 66

Hb% in PHC 35 27 57 73 56 54 45 41 35 56 47 26 552

Hb% in SC 6 4 19 22 4 31 8 5 0 0 0 6 105

TLC 0 0 0 0 2 0 1 0 0 0 2 1 6

DLC 7 15 7 25 10 2 3 2 0 5 3 2 81

ESR 0 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 0 1 0 2 0 2 1 1 0 2 1 2 12

Stool RE 50 0 0 0 0 0 0 2 0 0 0 0 52

Blood grouping 0 0 0 0 0 2 52 2 0 3 1 1 61

Sputum 0 0 0 0 0 0 0 0 1 1 0 0 2

Wet mount test 0 0 0 0 0 0 0 0 0 2 1 1 4

Page 166: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Khimiyong

Name of the PHC : Khimiyong

District : Changlang

Population Covered : 3829

No. of Sub-Centres : 2

Staff : 21

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Motorable/on

foot

Villag

es

Popu

lation

Mal

e

Fe

mal

e

No. of

ASHA

Eligibl

e

Coupl

e

Yanam 20 km Motorable 5 941 485 456 4 66

Jongji Havi 21 km Motorable 5 1217 598 619 5 122

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 3

Staff Nurse 1 ANM at Sub

Centres

4

Pharmacist 1 Health Assistant 2

Lab Technician 1 Ambulance Driver 1

Others (G-D) 6 Total 21

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 526 2 26

May’11 683 12 7

June’11 792 1 37

July’11 679 7 33

Aug’11 845 4 14

Sep’11 756 5 10

Oct’11 701 2 37

Nov’11 583 0 12

Dec’11 458 2 14

Jan’12 334 1 13

Feb’12 376 0 10

March’12 450 2 19

TOTAL 7183 38 232

Page 167: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Ju

n

11

Jul

y

11

Aug

11

Sep

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Fe

b

12

Ma

r

12

Tota

l

Blood for MP test 28 40 37 55 21 34 0 0 0 2 6 12 235

RMT done 19 26 20 46 44 17 0 8 10 7 9 12 218

Positive cases

(slide + RMT)

12 34 18 26 18 9 0 0 1 3 4 2 127

Total PV 6 19 9 18 14 5 0 0 1 0 2 2 76

Total PF 6 15 9 6 4 4 0 0 0 3 1 0 48

Total mixed type 0 0 0 2 0 0 0 0 0 0 1 0 3

Blood sugar 0 0 0 0 10 6 0 0 0 0 0 0 16

Widal 9 10 9 27 20 2 0 0 0 2 2 2 83

VDRL 4 5 2 3 10 5 2 4 0 1 9 3 48

Pregnancy test 8 6 3 4 13 13 6 10 11 7 10 3 94

Hb% in PHC 34 19 17 22 40 31 16 8 11 8 17 7 230

Hb% in SC 28 13 13 15 30 25 12 3 5 7 89 5 245

TLC 0 0 0 0 10 6 2 4 8 1 9 3 43

DLC 0 0 0 0 10 6 2 4 8 1 2 3 36

ESR 0 0 0 0 10 0 0 0 0 0 2 0 12

Urine RE 0 0 3 1 1 0 0 0 0 0 0 0 5

Stool RE 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood grouping 4 5 5 4 10 6 3 4 8 1 9 4 63

Sputum 0 0 0 0 0 1 0 0 0 0 1 0 2

Wet mount test 0 0 0 0 7 6 3 0 0 1 9 4 30

Mengio

Name of the PHC : Mengio

District : Papum Pare

Population Covered : 4386

No. of Sub-Centres : 3

Staff : 21

Page 168: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sub-Centres with Population

Name of

SC

Distanc

e from

PHC

Motorable/

on foot

Village

s

Popul

ation

Mal

e

Fe

ma

le

No.

of

ASH

A

Eligi

ble

Coup

le

Kamrung 14 km motorable 11 740 335 405 11 88

Nyopang 55 Km On foot 7 815 344 421 7 122

Pilla 65 Km On foot 4 334 150 185 4 44

Staff Pattern

Category Category

Doctor 2 ANM at PHC 5

Staff Nurse 1 ANM at Sub Centres 3

Pharmacist 1 Health Assistant 2

Lab Technician 1 Ambulance Driver 1

Others (G-D) 5 Total 21

Out-patient and In-patient details

Months OPD IPD Emergenc

y

April ‘11 482 9 0

May’11 459 3 0

June’11 569 25 0

July’11 665 33 1

Aug’11 617 10 10

Sep’11 481 10 9

Oct’11 262 3 3

Nov’11 317 6 55

Dec’11 333 1 62

Jan’12 298 4 84

Feb’12 294 8 47

March’12 342 14 60

TOTAL 5119 126 331

Page 169: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab

tests

Ap

r

11

Ma

11

Ju

n

11

Jul

y

11

Aug

11

Sep

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Fe

b

12

Ma

r

12

Tota

l

Blood for MP

test

35 81 43 51 41 35 96 21 6 26 33 14 482

RMT done 25 1 0 31 32 38 4 2 2 10 10 2 157

Positive cases

(slide + RMT)

16 20 13 15 10 12 24 4 0 1 6 1 122

Total PV 6 18 10 13 9 7 9 3 0 1 4 1 81

Total PF 9 2 3 2 1 5 12 0 0 0 2 0 36

Total mixed type 1 0 0 0 0 0 3 1 0 0 0 0 5

Blood sugar 0 3 1 2 0 0 0 0 0 1 0 0 7

Widal 23 23 9 42 22 36 40 9 0 11 11 13 239

VDRL 4 4 0 3 3 4 3 3 0 0 5 1 30

Pregnancy test 8 5 4 4 5 17 12 14 3 14 7 93

Hb% in PHC 37 22 12 16 13 31 22 23 22 4 33 23 258

Hb% in SC 17 19 8 16 15 10 14 17 18 6 21 13 174

TLC 0 10 0 1 0 0 0 0 0 0 3 0 14

DLC 0 10 0 1 0 0 0 3 0 0 7 10 31

ESR 0 10 0 1 0 0 0 1 0 0 7 1 20

Urine RE 1 0 0 2 2 0 3 1 0 0 0 0 9

Stool RE 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood grouping 4 4 0 4 4 0 0 0 0 1 3 1 21

Sangram

Name of the PHC : Sangram

District : Kurung Kumey

Population Covered : 6320

No. of Sub-Centres : 3

Staff : 25

Page 170: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sub-Centres with Population

Name of SC Distance

from

PHC

Motorable/on

foot

vill

age

s

Popu

latio

n

Male Femal

e

No. of

ASHA

Eligible

Couple

Pagba 16 Km Motorable 6 608 298 310 5 73

Leel 14 Km Motorable 13 1515 710 789 13 201

O' Point 6 Km Motorable 6 1162 566 598 6 156

Staff Pattern

Category Nos. Category Nos.

Doctor 1 ANM at PHC 4

Staff Nurse ANM at Sub Centres 6

Pharmacist 1 Health Assistant 1

Lab Technician 1 Ambulance Driver 1

Others (G-D) 9 Total 25

Radiographer 1

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 1062 47 53

May’11 1150 41 66

June’11 1299 44 64

July’11 1488 87 30

Aug’11 1415 50 47

Sep’11 1551 98 45

Oct’11 682 19 14

Nov’11 962 25 28

Dec’11 655 12 30

Jan’12 801 22 25

Feb’12 705 18 113

March’12 910 36 91

TOTAL 12680 499 606

Page 171: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Jun

11

Jul

y

11

Au

g

11

Sep

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Fe

b

12

M

ar

12

Tota

l

Blood for MP test 2 116 105 73 118 216 47 84 22 1 24 75 883

RMT done 21

1

32 26 123 30 0 0 0 9 19 26 29 505

Positive cases

(slide + RMT)

52 21 21 24 12 14 0 2 0 1 8 5 160

Total PV 16 15 15 12 5 13 0 2 0 1 4 1 84

Total PF 23 3 4 10 7 1 0 0 0 0 4 3 55

Total mixed type 13 3 2 2 0 0 0 0 0 0 0 1 21

Blood sugar 12 4 0 4 15 31 0 0 2 2 11 1 82

Widal 89 38 38 137 102 0 0 0 2 9 46 10

6

567

VDRL 1 8 15 6 20 1 3 7 1 0 7 11 80

Pregnancy test 13 14 24 19 29 18 8 28 11 30 10 18 222

Hb% in PHC 38 52 82 113 102 153 44 67 49 56 62 73 891

Hb% in SC 26 30 56 86 30 65 34 44 42 36 44 33 526

TLC 8 6 9 13 14 53 5 12 6 0 19 40 185

DLC 8 6 9 16 14 53 5 12 6 0 19 40 188

ESR 0 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 0 12 12 4 18 12 0 8 2 0 8 10 86

Stool RE 0 0 3 0 0 0 0 0 0 0 3 2 8

Blood grouping 5 17 15 9 56 14 0 11 2 5 5 24 163

Sputum 5 3 5 1 14 2 7 6 2 0 1 3 49

Wet mount test 0 0 0 0 0 9 1 0 3 0 1 0 14

Page 172: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Wakka

Name of the PHC : Wakka

District : Tirap

Population Covered : 11770

No. of Sub-Centres : 2

Staff : 21

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Motorable/on

foot

Villag

es

Popul

ation

Mal

e

Fema

le

No. of

ASHA

Eligibl

e

Coupl

e

Nginu 26 Km Motorable 5 5293 2721 2572 6 665

Khanu 24 Km Motorable 3 2256 1104 1152 4 267

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 4

Staff Nurse 2 ANM at Sub

Centres

4

Pharmacist 1 Health Assistant 2

Lab

Technician

1 Ambulance Driver 1

Others (G-D) 8 Total 21

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 1486 10 5

May’11 1483 6 6

June’11 2016 20 5

July’11 2321 24 10

Aug’11 2077 23 3

Sep’11 2499 40 8

Oct’11 1784 30 6

Nov’11 982 10 2

Page 173: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Dec’11 1101 8 3

Jan’12 862 10 9

Feb’12 963 4 14

March’12 1162 12 10

TOTAL 18736 197 81

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Ju

n

11

Ju

ly

11

Au

g

11

Se

p

11

Oc

t

11

No

v

11

Dec

11

Ja

n

12

Fe

b

12

Ma

r

12

Tota

l

Blood for MP test 0 1 19 30 33 49 63 22 8 2 7 1 235

RMT done 33 52 32 45 64 86 12 0 0 1 3 2 330

Positive cases

(slide + RMT)

7 5 2 3 2 10 7 1 0 0 0 0 37

Total PV 0 3 2 2 2 10 6 1 0 0 0 0 26

Total PF 5 2 0 1 0 0 1 0 0 0 0 0 9

Total mixed type 2 0 0 0 0 0 0 0 0 0 0 0 2

Blood sugar 0 0 0 0 0 0 0 0 0 0 2 0 2

Widal 0 22 28 53 82 50 0 0 0 1 5 1 242

VDRL 0 7 12 28 5 7 11 2 4 0 0 0 76

Pregnancy test 34 15 18 43 14 26 10 6 8 20 19 15 228

Hb% in PHC 34 43 60 62 75 68 36 10 28 21 22 19 478

Hb% in SC 24 22 11 17 4 22 7 2 7 12 2 13 143

TLC 0 0 0 0 2 1 34 0 3 3 1 0 44

DLC 0 1 11 0 7 3 4 0 4 3 1 0 34

ESR 0 5 12 4 15 14 4 0 4 1 0 0 59

Urine RE 0 4 26 82 70 57 29 4 27 7 20 5 331

Stool RE 0 0 0 1 1 2 1 0 0 0 0 0 5

Blood grouping 0 18 15 44 29 8 14 3 19 6 13 5 174

Sputum 0 4 12 9 2 7 3 5 7 0 1 2 52

Wet mount test 2 0 0 8 5 5 5 7 5 5 2 5 49

Page 174: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Walong

Name of the PHC : Walong

District : Anjaw

Population Covered : 2167

No. of Sub-Centres : 2

Staff : 17

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Motorable/on

foot

Villag

es

Popu

lation

Mal

e

Fe

mal

e

No. of

ASHA

Eligibl

e

Coupl

e

Yasong 21 Km Motorable 10 518 256 262 8 62

Kibithoo 85 Km Motorable 10 1180 425 755 6 137

Staff Pattern

Category Nos. Category Nos.

Doctor 1 ANM at PHC 4

Staff Nurse 0 ANM at Sub

Centres

4

Pharmacist 1 Health Assistant 0

Lab Technician 1 Ambulance Driver 1

Others (G-D) 5 Total 17

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 596 4 5

May’11 596 17 5

June’11 586 6 5

July’11 791 20 5

Aug’11 951 25 10

Sep’11 638 12 17

Oct’11 534 3 5

Nov’11 418 10 2

Dec’11 368 12 2

Jan’12 382 6 4

Page 175: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Feb’12 423 6 2

March’1

2

417 4 1

TOTAL 6700 125 63

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Jun

11

Jul

y

11

Au

g

11

Se

p

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Fe

b

12

Ma

r

12

Tota

l

Blood for MP test 1 43 31 10 20 17 6 13 18 11 35 29 234

RMT done 15 22 28 64 11 3 9 1 0 1 1 0 155

Positive cases

(slide + RMT)

6 9 8 21 2 0 1 0 0 0 0 0 47

Total PV 1 2 2 11 1 0 1 0 0 0 0 0 18

Total PF 2 7 6 7 1 0 0 0 0 0 0 0 23

Total mixed type 3 0 0 3 0 0 0 0 0 0 0 0 6

Blood sugar 2 7 6 1 7 3 1 2 2 1 8 5 45

Widal 7 21 20 25 40 11 6 11 7 9 19 25 201

VDRL 3 5 4 7 5 2 2 7 3 0 6 4 48

Pregnancy test 13 10 13 8 21 9 5 17 10 12 9 4 131

Hb% in PHC 12 26 18 17 34 10 11 19 10 5 38 30 230

Hb% in SC 6 7 8 13 8 2 1 3 0 3 1 0 52

TLC 0 4 1 0 14 6 4 12 5 0 13 8 67

DLC 1 7 4 1 20 7 5 12 5 0 13 8 83

ESR 1 3 5 1 19 3 0 1 0 0 1 1 35

Urine RE 2 7 10 11 22 5 4 3 2 1 2 6 75

Stool RE 0 0 0 0 0 0 0 0 0 0 1 1 2

Blood grouping 4 9 6 12 45 81 3 9 3 3 8 6 189

Sputum 0 0 1 0 3 1 0 1 1 0 2 3 12

Wet mount test 3 4 4 7 0 0 2 7 3 0 5 0 35

Page 176: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Tuting

Name of the PHC : Tuting

District : Upper Saing

Population Covered : 8643

No. of Sub-Centres : 5

Staff : 23

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 3

Staff Nurse 0 ANM at Sub

Centres

4

Pharmacist 1 Health Assistant 4

Lab Technician 1 Ambulance Driver 1

Others (G-D) 7 Total 23

Out-patient and In-patient details

Months OPD IPD Emergen

cy

April ‘11 1270 26 30

May’11 1264 8 40

June’11 1678 33 26

July’11 1633 19 73

Aug’11 1617 19 86

Sep’11 1178 20 83

Oct’11 1055 22 53

Nov’11 927 10 50

Dec’11 902 7 40

Jan’12 981 6 28

Feb’12 754 9 20

March’12 1032 35 15

TOTAL 14291 214 544

Page 177: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Ju

n

11

Ju

ly

11

Au

g

11

Sep

11

Oct

11

No

v

11

De

c

11

Ja

n

12

Feb

12

Ma

r

12

Total

Blood for MP test 63 109 494 30

9

320 140 113 60 32 77 51 0 1768

RMT done 25 96 167 19

2

120 0 19 13 18 39 38 29 756

Positive cases

(slide + RMT)

2 31 41 68 74 13 12 11 8 15 11 7 293

Total PV 1 13 22 29 32 7 6 7 6 7 2 5 137

Total PF 1 17 14 24 29 5 5 0 0 5 6 0 106

Total mixed type 0 1 5 15 13 1 1 4 2 3 3 2 50

Blood sugar 0 4 9 6 5 6 5 0 2 4 7 0 48

Widal 18 9 46 40 85 63 44 26 22 34 19 0 406

VDRL 8 13 17 9 17 19 8 5 7 11 18 0 132

Pregnancy test 3 13 15 18 16 15 14 9 15 16 31 15 180

Hb% in PHC 11 28 37 30 26 23 11 9 14 28 21 0 238

Hb% in SC 2 5 7 4 7 2 2 2 4 0 9 7 51

TLC 1 6 12 9 5 2 3 1 0 1 1 0 41

DLC 1 6 13 10 6 2 3 1 0 1 1 0 44

ESR 2 10 13 10 5 2 2 1 0 1 1 0 47

Urine RE 1 4 13 10 4 2 1 1 1 0 5 0 42

Stool RE 0 0 0 0 0 0 0 0 1 0 0 0 1

Blood grouping 4 4 28 20 20 10 4 0 7 12 17 0 126

Sputum test 6 12 15 10 14 13 5 0 4 16 4 0 99

Wet mount test 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 178: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Deomali

Name of the PHC : Deomali

District : Tirap

Population Covered :14309

Staff :23

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 3

Staff Nurse 0 ANM at Sub

Centres

4

Pharmacist 1 Health Assistant 4

Lab

Technician

1 Ambulance Driver 1

Others (G-D) 7 Total 23

Out-patient and In-patient details

Months OPD IPD Emergency

Aug’11 1730 46 265

Sep’11 1745 47 229

Oct’11 1447 14 268

Nov’11 1009 20 305

Dec’11 1227 9 264

Jan’12 768 9 75

Feb’12 652 0 48

March’1

2

954 1 34

TOTAL 9532 146 1488

Page 179: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Aug

11

Sep

11

Oct

11

Nov

11

Dec

11

Jan

12

Feb

12

Mar

12

Tot

al

Blood for MP test 90 157 48 84 61 57 0 9 506

RMT done 187 94 58 47 38 16 35 82 557

Positive cases

(slide + RMT)

97 37 6 13 12 16 2 16 199

Total PV 20 7 0 9 5 4 1 7 53

Total PF 65 28 6 4 7 12 1 7 130

Total mixed type 12 2 0 0 0 0 0 2 16

Blood sugar 4 0 2 2 2 3 0 0 13

Widal 0 370 83 98 109 78 15 72 825

VDRL 0 8 7 10 22 6 4 26 83

Pregnancy test 21 16 14 19 14 11 7 23 125

Hb% 20 39 29 46 72 46 17 60 329

TLC 0 0 37 19 10 12 4 41 123

DLC 0 0 37 19 10 12 4 41 123

ESR 0 0 39 6 10 12 4 41 112

Urine RE 4 51 52 20 36 11 8 55 237

Stool RE 0 0 0 0 0 0 0 2 2

Blood grouping 0 23 22 24 37 3 9 41 159

Page 180: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Meghalaya PHCs

Mawlong

Name of the PHC : Mawlong

District : East Khasi Hills

Population Covered : 3689

No. of Sub-Centres : 2

Staff : 17

Date of Taking over : 02.03.2009

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 3

Staff Nurse 2 ANM at Sub

Centres

2

Pharmacist 1 Health Assistant 0

Lab Technician 1 Ambulance Driver 1

Others (G-D) 5 Total 17

Out-patient and In-patient details

Months OPD IPD Emergenc

y

April ‘11 853 14 24

May’11 931 19 30

June’11 982 20 26

July’11 1014 15 28

Aug’11 853 12 33

Sep’11 786 12 36

Oct’11 1070 14 36

Nov’11 1288 28 43

Dec’11 1052 10 16

Page 181: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Jan’12 1150 12 148

Feb’12 1041 20 145

March’1

2

1009 18 206

TOTAL 12029 194 771

Details of Laboratory Services

Name of lab tests Ap

r

11

Ma

y

11

Jun

11

Jul

11

Au

g

11

Sep

11

Oc

t

11

Nov

11

De

c

11

Ja

n

12

Feb

12

Ma

r

12

Tota

l

Blood for MP test 60 112 116 36 85 125 62 154 73 92 102 107 1124

Positive cases 5 4 5 2 7 4 3 10 4 1 3 2 50

Total PV cases 2 0 2 0 0 1 1 3 1 0 2 0 12

Total PF cases 3 4 3 2 5 2 2 6 3 0 1 2 33

Total mixed 0 0 0 0 2 1 0 1 0 1 0 0 5

RMT Done 13 22 24 14 43 42 27 51 48 27 23 28 362

PV cases 1 0 1 0 0 1 1 2 1 0 1 0 8

PF cases 3 2 2 2 2 1 1 4 2 0 1 1 21

Mixed cases 0 0 0 0 2 1 0 1 0 1 0 0 5

Blood sugar 0 0 0 0 0 0 0 0 0 3 7 7 17

Widal 36 73 75 15 29 77 38 47 19 32 48 57 546

VDRL 9 20 23 8 9 47 17 14 8 17 19 21 212

Pregnancy test 15 16 5 6 11 10 6 5 5 5 9 11 104

Blood grouping 6 6 3 4 7 25 4 4 5 6 9 8 87

Hb% 45 26 18 13 12 94 57 78 71 10

2

107 114 737

TLC 42 26 17 13 10 66 38 72 54 32 27 30 427

DLC 42 25 17 13 10 65 38 72 54 32 27 30 425

ESR 43 42 46 13 20 72 39 76 54 35 31 34 505

Urine RE 20 37 31 11 19 48 17 41 25 31 23 26 329

Sputum 25 30 46 26 30 26 16 46 29 21 16 37 348

Stool RE 0 1 0 0 0 0 0 0 6 8 7 7 29

Wet mouth test 0 0 0 0 0 0 0 0 1 5 7 7 20

Page 182: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Mawsahew

Name of the PHC : Mawsahew

District : East Khasi Hills

Population Covered : 3297

No. of Sub-Centres : 3

Staff : 22

Date of Taking over : 03.03.2009

Sub-Centres with Population

Name of

SCs

Distanc

e from

PHC

Motorabl

e/on foot

Trekking

hrs from

PHC

vill

age

s

Popu

lation

Mal

e

Fe

mal

e

No.

of

ASH

A

No of

school

s

Wakhaliar 3 Motorable - 4 762 367 395 4 91

Rumnong 25 On foot 3.5 hours 8 470 250 220 2 47

Mawphu 40 On foot 7 hours 5 1188 562 626 3 154

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 2

Staff Nurse 2 ANM at Sub Centres 6

Pharmacist 1 Health Educator 1

Lab Technician 1 Ambulance Driver 1

Others (G-D) 6 Total 22

Page 183: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

Months OPD IPD Emergency

April ‘11 996 14 42

May’11 849 27 57

June’11 706 26 42

July’11 903 33 40

Aug’11 846 29 45

Sep’11 837 24 50

Oct’11 680 17 30

Nov’11 584 9 28

Dec’11 559 4 25

Jan’12 681 8 25

Feb’12 718 8 20

March’12 899 25 40

TOTAL 9258 221 444

Page 184: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ap

r

11

M

ay

11

Ju

n

11

Jul

11

Aug

11

Se

p

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Fe

b

12

M

ar

12

Total

Blood for MP test

Slide+RMT

27 44 34 124 68 94 1 21 51 14 0 23 501

Total Positive cases 0 1 0 0 0 0 1 2 0 0 0 0 4

Total PV cases 0 1 0 0 0 0 0 0 0 0 0 0 1

Total PF cases 0 0 0 0 0 0 1 0 0 0 0 0 1

Total mixed 0 0 0 0 0 0 0 2 0 0 0 0 2

Blood sugar 0 0 0 0 0 0 0 0 0 0 0 0 0

Widal 7 16 10 26 35 32 3 5 3 7 6 24 174

VDRL 8 8 3 13 14 13 0 2 3 8 6 8 86

Pregnancy test 12 6 5 6 12 6 2 4 2 4 15 3 77

Blood grouping 5 6 2 14 14 13 5 4 0 5 10 7 85

Hb% 10

0

97 45 88 100 70 21 20 29 26 40 60 698

Hb test done in SC 4 3 2 3 1 2 3 1 0 0 0 0 19

TLC 11 14 9 13 12 16 4 6 1 1 6 16 109

DLC 7 8 8 10 9 12 4 6 1 1 6 16 88

ESR 8 7 6 8 10 12 4 3 1 1 6 15 85

Urine RE 19 12 8 21 15 21 6 11 19 13 21 15 181

Sputum 7 11 0 4 12 7 0 1 0 1 0 0 43

Stool RE 2 0 0 2 0 0 0 1 0 0 0 0 5

Page 185: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Umtrai

Name of the PHC : Umtrai

District : Ri Bhoi

Population Covered : 4361

No. of Sub-Centres : 1

Date of Taking over : 01.09.2009

Out-patient and In-patient details

Months OPD IPD Emergenc

y

April ‘11 675 3 0

May’11 637 22 8

June’11 681 17 6

July’11 774 44 20

Aug’11 640 13 2

Sep’11 462 16 5

Oct’11 621 15 1

Nov’11 337 6 5

Dec’11 510 12 15

Jan’12 504 16 30

Feb’12 570 29 29

March’1

2

773 39 20

TOTAL 7184 232 141

Page 186: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ap

r

11

M

ay

11

Jun

11

Jul

11

Au

g

11

Se

p

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Feb

12

Ma

r

12

Tota

l

Blood for MP test 40 72 109 109 81 77 68 46 41 47 45 108 843

Total Positive

cases

2 11 13 14 5 5 1 2 0 1 2 2 58

Total PV cases 1 1 0 2 0 0 0 0 0 0 0 0 4

Total PF cases 1 10 13 12 5 5 1 2 0 1 2 2 54

Total mixed 0 0 0 0 0 0 0 0 0 0 0 0 0

Blood sugar 18 21 31 12 18 13 12 5 18 7 9 10 174

Widal 5 5 14 15 8 8 7 5 5 5 8 11 96

VDRL 16 7 11 10 8 11 16 3 12 4 6 6 110

Pregnancy test 9 8 10 14 9 10 6 6 6 10 7 12 107

Blood grouping 17 7 10 3 18 12 12 3 12 4 7 7 112

Hb% 56 54 80 71 57 55 50 49 45 57 77 62 713

Hb done in SC 0 0 0 0 0 0 0 0 0

TLC 12 17 31 26 14 18 20 15 15 17 29 24 238

DLC 12 17 31 26 14 18 20 15 15 17 29 24 238

ESR 6 7 16 23 14 16 20 15 21 17 31 24 210

Urine RE 26 26 32 15 15 13 14 17 21 7 18 17 221

Sputum 0 0 0 0 0 0 0 0 0 0 0 0 0

Stool RE 9 5 13 12 5 5 5 3 4 4 5 7 77

Page 187: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Aradonga

Name of the PHC : Aradonga

District : West Khasi Hills

Population Covered : 12041

No. of Sub-Centres : 2

Date of Taking over : 01.06.2011

Sub-Centres with Population

Name of SC Distanc

e from

PHC

Motorable/

on foot

Villa

ges

Populat

ion

Male Female No. of

ASHA

Eligibl

e

Couple

Mallangoko

na

22 KM Motorable 16 3137 1579 1558 15 950

Tyanghor 18 KM Tracking 16 3028 1565 1463 16 1120

Out-patient and In-patient details

Months OPD IPD Emergency

June’11 343 56 15

July’11 540 150 72

Aug’11 357 58 41

Sep’11 618 22 25

Oct’11 651 28 69

Nov’11 630 30 17

Dec’11 553 25

Jan’12 520 22 30

Feb’12 573 40 35

March’12 846 35 66

TOTAL 5631 466 239

Details of Laboratory Services

Page 188: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Name of lab tests Ju

n

10

Jul

10

Au

g

10

Sep

10

Oct

10

Nov

10

Dec

09

Ja

n

10

Feb

10

Mar

10

Total

Blood for MP test 0 0 0 0 0 25 92 80 165 203 566

Total Positive cases 0 0 0 0 0 2 0 16 12 26 56

Total PV cases 0 0 0 0 0 0 0 0 0 1 1

Total PF cases 0 0 0 0 0 2 20 16 12 25 75

Total mixed 0 0 0 0 0 0 0 0 0 0 0

RMT Done 85 288 99 130 120 86 0 30 48 130 1016

PV cases 19 16 50 3 4 0 0 1 0 1 94

PF cases 21 95 49 70 64 38 0 29 48 25 439

Mixed cases 0 8 4 6 6 6 0 0 0 0 30

Total Positive cases

(slide + RMT)

40 119 103 79 74 46 20 46 60 52 639

Blood sugar 0 5 1 0 1 0 0 0 163 0 170

Widal 0 24 11 3 10 0 4 4 9 15 80

VDRL 0 0 0 0 0 0 16 29 36 24 105

Pregnancy test 7 8 10 11 22 12 0 25 29 20 144

Blood grouping 0 1 12 13 1 9 0 24 32 22 114

Hb% 0 25 23 53 73 80 102 78 106 155 695

TLC 0 0 0 0 0 0 0 6 3 3 12

DLC 0 0 0 0 0 0 0 6 3 3 12

ESR 1 0 0 0 0 0 0 8 15 18 42

Urine RE 10 12 0 11 18 7 0 25 23 17 123

Page 189: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Warmawsaw

Name of the PHC : Warmawsaw

District : Ri Bhoi

Population Covered : 7201

No. of Sub-Centres : 1

Staff : 16

Date of Taking over : 01.06.2011

Staff Pattern

Category Nos. Category Nos.

Doctor 2 ANM at PHC 2

Staff Nurse 2 ANM at Sub Centres 2

Pharmacist 1 Accountant 1

Lab Technician 1 Ambulance Driver 1

Others (G-D) 5 Total 16

Out-patient and In-patient details

Months OPD IPD Inpatient

at

midnight

Minor

OT

Injection Casualty/E

mergency

Referra

l

June 2011 322 07 03 06 143 9 05

July 2011 577 28 07 12 143 9 05

August 11 674 36 06 10 232 17 Nil

Sept 11 524 23 05 5 300 19 02

Oct 11 570 26 16 5 500 52 0

Nov 11 411 14 8 4 396 32 0

Dec 11 375 23 26 14 103 35 0

Jan 12 431 24 10 5 39 19 0

Feb 12 346 18 7 5 19 15 0

March 12 506 13 7 2 145 59 0

TOTAL 4736 212 95 68 2020 266 12

Page 190: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Jun

11

Jul

11

Au

g

11

Sep

11

Oct

11

Nov

11

Dec

11

Ja

n

12

Fe

b

12

Mar

12

Total

Blood for MP test 150 253 347 157 300 156 211 41 35 82 1732

Total Positive cases 15 30 31 14 34 21 10 4 1 1 161

Total PV cases 5 13 17 4 8 0 0 0 0 0 47

Total PF cases 10 17 0 0 26 21 10 4 1 1 90

Total mixed 0 0 0 0 0 0 0 0 0 0 0

RMT Done 0 6 35 19 40 42 10 16 5 1 174

Widal 11 13 33 65 25 23 28 8 6 20 232

VDRL 03 2 6 16 0 0 2 1 0 14 44

Pregnancy test 03 2 12 06 9 9 10 11 4 9 75

Blood grouping 0 0 4 12 1 2 3 4 0 11 37

Hb% 18 37 25 41 42 29 39 37 26 58 352

TLC 0 1 4 19 2 5 4 4 4 32 75

DLC 0 1 4 19 4 5 4 4 4 32 77

ESR 0 1 4 27 3 5 4 4 4 32 84

Urine RE 0 0 1 17 12 7 11 8 3 18 77

Sputum 0 0 0 28 0 0 0 0 0 0 28

Stool RE 0 0 0 06 0 0 1 0 3 13 25

Wet mount Test 0 0 0 0 1 1 1 1 0 0 4

Page 191: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Jirang

Name of the PHC : Jirang

District : Ri Bhoi

Population Covered : 6443

No. of Sub-Centres : 0

Date of Taking over : 01.06.2011

Out-patient and In-patient details

Months OPD IPD Emergency

June 11 603 0 0

July11 673 0 0

Aug 11 447 0 0

Sep 11 417 0 4

Oct 11 1022 20 14

Nov 11 402 20 4

Dec 11 344 6 0

Jan 12 226 5 13

Feb 12 309 11 0

Mar 12 367 9 10

TOTAL 4810 71 41

Details of Laboratory Services

Name of lab tests Jun

11

Jul

11

Aug

11

Sep

11

Oct

11

Nov

11

Dec

11

Ja

n

12

Fe

b

12

M

ar

12

Total

Blood for MP test 0 46 19 30 54 58 96 76 76 69 524

Total Positive cases 0 19 12 08 8 4 6 1 3 3 64

Total PV cases 0 4 6 05 0 0 2 0 0 1 18

Total PF cases Nil 12 5 2 8 4 4 1 3 2 41

Total mixed Nil 3 1 1 0 0 0 0 0 0 5

RMT Done Nil 46 27 30 32 18 25 20 12 12 222

Page 192: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

PV cases Nil 4 6 5 0 0 2 0 0 1 18

PF cases Nil 13 5 2 8 4 4 1 3 2 42

Mixed cases Nil 2 1 2 0 0 0 0 0 0 5

Total positive cases

(slide + RMT)

0 38 24 17 16 8 12 2 6 6 129

Blood sugar Nil 0 - 0 0 0 0 0 0 0 0

Widal 0 0 0 0 6 5 24 14 18 12 79

VDRL 0 0 0 0 0 3 4 5 8 4 24

Pregnancy test 0 0 0 0 2 4 4 7 7 8 32

Blood grouping 0 2 3 0 5 2 2 0 8 4 26

Hb% 0 2 0 0 56 66 101 84 92 82 483

TLC 0 0 0 0 2 3 12 12 16 12 57

DLC 0 0 0 0 4 6 7 10 8 6 41

ESR 0 0 0 0 0 4 5 6 6 5 26

Urine RE 0 0 0 0 2 4 7 5 11 14 43

Page 193: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Manipur PHCs

Tousem

Name of the PHC : Tousem

District : Tamenglong

Population Covered : 15962

No. of Sub-Centres : 4

Staff : 20

Sub-Centres with Population

Name of

SC

Distance

from

PHC

Road

condition

No of

village

s

Popul

ation

Building Labour

room

Eligibl

e

Coupl

e

Aben 24 km Motorable 13 3924 Govt. Yes 521

Atengba 290 km Partial

Motorable

10 4473 Dilapidated

Govt. building

Nil 670

Namtiram 240 km Motorable 6 1565 No Govt.

building

Nil 264

Taningjan 270 km Partial

Motorable

8 3108 No Govt.

building

Nil 498

Staff Pattern

Category

Doctor 2

Staff Nurse 2

Pharmacist 1

Lab Technician 1

Others (G-D) 4

Page 194: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

Months OPD IPD Emergenc

y

May’11 248 6 Nil

June’11 313 2 Nil

July’11 246 14 Nil

Aug’11 257 14 Nil

Sep’11 225 18 1

Oct’11 280 4 Nil

Nov’11 274 7 1

Dec’11 435 0 0

Jan’12 503 15 9

Feb 12 366 0 3

Mar 12 431 6 4

TOTAL 3578 101 18

ANM at PHC 2

ANM at Sub

Centres

7

Ambulance

Driver

1

Total 20

Page 195: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab tests Ma

y

11

Ju

n

11

Jul

y

11

Au

g

11

Sep

11

Oct

11

Nov

11

De

c

11

Ja

n

12

Fe

b

12

Ma

r

12

Total

Blood for MP test 4 10 6 1 15 9 10 8 11 4 8 86

RMT done 4 10 31 28 24 6 5 18 11 9 8 154

Positive cases

(slide + RMT)

0 0 6 5 6 2 0 0 1 2 2 24

Total PV 0 0 1 3 3 2 0 0 0 0 0 9

Total PF 0 0 5 2 3 0 0 0 1 2 2 15

Total mixed type 0 0 0 0 0 0 0 0 0 0 0 0

Blood sugar 0 0 9 1 1 1 2 0 0 0 1 15

Widal 0 2 22 18 16 6 0 3 4 1 6 77

VDRL 0 0 0 5 0 8 0 7 7 3 2 32

Pregnancy test 8 2 6 3 9 8 2 15 7 4 9 73

Hb% in PHC 8 2 6 4 15 8 2 13 10 3 4 75

Urine RE 0 2 2 1 9 9 2 0 8 0 2 35

Stool RE 0 0 0 0 0 0 0 12 0 0 0 12

Blood grouping 8 2 9 4 4 4 2 7 9 3 3 55

Page 196: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Borobekra

Name of the PHC : Borobekra

District : Imphal East

Population Covered : 9072

No. of Sub-Centres : 3

Staff : 15

Date of Taking over : 01.05.2011

Sub-Centres with Population

Name of

SC

Distance

from PHC

Motorable

/on foot

Popul

ation

Eligible

couple

Building Labour

room

No of

staff

posted

Bhutankhal 3 km Motorable 2122 367 Rented Nil 2 ANMs

Jagradhor 4 km Motorable 1433 212 Rented Nil 2 ANMs

Durgapur 7 km Motorable 3432 631 Govt.

building

Nil 2 ANMs

Staff Pattern

Category

Doctor 2

Staff Nurse 2

Pharmacist 1

Lab Technician 1

Others (G-D) 2

ANM at PHC 1

ANM at Sub

Centres

5

Ambulance Driver 1

Total 15

Page 197: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

Months OPD IPD Emergency

May’11 230 0 11

June’11 557 Nil 27

July’11 612 20 34

Aug’11 652 Nil 32

Sep’11 687 15 Nil

Oct’11 564 5 23

Nov’11 659 6 12

Dec’11 454 2 5

Jan’12 316 7 11

Feb 12 440 4 8

March 12 672 6 42

TOTAL 5843 65 205

Details of Laboratory Services

Name of lab tests Ma

y

11

Ju

n

11

Jul

y

11

Au

g

11

Se

p

11

Oc

t

11

No

v

11

De

c

11

Ja

n

12

Feb

12

Mar

12

Tota

l

Blood for MP test 0 1 0 12 4 0 0 27 20 18 20 102

RMT done 0 48 90 83 18 28 13 12 10 14 20 336

Positive cases

(slide + RMT)

0 7 11 7 3 28 8 2 0 0 0 66

Total PV 0 0 4 4 3 12 3 2 0 0 0 29

Total PF 0 7 7 2 0 16 5 0 0 0 0 37

Total mixed type 0 0 0 1 0 0 0 0 0 0 0 1

Blood sugar 0 20 2 3 0 5 0 0 15 3 0 48

Widal 0 17 38 31 15 4 3 14 20 22 29 193

VDRL 0 3 4 3 0 0 0 2 3 4 4 23

Pregnancy test 0 1 0 3 18 7 15 12 15 26 27 124

Hb% in PHC 0 44 17 45 20 14 16 33 15 25 17 246

Hb% in SC 0 0 13 0 0 0 0 5 4 0 00 9

TLC 0 0 0 0 0 0 0 5 1 0 0 6

Page 198: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Patpuihmun

Name of the PHC : Patpuihmun

District : Churachandpur

No. of Sub-Centres : 7

Staff : 15

Sub-Centres with Population

Name of SC Distance

from PHC

Motorable/on

foot

Building Labour

room

Elect

ricity

Phailientangpunjee 95 km Motorable Nil Nil Yes

Buangmun 82 km Motorable Nil Nil Yes

Shivapurikhal 70 km Motorable Govt. Building Nil Yes

Chingmun 115 km 10 km trekking Nil Nil Nil

L. Kharkhuplien 35 km Trekking Nil Nil Nil

Kangreng 30 km Trekking Nil Nil Nil

Ngampabung 25 km Trekking Nil Nil Nil

Staff Pattern

Category

Doctor 1

Staff Nurse 3

Pharmacist 1

Lab Technician 1

Others (G-D) 3

ANM at PHC 4

ANM at Sub Centres 2

DLC 0 0 0 0 0 0 0 5 1 0 0 6

ESR 0 7 0 0 0 0 0 9 1 0 0 10

Urine RE 0 0 0 0 0 0 0 12 2 1 0 15

Blood grouping 0 0 48 0 0 0 1 18 9 15 8 99

Page 199: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Health Assistant 0

Ambulance Driver 0

Total 15

Out-patient and In-patient details

Months OPD IPD Emergency

Oct’11 395 5 10

Nov’11 252 4 5

Dec’11 237 6 4

Jan’12 210 16 75

Feb 12 76 9 14

Mar 12 97 0 0

TOTAL 1267 40 108

Details of Laboratory Services

Name of lab tests Oct

11

Nov

11

Dec

11

Jan

12

Feb

12

Mar

12

Total

Blood for MP test 0 0 0 0 15 0 15

RMT done 17 14 11 13 0 12 67

Positive cases

(slide + RMT)

0 0 0 0 15 0 15

Blood sugar 5 0 0 0 0 0 5

Widal 2 2 7 0 5 0 16

VDRL 0 0 0 0 2 0 2

Pregnancy test 4 7 2 4 0 3 20

Hb% in PHC 10 13 5 3 0 0 31

Blood grouping 5 5 0 0 0 0 10

Page 200: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Orissa PHCs

Ganjam District

Alasu

Name of the PHC : Alasu

Taluk : Jagannathprasad

District : Ganjam

Population Covered : 20690

No. of Sub-Centres : 3

Staff : 7

Date of Taking over : 17.10.09

Sub-Centres with Population

Sl.

No

Name of

SC

Distance

from PHC

Building

(Y/N)

No. of

villages

Pop

ulati

on

Eligible

Couple

No. of

ASHA

No of

AW

W

No

of

VH

SC

No

of

SH

G

Male Female

I ALASU 1 KM NO 18 3388 2687 1098 5 9 1 24

Ii KADUA 3 KM NO 18 4344 2905 1248 6 12 1 25

Iii RAUTI 5 KM NO 12 4179 3187 1320 8 12 1 22

Staff Pattern

Sl.No Designation Sanctioned Available

i Medical

Officer

1 1

ii Pharmacist 1 1

iii ANM 1 1

iv Lab.

Technician

1 1

v PHC

Coordinator

1 1

vi AYUSH 1 1

vii Attendant 1 1

Page 201: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

OPD

Male Female

April 2010 287 245

May 416 314

Jun 428 343

Jul 556 379

Aug 470 382

Sep 549 374

Oct 689 568

Nov 743 615

Dec 719 582

January 2011 512 582

Feb 649 533

Mar 879 619

TOTAL 6897 5536

Details of Laboratory Services

Name of lab

tests

Apr

‘10 May June Jul Aug Sep Oct Nov Dec

Jan

‘11 Feb Mar

Total

Blood for

MP test

53 77 74 76 88 78 88 84 79 89 82 98 966

Positive

cases (slide +

RMT)

2 3 2 3 4 7 8 7 3 3 4 3 49

Total PV 0 0 0 1 0 0 0 1 0 0 0 0 2

Total PF 2 3 2 2 4 7 8 6 3 3 4 3 47

Blood sugar 6 5 6 17

Hb% in PHC 45 60 49 60 69 80 61 47 70 78 72 65 756

TLC 51 52 50 50 70 75 63 45 78 82 65 72 753

DLC 51 52 50 50 70 75 63 45 78 82 65 72 753

ESR 0 0 0 0 0 0 0 0 0 0 0 0 0

Urine RE 48 59 60 56 60 86 50 40 80 75 68 80 762

CT BT Time 5 4 3 7 8 7 0 0 10 12 13 14 83

Page 202: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Manitara

Name of the PHC : Manitara

Taluk : Buguda

District : Ganjam

Population Covered : 21644

No. of Sub-Centres : 3

Staff : 6

Date of Taking Over : 04.10.2008

Sub-Centres with Population

Sl.

No

.

Name of SC Distan

ce

from

PHC

Buildin

g (Y/N)

No. of

village

s

Population Eligib

le

Coupl

e

No.

of

ASH

A

No

of

Ang

anw

adi

No

of

VHS

C

No

of

SH

G

Male Femal

e

I Manitara SC 0 Y 7 3637 3310 1293 8 9 1 16

Ii Kanakuturu 7 Y 4 3161 3179 985 6 8 1 16

Iii Golabandha 14 Y 6 3147 3147 1100 4 11 1 22

Staff Pattern

Designation Sanctioned Available

i Medical Officer 1 1

ii Pharmacist 1 1

iii ANM 1 1

iv Lab. Technician 1 1

v PHC Coordinator 1 1

vii Attendant 1 1

Page 203: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient and In-patient details

IPD OPD

Male Female Male Female

April 2010 0 1 218 237

May 1 1 231 251

Jun 2 1 488 358

Jul 0 0 697 600

Aug 2 0 240 346

Sep 2 1 486 690

Oct 2 1 654 400

Nov 0 1 499 531

Dec 1 1 697 756

January 2011 1 0 698 620

Feb 1 0 773 699

Mar 0 1 596 876

TOTAL 9 8 6277 6364

Details of Laboratory Services

Name of

lab tests

Apr

‘10 May June Jul Aug Sep Oct Nov Dec

Jan

‘11 Feb Mar

Total

Blood for

MP test 48 42 43 87 53 40 45 40 25 54 18 44 539

Positive

cases

(slide +

RMT)

Total PV 7 0 0 2 1 0 10

Total PF 7 7 1 1 0 2 1 3 1 0 2 4 29

Total

mixed type

HIV tests

Positive

Blood

sugar 7 3 10 4 2 8 6 12 7 7 14 15 95

Page 204: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Widal 0 0 0 0 0 0 0 0 0 0 0 0 0

VDRL 2 1 3 0 2 0 0 0 0 19 0 0 27

Pregnancy

test 6 5 9 5 4 10 10 12 12 10 21 16 120

Hb% in

PHC 26 25 45 32 32 30 33 30 30 38 42 40 403

TLC 18 13 18 6 8 20 18 14 14 22 19 28 198

DLC 20 19 20 15 15 18 21 20 20 25 25 25 243

ESR 7 6 15 3 2 10 9 10 10 12 13 15 112

Urine RE 8 5 10 4 2 10 6 12 12 7 15 14 105

Blood

grouping 7 4 46 10 8 8 4 12 12 15 22 19 167

Rapid test

for HIV 0 0 0 0 0 0

CT BT

Time 2 0 0 2 2 2 1 0 9

Others 2 2 2 3 8 10 5 5 37

Rahada

Name of the PHC : Rahada

Taluk : Khallikote

District : Ganjam

Population Covered : 28864

No. of Sub-Centres : 4

Staff : 6

Date of Taking over : 01.10.2008

Page 205: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Sub-Centres with Population

Sl.

No. Name of SC

Dista

nce

from

PHC

Build

ing

(Y/N)

No. of

village

s Population

Eligibl

e

Coupl

e

No.

of

ASH

A

No of

Anga

nwadi

No

of

VHS

C

No of

SHG

Male Female

I Angargaon 4 Y 13 5545 5342 1783 8 13 1 2

Ii Sandhamula 1 N 7 2755 2338 850 4 6 1 1

Iii Sankuda 6 Y 4 2546 2620 872 5 6 1 2

Iv Talasara 3 Y 9 3968 3750 1225 5 8 1 2

Staff Pattern

Sanctioned Available

i Medical

Officer

1 1

ii Pharmacist 1 1

iii Staff Nurse 1 1

iv Lab.

Technician

1 1

v PHC

Coordinator

1 1

vii Attendant 1 1

Out-patient and In-patient details

IPD OPD EMERGENCY

Male Female Male Female Male Female

April 2010 2 1 524 602 1 1

May 9 8 566 597 0 1

Jun 18 22 599 681 1 0

Jul 21 18 1020 968 1 1

Aug 14 17 751 902 1 2

Sep 8 6 745 805 1 0

Oct 5 7 740 632 1 1

Nov 7 9 643 650 0 1

Dec 6 8 650 750 1 2

January 2011 8 11 980 1003 1 0

Feb 7 11 994 888 1 1

Mar 8 10 920 1006 1 2

TOTAL 113 128 9132 9484 10 12

Page 206: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab

tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb. Mar. Total

Blood for Mp

test 43 61 40 119 85 79 50 35 42 38 50 41

Total PV 2 7 1 1 2 2 0 0 0 0 0 0

Total PF 1 1 60 14 7 6 2 3 4 3 3 0

Blood sugar 2 3 3 3

Widal 10 15 7 11 4 0

Hb% in PHC 8 12 21 32 13 21 6 11 19 14 14 11 182

TLC 54 68 76 115 57 65 46 77 57 60 61 55 791

DLC 54 68 76 116 58 65 46 77 57 61 61 55 794

ESR 19 27 32 34 11 19 15 29 18 18 17 18 257

Urine RE 16 20 31 34 16 18 29 22 28 35 26 275

Others(BS/BP) 6 16 8 10 2 10 2 10 4 2 6 6 82

Goudagotha

Name of the PHC : Goudagotha

Taluk : Surada

District : Ganjam

Population Covered : 15279

No. of Sub-Centres : 2

Staff : 7

Date of Taking over : 12.09.2008

Sub-Centres with Population

Sl.

No. Name of SC

Dista

nce

from

PHC

Build

ing

(Y/N)

No. of

village

s

Popu

latio

n

Eligibl

e

Couple

No.

of

ASH

A

No

of

Ang

anw

adi

No

of

VH

SC

No

of

SHG

Male Female

I Goudagotha 0 Y 43 4400 4500 1530 7 11 19 59

Ii Merikote 18 Y 33 3427 3301 1450 7 10 13 38

Page 207: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Staff Pattern

Sanctioned Available

i Medical

Officer

1 1

ii Pharmacist 1 1

iii ANM 1 1

iv Lab.

Technician

1 1

v PHC

Coordinator

1 1

vi AYUSH 1 1

vii Attendant 1 1

Out-patient and In-patient details

IPD OPD EMERGENCY

Male Female Male Female Male Female

April 2010 17 10 379 335 2 0

May 10 15 325 350 1 2

Jun 5 17 290 313 1 0

Jul 13 12 450 476 0 1

Aug 8 7 380 365 1 1

Sep 0 0 465 420 2 2

Oct 0 0 529 445 1 1

Nov 0 0 585 442 2 1

Dec 0 0 485 538 1 1

January 2011 0 0 642 565 1 0

Feb 0 0 492 484 1 0

Mar 5 8 539 409 1 1

TOTAL 58 69 5561 5142 14 10

Page 208: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Details of Laboratory Services

Name of lab

tests Apr May June Jul Aug Sep Oct Nov Dec Jan Feb. Mar. Total

Blood for

MP test 210 212 126 140 152 64 130 76 109 94 100 82 1495

Positive

cases (slide +

RDK) 4 14 10 5 11 3 7 3 6 8 10 5 86

Total PV 1 2 2 1 2 0 1 0 1 2 0 0 12

Total PF 3 12 8 4 9 3 6 3 5 6 10 5 74

Pregnancy

test 7 4 3 5 4 5 5 5 5 6 4 53

Hb% in PHC 28 22 24 22 90 30 27 18 23 21 23 18 346

TLC 12 5 15 8 5 2 6 4 8 6 8 5 84

DLC 25 18 20 18 85 8 16 14 22 20 22 15 283

ESR 8 8 8 5 4 4 5 5 8 12 9 5 81

Urine RE 32 28 25 31 20 26 27 17 17 27 17 15 282

Blood

grouping 5 5 6 0 13 0 6 35

CT BT Time 5 3 2 2 3 5 0 7 7 6 40

Others Stool 4 5 4 3 0 0 4 4 4 7 4 5 44

Page 209: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Baranga

Name of the PHC : Baranga

Taluk : Patrapur

District : Ganjam

Population Covered : 24871

No. of Sub-Centres : 5

Staff : 6

Date of Taking over : 01.10.2008

District: Kandhmal

Lankagarh Name of the PHC : Lankagarh Taluk : Tumudibandha District : Kandhamal Population Covered : 7500 No. of Sub-Centres : 1 Staff : 3

Staff Pattern

Sl.No Designation Sanctioned Available

i Medical Officer 1 0

ii Pharmacist 1 0

iii ANM 1 0

iv Lab. Technician 1 0

v PHC Coordinator 1 1

vi AYUSH 1 1

vii Attendant 1 1

Page 210: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient details

OPD Diarrhea & dehydration

cases

Jan 12 265 4

Feb 12 452 31

Mar 12 608 15

Khamankholo

Name of the PHC : Khamankholo Taluk : Barakhama District : Kandhamal Population Covered : 7842 No. of Sub-Centres : 2 Staff : 4

Staff Pattern

Sl.No Designation Sanctioned Available

i Medical Officer 1 0

ii Pharmacist 1 1

iii ANM 1 0

iv Lab. Technician 1 0

v PHC Coordinator 1 1

vi AYUSH 1 1

vii Attendant 1 1

Page 211: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient details

OPD

Jan 12 302

Feb 12 607

Mar 12 511

Sudra

Name of the PHC : Sudra Taluk : Barakhama District : Kandhamal Population Covered : 6580 No. of Sub-Centres : 1 Staff : 4

Staff Pattern

Sl.No Designation Sanctioned Available

i Medical Officer 1 0

ii Pharmacist 1 1

iii ANM 1 0

iv Lab. Technician 1 0

v PHC Coordinator 1 1

vi AYUSH 1 1

vii Attendant 1 1

Page 212: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient details

OPD Diarrhea & dehydration

cases

Jan 12 676 4

Feb 12 716 12

Mar 12 886 13

Sindhrigaon

Name of the PHC : Sindhrigaon Taluk : Barakhama District : Kandhamal Population Covered : 8907 No. of Sub-Centres : 2 Staff : 6

Staff Pattern

Sl.No Designation Sanctioned Available

i Medical Officer 1 1

ii Pharmacist 1 1

iii ANM 1 0

iv Lab. Technician 1 1

v PHC Coordinator 1 1

vi AYUSH 1 1

vii Attendant 1 1

Page 213: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient details

OPD Diarrhea & dehydration

cases

Jan 12 143

Feb 12 1003 125

Mar 12 1177 60

Sunagaon

Name of the PHC : Sunagaon Taluk : Tumudibandha District : Kandhamal Population Covered : 5949 No. of Sub-Centres : 2 Staff : 4

Staff Pattern

Sl.No Designation Sanctioned Available

i Medical Officer 1 0

ii Pharmacist 1 1

iii ANM 1 0

iv Lab. Technician 1 0

v PHC Coordinator 1 1

vi AYUSH 1 1

vii Attendant 1 1

Page 214: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Out-patient details

OPD Diarrhea & dehydration

cases

Jan 12 114 14

Feb 12 501 52

Mar 12 781 60

Andhra Pradesh PHCs

Gadiguda

Name of the PHC: Gadiguda

Taluk : Utanoor

Name of

Lab Test

Apr-

11 May Jun Jul Aug Sep Oct Nov Dec

Jan-

12 Feb Mar Total

Blood for

MP Test 139 150 268 330 150 420 404 200 255 170 119 200 2805

Total PV 0

Total PF 2 1 3

Total

Mixed type 0

Hbs ag test 18 21 21 24 19 21 19 19 12 18 15 15 222

Widal 3 3 2 8

VDRL 4 1 5

Pregnancy

Test 18 21 17 24 19 21 19 19 12 18 15 15 218

TLC 13 16 18 22 20 20 21 20 11 15 15 15 206

DLC 0

ESR 0

Urine RE 18 21 21 24 19 21 19 19 12 18 15 15 222

Blood

Groping 10 7 9 9 7 8 8 8 8 8 7 89

Water Test

For H2S

Method 0

HIV Test

ICTC 3 3 4 3 4 4 3 24

Bile salt 0

Bile

pigment 0

Total 223 239 345 433 241 515 496 288 314 251 190 267 3802

Page 215: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

District : Adilabad

Sub-Center with population

Sl.

No

.

Name of

SC

Distan

ce

from

PHC

Building

(Y/N)

No. of

village

s

Population Eligib

le

Coupl

e

No. of

ASH

A

No of

Angana

wadi

No

of

VHS

C

No

of

SH

G Mal

e

Femal

e

I Gadhiguda Yes 16

7000 7240 12530

2 10 2 10

Ii Mediguda 7 Kms

Under

Construc

tion 13 2 10 2 9

Iii Paraswada

12

Kms

Under

Construc

tion 17 2 9 2 11

National Health Programmes

Sl

No. Programs April May June July Aug Sep Oct Nov Dec Jan Feb. Mar. Total

MALARIA

No of fever

cases identified 139 150 268 330 150 420 404 220 255 160 119 200 2815

No. of blood

smear slides 139 150 268 330 150 420 404 220 255 160 119 200 2815

Slides sent to

PHC 100 100 200 230 100 320 300 120 200 100 80 150 2000

No.of Positive

cases 2 1 3

Of malaria 2 1 3

Tuberculosis: 0

No.of cases

Registered from

beginning 1 2 2 5

No.of newly

detected cases

this year 1 2 2 5

No.of newly

detected cases

during month 1 2 2 5

No.of cases on

treatment 1 2 2 5

HIV / AIDS: 0

Page 216: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

No. of

awareness

programs

conducted 4 3 2 2 4 5 5 3 3 4 2 2 39

No. of cases

suspected and

referred 2 4 1 3 2 3 2 1 18

No. of cases

confirmed 1 1

Lingapura

Name of the PHC: Lingapura

Taluk : Utnoor

District : Adilabad

Sub-Center with population

Sl

.

N

o.

Name of

SC

Distanc

e from

PHC

Building

(Y/N)

No. of

village

s

Population Eligib

le

Coup

le

No

. of

AS

H

A

No of

Angan

awadi

No

of

VHS

C

No of

SHG Mal

e

Femal

e

I Lingapur No 16

6000 6302 1076

5 8 2 10

Ii Kothapally 8 Kms

Old

Building 10 1 7 2 8

Ii

i

Gumnoor

(B) 7 Kms

Under

Construc

tion 14 2 5 1 5

Page 217: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

Laboratory details

Name of Lab

Test Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Blood for MP

Test 255 200 175 120 130 457 546 430 375 255 184 250 3377

Total PV 1 1 2

Total PF 1 4 9 2 2 18

Total Mixed

type 0

Hbs ag test 13 16 16 15 14 13 20 14 13 20 19 23 196

Widal 5 3 8 3 4 5 6 4 38

VDRL 6 2 4 2 4 3 2 23

Pregnancy Test 13 16 16 15 14 13 20 14 13 20 19 23 196

Hb% in PHC 10 12 12 9 11 11 12 9 11 11 12 12 132

TLC 13 16 13 11 14 9 14 13 14 21 17 20 175

DLC 0

ESR 0

Urine RE 13 16 13 8 14 13 20 14 13 20 19 23 186

Blood Groping 13 10 10 7 6 5 11 9 11 12 12 11 117

Water Test For

H2S Method 0

HIV Test ICTC 8 6 6 4 4 5 3 4 8 6 5 59

Bile salt 0

Bile pigment 0

Total 338 298 261 190 212 530 670 510 462 378 297 373 4519

National Health Programmes

Sl

No. Programs

Ap

r May Jun July Aug Sep Oct Nov Dec Jan Feb. Mar. Total

MALARIA

No of fever

cases identified 255 200 175 120 130 457 546 430 375 255 184 250 3377

No. of blood

smear slides 255 200 175 120 130 457 546 430 375 255 184 250 3377

Slides sent to

PHC 200 150 80 80 70 300 446 330 300 200 100 190 2446

No.of Positive

cases 1 4 10 2 17

Of malaria 1 4 10 2 17

Tuberculosis: 0

Page 218: Annexure State-wise Report of Primary Health Centres 2011-2012 - Karuna … · 2015-09-24 · 12 WASTE MANAGEMENT Not implemented KT has implemented the waste management in the PHC

No.of cases

Registered from

beginning 2 2 4

No.of newly

detected cases

this year 2 2 4

No.of newly

detected cases

during month 2 2 4

No.of cases on

treatment 2 2 4

HIV / AIDS: 0

No. of

awareness

programs

conducted 3 4 6 3 4 5 3 2 2 32

No. of cases

suspected and

referred 2 2 4 1 1 1 11