anel · pdf fileetap 14 power system design&analysis and earthing ... 72 assignment)...
TRANSCRIPT
Operation Areas
Medium and Low Voltage
Panel Production
Ship Electric & Electronic Systems
Recycling
Renewable Energy
Operation & Maintenance
MEP(Mechanical Electrical Plumbing)
History Highlights
1986 Foundation of Anel
Darlık Dam: The First Project
1988 KAV Factory: The First Industrial Facility Project
1990 Foundation of AnelSis (Panel Production)
1991 Hürriyet (a daily newspaper with high circulation in Turkey) Headquarters: Transition to Business Centers withTechnological Infrastructure
1998 Foundation of Operation & Maintenance Unit
1999 Istanbul Atatürk International Airport: The First International
Airport Project in Turkey
Marriott Tverskaya Hotel: The First International ProjectFoundation of Russia Office
Turkcell Maltepe Operation Center
1986 20002000 Ford Otosan Gölcük Factory: One of the Biggest
Automotive Factories With Its 1 Million m2 Total Area In and Around Europe
2004 Cairo International Airport Terminal 3: The First Overseas International Airport Project
2005 Foundation of AnelMarin (Ship Electric & Electronic Systems)
Ankara Esenboğa International Airport
2006 MİLGEM Project
Foundation of Qatar Office
2007 Hamad International Airport
2009 Transition to Electromechanical ContractingStructure
Foundation of AnelEnerji (Renewable Energy)
20102010 Foundation of AnelDoğa (Recycling)
Anel Elektrik’s Public Offering
Cyprus Solar Power Plant Foundation
2011 Marmaray BC1: World’s Deepest Submerged Tube Project
2012 BP Head Office: The First Project in Baku
2013 Abu Dhabi Midfield Terminal Project: The Star Project of Abu Dhabi 2030 Projection
Baku Olympic Stadium: The First Stadium Project
2015 DP World Yarımca Container Terminal
Qatar Rail Redline South Underground: One Of The Most Important Transportationand Infrastructure Projects of The Gulf Area
2016 Dubai-I (Bluewaters) Terminal Building: The First Project Award in Dubai
2017 Qatar Rail Green Line Stabling Yard
The University College London Hospital Proton Beam Therapy Center Phase 4:
The First Project Award in UK
History Highlights
▪ Specialized in electrical and mechanical contracting
▪ Provided service for more than 200 projectswith 117,5 million man/hours since 1986
▪ Diversified business experience (16 differenttypes of projects)
▪ Online MEP Design Committee to internallyinnovate engineering solutions
Profile
Anel; Engineering
company
for more than
30 years
2017 Revenue:
278 million USD** The revenue belongs to Anel Elektrik Proje Taahhüt ve Ticaret Inc.
▪200th in ‘’The Top 250
International Contractors List
2017’’ of ENR (Engineering News
Record)
▪254thlargest Company in
'Fortune 500 Turkey List of 2016
▪5thcompany in "Contracting
Services" and 36th in the "First
500 Service Exporters" List of TIM
Profile
Geographic Settlement
▪Ongoing Projects
Turkey, United Kingdom (England), Qatar, United Arab Emirates (Abu Dhabi, Dubai)
▪ Completed Projects
Egypt, Jordan, Bulgaria, Ukraine, Russia, Georgia, Azerbaijan, Turkey, Qatar
Regions Of Focus
▪ Turkey
▪ Middle East and North Africa▪ Qatar, United Arab Emirates, Bahrain, Kuwait, Umman, Iran, Algeria, Morocco, Egypt
▪ Africa▪ Botswana, Ethiopia, Gabon, Ghana, South Africa, Kenya, Mauritius, Namibia, Tanzania
▪ South Asia▪ Sri Lanka, Vietnam, Indonesia, Philippines, Malaysia, Thailand, Myanmar
▪ Western Europe▪ England, The Netherlands
▪ Eastern Europe▪ Bulgaria, Croatia, Hungary, Poland, Romania, Macedonia, Bosnia-Herzegovina
Project Types Of Focus▪ Airports▪ Roads▪ Data Centers▪ Tunnels and Railway Systems ▪ Ports▪ Hospitals▪ Laboratories▪ Pharmaceutical Industries▪ Technological Buildings▪ Business Centers▪ Commercial Buildings▪ Cultural Facilities▪ Sport Facilities▪ Hotels▪ Shopping Malls▪ Industrial Buildings
HSE and Other AwardsDate Award Project Awarder Country
September 2012 Best Subcontractor For Safety Excellence Hamad Bin Khalifa Medical CenterHyundai Engineering &
Construction Qatar
September 2013 Best Subcontractor of the month - HSEAbu Dhabi International Airport Midfield
Terminal Building TCA-JV UAE
October 2013 Best Subcontractor of the month - HSEAbu Dhabi International Airport Midfield
Terminal Building TCA-JV UAE
November 2013 16 Million Accident Free Man-Hours Hamad International Airport CP18 SOJV Qatar
March 2015 Best Subcontractor of the month - HSEAbu Dhabi International Airport Midfield
Terminal Building TCA-JV UAEJune 2015 1.800.000 Accident Free Man-Hours Baku Olympic Stadium Tekfen Azerbaijan
November 2015 Best In Construction Industry - HSEQatar Research and Development
ComplexREDCO Construction Al
Mana Qatar
May 2016 Best Subcontractor Appreciation Award Hamad Bin Khalifa Medical CenterHyundai Engineering &
Construction Qatar
December 2016 Best Subcontractor of the month - HSEAbu Dhabi International Airport Midfield
Terminal Building TCA-JV UAE
December 2016 15 Million Man-Hours Without LTIAbu Dhabi International Airport Midfield
Terminal Building TCA-JV UAE
February 2018 3 Million Man-Hours Without LTIAbu Dhabi International Airport Midfield
Terminal Building TCA-JV UAE
Management Systems
▪ IS0 9001 Quality Management System
▪ ISO 14001 Environment Management System
▪ OHSAS 18001 Occupational Health & Safety Management System
Revenues
* The revenue belongs to Anel Elektrik Proje Taahhüt ve Ticaret Inc.
Anel*Revenues – USD
31.12.2017 31.12.2016 31.12.2015 31.12.2014 31.12.2013 31.12.2012 31.12.2011
278.466.307 219.169.829 200.298.259 285.187.099 236.542.961 165.411.001 185.916.053
31.12.2017 31.12.2016 31.12.2015 31.12.2014 31.12.2013 31.12.2012 31.12.2011
278.466.307
219.169.829200.298.259
285.187.099
236.542.961
165.411.001185.916.053
Backlog
Backlog - million USD Backlog Distribution Estimates - million USD
2017 Q4Current Backlog
356 million USD
InternationalDomestic
6299
138
85
66
1512
4225
276
565
530
373
515488
356
163 177
427
445
307
500
476
352
2010 2011 2012 2013 2014 2015 2016 2017
267
86
3
2018 2019 2020
Domestic Projects
Backlog
Project Client Location Total Amount Backlog
KaplankayaSinerji İnşaat Mimarlık
Müşavirlik A.Ş.Aydın 4.145.383 598.781
Peska Bodrum Project (Barbaros Reserve Bodrum Residences)
Sera Yapı Endüstri ev Ticaret A.Ş.
Bodrum 3.355.378 3.333.801
Now Bomonti Office Now Gayrimenkul A.Ş. Istanbul 1.964.794 39.825
Marmaray RenovationTaisei Corporation Merkezi Japonya Istanbul 290.646 290.646
TOTAL (USD) 9.756.202 4.263.053
Overseas Projects
Backlog
Project Client Location Total Amount Backlog
Abu Dhabi International Airport Midfield Terminal Building
TAV/CCC/ArabTec JointVenture
UAE 434.917.136 127.281.484
Qatar Rail Red Line South Underground Metro QDVC-GS E&C-Al DarwishEng. JV
Qatar 258.925.366 86.885.320
Al Rayyan Road Development Doğuş Onur JV Qatar 49.755.353 25.437.391
Qatar Rail Red Line South Elevated and At Grade MetroFCC-Yüksel-Archirodon-
Petroserv JVQatar 70.533.456 13.659.920
Qatar Rail Green Line Stabling Yard Fujita Corporation Qatar 43.681.319 43.681.319
The University College London Hospital Proton Beam Therapy Center Phase 4
Bouygues Limited England 34.081.902 34.081.902
Dubai–I (Bluewaters) Terminal BuildingHyundai Engineering and
Construction Co. Ltd.UAE 20.708.447 20.708.447
Other Overseas Projects 5.298.445 559.229
TOTAL (USD) 917.901.424 352.295.012
GRAND TOTAL (Domestic + Overseas) 927.657.626 356.558.065
Project completion period; 2-3 years average
UAE42%
Turkey1%
Qatar48%
England9%
Backlog Breakdown by Country
Airport36%
Roads & Railway
Systems & Others
54%
Hospital9%
Business Center &
Mall1%
Backlog Breakdown by Project Type
Backlog
▪ MV Cabling
▪ MV Cubicles
▪ Power Transformers
▪ SCADA System
▪ Busduct
▪ LV Cabling
▪ LV Panel Boards
▪ Cable Containment
▪ Power Management Systems
▪ Diesel Generators
▪ Uninterruptable Power Supply(UPS)
▪ Lighting Fixtures
Scope Of Works: Electrical
▪ Lighting Control Systems
▪ Earthing
▪ Lightning Protection
▪ Public Address and Announcement Systems
▪ Fire Alarm Systems
▪ Master Clock Systems
▪ IT Systems
▪ CCTV Systems
▪ MATV Systems
▪ Card Access Systems
▪ Building Management System
Scope Of Works: Mechanical
▪ Plumbing
▪ Domestic Cold Water
▪ Domestic Hot Water
▪ Water Treatment
▪ Sewage Water
▪ Drain Water
▪ Grey Water
▪ Storm Water
▪ Gravity System
▪ Siphonic System
▪ Heating System
▪ Individual Heating
▪ Central Heating
▪ District Heating
▪ Air Conditioning and Ventilation System
▪ Individual Cooling (Split Units)
▪ Central Cooling
▪ All Air Systems
▪ All Water Systems
▪ Air and Water Combined Systems
▪ Variable Refrigerant Flow Systems
▪ Building Management System
▪ Natural Gas System
▪ Superheated Water System
▪ Compressed Air System
▪ Steam System
▪ LPG System
▪ Fire Fighting Systems▪ Fire Suppression Systems▪ Water Suppression Systems▪ Gas Suppression Systems
▪ Individual Suppression Systems (FM200)▪ Central Suppression Systems (Inert Gas)
▪ Smoke Control Systems▪ Stair and Lift Pressurization System
MEP Contracting Process
ENGINEERING WORKSDesign Review
CalculationsBIM Modelling & Clash Resolution
Material SubmissionsMethod Statements
PROCUREMENT & LOGISTICS
Material Take-offPurchase OrdersMaterial Delivery
Storage & On Site Transport
PLANNING & COST CONTROL
Time ScheduleLabor Time KeepingProgress Monitoring
Cost MonitoringChange Management
CONSTRUCTIONMounting
Site MobilizationInstallation SupervisionResource Distribution
Interfacing with othersProtection Of The Works
QA/QC & HSE MONITORING
Material InspectionsInstallation Inspection
Progress DocumentationSafety Inspection & Records
TESTING, COMMISSIONING & HANDOVER
Factory Inspection TestsSite Acceptance Tests
As Built DrawingsOperation & Main Manuals
Project Handover Document
Technological ToolsDesign
▪ Etap 14 Power System Design&Analysis and EarthingCalculations
▪ Caneco BT-International Electrical Design Software 5.3▪ Siemens-Simaris Design Professional 9.0▪ Schneider Electric-ecodial Advance Calculation 4.8 Int▪ Dialux Lighting Building Calculation▪ Carrier E20-II H.A.P -Trace 700 ▪ Pipe Stress Analyse▪ Trane Acoustics Program (TAP)
Drawing
▪ AutoCAD LT / AutoCAD-MEP / Revit / NavisworksManage
Planning▪ P6 Professional R17.12.0 (Server – Standalone) ▪ Microsoft Project Professional 2013
ERP▪ SAP▪ Business Objects (BO) Management Reporting
Active Risk Management: ARM 7
BIM for Construction
Design
3D Design
Architectural & Engineering Design DocumentationMEP Engineering CalculationsLife Safety & Logistic ModellingEnergy AnalysisClash Analysis
Construction
4D Scheduling
3D + Time ElementProject Phasing SimulationsConstruction Sequencing & SchedulingJust in Time Equipment DeliveryDetailed Simulation InstallationVirtual Construction
5D EstimatingQuantity Extraction for Cost EstimationValue EngineeringModular Solutions
Facility Sustainability
6D Facility Management
Life Cycle BIM StrategiesBIM As-BuiltsBIM Maintenance Plans&Tech SupportBIM embedded O&M ManualsCOBie Data Populations & Extraction
For continuousdevelopment;▪ Sharing different project
experiences
▪ Ensuring information sharing
▪ Experience Pool
▪ Forum Anel
▪ Yammer
▪ Periodical Newsletters
▪ AnelAkademi trainings
▪ In-class trainings
▪ Professional Talks
Information and ExperienceSharing Platforms
Our Team
20 nationsWe are a big team
This is the underlying force
behind our success!
4.000+employeeswho
always improves and developsfollows innovationscreates value in society as much as in projects.
36 Terfi
60 İç Geçiş
1012Beyaz Yaka
35Yaş
Ortalaması
6 YılOrtalama
Çalışma Süresi
% 35İç Kaynak Oranı
Working togetherapproximately
6 Years
Team Profile
13 YearsSector Experience
44%
35%
15%
6% Between 0-2 Years
Between 2-5 Years
Between 5-10 Years
Over 10 Years
We use analytical methods to be fair and objective, in addition to the expectations of theemployees while making decisions about promotions and assignments
35%Recruitment Ratio of
Internal Source(36 promotion, 72 assignment)
*2017 datas.
Team Profile
BehavioralCompetencyAssessments
Technical CompetencyAssessments
Target- orientedPerformanceAssessments
Education and Development
39%
32%
15%
14%HSE
Technical
Orientation and CareerDevelopment
Personal Development
WHAT TO KNOW ABOUT BUILDING MECHANICAL DESIGN
REVIT MEPWHAT MAKES A LEADER?
PROJECT MANAGEMENT: SIL (SAFETY INTEGRITY LEVEL)
LEADING THE TEAM YOU INHERIT
DECISION MAKING TIPSELECTRICAL DESIGN PROJECT PREPARATION
CALCULATION OF MAX. QUANTITY
OCCUPATIONAL SAFETY
IN ELECTRICAL WORKWORKING AT HEIGHTDOCUMENT MANAGEMENT SYSTEM
BEST PRACTICES IN REVIT
Our training catalogue includes;
2.457Total
traininghours
Engineer Technician
14.15hours
9.6hours
53%
25%
19%
3%Engineer
Technician
Administrative
Other
Education and Development
▪ The Contractors Health and Safety Assessment Scheme
▪ GSAS (The Global Sustainability Assessment System) Service Provider
▪ Kahramaa Grade A certificate▪ ICT certificate
Certificates
All ProjectsTransportation
▪ Hamad International Airport▪ Abu Dhabi International Airport Midfield Terminal
▪ Cairo International Airport Terminal 3
▪ Atatürk International Airport▪ Atatürk International Airport International Terminal
Development 3
▪ Tbilisi International Airport
▪ Adnan Menderes International Airport▪ Esenboğa International Airport
▪ Erzincan Airport
▪ Adıyaman Airport▪ Batum International Airport
▪ Al Rayyan Road
▪ DP World Yarımca Container Terminal▪ Qatar Rail Green Line Stabling Yard
▪ Qatar Rail Redline South Underground Metro
▪ Qatar Rail Redline South Elevated and At Grade Metro▪ Qatar Rail Redline South Underground West Bay Station
▪ Marmaray BC1
Commercial▪ Dubai-I (Bluewaters) Terminal Building
▪ 42 Maslak
▪ Kosifler Kavacık Showroom
▪ BP Head Office
▪ Anel Business Center
▪ Al Handasa Complex
▪ Vodafone Head Office
▪ Al Reem Tower
▪ Türkiye Finans Participation Bank Head Office
▪ Sun Plaza
▪ Kuyumcukent Goldsmiths’ Complex
▪ Marmara Forum
▪ Forum İstanbul
▪ IKEA Mega Center Shopping Mall
▪ Mavibahçe Shopping Mall
▪ Genjlik Mall
▪ Ramstore 14
Data Centers
▪ Abu Dhabi International Airport Midfield Terminal
▪ Qatar Foundation Research & Development Complex
▪ Turkcell Buildings & Call Center Buildings
▪ Hamad International Airport
▪ Is REIT Tuzla Technology & Operation Center
▪ Demirbank Headquarter Building
▪ Erzincan Airport
▪ Adıyaman Airport
All ProjectsHotels
▪ Marriott Tverskaya Hotel
▪ Sochi Marriott KrasnayaPolyana Hotel
▪ Shangri La Hotel
▪ Wyndham Hotel
▪ Four Seasons Hotel
▪ Bodrum Kaplankaya Phase 1
▪ Holiday Inn Hotel
▪ St. Regis Hotel
▪ Les Ottomans Hotel
▪ Hilton Garden Inn Hotel(Mardin-Kütahya-Konya-Şanlıurfa, Turkey)
▪ Sheraton Hotel
Technological Buildings
▪ Sabancı University Nanotechnology
Research and Application Center
▪ Qatar Foundation Research & Development Complex
▪ Central Reference Laboratory
▪ Is REIT Tuzla Technology & Operation Center
Health Facilities
▪ The University College London Hospital Proton Beam Therapy Center Phase 4
▪ Hamad Bin Khalifa Medical Center
▪ Sidra Medical & Research Center – Completion Works
▪ BSK Medline Hospital
Sport Facilities
▪ Baku Olympic Stadium
▪ Jockey Club Hippodrome
▪ Rosa Khutor Mountain Olympic Village
Education and Culture
▪ Qatar National Convention Center
▪ Garanti Culture Center
▪ Vehbi Koç Foundation Culture and Community Center
▪ King’s Academy High School
Industrial Facilities
▪ Ford Automotive Gölcük Factory
▪ Ford Automotive Yeniköy Factory(B460)
▪ Abdi İbrahim PharmaceuticalPlant – R&D Building
▪ Tetrapak Packaging Factory
▪ Vyksa Steel Production Plant
▪ Bosch – Rexroth Factory
▪ SUN-JUT Production Plant
▪ APS Textile Factory
All Projects
21.000.000 (21 million) man-hours utilized for commercial projects
51.000.000 (51 million) man-hours utilized for transportation projects,
TransportationReferences:
▪ Hamad International Airport▪ Abu Dhabi International Airport Midfield Terminal▪ Cairo International Airport Terminal 3▪ Atatürk International Airport▪ Atatürk International Airport International Terminal Development 3▪ Tbilisi International Airport▪ Adnan Menderes International Airport▪ Esenboğa International Airport▪ Batum International Airport▪ Erzincan Airport▪ Adıyaman Airport▪ Al Rayyan Road▪ DP World Yarımca Container Terminal▪ Qatar Rail Green Line Stabling Yard▪ Qatar Rail Redline South Underground Metro▪ Qatar Rail Redline South Elevated and At Grade Metro▪ Qatar Rail Redline South Underground West Bay Station ▪ Marmaray BC1
Hamad International Airport (Doha, Qatar)
Total Area : 680.000 m2
Employer : NDIA Steering Committee
CP99 Project Launch : 2013Project Completion : 2016Main Contractor : Six Construct - Midmac JV (SMJV)
CP110-CP111Project Launch : 2012Project Completion : 2015Main Contractor : QIT Imar - Alec JV
CP18-CP29Project Launch : 2007Project Completion : 2014Main Contractor : TAISEI - TAV Sky Oryx JV
Ranked 6th Best Airport in the World (2017 Skytrax World Airport Awards)
Abu Dhabi International Airport Midfield Terminal(Abu Dhabi, UAE)
Total Area : 730.000 m2
Project Launch : 2012
Project Completion : 2018
Employer : ADAC
Main Contractor : TCA JV (TAV/CCC/Arabtec Joint Venture)
Scope Of Work : Electrical
Our 8th International Airport Project
The star project of Abu Dhabi 2030 ProjectionThe biggest building of Abu Dhabi
Cairo International AirportTerminal 3(Cairo, Egypt)
Total Area : 220.000 m2
Project Launch : 2004
Project Completion: : 2009
Employer : Cairo Airport Company
Main Contractor : TAV
Scope Of Work : Electrical
Atatürk International Airport(Istanbul, Turkey)
Total Area : 495.000 m2
Project Launch : 1999
Project Completion : 2010
Employer : DHMI (General Directorate of State Airports Authority)
Main Contractor : TAV
Scope of Work : Electrical
Atatürk International AirportInternational Terminal Development 3(Istanbul, Turkey)
Total Area : 26.000 m2
Project Launch : 2015
Project Completion : 2016
Scope Of Work : Electrical
Tbilisi International Airport(Tbilisi, Georgia)
Total Area : 21.500 m2
Project Launch : 2006
Project Completion : 2007
Employer : Tbilisi International Airport JSC
Main Contractor : TAV
Scope Of Work : Electrical
Adnan Menderes International Airport(İzmir, Turkey)
Total Area : 177.000 m2
Project Launch : 2005
Project Completion : 2007
Employer : DHMI (General Directorate of State Airports Authority)
Main Contractor : TAV
Scope Of Work : Electrical
Esenboğa International Airport(Ankara, Turkey)
Total Area : 180.000 m2
Project Launch : 2005
Project Completion : 2008
Employer : DHMI (General Directorate of State Airports Authority)
Main Contractor : TAV
Scope Of Work : Electrical
Erzincan Airport(Erzincan, Turkey)
Total Area : 43.000 m2
Project Launch : 2009
Project Completion : 2010
Employer : DHMI (General Directorate of State Airports Authority)
Main Contractor : Sera İnşaat
Scope Of Work : Electrical
Adıyaman Airport(Adıyaman, Turkey)
Total Area : 34.000 m2
Project Launch : 2011
Project Completion : 2013
Employer : DHMI (General Directorate of State Airports Authority)
Main Contractor : Sera Yapı A.Ş.
Scope Of Work : Electrical
Batum International Airport(Batum, Georgia)
Total Area : 6.000 m2
Project Launch : 2006
Project Completion : 2007
Employer : Georgia Airlines
Main Contractor : Evrensel Georgia
Scope Of Work : Electrical
Al Rayyan Road(Doha, Qatar)
Total Length : 10,7 km
Project Launch : 2014
Project Completion : 2017
Employer : Public Works Authority -Ashghal
Main Contractor : Doğuş Onur JV
Scope Of Work : Mechanical
Installation of 120,000 m pipeline
(Diameters vary between 100-1400 mm)Manufacturing and testing practices
to handle 10,000 tons of
pressure on the pipelines
DP World Yarımca ContainerTerminal(Kocaeli, Turkey)
Total Area : 460.000 m2
Project Launch : 2015
Project Completion : 2016
Employer : DP World Yarımca Liman İşletmeleri A.Ş.
Main Contractor : STFA İnşaat A.Ş.
Scope Of Work : Electrical and Mechanical 1.3 Million TEU capacity
One Of The Biggest Container Terminals In Turkey
Qatar Rail Green LineStabling Yard(Doha, Qatar)
Total Area : 37.500 m2
Project Launch : 2017
Project Completion : 2018
Employer : Qatar Rail Company
Main Contractor : Fujita Corporation
Scope Of Work : Electrical and Mechanical
Qatar Rail Redline South Underground Metro(Doha, Qatar)
Tunnel Length : 32 km
Total Area : 32 km and 5 stations(151.000 m2)
Project Launch : 2015
Project Completion : 2018
Employer : Qatar Rail Company
Main Contractor : QDVC-GS E&C-Al Darwish Eng. JV
Scope Of Work : Electrical and Mechanical
One of the most importanttransportation and infrastructure
projects of the Gulf Area
Qatar Rail Redline South Underground Metro West Bay Station (Doha, Qatar)
Total Area : 35.000 m2
Project Launch : 2018
Project Completion : 2018
Employer : Qatar Rail Company
Main Contractor : ISG JV
Scope Of Work : Supply Of Manpower & Supervisions
Qatar Rail Redline South Elevated and At Grade Metro(Doha, Qatar)
Total Area : 30.000 m2
Project Launch : 2016
Project Completion : 2017
Employer : Qatar Rail Company
Main Contractor : FCC-Yüksel-Archirodon-Petroserv JV
Scope Of Work : Electrical and Mechanical
Marmaray BC1 Railway Bosphorus Tube Crossing, Tunnels and
Stations (Istanbul, Turkey)
Project Launch : 2011
Project Completion : 2013
Employer : DLH (General Directorate of Construction of Railways, Ports and Airports)
Main Contractor : TAISEI (Project Contractor: TAISEI Gama Nurol JV)
Scope Of Work : Electrical and Mechanical
The World'sDeepest Immersed Tunnel
The total length of the Package BC1 under Anel’s Contract ; 13.6 km,Bored tunnel length; 9.8 km,Immersed tube length;
1.4 km Cut-and-cover tunnel length; 2.4 km 5 underground stations
Commercial
References:
▪ Dubai-I (Bluewaters) Terminal Building▪ 42 Maslak▪ Kosifler Kavacık Showroom▪ BP Head Office▪ Anel Business Center▪ Al Handasa Complex▪ Vodafone Head Office▪ Al Reem Tower▪ Türkiye Finans Participation Bank Head Office▪ Sun Plaza▪ Kuyumcukent Goldsmiths’ Complex▪ Marmara Forum▪ Forum İstanbul▪ IKEA Mega Center Shopping Mall▪ Mavibahçe Shopping Mall▪ Genjlik Mall▪ Ramstore 14▪ Now Bomonti Office
Dubai-I (Bluewaters) Terminal Building(Dubai, UAE)
Total Area : 10.000 m2
Project Launch : 2016
Project Completion : 2019
Employer : MERAAS Development
Main Contractor : Hyundai Engineering and Construction Co. Ltd.
Scope Of Work : Electrical and Mechanical
42 Maslak(Istanbul, Turkey)
Total Area : 250.000 m2
Number of Floors : 42
Project Launch : 2012
Project Completion : 2017
Employer : Bay İnşaat
Scope Of Work : Electrical and Mechanical
LEED Gold Certificated by US Green Building Council
Kosifler Kavacık Showroom(Istanbul, Turkey)
Total Area : 20.198 m2
Project Launch : 2016
Project Completion : 2017
Employer : Kosifler İnşaat
Scope Of Work : Electrical and Mechanical
Now Bomonti Office(Istanbul, Turkey)
Total Area : 41.600 m2
Project Launch : 2016
Project Completion : 2017
Employer : NOW Gayrimenkul A.Ş.
Scope Of Work : Electrical
BP Head Office(Baku, Azerbaijan)
Total Area : 24.000 m2
Project Launch : 2012
Project Completion : 2014
Main Contractor : Lindner LLC
Employer : BP
Scope Of Work : Electrical and Mechanical
Anel Business Center(Istanbul, Turkey)
Total Area : 67.000 m2
Project Launch : 2007
Project Completion : 2009
Number of Floors : 19
Employer : Anel Group
Scope Of Work : Electrical and Mechanical
Al Handasa Complex(Doha, Qatar)
Total Area : 80.000 m2
Number of Floors : 27 (on 4 buildings)
Project Launch : 2005
Project Completion : 2008
Employer : H.H Shk.MohamedKhalifa Al Thani
Main Contractor : Baytur İnşaat
Scope Of Work : Electrical
Vodafone Head Office(Istanbul, Turkey)
Total Area : 18.000 m2
Number of Floors : 16
Project Launch : 2007
Project Completion : 2008
Employer : Sera Yapı Endüstrisi ve Ticaret A.Ş.
Scope Of Work : Electrical
Al Reem Tower(Doha, Qatar)
Total Area : 18.000 m2
Number of Floors : 21
Project Launch : 2005
Project Completion : 2007
Employer : Faisal Bin Mohamad Al Thani
Main Contractor : Baytur İnşaat
Scope Of Work : Electrical
Türkiye Finans ParticipationBank Head Office(Istanbul, Turkey)
Total Area : 24.500 m2
Project Launch : 2016
Project Completion : 2017
Employer : Türkiye Finans Katılım Bankası
Main Contractor : Oğuz Bayazıt Mühendislik İnşaat Sanayi Ltd. Şti.
Scope Of Work : Electrical
Sun Plaza(Istanbul, Turkey)
Total Area : 60.000 m2
Number Of Floors : 38
Project Launch : 2004
Project Completion : 2006
Employer : Sun'i Jüt San. ve Tic. A.Ş.
Scope Of Work : Electrical
Kuyumcukent Goldsmiths’ Complex(Istanbul, Turkey)
Total Area : 400.000 m2
Project Launch : 2003
Project Completion : 2005
Employer : S.S Kuyumcukent Yapı Koop.
Main Contractor : Baytur İnşaat A.Ş.
Scope Of Work : Electrical
Additional Work
Total Area : 170.000 m2
Project Launch : 2010
Project Completion : 2011
Employer : Kuyaş KuyumcukentGayrimenkul Yat. A.Ş
Main Contractor : Anel Sera JV
Marmara Forum(Istanbul, Turkey)
Total Area : 350.000 m2
Project Launch : 2010
Project Completion : 2011
Employer : Multi-Turkmall
Main Contractor : Yapı Merkezi & Yorumİnşaat
Scope Of Work : Electrical and Mechanical
Forum İstanbul(Istanbul, Turkey)
Total Area : 450.000 m2
Project Launch : 2008
Project Completion : 2010
Employer : Multi-Turkmall
Main Contractor : Yorum İnşaat
Scope Of Work : Electrical
IKEA Mega Center ShoppingMall(Kazan, Russia)
Total Area : 153.000 m2
Project Launch : 2006
Project Completion : 2007
Employer : IKEA
Main Contractor : ENKA
Scope Of Work : Electrical
Mavibahçe Shopping Mall(Izmir, Turkey)
Total Area : 119.000 m2
Project Launch : 2015
Project Completion : 2016
Employer : Opera Gayrimenkul A.Ş.
Scope Of Work : Electrical and Mechanical
The biggest shoppingmall of İzmir (Turkey)
Genjlik Mall(Baku, Azerbaijan)
Total Area : 120.000 m2
Project Launch : 2014
Project Completion : 2016
Employer : Pasha Construction
Scope Of Work : Electrical and Mechanical
The Biggest Shopping MallOf Baku
Ramstore 14(Moscow, Russia)
Total Area : 62.000 m2
Project Launch : 2005
Project Completion : 2006
Employer : Ramstore
Main Contractor : ENKA
Scope Of Work : Electrical
Data Centers
References:
▪ Abu Dhabi International Airport Midfield Terminal▪ Qatar Foundation Research & Development Complex▪ Turkcell Buildings & Call Center Buildings▪ Hamad International Airport▪ Is REIT Tuzla Technology & Operation Center▪ Demirbank Headquarter Building▪ Erzincan Airport▪ Adıyaman Airport
Abu Dhabi International Airport Midfield Terminal(Abu Dhabi, UAE)
Total Area : 730.000 m2
Data Center Area : 1.238 m2
Main Contractor : TCA JV (TAV/CCC/Arabtec
Joint Venture)
Employer : ADAC
Scope of Work : Electrical
Total No of Cabinets : 277
4 MCR Rooms
Our 8th International Airport Project
The star project of Abu Dhabi 2030 ProjectionThe biggest building of Abu Dhabi
Qatar Foundation Research & Development Complex(Doha, Qatar)
Total Area : 40.000 m2
Data Center Area : 400 m2
Main Contractor : Redco Construction -
Almana
Employer : Qatar Foundation
Scope of Work : Electrical and Mechanical
South Building:
▪ Data Center Room
▪ 2 Computer Search Labs
▪ 6 IDF Rooms
▪ 2 MDF Rooms
▪ IT Server Room
▪ Security Room
Utility Building:
▪ 1 IDF Room
▪ 1 BAS Room
North Building:
▪ 10 IDF Rooms
▪ 2 MDF Rooms
Turkcell BuildingsCall Center Buildings
Turkcell BuildingsMaltepe (Istanbul), Davutpaşa (İstanbul), Bursa, İzmir, Antalya, Adana,Diyarbakır, Samsun, Erzurum, Konya, Muğla, Bodrum, Aydın, Denizli, Manisa, Van, Kayseri, Eskişehir, Sakarya, Kartal, Ankara
Call Center Buildings▪ Turkcell Global Bilgi Ümraniye
▪ İstanbul Global Bilgi Head Quarter
▪ Ankara (Turkcell) Global Bilgi (Ministry of Health Call Center)
▪ Sarnıç-Izmir Alonet (HSBC Bank Call Center)
▪ Konya Call-Us (Vodafone) Call Center
▪ Urfa (Tempo A.Ş.) Call Center
▪ Mecidiyeköy-Istanbul (Tempo A.Ş.) Call Center
▪ Eyüp (Teleperformance) Call Center
▪ Edirne (Turkcell) Global Bilgi Call Center
▪ Erzurum (Turkcell) Global Bilgi
▪ Kağıthane-Istanbul (Callpex) Call Center
Hamad International Airport(Doha, Qatar)
Total Area : 680.000 m2
Employer : NDIA Steering Committee
Scope of Work : Electrical and Mechanical
CP99 Data Center Area : 450 m2
3 Data Center RoomsOoeredo and Vodafone Data Center RoomMain Contractor : Six Construct - Midmac JV (SMJV)
CP18 Data Center Area : 350 m2
Main Contractor : TAISEI - TAV Sky Oryx JV
Awarded with The Global 5-Star Airport Rating(Skytrax)
Ranked 6th Best Airport in the World (2017 Skytrax World Airport Awards)
Is REIT Tuzla Technology & Operation Center(Istanbul, Turkey)
Total Area :270.000 m2
Data Center Area : 400 m2
Main Contractor : Koray İnşaat
Employer : İş Gayrimenkul YatırımOrtaklığı (Is Real Estate Investment Trust Co.)
Scope of Work : Electrical and Mechanical
Total No of Cabinets : 80SIGN of the City Awards
‘Best Office’ award
Demirbank Headquarter Building(İstanbul, Turkey)
Total Area : 15.500 m2
Data Center Area : 55 m2
Scope of Work : Electrical
Main Contractor : Koray İnşaat
Employer : Demirbank
Total No of Cabinets : 12
Erzincan Airport(Erzincan, Turkey)
Total Area : 43.000 m2
Data Center Area : 54 m2
Scope of Work : Electrical
Main Contractor : Sera İnşaat
Employer : DHMİ
Total No of Cabinets : 18
Adıyaman Airport(Adıyaman, Turkey)
Total Area : 34.000 m2
Data Center Area : 64 m2
Scope of Work : Electrical
Main Contractor : Sera Yapı
Employer : DHMİ
Total No of Cabinets : 22
HotelsReferences:
▪ Marriott Tverskaya Hotel▪ Sochi Marriott Krasnaya Polyana Hotel▪ Shangri La Hotel▪ Wyndham Hotel▪ Four Seasons Hotel▪ Bodrum Kaplankaya Phase 1▪ Holiday Inn Hotel▪ St. Regis Hotel▪ Les Ottomans Hotel▪ Hilton Garden Inn Hotel
(Mardin-Kütahya-Konya-Şanlıurfa, Turkey)▪ Sheraton Hotel
Marriott Tverskaya Hotel(Moscow, Russia)
Total Area : 20.000 m 2
Project Launch : 1994
Project Completion : 1997
Employer : Marriott
Main Contractor : EMT
Scope Of Work : Electrical
Sochi Marriott KrasnayaPolyana Hotel(Sochi, Russia)
Total Area : 67.318 m2
Project Launch : 2012
Project Completion : 2013
Employer : TKS
Main Contractor : Koray İnşaat San. ve Tic. A.Ş.
Scope Of Work : Electrical and Mechanical
Shangri La Hotel(Istanbul, Turkey)
Total Area : 42.000 m2
Project Launch : 2011
Project Completion : 2013
Employer : Ege Yapı Ltd.
Scope Of Work : Electrical and Mechanical
Wyndham Hotel(Istanbul, Turkey)
Total Area : 67.000 m2
Project Launch : 2011
Project Completion : 2013
Employer : Kılıçbey Turizm İşl. İnşaat ve San. Tic. A.Ş.
Scope Of Work : Electrical and Mechanical
Four Seasons Hotel(Istanbul, Turkey)
Total Area : 48.000 m2
Project Launch : 2006
Project Completion : 2008
Employer : Atik Pasha Turizm A.Ş.
Main Contractor : Yapı Merkezi İnşaat ve Sanayi A.Ş.
Scope Of Work : Electrical
Bodrum Kaplankaya Phase 1(Aydın, Turkey)
Total Area : 16.750 m2
Project Launch : 2016
Project Completion : 2016
Employer : Ceviz Sırtı Gayrimenkul /
Capital Partners
Main Contractor : Sinerji İnşaat
Scope Of Work : Electrical
Holiday Inn Hotel(Moscow, Russia)
Total Area : 57.000 m2
Project Launch : 2005
Project Completion : 2007
Employer : EMT
Scope Of Work : Electrical
St. Regis Hotel(Istanbul, Turkey)
Total Area : 23.000 m2
Project Launch : 2012
Project Completion : 2015
Employer : Demsa
Scope Of Work : Electrical and Mechanical
Les Ottomans Hotel(Istanbul, Turkey)
Total Area : 11.050 m2
Project Launch : 2003
Project Completion : 2006
Employer : Astay Grup
Main Contractor : Unit Turizm Yatırımları A.Ş.
Scope Of Work : Electrical
Hilton Garden Inn Hotel(Mardin-Kütahya-Konya-Şanlıurfa, Turkey)
Employer : Kosifler İnşaat
Scope Of Work : Electrical
Sheraton Hotel(Samsun, Turkey)
Total Area : 46.000 m2
Project Launch : 2013
Project Completion : 2015
Employer : Tanrıverdi Holding
Main Contractor : Ege Yapı
Scope Of Work : Electrical
TechnologicalBuildings
References:
▪ Sabancı University Nanotechnology Research and Application Center
▪ Qatar Foundation Research & Development Complex▪ Central Reference Laboratory▪ Is REIT Tuzla Technology & Operation Center
Sabancı UniversityNanotechnology Research and Application Center(Istanbul, Turkey)
Total Area : 9.000 m2
Project Launch : 2010
Project Completion : 2011
Employer : Sabancı University
Main Contractor : Koray İnşaat
Scope Of Work : Electrical and Mechanical
LEED and BREEAM Certificate
Qatar Foundation Research & Development Complex(Doha, Qatar)
Total Area : 40.000 m2
Project Launch : 2013
Project Completion : 2016
Employer : Qatar Foundation
Main Contractor : Redco Construction -Almana
Scope Of Work : Electrical and Mechanical
With our HSE practices, we were awarded as
“Best In Construction Industry” by REDCO Construction Almana.
Central Reference Laboratory(Tbilisi, Georgia)
Total Area : 11.000 m2
Project Launch : 2006
Project Completion : 2009
Main Contractor : Bechtel International Systems
Scope Of Work : Electrical
Is REIT Tuzla Technology & Operation Center(Istanbul, Turkey)
Total Area : 270.000 m2
Project Launch : 2013
Project Completion : 2016
Employer : İş GYO (Real EstateInvestment Company)
Main Contractor : Koray İnşaat
Scope Of Work : Electrical and MechanicalSIGN of the City Awards
‘Best Office’ award
Health Facilities
References:
▪ The University College London Hospital Proton Beam TherapyCenter Phase 4
▪ Hamad Bin Khalifa Medical Center▪ Sidra Medical & Research Center – Completion Works
▪ BSK Medline Hospital
Total Area : 31.000 m2
Project Launch : 2018
Project Completion : 2020
Employer : University College LondonHospitals NHS Foundation Trust
Main Contractor : BOUYGUES UK
Scope Of Work : Electrical and Mechanical
The University College London Hospital Proton Beam TherapyCenter Phase 4 (London, England, UK)
Hamad Bin Khalifa MedicalCenter(Doha, Qatar)
Total Area : 220.000 m2
Number Of Beds : 890
Project Launch : 2011
Project Completion : 2016
Employer : Public Works Authority -Ashghal
Main Contractor : Hyundai Eng. & Const.
Scope Of Work : Electrical (Extra Low Voltage)
Sidra Medical & Research Center – Completion Works(Doha, Qatar)
Total Area : 300.000 m2 (6th, 7th and Roof Floors)
Number Of Beds : 550
Project Launch : 2015Project Completion : 2017Employer : Qatar Foundation - AstadMain Contractor : Midmac-CCC JV
(Contractor: Qatar KENTZ WLL)
Scope Of Work : Mechanical
BSK Medline Hospital(Antalya, Turkey)
Total Area : 10.000 m2
Number Of Beds : 97
Project Launch : 2010
Project Completion : 2011
Employer : EAG Turizm ve İnşaatScope Of Work : Electrical and Mechanical
SportFacilities
References:
▪ Baku Olympic Stadium▪ Jockey Club Hippodrome▪ Rosa Khutor Mountain Olympic Village
Baku Olympic Stadium(Baku, Azerbaijan)
Total Area : 496.000 m2
Project Launch : 2013
Project Completion : 2015
Employer : SOCAR
Main Contractor : Tekfen İnşaat
Scope Of Work : Electrical and Mechanical
Hosted 1st EuropeanOlympic Games
Capacity of up to 68.000 spectators
Diamond Award in the category of ‘Structual System’ (2016)The Best Project in the category of Sport/ Entertainment (2015)
Jockey Club Hippodrome(İzmir, Turkey)
Total Area : 40.000 m2
Project Launch : 2007
Project Completion : 2008
Employer : TJK
Scope Of Work : Electrical
Rosa Khutor Mountain Olympic Village(Sochi, Russia)
Total Area : 76.532 m2
Project Launch : 2012
Project Completion : 2014
Employer : Roza Khutor
Main Contractor : Hazinedaroğlu Özkan İnşaat A.Ş.
Scope Of Work : Electrical and Mechanical
Educationand Culture
References:
▪ Qatar National Convention Center▪ Garanti Culture Center▪ Vehbi Koç Foundation Culture and Community Center▪ King’s Academy High School
Qatar National ConventionCenter(Doha, Qatar)
Total Area : 120.000 m2
Project Launch : 2007
Project Completion : 2011
Employer : Qatar Foundation
Main Contractor : Baytur İnşaat
Scope Of Work : Electrical
Garanti Culture Center(Istanbul, Turkey)
Total Area : 9.750 m2
Project Launch : 2010
Project Completion : 2011
Employer : Garanti Bankası
Main Contractor : Promim Mimarlık
Scope Of Work : Electrical and Mechanical
Vehbi Koç Foundation Culture and CommunityCenter(Kocaeli, Turkey)
Total Area : 11.000 m2
Project Launch : 2010
Project Completion : 2011
Employer : Vehbi Koç Vakfı
Main Contractor : Ark İnşaat
Scope Of Work : Electrical
King’s Academy High School(Madaba, Jordan)
Total Area : 60.000 m2
Project Launch : 2004
Project Completion : 2006
Employer : Royal Court Engineering Dept.
Main Contractor : Koray İnşaat
Scope Of Work : Electrical
Industrial
Facilities
References:
▪ Ford Automotive Gölcük Factory▪ Ford Automotive Yeniköy Factory (B460)▪ Abdi İbrahim Pharmaceutical Plant – R&D Building▪ Tetrapak Packaging Factory▪ Vyksa Steel Production Plant
▪ Bosch – Rexroth Factory▪ SUN-JUT Production Plant▪ APS Textile Factory
Ford Automotive Gölcük Factory(Kocaeli, Turkey)
Total Area : 346.800 m2
Project Launch : 2000
Project Completion : 2007
Employer : Ford Otomotiv A.Ş.
Scope Of Work : Electrical
Ford Automotive Yeniköy Factory (B460)(Kocaeli, Turkey)
Total Area : 126.141 m2
Project Launch : 2012
Project Completion : 2014
Employer : Ford Otomotiv A.Ş.
Main Contractor : Ark İnşaat
Scope Of Work : Electrical
Abdi İbrahim PharmaceuticalPlant – R&D Building (Istanbul, Turkey)
Total Area : 15.000 m2
Project Launch : 2004
Project Completion : 2006
Employer : Abdi İbrahim A.Ş.
Scope Of Work : Electrical
Tetrapak Packaging Factory(Moscow, Russia)
Total Area : 22.000 m2
Project Launch : 2007
Project Completion : 2008
Employer : Tetrapak
Main Contractor : Delta Construction
Scope Of Work : Electrical
Vyksa Steel Production Plant(Vyksa, Russia)
Total Area : 110.000 m2
Project Launch : 2007
Project Completion : 2008
Employer : OMK
Main Contractor : GAMA
Scope Of Work : Electrical
Bosch – Rexroth Factory(Gebze, Turkey)
Total Area : 4.000 m2
Project Launch : 2008
Project Completion : 2009
Employer : Bosch - Rexroth
Main Contractor : Siemens
Scope Of Work : Electrical
SUN-JUT Production Plant(Istanbul, Turkey)
Total Area : 22.000 m2
Project Launch : 2007
Project Completion : 2008
Employer : Greif / Unsa
Scope Of Work : Electrical
APS Textile Factory(Amasya, Turkey)
Total Area : 17.500 m2
Project Launch : 2005
Project Completion : 2005
Employer : APS Tekstil ve Ticaret A.Ş.
Scope Of Work : Electrical
Well Established Relationships
Operation & Maintenance
Providing all necessary operation
and maintenance services for the seamless operation of the facilities
Since 1998
4.863.419 USD
8.915.302 USD
8.928.195 USD
9.285.000 USD
2014 2015 2016 2017
Revenue
The Advantages of O&M
Energy, Time and Workforce
Savings
Correct Analysis in Investment
Budgets
Increase in Efficiency
Immediate Intervention & Coordination
from one center
Fast Solution
Decrease in Enterprise
Maintenance Expenses
Monitoring and Case Tracking by Our Expert Team
Minimized System Errors
and Work Accidents
Advanced Technology Compliance
References
Baku Olympic StadiumTurkcell
Building facility management and operations andmaintenance, periodical maintenance and controls, failureintervention services and structural renovation/infrastructureprojects, occupational health and safety, energy projectinvestment consulting, and emergency field services forcommunication operators for 23 facilities across Turkey,consisting of 19 Headquarters and 4 Auxiliary buildings.
References
Coca - Cola
Turkey / Middle East Technical operations, maintenanceand repair, energy management, environment, waste andrecycling, technical budget and investment planning,occupational health and safety services and specialproject/application services (For instance, P.A.T. Testing)for General Directorate's building electromechanicalsystems
DP World Yarımca ContainerTerminal
42 Maslak
References
24/7 operation and maintenance services for the main andBuilding Automatization System 42 Maslak which has a 250.000m2 total area
Digiturk (beIN)
Turkey / Middle East Technical operations, maintenance andrepair, energy management, environment, waste andrecycling, technical budget and investment planning,occupational health and safety services and specialproject/application services (For instance, P.A.T. Testing) forGeneral Directorate's building electromechanical systems
References
Anel Business Center
The electromechanical monitoring and operations ofAnel Business Center, where Anel Group and 15headquarter of other companies are located.
On-call and maintenance requests, operation & maintenance ofmobile service for Esentepe General Directorate building, in-house technical team and operation&maintenance services atDudullu Datacenter building.
Superonline
References
Vodafone
Operations, maintenance, preventive periodicalmaintenance and controls, failure intervention servicesand mobile field emergency services for celular basestations and communication operators across Turkey(2009-2011)
Technical operations, operation and maintenance, energymanagement, environment, waste and recycling, technicalbudget and investment planning, and occupational health andsafety services for Sütlüce General Directorate'selectromechanical systems.
Arçelik
References
ALSTOM
Operation & maintenance services, monitoring andmanagement of all production lines, systems, machines andauxiliary plants, as well as the revision, Project managementof the systems and machines at ALSTOM factory (Formerlyknown as Areva/Alstom Energy Industries INC), which has a55,000 m2 total area with 45,000 m2 of production area thatproduces on-demand transformers, LV cells and cutters forexport to 84 countries.
Operation and maintenance service for electrical andmechanical systems of GE Aviation Gebze complex.
GE Aviation
References
Atatürk International Airport
Operation and maintenance services for the internationaland domestic terminals and the parking garage of IstanbulAtaturk Airport
Periodical maintenance, operational monitoring, malfunctionintervention and services for electrical systems at BMW KosiflerCenter automobile headquarters and showroom buildings.
Kosifler
▪AnelEnerji: The first
Turkish company to:
✓Enter foreign markets
▪ The EPC Contractor of the first power
plant in Cyprus -1.3MWp – EU Funded
Profile
Location: Komotini, Greece
Field Size: 2.000 m2
Total DC Power (kWp): 100
Total Number Of Panels: 420
Total Number Of Inverters: 5
Komotini Solar Power Plant
Location: Dimitrovgrad, Bulgaria
Field Size: 50.000 m2
Total DC Power (kWp): 2.268
Total Number Of Panels: 10.800
Total Number Of Inverters: 6
DimitrovgradSolar Power Plant
Location: Troyanovo, Bulgaria
Field Size: 33.000 m2
Total DC Power (kWp): 1.500
Total Number Of Panels: 7.182
Total Number Of Inverters: 5
TroyanovoSolar Power Plant
Location: Chirpan, Bulgaria
Field Size: 37.000 m2
Total DC Power (kWp): 1.500
Total Number Of Panels: 7.128
Total Number Of Inverters: 132
Chirpan Solar Power Plant
Location: Lefkosia, Turkish Republic of Northern Cyprus
Field Size: 20.000 m2
Total DC Power (kWp): 1.300
Total Number Of Panels: 6.192
Total Number Of Inverters: 86
CyprusSerhatköy Solar Power Plant
Location: Malatya, Turkey
Total DC Power (kWp): 5.300
Total Number Of Panels: 21.200
Total Number Of Inverters: 181
Malatya İnönü UniversityTurgut Özal Medical Center
Profile
27 years of experience
2.000 m2 Production Area
Franchising agreement with Schneiderand Siemens
35 Employees;
3 engineers, 32 technicians, and support departments
▪ Low Voltage Electrical Panel Production
▪Medium Voltage Electrical Panel Production
▪Operation & Maintenance
▪ Supervision
Operation Areas
▪ 3rd Airport (İstanbul, Turkey, 2016)
▪ Kars Airport (Kars, Turkey, 2013)
▪ Hamad International Airport (Doha, Qatar, 2007)
▪ Batum International Airport (Batum, Georgia, 2006)
▪ Tbilisi Airport (Tbilisi, Georgia, 2006)
▪ Esenboğa International Airport (Ankara, Turkey, 2005)
▪ Adnan Menderes International Airport (İzmir, Turkey, 2005)
▪ Ataturk International Airport (İstanbul, Turkey, 2000)
Airports
▪ HSBC Head Office (İstanbul, Turkey, 2007)
▪ Akbank Branches (Turkey-wide, 2005)
▪ Isbank Avcılar Branch (Turkey-wide, 2002)
Banks
▪ Turkcell Kartal (İstanbul, Turkey, 2007)
▪ Aycell Base Stations (Turkey-wide, 2002)
Technological Buildings
GSM
▪ Sabancı University Nanotechnology Center (İstanbul, Turkey, 2012)
▪ Marmaray BC1 (İstanbul, Turkey, 2013)
▪ Alstom Transport, Signalization Panels(Kütahya, Turkey, 2015)
▪ Alstom Transport, Lusail Signalization Panels(Qatar, 2016)
Tunnels & Railways
▪ Iraqi Treatment Plant-Degremont (Iraq, 2007)
▪ Sibiu Treatment Plant (Romania, 2007)
▪ Sedele Printing (İstanbul, Turkey, 2006)
▪ Lineadecor (Gebze, Turkey, 2006)
▪ Sumitomo Densetsu Co. Dolphin Project (Qatar, 2005-2006)
▪ Kaşmir Carpet Factory (İstanbul, Turkey, 2005)
▪ Ford Otosan Samandıra Plant (İstanbul, Turkey, 2005)
▪ APS Tekstil (Merzifon, Turkey, 2005)
▪ Gülsan A.Ş. Nappy Factory (Gaziantep, Turkey, 2004)
Industrial Plants
▪ Beksa A.Ş. (Adapazarı, Turkey, 2004)
▪ ToyotaSA Welding, Pressing, Resin and Paint Buildings (İzmit, Turkey, 2005-2006)
▪ Petkim (İzmit, Turkey, 2004)
▪ Novartis Pharmaceutical Factory (İstanbul, 2003)
▪ Gül Enerji Cogeneration Plant (Gaziantep, Turkey, 2003)
▪ Gülsan A.Ş. (Gaziantep, Turkey, 2002)
▪ Las Vaguadas Project (Las Vagaudas, Spain, 2008)
▪ Al Mansuriya Project (Iraq, 2013)
▪ Mossul East Project (Iraq, 2012)
▪ Pakistan Project (Pakistan, 2010-2012)
▪ Sabriya Project (Al Sabriya, Kuwait, 2008)
▪ Magva Project (Al Ahmadi, Kuwait, 2008)
▪ Poolberg Project (France, 2007)
▪ Herrenwasser Project (Switzerland, 2007)
▪ Tishreen Project (France, 2007)
▪ Moscow City Project (Russia, 2006)
▪ Sheraton Hotel (Samsun, Turkey, 2014)
▪ St. Regis Hotel (İstanbul, Turkey, 2013)
▪ Shangri La Hotel (İstanbul, Turkey, 2013)
▪ Hilton Garden Inn (4 different cities in Turkey, 2010-2011)
▪ Four Seasons Hotel (İstanbul, Turkey, 2007)
▪ Park Hyatt (İstanbul, Turkey, 2007)
▪ Sofa Hotel (İstanbul, Turkey,2006)
▪ Les Ottomans (İstanbul, Turkey, 2004)
▪ Jasmin Resort Hotel (Antalya, Turkey, 2004)
Hotels
▪ 42 Maslak (İstanbul, 2014)
▪ Is REIT Technology&Operation Center (İstanbul, Turkey, 2014)
▪ Anel Business Center (İstanbul, Turkey, 2007)
▪ Turkish Trade Center (Ankara, Turkey, 2007)
▪ Bellevue Residence (İstanbul, Turkey, 2007)
▪ Sun Plaza (İstanbul, Turkey, 2005)
▪ Dim Plaza (İstanbul, Turkey, 2005)
Business Centers
▪ Muğla University (Muğla, Turkey, 2006)
▪ ToyotaSA Social Facilities (Adapazarı, Turkey, 2002)
Sport Facilities
Social Facilities
▪ Baku Olympic Stadium (Baku, Azerbaijan, 2014)
▪ Kadir Has Stadium (Kayseri, Turkey, 2008)
▪ TJK İzmir Hippodrome (İzmir, Turkey, 2006)
▪ Mavibahçe Shopping Mall (İzmir, Turkey, 2015)
▪ Genjlik Mall (Baku, Azerbaijan, 2014)
▪ Magnesia Shopping Mall (Manisa, Turkey, 2011)
▪ Marmara Forum (İstanbul, Turkey, 2010)
▪ Forum İstanbul (İstanbul, Turkey, 2008)
▪ Galleria Shopping Center (İstanbul, Turkey, 2006)
▪ Hey Tekstil (İstanbul, Turkey, 2004)
▪ Kuyumcukent (İstanbul, Turkey, 2003)
▪ Favori Jewelry (İstanbul, Turkey, 2003)
▪ Masera Shopping Center (Konya, Turkey, 2002)
▪ Kosifler Plaza (İstanbul, Turkey, 2002)
Shopping Centers & Showrooms
▪ Alcatel (Turkey-wide, 2005)
▪ ABB (Turkey-wide and abroad, 2005-2006)
▪ Opet Petrol Stations (Turkey-wide, 2005-2007)
▪ Botaş Police Station Buildings (Turkey-wide, 2005-2006)
▪ RMS-A/RMS-B Type Stations (Turkey-wide, 2005)
▪ Areva (Turkey-wide and abroad, 2005-2007)
Others
▪ Consulate General Of Greece (İstanbul, Turkey, 2002)
▪ Netherlands Consulate (Ankara, Turkey, 2002)
Consulates
Operation Areas
Metal Wastes
Automobile & service Wastes
HazardousWaste
Electric and Electronic
Waste
Naval ProjectsManufacturing
Harnessing
Commissioning& Tests
After SalesServices
LogisticsSupport
Cabling
Outfitting
Design
High Technology
High Standards
▪ Concept and configuration design of ship electric &electronic systems according to NATO standards &International Classification Society rules.
▪ Design, Manufacturing and Navy Calification Testing ofSwitchboards and Consoles, meeting Shock, Vibration,Environmental, EMI/EMC and Acouistic signiturediscipline requirements of regarding Mil-Specs
▪ Design and Manufacturing of Navy type Special Systems▪ System Integration▪ Harnessing of military type connectors▪ Project Management & Consultancy▪ Operation & Maintenance▪ Electrical Outfitting and Cabling onboard▪ Testing and commissioning of systems (STW, IT, FAT, HAT,
SAT, SIT)▪ Logistic support
Scope Of Work
MİLGEM(Ada-Class Corvette 4 ships)
Scope of Work: • Ship Electrical System
Design (Approved bySociety Class)
• Design and Manufacturingof Navy type Switchboardsand Special Systems (TypeApproved Certificated bySociety Class)
• Electrical Outfitting and Cabling onboard
Acquisition Authority: SSMMain Contractor: STMProject Launch: 2006Project Completion: ongoing
Scope of Work: ShipElectrical System Design (Approved by Society Class)
Acquisition Authority: SSM
Main Contractor: STM
Project Launch: 2016
Project Completion: ongoing
MİLGEM İ(İ-Class Frigate 4 Ships)
Mine HunterVessel(A-Class M/V Tipi 4th Ship)
Scope Of Work:▪ Manufacturing of
Switchboards, Bridge Consoles & CommandControl Consoles
▪ Electrical Outfitting and Cabling onboard
Acquisition Authority: SSMMain Contractor: GermanMine Hunter ConsortiumProject Launch: 2006Project Completion: 2007
Scope of Work:
▪ Ship Electrical SystemRetrofit Design
▪ Manufacturing of Switchboards
▪ Supplying of PowerEquipment
Acquisition Authority: SSM
Main Contractor: HAVELSAN
Project Launch: 2005
Project Completion: 2013
GENESİS(G-Class Frigate 8 ships)
Diving Boat(2 ships)
Scope of Work: ▪ Ship Electrical System
(Approved by Society Class)▪ Design and Manufacturing of
Switchboards, Bridge Console, Alarm&Monitoring Systemand Navy type Special Systems(Approved by Society Class)
▪ Electrical Outfitting and Cabling onboard
Acquisiton Authority: RoyalSaudi Naval Forces
Main Contractor: Alkhorayef-Arı Makine
Project Launch: 2013
Project Completion: 2014
Scope Of Work:▪ Design and Manufacturing of
Radar Power Distribution Units▪ Supplying of Power Equipment▪ MIL-S-901D Shock,
MIL-STD-461F EMI/EMC,MIL-STD-810G Environmental,MIL-STD-167-1 Vibration,MIL-STD-1474 Acouistic
Navy Calification Testing / Analysis
Acquisiton Authority : SSMMain Contractor: ASELSANProject Launch: 2015Project Completion: ongoing
ÇAFRAD-MultifunctionalPhased Array Radar(TF2000-Class Frigate -Prototype and4 Series Phases)
Scope Of Work:▪ Design and Manufacturing of
Radar Power Distributin Units▪ Supplying of Power Equipment▪ MIL-S-901D Shock,
MIL-STD-461F EMI/EMC,MIL-STD-810G Environmental,MIL-STD-167-1 Vibration,MIL-STD-1474 Acouistic
Navy Calification Testing / Analysis
Acquisition Authority: SSMMain – Subcontractor: Sedef Shipyard-ASELSANProject Launch: 2017 Project Completion: ongoing
LHD-Radar(Landing Helicopter Dock-Prototype and Serie Phase)
MOSHIP, KURYED, MİLLİ SİSMİK & LST(6 Ships)
Scope Of Work: Integration and Harnessing of Militarytype connectors of ASELSAN Weapon&ElectronicSystems (by staff, having J-STD-001 Class 3 andIPC/WHMA-A-620 certifications) Acquisition Authority: SSMMain Contractor: İstanbul Shipyard/ADİK-ASELSANProject Launch:2013Project Completion: 2017
Scope Of Work: Integration and Harnessing of Militarytype connectors of ASELSAN Weapon&Electronic Systems(by staff, having J-STD-001 Class 3 and IPC/WHMA-A-620 certifications) Acquisition Authority: SSMMain Contractor: ASELSAN-MİKESProject Launch: 2012Project Completion: 2015
3B AR-3D SearchRadar(MEKO&G-Class of 8 Frigates)
Our Other Projects
DİMDEG-Replenishment At Sea& Combat Support ShipScope Of Work: Ship Electrical System (Approved bySociety Class)Acquisition Authority: SSMMain Contractor: STMProject Launch: 2013Project Completion: 2015
Export Navy Projects(8 Various Class Ships)
Scope Of Work : • Ship Electrical System (Approved by Society Class)• Design and Manufacturing of Switchboards, Bridge
Console, Alarm&Monitoring System and Navy typeSpecial Systems (Approved by Society Class)
• Electrical Outfitting and Cabling onboardMain – Subcontractor: YALTES-DEARSAN ShipyardProject Launch: 2014Project Completion: 2017
calculate our carbon footprint.recycle our wastes.use our energy and water efficiently.green our environment.
Nature is our sore point
27.00027 thousand saplings
12.00012 thousand tones
66tones and batteries
of 47 kg
57.00057 thousand treesWe
We donated
We avoided a total amount of gas emission that could be
cleaned up via
We totally recycled paper waste of
We avoided CO₂ emission of totally
*Total numbers of 3 years
We carry out all our activities in accordance with the 10 principles stated in the agreement.
We signed The United Nations Global Compact Agreement
Our employees voluntarily support the programs of Çelikel Education Foundation.
We stand by the youth who will create tomorrow
321hours volunteering
in 1 year
In Galeri 5, we offer young artists the opportunity to display their talent.
We supportart and artists!
Contact
www.anel.com.tr
QatarBLDG 317 Office 3 & 5 St.250 Zone 43 Al-Hilal D-Ring Road, P.O. Box 21346 Doha, QatarPhone: (+974) 4 421 02 01 / 4 498 85 07 Fax: +974 4 436 36 29
United Arab EmiratesZayed The First Street, Pearl Plaza Building, Office No: MZ-9W - 10 / C - 69PO Box : 46373, Khalidiya, Abu Dhabi / UAEPhone : +971 2 666 49 17 Fax: +971 2 666 49 27
RussiaAnel Injenerno Tehnologicheski Kompaniya127422, Moscow, Timiryazevskaya Street 1Phone: +7 495 287 30 16 Fax: +7 495 287 30 16
Saray Mah. Site Yolu Caddesi, No:5/4 34768 Ümraniye İstanbul / TürkiyePhone : +90 216 636 20 00 Fax : +90 216 636 25 00
Saray Mah. Site Yolu Caddesi, No:5/4 34768 Ümraniye İstanbul /TürkiyePhone : +90 216 636 20 00 Fax : +90 216 636 25 00
Saray Mah. Site Yolu Caddesi, No:5/4 34768 Ümraniye İstanbul /TürkiyePhone : +90 216 636 20 00 Fax : +90 216 636 25 00
Saray Mah. Site Yolu Caddesi, No:5/4 34768 Ümraniye İstanbul / TürkiyePhone : +90 216 636 20 00 Fax : +90 216 636 25 00
Bağdat Cad. Uzay Çıkmazı Suadiye 41170 Kartepe/Kocaeli /Türkiye
Phone : +90 262 352 25 20 Fax : +90 216 636 28 01
Metro Ofis Plaza, Yeşilbağlar Mah. Kaptan Sok. No:19 Kat:9 34893 Pendik / İstanbul / TürkiyePhone : +90 216 494 10 65 / +90 216 494 10 89Fax : +90 216 494 12 05
Head OfficeAnel İş MerkeziSaray Mah. Site Yolu Caddesi, No:5/4 34768 Ümraniye / İstanbul / TürkiyeTel: +90 216 636 20 00Fax: +90 216 636 25 00
United Kingdom88 Kingsway, Holborn, London, WC2B 6AAPhone: +44 (0) 20 78 41 2790
Certain statements contained in this presentation may be considered "forward-looking statements”. Our forward-looking statements generally contain words such as "estimate," "project, "predict," "believe," "expect," "anticipate," "potential," "plan," "goal," “will” or other words which mean the uncertainty of future events. These forward-looking statements are based on our current expectations, estimates and assumptions and are subject to certain risks and uncertainties. Although Anel Elektrik believes that the expectations reflected in our forward-looking statements are reasonable at this time, actual results could differ materially from those projected or assumed in any of our forward-looking statements. Therefore, Anel Elektrik disclaims any obligation to update these statements, and we caution you not to rely on them unduly.
Disclaimer