analysis report (louis ray visit)
TRANSCRIPT
-
8/8/2019 Analysis Report (Louis Ray Visit)
1/55
ANALYSIS REPORT
Well No: SK-004
Date: 18th Nov 2010
Average PPRL: 11275 Current PPRL: 10928
Average MPRL: 7177 Current MPRL: 7264
Average Load Span: 4098
Current Load Span: 3664
Average Card Area:
Current Card Area:
Echometer FAP: 4500
(8/13/2010)
Calculated FAP: 3471
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Cards with TV Leakage
Card with TV Leakage
Cards before WOJ
Leakage
Average Production: 23.8
bfpd
Current Production: 15.07
bfpd (4.2.10)
Test Production Trend
1
-
8/8/2019 Analysis Report (Louis Ray Visit)
2/55
2
-
8/8/2019 Analysis Report (Louis Ray Visit)
3/55
Well History:
Well got stuck-up on 29th June. It went on Work over on 17th October. After
WOJ, the cards obtained depicted TV leakage.
Recommendations & performance (if any):
Pump reseating was recommended on 12th November and was reseated on
13th November. No change in card shape observed after pump reseating.
Remarks and Specific Observations
A decreasing trend in well test production was observed even before project
initiation.
3
-
8/8/2019 Analysis Report (Louis Ray Visit)
4/55
Well No: SK-006
Date: 26th Nov 2010
Average PPRL: 8323 Current PPRL: 9136
Average MPRL: 7427 Current MPRL: 8096
Average Load Span: 896
Current Load Span: 1040
Average Card Area:
Current Card Area:
Echometer FAP: 5046
(11/24/2010)
Calculated FAP: 5004
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Cards with TV closure
problem
Card with TV closure
problem
B efore WOJ ( No
Production )
Average Production: 11.39
bfpd
Current Production: 11.68
bfpd (4.2.10)
Test Production Trend
4
-
8/8/2019 Analysis Report (Louis Ray Visit)
5/55
Well History:
Well went on WOJ on 13th November 2010. Not much of change observed
after work over.
Recommendations & performance (if any):
Travelling valve closure problem and/or worn out valves envisaged.
Remarks and Specific Observations
No production was observed in this well since the start of the project. Well
was shut down for three months due to uneconomical producing rate.
5
-
8/8/2019 Analysis Report (Louis Ray Visit)
6/55
Well No: SK-010
Date: 26th Nov 2010
Average PPRL: 12200 Current PPRL: 12512
Average MPRL: 7950 Current MPRL: 7520
Average Load Span: 4250
Current Load Span: 4992
Average Card Area:
Current Card Area: 2569.96
Echometer FAP (ft): 3878
(10/25/10)
Calculated FAP: 2409
DF Multiplier (Upstroke):
1.15
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Normal Card
Average Production: 140
bfpd
Current Production: 152 bfpd
Test Production Trend
6
NIL
-
8/8/2019 Analysis Report (Louis Ray Visit)
7/55
Well History:
NIL
Recommendations & performance (if any):
Recommended for SPM increase on 26th July 10. Recommendation was kept in
abeyance due to the well being stable at this SPM.
Remarks and Specific Observations
Production is stable since initiation of project.
7
-
8/8/2019 Analysis Report (Louis Ray Visit)
8/55
Well No: SK-042
Date: 29th Nov 2010
Average PPRL: 11487 Current PPRL: 14176
Average MPRL: 5678 Current MPRL: 7408
Average Load Span: 5809
Current Load Span: 6768
Average Card Area:
Current Card Area: 2864
Echometer FAP (ft): 361
(6/15/2010)
Calculated FAP: 2327
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Cards with split barrel Card with TV closure
problem
B efore Rod Stuck up
Average Production: 13 bfpd
(till June)
Current Production: NIL (After
WOJ)
Test Production Trend
8
-
8/8/2019 Analysis Report (Louis Ray Visit)
9/55
9
-
8/8/2019 Analysis Report (Louis Ray Visit)
10/55
Well History:
Rod got stuck-up on 1st July 10 (just after the start of the project). Reason
could not be inferred. Well came back from WOJ on 23rd August 10. HOC was
done on 8th September 10. Prominent valve leakage and/or split barrel
tendency was observed since then.
Recommendations & performance (if any):
Check for split barrel was recommended on 29th Sep. 2010 and the well was
consequently shut down for another WOJ on 30th Aug. 2010.
Remarks and Specific Observations
No production has been observed since the WOJ.
10
-
8/8/2019 Analysis Report (Louis Ray Visit)
11/55
Well No: SK-057
Date: 29th Nov 2010
Average PPRL: 13804 Current PPRL: 12864
Average MPRL: 9010 Current MPRL: 7952
Average Load Span: 4794
Current Load Span: 4912
Average Card Area:
Current Card Area: 2282.57
Echometer FAP (ft): 2856
(11/24/2010)
Calculated FAP: 1147
DF Multiplier (Upstroke): 1 DF Multiplier (Downstroke):
0.125
Normal Card:
Current Card:
Special Card (if
any):
Cards with kinks Card showing kink in
Down-stroke
Flip card due to unit
vibration
Average Production: 15 bfpd Current Production: 18.85
bfpd
Test Production Trend
11
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
12/55
Well History:
Frequent flip cards were observed till August 2010. Unit vibration check and
repositioning was recommended and performed on 26th August 2010. Normal
cards are obtained since then with kinks in the cards occasionally.
Recommendations & performance (if any):
Vibration check due to Flip cards was recommended as mentioned above.
SPM reduction was recommended due to high gas interference, on 10th Oct.
2010 and was reduced from 3.5 to 2.15 on 29th Oct. 2010. Cards showing
better fillage have been observed since then.
Remarks and Specific Observations
Average production from this well is about 15 bfpd, the data for June, July and
August 2010 are highly misleading (with productions of 47, 29 and 31 bfpd
respectively).
12
-
8/8/2019 Analysis Report (Louis Ray Visit)
13/55
Well No: SK-059
Date: 29th Nov 2010
Average PPRL: 13932 Current PPRL: 13056
Average MPRL: 8564 Current MPRL: 7664
Average Load Span: 5368
Current Load Span: 5392
Average Card Area:
Current Card Area: 1559
Echometer FAP (ft): NA
(Annulus valve leakage)
Calculated FAP: 36
DF Multiplier (Upstroke): 1 DF Multiplier (Downstroke):
0.8
Normal Card:
Current Card:
Special Card (if
any):
Cards with Gas
interference
Card with gas
interference
Cards before & after SL
change
Average Production: 32 bfpd Current Production: 33.97
bfpd
Test Production Trend
13
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
14/55
Well History:
No major Intervention job performed till now.
Recommendations & performance (if any):
SPM reduction from 3.2 to 2.5 and SL increase from 64 to 86 in was
recommended on 10th Oct. 2010. SL was increased on 26th Oct. 2010.
Increase in production has been observed after SL change.
SPM reduced to 2.1 on 26th Nov. 2010. Well under observation.
Remarks and Specific Observations
The effective down-hole stroke length is very less as compared to surface
stroke length (Sp/S=0.75).
14
-
8/8/2019 Analysis Report (Louis Ray Visit)
15/55
Well No: SK-063
Date: 29th Nov 2010
Average PPRL: 16500 Current PPRL: 18592
Average MPRL: 9700 Current MPRL: 8416
Average Load Span: 6800
Current Load Span: 10176
Average Card Area:
Current Card Area: 3253
Echometer FAP (ft): 2592
(10/19/10)
Calculated FAP: -1363
DF Multiplier (Upstroke): 2.8 DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Cards with increasing
card area
Card with high card area Closed flow line
valve
Average Production: 39 bfpd Current Production: 40.06
bfpd
Test Production Trend
15
-
8/8/2019 Analysis Report (Louis Ray Visit)
16/55
Well History:
No major Intervention job performed till now.
Recommendations & performance (if any):
SPM reduction from 3.2 to 2.5 and SL increase from 64 to 86 in was
recommended on 10th Oct. 2010. SL was increased on 17th Oct. 2010. Slight
increase in production has been observed after SL change.
Remarks and Specific Observations
SPM reduction is pending. The effective down-hole stroke length is very less
as compared to surface stroke length (Sp/S=0.75). Card area and load span
(vertical well profile) are abnormally high and have been increasing
gradually.
16
-
8/8/2019 Analysis Report (Louis Ray Visit)
17/55
Well No: SK-066
Date: 29th Nov 2010
Average PPRL: 13000 Current PPRL: 14976
Average MPRL: 9000 Current MPRL: 7984
Average Load Span: 4000
Current Load Span: 6992
Average Card Area:
Current Card Area: 2510
Echometer FAP (ft): 840
(10/14/10)
Calculated FAP: -793
DF Multiplier (Upstroke): 1 DF Multiplier (Down-stroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Cards with incomplete
fillage
Card with incomplete
fillage
Tubing Leakage &
2.1 SPM
Average Production: 39.55
bfpd
Current Production: 20.75
bfpd
Test Production Trend
17
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
18/55
Well History:
Well went on WOJ for Tubing leakage on 5th September 2010 and was
put on RPc on 24th September 2010.
Vibration was observed at well-site therefore, No: of counterweights
were changed from 2 to 4 on 13th Oct. 2010.
Skid leveling was done on 28th Oct. 2010.
Recommendations & performance (if any):
Check for tubing leakage was recommended on 5th July and was
subsequently confirmed by ONGC from Pressure Build-up test on 9th
July 2010.
SPM increase was recommended on 1st Oct. 2010. It was increased
from 2 to 4 on 8th Oct. 2010
Remarks and Specific Observations
Decreasing trend in FAP is observed.
18
-
8/8/2019 Analysis Report (Louis Ray Visit)
19/55
-
8/8/2019 Analysis Report (Louis Ray Visit)
20/55
Well History:
Rod got stuck-up on 2nd Oct. 2010. HOC was done to release stuck-up on 3rd
Oct. 2010. But, stuck-up could not be released and Well was under WOJ from
29th Oct. 2010 to 14th Nov. 2010. Cards with valve leakage observed after
WOJ. Installation of pump with service valves confirmed from ONGC.
Recommendations & performance (if any):
HOC was recommended due to high rod stress and card area on 14th Aug.
2010. HOC was done on 17th Sep. 2010. No change in card shape was
observed after that.
Remarks and Specific Observations
Decreasing trend well test production observed from May 2010 to September
2010.
20
-
8/8/2019 Analysis Report (Louis Ray Visit)
21/55
Well No: SK-73
Date: 26th Nov 2010
Average PPRL: 6800 Current PPRL: 7280
Average MPRL: 4100 Current MPRL: 3520
Average Load Span: 2700
Current Load Span: 3760
Average Card Area:
Current Card Area: 1415.38
Echometer FAP: 332
(10/14/2010)
Calculated FAP: 0
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Cards varying span Current card Flip cards
Average Production: 148.5
bfpd
Current Production:
171.13
Test Production Trend
21
SPM
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
22/55
Well History:
Fluctuating trend in card area and load span was observed and Pulley
was reported to be broken on 8th Sep. 2010.It was repaired on 10th
Sep.
Frequent flip cards were also observed and the unit was repositioned
and balanced on 5th Sep. 2010.
Frequent electrical panel and Motor problems were observed which
can be attributed to Load fluctuations.
Recommendations & performance (if any):
Recommended for SPM increase from 6.5 to 8.5 on 28th July. SPM was
increased on 27th August but due to abnormal increase in water cut it was
reverted to 6.5 on 20th Sep. 2010.
Remarks and Specific Observations
Water cut values have been observed to be increasing but oil production is
constant over time.
22
-
8/8/2019 Analysis Report (Louis Ray Visit)
23/55
Well No: SK-78
Date: 26th Nov 2010
Average PPRL: 11350 Current PPRL: 11376
Average MPRL: 5700 Current MPRL: 5728
Average Load Span: 5650
Current Load Span: 5648
Average Card Area:
Current Card Area: 2325.37
Echometer FAP: 4107
(11/25/2010)
Calculated FAP: 3146
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card NIL
Average Production: 138.61
bfpd
Current Production:
190.9 bfpd
Test Production Trend
23
NIL
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
24/55
Well History:
NIL
Recommendations & performance (if any):
Recommended for SPM increase from 5.5 to 7 on 28th July. SPM was increased
on 2nd August.
Remarks and Specific Observations
Increasing trend in production has been observed since SPM increase.
24
-
8/8/2019 Analysis Report (Louis Ray Visit)
25/55
Well No: SK-79
Date: 26th Nov 2010
Average PPRL: 11679 Current PPRL: 10496
Average MPRL: 10802 Current MPRL: 8368
Average Load Span: 877
Current Load Span: 2128
Average Card Area:
Current Card Area: 1036.76
Echometer FAP: 5353
(11/15/2010)
Calculated FAP: 4877
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card Cards with Kinks
Average Production: 58.56 bfpd Current Production:
105.5 bfpd
Test Production Trend
25
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
26/55
Well History:
Frequent flip cards due to vibration were observed. HOC was done on 31st
Oct. 2010. No change in card shape observed.
Recommendations & performance (if any):
Recommended for SPM increase from 2 to 3 on 26th July. SPM was increased
to 3.2 on 12th August 2010.
Remarks and Specific Observations
Kinks in cards still observed. Card span is fluctuating and the well also has
flumping tendency.
26
-
8/8/2019 Analysis Report (Louis Ray Visit)
27/55
Well No: SK-085 (Deviated)
Date: 26th Nov 2010
Average PPRL: 13650 Current PPRL: 12688
Average MPRL: 8500 Current MPRL: 8240
Average Load Span: 5100
Current Load Span: 4448
Average Card Area:
Current Card Area: 2798.81
Echometer FAP: 2110.69
(25/11/2010)
Calculated FAP: 2061
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards
Current card
Card before well shut
down
Average Production: 30.21
bfpd
Current Production: 12.56 bfpd
(22.11.10)
Test Production Trend
27
-
8/8/2019 Analysis Report (Louis Ray Visit)
28/55
28
-
8/8/2019 Analysis Report (Louis Ray Visit)
29/55
Well History:
Rod part on 1st July. Well was put on RPC on 19th August after workover. High
rodstress observed and occasional kink seen in the card. Sudden decrease in
Load span is seen from 4th November. The well has shown no production in
November and is shutdown for workover by ONGC on 26th November.
Recommendations & performance (if any):
Reduce the pump size and redesign rod string.
No build-up observed after recent water circulation. The well
has been taken for WOJ.
Remarks and Specific Observations
Deep rod part suspected, due to sudden decrease in load span.
29
-
8/8/2019 Analysis Report (Louis Ray Visit)
30/55
Well No: SK-86
Date: 26th Nov 2010
Average PPRL: 11527 Current PPRL: 12944
Average MPRL: 7745 Current MPRL: 8320
Average Load Span: 3782
Current Load Span: 4624
Average Card Area:
Current Card Area: 1324
Echometer FAP: 4541
(10/19/2010)
Calculated FAP: 2140
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards with gas
interference
Current card with gas
interference
Average Production: 18 bfpd Current Production:
16.9 bfpd
Test Production Trend
30
NIL
-
8/8/2019 Analysis Report (Louis Ray Visit)
31/55
Well History:
Nomajor interventions occurred in this well. Well is running under stable load
& stress values limits.
Recommendations & performance (if any):
Recommended for SPM decrease from 6 to 4 and stroke length increase from
86in to 120in from 15th October to reduce the gas interference tendency.
Action still pending.
Remarks and Specific Observations
Gas interference is observed in the cards right from the start of the project.
31
-
8/8/2019 Analysis Report (Louis Ray Visit)
32/55
Well No: SK-92
Date: 26th Nov 2010
Average PPRL: 13000 Current PPRL: 12480
Average MPRL: 7700 Current MPRL: 8352
Average Load Span: 5300
Current Load Span: 4128
Average Card Area:
Current Card Area: 2608
Echometer FAP: 1515
(11/24/2010)
Calculated FAP: 1727
DF Multiplier (Upstroke): 2.4
DF Multiplier (Downstroke):
0.8
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card Card s before & after SPM
decr ease
Average Production: 25 bfpd Current Production:
22.83 bfpd
Test Production Trend
32
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
33/55
Well History:
Nomajor interventions occurred in this well. Well is running under stable load
& stress values limits.
Recommendations & performance (if any):
Recommended for SPM decrease from 3.5 to 2.5 on 2nd Nov 2010. SPM was
decreased to 1.8 on 16th November 2010. Fillage in cards improved a lot after
SPM reduction but production has also gone down. Reason might decreasing
SPM lower than what was recommended (2.5).
Remarks and Specific Observations
Test data of October and august is highly misleading.
Well No: SK-093 (Vertical)
33
-
8/8/2019 Analysis Report (Louis Ray Visit)
34/55
Date: 26th Nov 2010
Average PPRL: 15500 Current PPRL: 15184
Average MPRL: 6200 Current MPRL: 5776
Average Load Span: 9300
Current Load Span: 9408
Average Card Area:
Current Card Area: 4624.21
Echometer FAP:
1500(15/11/2010)
Calculated FAP: 179
DF Multiplier (Upstroke): 5
DF Multiplier (Downstroke):
6
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card
Cards with Kinks
Average Production: 28.15 bfpd Current Production:
3.80bfpd
Test Production Trend
34
-
8/8/2019 Analysis Report (Louis Ray Visit)
35/55
Well History:
High rod stresses were observed since 14th July. Distorted cards were
observed since 3rd August. After placing dead weights on the unit, better
cards were observed. HOC was carried out on well on 28th August, the
decrease in load values was observed just for 3 days. The load started
increasing from 31st August. The loads are now stable in a range of 7000 to
15000lbs.
Recommendations & performance (if any):
HOC was recommended for high rod stress and increasing loads.
Vibration check to check for distorted cards.
Remarks and Specific Observations
It has been observed that after placing of dead weights the vibrations have
reduced and better cards were observed. But recently cards with kinks are
obtained frequently. The well goes on Lo-Lo Load shut down. Vibration at the
start of upstroke has been confirmed from ONGC, ALS Dept.
35
-
8/8/2019 Analysis Report (Louis Ray Visit)
36/55
Well No: SK-95(Deviated Profile)
Date: 26th Nov 2010
Average PPRL: 14982 Current PPRL: 13152
Average MPRL: 4978 Current MPRL: 4576
Average Load Span: 10004
Current Load Span: 8576
Average Card Area:
Current Card Area: 4409
Echometer FAP: 1345
(11/24/2010)
Calculated FAP: -2131
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards after WOJ Current card after WOJ Card s showing rod part
Average Production: Cant be defined
as Nov. data is the first test data after project
commences.
Current Production:
15.07 bfpd
Test Production Trend
36
-
8/8/2019 Analysis Report (Louis Ray Visit)
37/55
Well History:
Rod part happened at the very start of project on 20 June. Well was under
workover since then and came back to normal operation on 26 October 2010.
Recommendations & performance (if any):
Recommendation for reducing the pump size and redesigning the rod string
from 3rd Nov 2010.
Remarks and Specific Observations
Continuously very high stress level is observed in rod string especially in 5/8
rod. May be chances of rod part again.
37
-
8/8/2019 Analysis Report (Louis Ray Visit)
38/55
Well No: SK-102
Date: 26th Nov 2010
Average PPRL: 9700 Current PPRL: 10272
Average MPRL: 8100 Current MPRL: 7648
Average Load Span: 1600
Current Load Span: 2624
Average Card Area:
Current Card Area: 1575
Echometer FAP: 4693
(10/21/2010)
Calculated FAP: 3021
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card
Average Production: 45 bfpd till
Sep; increasing trend after that
Current Production:
139.4 bfpd
Test Production Trend
38
NIL
SPM
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
39/55
Well History:
Nomajor interventions occurred in this well. Well is running under stable load
& stress values limits.
Recommendations & performance (if any):
Recommended for SPM increase to 4 from 27 July. SPM was increased in
steps from 1.8 to 2.25 to 2.75 and finally 4 as there was probability of sand
incursion.
Well has been consistently giving increased production as and when SPM is
increased as evident from the production trend.
Remarks and Specific Observations
NA
39
-
8/8/2019 Analysis Report (Louis Ray Visit)
40/55
Well No: SK-121(deviated)
Date: 26th Nov 2010
Average PPRL: 16800 Current PPRL: 17312
Average MPRL: 8750 Current MPRL: 8736
Average Load Span: 8050
Current Load Span: 8576
Average Card Area:
Current Card Area: 6413
Echometer FAP: -162
(10/06/2010)
Calculated FAP: 294
DF Multiplier (Upstroke): 17
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards showing TV
leakge
Current card showing TV
leakage
Card s with loss of load
during UPstroke
Average Production: 6 bfpd Current Production:
16.41 bfpd
Test Production Trend
40
-
8/8/2019 Analysis Report (Louis Ray Visit)
41/55
Well History:
HOC was done in the very beginning of the project as very high load and
stress values were observed. HOC was done subsequently but few days after
the HOC load and stress values again reached to the same level.
Recommendations & performance (if any):
Recommendation for valve check has been going since the start of the
project as it was very evident from the cards(TV leakage behavior).
Recommendation for reducing the pump size and redesigning the rod string
from 3rd Nov 2010
Remarks and Specific Observations
Continuously very high stress level is observed in rod string especially in 5/8
rod. May be chances of rod part.
41
-
8/8/2019 Analysis Report (Louis Ray Visit)
42/55
Well No: SK-122
Date: 26th Nov 2010
Average PPRL: 13900 Current PPRL: 14112
Average MPRL: 8200 Current MPRL: 8208
Average Load Span: 5700
Current Load Span: 5904
Average Card Area:
Current Card Area: 1968
Echometer FAP: 4603
(10/21/2010)
Calculated FAP: 3568
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
0.5
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card Distorted Cards
due to unit vibration
Average Production: 135 bfpd Current Production:
130.2 bfpd
Test Production Trend
42
SPM
-
8/8/2019 Analysis Report (Louis Ray Visit)
43/55
Well History:
SPM increased to 6.4 from 5.2 on 13th Aug 2010 and unit replaced.
HOC done on 9th Oct 2010 as frequency of distorted cards increased. Reason
inferred was downhole friction.
Skid changed on 13th Oct 2010 to reduce unit vibrations.
Chemical pushing job is done every month in this well by ONGC.
Recommendations & performance (if any):
Recommendation for SPM increase on 26th july. SPM was increased to 6.4
from 5.2 on 13 Aug.
Increase in production observed after SPM increase. Well is behaving very
stable and giving consistent production.
Recommendation for unit vibration check and balancing the unit is been
given as of now as more frequently distorted cards are observed. Action
pending.
Remarks and Specific Observations
Frequent observation of distorted cards due to unit vibrations. Also seen
physically in the field, vibrations in the unit.
43
-
8/8/2019 Analysis Report (Louis Ray Visit)
44/55
Well No: SK-124 (Deviated)
Date: 26th Nov 2010
Average PPRL: 13185 Current PPRL: 14224
Average MPRL: 6063 Current MPRL: 8496
Average Load Span: 7122
Current Load Span: 5728
Average Card Area:
Current Card Area: 1552.36
Echometer FAP: 1037
(10/11/10)
Calculated FAP: -1228
DF Multiplier (Upstroke): 1
DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card
Average Production: 22.22 bfpd
Current Production:
14.04 bfpd
Test Production Trend
44
NIL
-
8/8/2019 Analysis Report (Louis Ray Visit)
45/55
Well History:
Belt and Gear box problems were observed and repaired.
Recommendations & performance (if any):
Recommended for HOC due to high rod stress. HOC was done on 10th June
2010. No change in rod stresses was observed after that. It was subsequently
recommended for resize the pump and redesign the rod string on 3rd Nov.
2010. Action is still pending.
Remarks and Specific Observations
NIL
45
-
8/8/2019 Analysis Report (Louis Ray Visit)
46/55
Well No: SK-128
Date: 26th Nov 2010
Average PPRL: 10750 Current PPRL: 11024
Average MPRL: 7600 Current MPRL: 6976
Average Load Span: 3150
Current Load Span: 4048
Average Card Area:
Current Card Area: 1626.72
Echometer FAP: 1893
(10/14/10)
Calculated FAP: 1891
DF Multiplier (Upstroke): 1.8
DF Multiplier (Downstroke):
2.2
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card
Average Production: 15.65 bfpd Current Production: 0
bfpd
Test Production Trend
46
NIL
-
8/8/2019 Analysis Report (Louis Ray Visit)
47/55
Well History:
NIL
Recommendations & performance (if any):
The well was recommended to be tested on Independent flow line. But
production rate decreased on independent flow line. It Might be a case of
high back pressure.
Remarks and Specific Observations
NIL
47
-
8/8/2019 Analysis Report (Louis Ray Visit)
48/55
Well No: SK-135
Date: 19th Nov 2010
Average PPRL: 11000 Current PPRL: 11712
Average MPRL: 6473 Current MPRL: 8336
Average Load Span: 4527
Current Load Span: 3376
Average Card Area:
Current Card Area:
Echometer FAP: 2061
(10/21/2010)
Calculated FAP: 2235
DF Multiplier (Upstroke): 6
DF Multiplier (Downstroke):
0.9
Normal Card:
Current Card:
Special Card (if
any):
Cards with worn out
pump
Card with worn out pump Cards with gas lock
behaviour
Average Production: 30 bfpd
till june
Continuous decline
after that
Current Production: Nil as on
November
48
-
8/8/2019 Analysis Report (Louis Ray Visit)
49/55
Test Production Trend
49
-
8/8/2019 Analysis Report (Louis Ray Visit)
50/55
Well History:
From the production history graph shown above, it is clearly seen the rapid
production decline from June onwards. Well has been producing lot of gas.
Recommendations & performance (if any):
After observing gas lock tendency in cards; it was recommended to decrease
the SPM from 4.2 to 2.1. There was little bit improvement in cards but
production still not observed as such.
Remarks and Specific Observations
After doing pump reseating recently, production is observed in the well
site, but no production is observed in the test separator as told by
ONGC personnel.
50
-
8/8/2019 Analysis Report (Louis Ray Visit)
51/55
Well No: SK-136
Date: 20th Nov 2010
Average PPRL: 15300 Current PPRL: 0
Average MPRL: 7200 Current MPRL: 0
Average Load Span: 8100
Current Load Span: 0
Average Card Area:
Current Card Area:
Echometer FAP: 332
(10/14/2010)
Calculated FAP: 0
DF Multiplier (Upstroke): 2
DF Multiplier (Downstroke):
2
Well is currently shutdown since no production is observed &
polished rod getting heated.
Normal Card:
Current Card:
Special Card (if
any):
Cards with incomplete
fillage
Well not running
Cards after SPM reduction
Average Production: 40 bfpd
till june
Continuous decline
after that
51
-
8/8/2019 Analysis Report (Louis Ray Visit)
52/55
Current Production: Nil as on
November
Test Production Trend
52
-
8/8/2019 Analysis Report (Louis Ray Visit)
53/55
Well History:
From the production history graph shown above, it is clearly seen the rapid
production decline from June onwards. Well has been producing lot of gas.
Recommendations & performance (if any):
Recommendation for SPM reduction was given keeping in view to increase
the pump fillage, after that shape of the card changed as shown above in the
case of special card. Production was still not observed and polished rod was
getting heated. So it was decided to shut down the well.
Remarks and Specific Observations
Before SPM increase it was observed that fillage increases by 40-50% after
the well comes from its idle time (15mins). But those improved fillage cards
last for just 5 mins; after that again fillage goes back to 25%(as shown in
normal cards).
53
-
8/8/2019 Analysis Report (Louis Ray Visit)
54/55
Well No: SK-153
Date: 26th Nov 2010
Average PPRL: 11200 Current PPRL: 11296
Average MPRL: 7300 Current MPRL: 7552
Average Load Span: 3900
Current Load Span: 3744
Average Card Area:
Current Card Area: 2756.17
Echometer FAP: 5771
(10/4/10)
Calculated FAP: 1712
DF Multiplier (Upstroke): 1 DF Multiplier (Downstroke):
1
Normal Card:
Current Card:
Special Card (if
any):
Normal Cards Current card
Average Production: 83.52 bfpd Current Production:
79.12 bfpd
Test Production Trend
54
NIL
-
8/8/2019 Analysis Report (Louis Ray Visit)
55/55
Well History:
NIL
Recommendations & performance (if any):
NIL
Remarks and Specific Observations
Fluid has a water cut of 98%. As reported by ONGC, the well produces fluid
through the annulus while it is pumped and no production is observed from
the well otherwise.