    ANALYSIS REPORT

    Well No: SK-004

    Date: 18th Nov 2010

    Average PPRL: 11275 Current PPRL: 10928

    Average MPRL: 7177 Current MPRL: 7264

    Average Load Span: 4098

    Current Load Span: 3664

    Average Card Area:

    Current Card Area:

    Echometer FAP: 4500

    (8/13/2010)

    Calculated FAP: 3471

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with TV Leakage

    Card with TV Leakage

    Cards before WOJ

    Leakage

    Average Production: 23.8

    bfpd

    Current Production: 15.07

    bfpd (4.2.10)

    Test Production Trend

    1

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    2/55

    2

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    3/55

    Well History:

    Well got stuck-up on 29th June. It went on Work over on 17th October. After

    WOJ, the cards obtained depicted TV leakage.

    Recommendations & performance (if any):

    Pump reseating was recommended on 12th November and was reseated on

    13th November. No change in card shape observed after pump reseating.

    Remarks and Specific Observations

    A decreasing trend in well test production was observed even before project

    initiation.

    3

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    4/55

    Well No: SK-006

    Date: 26th Nov 2010

    Average PPRL: 8323 Current PPRL: 9136

    Average MPRL: 7427 Current MPRL: 8096

    Average Load Span: 896

    Current Load Span: 1040

    Average Card Area:

    Current Card Area:

    Echometer FAP: 5046

    (11/24/2010)

    Calculated FAP: 5004

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with TV closure

    problem

    Card with TV closure

    problem

    B efore WOJ ( No

    Production )

    Average Production: 11.39

    bfpd

    Current Production: 11.68

    bfpd (4.2.10)

    Test Production Trend

    4

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    5/55

    Well History:

    Well went on WOJ on 13th November 2010. Not much of change observed

    after work over.

    Recommendations & performance (if any):

    Travelling valve closure problem and/or worn out valves envisaged.

    Remarks and Specific Observations

    No production was observed in this well since the start of the project. Well

    was shut down for three months due to uneconomical producing rate.

    5

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    6/55

    Well No: SK-010

    Date: 26th Nov 2010

    Average PPRL: 12200 Current PPRL: 12512

    Average MPRL: 7950 Current MPRL: 7520

    Average Load Span: 4250

    Current Load Span: 4992

    Average Card Area:

    Current Card Area: 2569.96

    Echometer FAP (ft): 3878

    (10/25/10)

    Calculated FAP: 2409

    DF Multiplier (Upstroke):

    1.15

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Normal Card

    Average Production: 140

    bfpd

    Current Production: 152 bfpd

    Test Production Trend

    6

    NIL

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    7/55

    Well History:

    NIL

    Recommendations & performance (if any):

    Recommended for SPM increase on 26th July 10. Recommendation was kept in

    abeyance due to the well being stable at this SPM.

    Remarks and Specific Observations

    Production is stable since initiation of project.

    7

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    8/55

    Well No: SK-042

    Date: 29th Nov 2010

    Average PPRL: 11487 Current PPRL: 14176

    Average MPRL: 5678 Current MPRL: 7408

    Average Load Span: 5809

    Current Load Span: 6768

    Average Card Area:

    Current Card Area: 2864

    Echometer FAP (ft): 361

    (6/15/2010)

    Calculated FAP: 2327

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with split barrel Card with TV closure

    problem

    B efore Rod Stuck up

    Average Production: 13 bfpd

    (till June)

    Current Production: NIL (After

    WOJ)

    Test Production Trend

    8

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    9/55

    9

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    10/55

    Well History:

    Rod got stuck-up on 1st July 10 (just after the start of the project). Reason

    could not be inferred. Well came back from WOJ on 23rd August 10. HOC was

    done on 8th September 10. Prominent valve leakage and/or split barrel

    tendency was observed since then.

    Recommendations & performance (if any):

    Check for split barrel was recommended on 29th Sep. 2010 and the well was

    consequently shut down for another WOJ on 30th Aug. 2010.

    Remarks and Specific Observations

    No production has been observed since the WOJ.

    10

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    11/55

    Well No: SK-057

    Date: 29th Nov 2010

    Average PPRL: 13804 Current PPRL: 12864

    Average MPRL: 9010 Current MPRL: 7952

    Average Load Span: 4794

    Current Load Span: 4912

    Average Card Area:

    Current Card Area: 2282.57

    Echometer FAP (ft): 2856

    (11/24/2010)

    Calculated FAP: 1147

    DF Multiplier (Upstroke): 1 DF Multiplier (Downstroke):

    0.125

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with kinks Card showing kink in

    Down-stroke

    Flip card due to unit

    vibration

    Average Production: 15 bfpd Current Production: 18.85

    bfpd

    Test Production Trend

    11

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    12/55

    Well History:

    Frequent flip cards were observed till August 2010. Unit vibration check and

    repositioning was recommended and performed on 26th August 2010. Normal

    cards are obtained since then with kinks in the cards occasionally.

    Recommendations & performance (if any):

    Vibration check due to Flip cards was recommended as mentioned above.

    SPM reduction was recommended due to high gas interference, on 10th Oct.

    2010 and was reduced from 3.5 to 2.15 on 29th Oct. 2010. Cards showing

    better fillage have been observed since then.

    Remarks and Specific Observations

    Average production from this well is about 15 bfpd, the data for June, July and

    August 2010 are highly misleading (with productions of 47, 29 and 31 bfpd

    respectively).

    12

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    13/55

    Well No: SK-059

    Date: 29th Nov 2010

    Average PPRL: 13932 Current PPRL: 13056

    Average MPRL: 8564 Current MPRL: 7664

    Average Load Span: 5368

    Current Load Span: 5392

    Average Card Area:

    Current Card Area: 1559

    Echometer FAP (ft): NA

    (Annulus valve leakage)

    Calculated FAP: 36

    DF Multiplier (Upstroke): 1 DF Multiplier (Downstroke):

    0.8

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with Gas

    interference

    Card with gas

    interference

    Cards before & after SL

    change

    Average Production: 32 bfpd Current Production: 33.97

    bfpd

    Test Production Trend

    13

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    14/55

    Well History:

    No major Intervention job performed till now.

    Recommendations & performance (if any):

    SPM reduction from 3.2 to 2.5 and SL increase from 64 to 86 in was

    recommended on 10th Oct. 2010. SL was increased on 26th Oct. 2010.

    Increase in production has been observed after SL change.

    SPM reduced to 2.1 on 26th Nov. 2010. Well under observation.

    Remarks and Specific Observations

    The effective down-hole stroke length is very less as compared to surface

    stroke length (Sp/S=0.75).

    14

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    15/55

    Well No: SK-063

    Date: 29th Nov 2010

    Average PPRL: 16500 Current PPRL: 18592

    Average MPRL: 9700 Current MPRL: 8416

    Average Load Span: 6800

    Current Load Span: 10176

    Average Card Area:

    Current Card Area: 3253

    Echometer FAP (ft): 2592

    (10/19/10)

    Calculated FAP: -1363

    DF Multiplier (Upstroke): 2.8 DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with increasing

    card area

    Card with high card area Closed flow line

    valve

    Average Production: 39 bfpd Current Production: 40.06

    bfpd

    Test Production Trend

    15

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    16/55

    Well History:

    No major Intervention job performed till now.

    Recommendations & performance (if any):

    SPM reduction from 3.2 to 2.5 and SL increase from 64 to 86 in was

    recommended on 10th Oct. 2010. SL was increased on 17th Oct. 2010. Slight

    increase in production has been observed after SL change.

    Remarks and Specific Observations

    SPM reduction is pending. The effective down-hole stroke length is very less

    as compared to surface stroke length (Sp/S=0.75). Card area and load span

    (vertical well profile) are abnormally high and have been increasing

    gradually.

    16

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    17/55

    Well No: SK-066

    Date: 29th Nov 2010

    Average PPRL: 13000 Current PPRL: 14976

    Average MPRL: 9000 Current MPRL: 7984

    Average Load Span: 4000

    Current Load Span: 6992

    Average Card Area:

    Current Card Area: 2510

    Echometer FAP (ft): 840

    (10/14/10)

    Calculated FAP: -793

    DF Multiplier (Upstroke): 1 DF Multiplier (Down-stroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with incomplete

    fillage

    Card with incomplete

    fillage

    Tubing Leakage &

    2.1 SPM

    Average Production: 39.55

    bfpd

    Current Production: 20.75

    bfpd

    Test Production Trend

    17

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    18/55

    Well History:

    Well went on WOJ for Tubing leakage on 5th September 2010 and was

    put on RPc on 24th September 2010.

    Vibration was observed at well-site therefore, No: of counterweights

    were changed from 2 to 4 on 13th Oct. 2010.

    Skid leveling was done on 28th Oct. 2010.

    Recommendations & performance (if any):

    Check for tubing leakage was recommended on 5th July and was

    subsequently confirmed by ONGC from Pressure Build-up test on 9th

    July 2010.

    SPM increase was recommended on 1st Oct. 2010. It was increased

    from 2 to 4 on 8th Oct. 2010

    Remarks and Specific Observations

    Decreasing trend in FAP is observed.

    18

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    19/55

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    20/55

    Well History:

    Rod got stuck-up on 2nd Oct. 2010. HOC was done to release stuck-up on 3rd

    Oct. 2010. But, stuck-up could not be released and Well was under WOJ from

    29th Oct. 2010 to 14th Nov. 2010. Cards with valve leakage observed after

    WOJ. Installation of pump with service valves confirmed from ONGC.

    Recommendations & performance (if any):

    HOC was recommended due to high rod stress and card area on 14th Aug.

    2010. HOC was done on 17th Sep. 2010. No change in card shape was

    observed after that.

    Remarks and Specific Observations

    Decreasing trend well test production observed from May 2010 to September

    2010.

    20

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    21/55

    Well No: SK-73

    Date: 26th Nov 2010

    Average PPRL: 6800 Current PPRL: 7280

    Average MPRL: 4100 Current MPRL: 3520

    Average Load Span: 2700

    Current Load Span: 3760

    Average Card Area:

    Current Card Area: 1415.38

    Echometer FAP: 332

    (10/14/2010)

    Calculated FAP: 0

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards varying span Current card Flip cards

    Average Production: 148.5

    bfpd

    Current Production:

    171.13

    Test Production Trend

    21

    SPM

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    22/55

    Well History:

    Fluctuating trend in card area and load span was observed and Pulley

    was reported to be broken on 8th Sep. 2010.It was repaired on 10th

    Sep.

    Frequent flip cards were also observed and the unit was repositioned

    and balanced on 5th Sep. 2010.

    Frequent electrical panel and Motor problems were observed which

    can be attributed to Load fluctuations.

    Recommendations & performance (if any):

    Recommended for SPM increase from 6.5 to 8.5 on 28th July. SPM was

    increased on 27th August but due to abnormal increase in water cut it was

    reverted to 6.5 on 20th Sep. 2010.

    Remarks and Specific Observations

    Water cut values have been observed to be increasing but oil production is

    constant over time.

    22

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    23/55

    Well No: SK-78

    Date: 26th Nov 2010

    Average PPRL: 11350 Current PPRL: 11376

    Average MPRL: 5700 Current MPRL: 5728

    Average Load Span: 5650

    Current Load Span: 5648

    Average Card Area:

    Current Card Area: 2325.37

    Echometer FAP: 4107

    (11/25/2010)

    Calculated FAP: 3146

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card NIL

    Average Production: 138.61

    bfpd

    Current Production:

    190.9 bfpd

    Test Production Trend

    23

    NIL

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    24/55

    Well History:

    NIL

    Recommendations & performance (if any):

    Recommended for SPM increase from 5.5 to 7 on 28th July. SPM was increased

    on 2nd August.

    Remarks and Specific Observations

    Increasing trend in production has been observed since SPM increase.

    24

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    25/55

    Well No: SK-79

    Date: 26th Nov 2010

    Average PPRL: 11679 Current PPRL: 10496

    Average MPRL: 10802 Current MPRL: 8368

    Average Load Span: 877

    Current Load Span: 2128

    Average Card Area:

    Current Card Area: 1036.76

    Echometer FAP: 5353

    (11/15/2010)

    Calculated FAP: 4877

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card Cards with Kinks

    Average Production: 58.56 bfpd Current Production:

    105.5 bfpd

    Test Production Trend

    25

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    26/55

    Well History:

    Frequent flip cards due to vibration were observed. HOC was done on 31st

    Oct. 2010. No change in card shape observed.

    Recommendations & performance (if any):

    Recommended for SPM increase from 2 to 3 on 26th July. SPM was increased

    to 3.2 on 12th August 2010.

    Remarks and Specific Observations

    Kinks in cards still observed. Card span is fluctuating and the well also has

    flumping tendency.

    26

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    27/55

    Well No: SK-085 (Deviated)

    Date: 26th Nov 2010

    Average PPRL: 13650 Current PPRL: 12688

    Average MPRL: 8500 Current MPRL: 8240

    Average Load Span: 5100

    Current Load Span: 4448

    Average Card Area:

    Current Card Area: 2798.81

    Echometer FAP: 2110.69

    (25/11/2010)

    Calculated FAP: 2061

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards

    Current card

    Card before well shut

    down

    Average Production: 30.21

    bfpd

    Current Production: 12.56 bfpd

    (22.11.10)

    Test Production Trend

    27

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    28/55

    28

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    29/55

    Well History:

    Rod part on 1st July. Well was put on RPC on 19th August after workover. High

    rodstress observed and occasional kink seen in the card. Sudden decrease in

    Load span is seen from 4th November. The well has shown no production in

    November and is shutdown for workover by ONGC on 26th November.

    Recommendations & performance (if any):

    Reduce the pump size and redesign rod string.

    No build-up observed after recent water circulation. The well

    has been taken for WOJ.

    Remarks and Specific Observations

    Deep rod part suspected, due to sudden decrease in load span.

    29

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    30/55

    Well No: SK-86

    Date: 26th Nov 2010

    Average PPRL: 11527 Current PPRL: 12944

    Average MPRL: 7745 Current MPRL: 8320

    Average Load Span: 3782

    Current Load Span: 4624

    Average Card Area:

    Current Card Area: 1324

    Echometer FAP: 4541

    (10/19/2010)

    Calculated FAP: 2140

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards with gas

    interference

    Current card with gas

    interference

    Average Production: 18 bfpd Current Production:

    16.9 bfpd

    Test Production Trend

    30

    NIL

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    31/55

    Well History:

    Nomajor interventions occurred in this well. Well is running under stable load

    & stress values limits.

    Recommendations & performance (if any):

    Recommended for SPM decrease from 6 to 4 and stroke length increase from

    86in to 120in from 15th October to reduce the gas interference tendency.

    Action still pending.

    Remarks and Specific Observations

    Gas interference is observed in the cards right from the start of the project.

    31

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    32/55

    Well No: SK-92

    Date: 26th Nov 2010

    Average PPRL: 13000 Current PPRL: 12480

    Average MPRL: 7700 Current MPRL: 8352

    Average Load Span: 5300

    Current Load Span: 4128

    Average Card Area:

    Current Card Area: 2608

    Echometer FAP: 1515

    (11/24/2010)

    Calculated FAP: 1727

    DF Multiplier (Upstroke): 2.4

    DF Multiplier (Downstroke):

    0.8

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card Card s before & after SPM

    decr ease

    Average Production: 25 bfpd Current Production:

    22.83 bfpd

    Test Production Trend

    32

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    33/55

    Well History:

    Nomajor interventions occurred in this well. Well is running under stable load

    & stress values limits.

    Recommendations & performance (if any):

    Recommended for SPM decrease from 3.5 to 2.5 on 2nd Nov 2010. SPM was

    decreased to 1.8 on 16th November 2010. Fillage in cards improved a lot after

    SPM reduction but production has also gone down. Reason might decreasing

    SPM lower than what was recommended (2.5).

    Remarks and Specific Observations

    Test data of October and august is highly misleading.

    Well No: SK-093 (Vertical)

    33

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    34/55

    Date: 26th Nov 2010

    Average PPRL: 15500 Current PPRL: 15184

    Average MPRL: 6200 Current MPRL: 5776

    Average Load Span: 9300

    Current Load Span: 9408

    Average Card Area:

    Current Card Area: 4624.21

    Echometer FAP:

    1500(15/11/2010)

    Calculated FAP: 179

    DF Multiplier (Upstroke): 5

    DF Multiplier (Downstroke):

    6

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card

    Cards with Kinks

    Average Production: 28.15 bfpd Current Production:

    3.80bfpd

    Test Production Trend

    34

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    35/55

    Well History:

    High rod stresses were observed since 14th July. Distorted cards were

    observed since 3rd August. After placing dead weights on the unit, better

    cards were observed. HOC was carried out on well on 28th August, the

    decrease in load values was observed just for 3 days. The load started

    increasing from 31st August. The loads are now stable in a range of 7000 to

    15000lbs.

    Recommendations & performance (if any):

    HOC was recommended for high rod stress and increasing loads.

    Vibration check to check for distorted cards.

    Remarks and Specific Observations

    It has been observed that after placing of dead weights the vibrations have

    reduced and better cards were observed. But recently cards with kinks are

    obtained frequently. The well goes on Lo-Lo Load shut down. Vibration at the

    start of upstroke has been confirmed from ONGC, ALS Dept.

    35

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    36/55

    Well No: SK-95(Deviated Profile)

    Date: 26th Nov 2010

    Average PPRL: 14982 Current PPRL: 13152

    Average MPRL: 4978 Current MPRL: 4576

    Average Load Span: 10004

    Current Load Span: 8576

    Average Card Area:

    Current Card Area: 4409

    Echometer FAP: 1345

    (11/24/2010)

    Calculated FAP: -2131

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards after WOJ Current card after WOJ Card s showing rod part

    Average Production: Cant be defined

    as Nov. data is the first test data after project

    commences.

    Current Production:

    15.07 bfpd

    Test Production Trend

    36

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    37/55

    Well History:

    Rod part happened at the very start of project on 20 June. Well was under

    workover since then and came back to normal operation on 26 October 2010.

    Recommendations & performance (if any):

    Recommendation for reducing the pump size and redesigning the rod string

    from 3rd Nov 2010.

    Remarks and Specific Observations

    Continuously very high stress level is observed in rod string especially in 5/8

    rod. May be chances of rod part again.

    37

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    38/55

    Well No: SK-102

    Date: 26th Nov 2010

    Average PPRL: 9700 Current PPRL: 10272

    Average MPRL: 8100 Current MPRL: 7648

    Average Load Span: 1600

    Current Load Span: 2624

    Average Card Area:

    Current Card Area: 1575

    Echometer FAP: 4693

    (10/21/2010)

    Calculated FAP: 3021

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card

    Average Production: 45 bfpd till

    Sep; increasing trend after that

    Current Production:

    139.4 bfpd

    Test Production Trend

    38

    NIL

    SPM

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    39/55

    Well History:

    Nomajor interventions occurred in this well. Well is running under stable load

    & stress values limits.

    Recommendations & performance (if any):

    Recommended for SPM increase to 4 from 27 July. SPM was increased in

    steps from 1.8 to 2.25 to 2.75 and finally 4 as there was probability of sand

    incursion.

    Well has been consistently giving increased production as and when SPM is

    increased as evident from the production trend.

    Remarks and Specific Observations

    NA

    39

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    40/55

    Well No: SK-121(deviated)

    Date: 26th Nov 2010

    Average PPRL: 16800 Current PPRL: 17312

    Average MPRL: 8750 Current MPRL: 8736

    Average Load Span: 8050

    Current Load Span: 8576

    Average Card Area:

    Current Card Area: 6413

    Echometer FAP: -162

    (10/06/2010)

    Calculated FAP: 294

    DF Multiplier (Upstroke): 17

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards showing TV

    leakge

    Current card showing TV

    leakage

    Card s with loss of load

    during UPstroke

    Average Production: 6 bfpd Current Production:

    16.41 bfpd

    Test Production Trend

    40

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    41/55

    Well History:

    HOC was done in the very beginning of the project as very high load and

    stress values were observed. HOC was done subsequently but few days after

    the HOC load and stress values again reached to the same level.

    Recommendations & performance (if any):

    Recommendation for valve check has been going since the start of the

    project as it was very evident from the cards(TV leakage behavior).

    Recommendation for reducing the pump size and redesigning the rod string

    from 3rd Nov 2010

    Remarks and Specific Observations

    Continuously very high stress level is observed in rod string especially in 5/8

    rod. May be chances of rod part.

    41

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    42/55

    Well No: SK-122

    Date: 26th Nov 2010

    Average PPRL: 13900 Current PPRL: 14112

    Average MPRL: 8200 Current MPRL: 8208

    Average Load Span: 5700

    Current Load Span: 5904

    Average Card Area:

    Current Card Area: 1968

    Echometer FAP: 4603

    (10/21/2010)

    Calculated FAP: 3568

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    0.5

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card Distorted Cards

    due to unit vibration

    Average Production: 135 bfpd Current Production:

    130.2 bfpd

    Test Production Trend

    42

    SPM

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    43/55

    Well History:

    SPM increased to 6.4 from 5.2 on 13th Aug 2010 and unit replaced.

    HOC done on 9th Oct 2010 as frequency of distorted cards increased. Reason

    inferred was downhole friction.

    Skid changed on 13th Oct 2010 to reduce unit vibrations.

    Chemical pushing job is done every month in this well by ONGC.

    Recommendations & performance (if any):

    Recommendation for SPM increase on 26th july. SPM was increased to 6.4

    from 5.2 on 13 Aug.

    Increase in production observed after SPM increase. Well is behaving very

    stable and giving consistent production.

    Recommendation for unit vibration check and balancing the unit is been

    given as of now as more frequently distorted cards are observed. Action

    pending.

    Remarks and Specific Observations

    Frequent observation of distorted cards due to unit vibrations. Also seen

    physically in the field, vibrations in the unit.

    43

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    44/55

    Well No: SK-124 (Deviated)

    Date: 26th Nov 2010

    Average PPRL: 13185 Current PPRL: 14224

    Average MPRL: 6063 Current MPRL: 8496

    Average Load Span: 7122

    Current Load Span: 5728

    Average Card Area:

    Current Card Area: 1552.36

    Echometer FAP: 1037

    (10/11/10)

    Calculated FAP: -1228

    DF Multiplier (Upstroke): 1

    DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card

    Average Production: 22.22 bfpd

    Current Production:

    14.04 bfpd

    Test Production Trend

    44

    NIL

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    45/55

    Well History:

    Belt and Gear box problems were observed and repaired.

    Recommendations & performance (if any):

    Recommended for HOC due to high rod stress. HOC was done on 10th June

    2010. No change in rod stresses was observed after that. It was subsequently

    recommended for resize the pump and redesign the rod string on 3rd Nov.

    2010. Action is still pending.

    Remarks and Specific Observations

    NIL

    45

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    46/55

    Well No: SK-128

    Date: 26th Nov 2010

    Average PPRL: 10750 Current PPRL: 11024

    Average MPRL: 7600 Current MPRL: 6976

    Average Load Span: 3150

    Current Load Span: 4048

    Average Card Area:

    Current Card Area: 1626.72

    Echometer FAP: 1893

    (10/14/10)

    Calculated FAP: 1891

    DF Multiplier (Upstroke): 1.8

    DF Multiplier (Downstroke):

    2.2

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card

    Average Production: 15.65 bfpd Current Production: 0

    bfpd

    Test Production Trend

    46

    NIL

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    47/55

    Well History:

    NIL

    Recommendations & performance (if any):

    The well was recommended to be tested on Independent flow line. But

    production rate decreased on independent flow line. It Might be a case of

    high back pressure.

    Remarks and Specific Observations

    NIL

    47

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    48/55

    Well No: SK-135

    Date: 19th Nov 2010

    Average PPRL: 11000 Current PPRL: 11712

    Average MPRL: 6473 Current MPRL: 8336

    Average Load Span: 4527

    Current Load Span: 3376

    Average Card Area:

    Current Card Area:

    Echometer FAP: 2061

    (10/21/2010)

    Calculated FAP: 2235

    DF Multiplier (Upstroke): 6

    DF Multiplier (Downstroke):

    0.9

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with worn out

    pump

    Card with worn out pump Cards with gas lock

    behaviour

    Average Production: 30 bfpd

    till june

    Continuous decline

    after that

    Current Production: Nil as on

    November

    48

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    49/55

    Test Production Trend

    49

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    50/55

    Well History:

    From the production history graph shown above, it is clearly seen the rapid

    production decline from June onwards. Well has been producing lot of gas.

    Recommendations & performance (if any):

    After observing gas lock tendency in cards; it was recommended to decrease

    the SPM from 4.2 to 2.1. There was little bit improvement in cards but

    production still not observed as such.

    Remarks and Specific Observations

    After doing pump reseating recently, production is observed in the well

    site, but no production is observed in the test separator as told by

    ONGC personnel.

    50

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    51/55

    Well No: SK-136

    Date: 20th Nov 2010

    Average PPRL: 15300 Current PPRL: 0

    Average MPRL: 7200 Current MPRL: 0

    Average Load Span: 8100

    Current Load Span: 0

    Average Card Area:

    Current Card Area:

    Echometer FAP: 332

    (10/14/2010)

    Calculated FAP: 0

    DF Multiplier (Upstroke): 2

    DF Multiplier (Downstroke):

    2

    Well is currently shutdown since no production is observed &

    polished rod getting heated.

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Cards with incomplete

    fillage

    Well not running

    Cards after SPM reduction

    Average Production: 40 bfpd

    till june

    Continuous decline

    after that

    51

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    52/55

    Current Production: Nil as on

    November

    Test Production Trend

    52

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    53/55

    Well History:

    From the production history graph shown above, it is clearly seen the rapid

    production decline from June onwards. Well has been producing lot of gas.

    Recommendations & performance (if any):

    Recommendation for SPM reduction was given keeping in view to increase

    the pump fillage, after that shape of the card changed as shown above in the

    case of special card. Production was still not observed and polished rod was

    getting heated. So it was decided to shut down the well.

    Remarks and Specific Observations

    Before SPM increase it was observed that fillage increases by 40-50% after

    the well comes from its idle time (15mins). But those improved fillage cards

    last for just 5 mins; after that again fillage goes back to 25%(as shown in

    normal cards).

    53

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    54/55

    Well No: SK-153

    Date: 26th Nov 2010

    Average PPRL: 11200 Current PPRL: 11296

    Average MPRL: 7300 Current MPRL: 7552

    Average Load Span: 3900

    Current Load Span: 3744

    Average Card Area:

    Current Card Area: 2756.17

    Echometer FAP: 5771

    (10/4/10)

    Calculated FAP: 1712

    DF Multiplier (Upstroke): 1 DF Multiplier (Downstroke):

    1

    Normal Card:

    Current Card:

    Special Card (if

    any):

    Normal Cards Current card

    Average Production: 83.52 bfpd Current Production:

    79.12 bfpd

    Test Production Trend

    54

    NIL

  • 8/8/2019 Analysis Report (Louis Ray Visit)

    55/55

    Well History:

    NIL

    Recommendations & performance (if any):

    NIL

    Remarks and Specific Observations

    Fluid has a water cut of 98%. As reported by ONGC, the well produces fluid

    through the annulus while it is pumped and no production is observed from

    the well otherwise.