UK OP Rhyl Flats 8km Abergele North Wales 25
UK UC Greater Gabbard 26km off Orford, Suffolk Thames Estuary 140
UK UC Gwynt y Mor 13km off the North Wales coast North Wales 160
UK AS Galloper FW (extension t 27 km off the Suffolk coast Thames Estuary 140
UK AS Triton Knoll Greater Wash Greater Wash < 288
UK PL Dogger Bank approx 125-195 km off the Yorkshire coast North Sea
UK PL Atlantic Array OWF outer Bristol Channel South West 250
B OP OperationalB OP Thornton Bank - Phase 1 (Pilot) 30 km in the North Sea off the Belgian coast Belgique 6
B OP Thornton Bank - Phase 2 30 km in the North Sea off the Belgian coast Belgique 48
D PL Nordsee Ost 1 40 km north of the North Sea island of Juist Germany 40 26-34 162
Offshore Wind Farms
# of
Turbines
Depth
(m)
dist. to
shore
(km)
Wind farm Location Region
-
8/2/2019 Anlisis Sector Offshore v1.2
2/18
Wind farm Location
--------------------------------------------------------------------------------------------------------------
OperationalThornton Bank - Phase 1 (Pilot) 30 km in the North Sea off the Belgian coast
Thornton Bank - Phase 2 30 km in the North Sea off the Belgian coast
Under Construction
Approved
Application Submitted
Offshore Wind Farms
-
8/2/2019 Anlisis Sector Offshore v1.2
3/18
Region Turbines Power Manuf MW PEM ~HEN
---------------------------------------------------------------------------------------------------------------
Belgique 6 5 Repowe 30.0 Jun'09
Belgique 48 6.15 Repowe 295.2
-
8/2/2019 Anlisis Sector Offshore v1.2
4/18
Developer (Consorcio)
----------------------------------------------------
C-Power (a group of 4 reputable Belgian shareholder
C-Power
Siemens
ScottishPower
SSERenewable
Centrica
DONGEnergy
E.ONUK
Vattenfall
RWENpower
-
8/2/2019 Anlisis Sector Offshore v1.2
5/18
Company Share Company Share Company Share WEB
Partner 1 Partner 2 Partner 3
-
8/2/2019 Anlisis Sector Offshore v1.2
6/18
G11X 115m 75 -110m 5.0 MW
G14X - - 6 - 7 MW
Bard Bard 5.0 122m 90m 5.0 MW
SWT-3.6-120 120m 3.60 MW
SWT-6.0-120 120m 5.0 MW
Mingyang 6.50 MW
Gamesa
Siemens
Dimetro
RotorFabricante Modelo PotenciaAltura Buje
-
8/2/2019 Anlisis Sector Offshore v1.2
7/18
Prototipo Comercial
4Q'12
(E.ON) 2013
- 2014
Generador asncrono doblemente
alimentado con multiplicadora de 2
etapas.
20102011
Bard Offshore 1
2Q'11 2014
Multiplicadora de 2 etapas y sistema
elctrico redundante basado en (a)
generador sncrono de imanes
permanentes y (b) full converter
"Direct-drive" con generador sncrono
de imanes permanentes y (b) full
converter
DisponibilidadTecnologa
-
8/2/2019 Anlisis Sector Offshore v1.2
8/18
PrototipoPrimer Lote
< 20
AREVA M5000
BARD 6.5 BARD 5.0
REpower 6M(6.15MW, r=126m)
3 prot@'13
SWT-6.0-120(previsto rotor 150m)
Direct-drive
SL 6000 SL5000
V112-3.0MW
2011 2012
ECO 150 6MW
Haliade 150 - 6MW
Direct-drive1 prot@Mar'12 @Carnet
(cerca de Saint-Nazaire)
Britannia
7 / 10MWr=150m
G128 - 4.5 MW
GE 4.1 - 113
Direct-drive
Resumen de Situacin Actua
Disponibilidad de Pr
-
8/2/2019 Anlisis Sector Offshore v1.2
9/18
5.5 MW
N150/6MWDirect-drive
r=150m
V164 - 7.0 MW
(China)
DD115-5MW
Direct-drive
AMSC Windtech (US)
Goldwind6M
Direct-drive
Sway (Norway)10M
Direct-drive
-
8/2/2019 Anlisis Sector Offshore v1.2
10/18
Primera Serie
< 100
Produccin en Serie >
200
REpower 5M1 prot@oct'04 (r=126m)
In Operation @Mar'12:
44 offshore + 11 onshore
SWT-3.6-120 SWT-3.6-107
SL3000/90
V90-3.0MWV164-
7.0MW
2013 2014
6MW Haliade:
Produccin en serie
G14X (6 - 7 MW)
l de Aeros MultiMW Offshore
totipos Anunciados
-
8/2/2019 Anlisis Sector Offshore v1.2
11/18
6 7 MW DD
10MW SeaTitanr=190
-
8/2/2019 Anlisis Sector Offshore v1.2
12/18
Developer/s Id Pas Regin MW
Ming Yang Wind W. Power Somovit Bulgaria Somovit 4.5 MW
Ming Yang Wind A1 Development Milkovitsa Bulgaria Pleven (north of 120.0 MW
Goldwind Mainstream RenewablNegrete Cuel (centrChile Negrete Cuel 34.5 MW
Goldwind Mainstream RenewablShady Oaks USA Shady Oaks 109.0 MWGoldwind CELEC (Ecuador's electricity corporation) Ecuador
Vestas Vestas Talinay Oriente WF Chile Limari 100.0 MW
Developer/s Id Pas Regin MW
Sinovel Huaneng Renewables Lingang China Lingang waters, 102.0 MW
OFFSHOREDatos Proyecto
ONSHOREDatos Proyecto
-
8/2/2019 Anlisis Sector Offshore v1.2
13/18
Aero #Aer Alcance Finance
1.5 MW 3 EPC 6-Feb Jul '12
1.5 MW 80 EPC Dec '12
GW87-1,5MW 23 CDB
GW87-1,5MW Co-developAug '12
Aero #Aer Alcance Finance
6.0 MW 17
Signed 1st ShipmentPlanned
Start
Planned
Commissioning
Signed 1st ShipmentPlanned
Start
Planned
Commissioning
-
8/2/2019 Anlisis Sector Offshore v1.2
14/18
120207 China Ming Yang To Supply Turbines For Bulgarian Wind Projects
120207 China Ming Yang To Supply Turbines For Bulgarian Wind Projects
111209 Goldwind to build Mainstream Chilean project
111209 Goldwind to build Mainstream Chilean project111209 Goldwind to build Mainstream Chilean project
111209 Goldwind to build Mainstream Chilean project
111121 Mingyang finalises testing on 6.5MW offshore turbine
120202 Sinovel to roll out 6MW offshore turbine at Shanghai
NdP
NdP
-
8/2/2019 Anlisis Sector Offshore v1.2
15/18
gearboxelectrical
systems
power
electronics.InterArray Export
Repower 5M/6M 4-8% 30%
FAILURE RATES
Modelo
-
8/2/2019 Anlisis Sector Offshore v1.2
16/18
120227 Close up - Repower's Axel Birk on offshore turbine development
FUENTE
-
8/2/2019 Anlisis Sector Offshore v1.2
17/18
http://www.bwea.com/ukwed/offshore.asp
http://www.bwea.com/ukwed/offshore.asphttp://www.bwea.com/ukwed/offshore.asp -
8/2/2019 Anlisis Sector Offshore v1.2
18/18
Top Head Mass = nacelle + rotor
http://www.bwea.com/ukwed/offshore.asp