12
HARGA SATUAN HARGA BAHAN HARGA UPAH JUMLAH ( Rp.) (Rp.) (Rp.) HARGA (Rp.) 1 4 5 6 7 1 1.000 M' Pengukuran & pemasangan bouwplank 0.012 M 3 Kayu usuk 5/7 ( kruwing ) 3,500,000.00 42,000.00 42,000.00 0.020 Kg Paku reng 16,000.00 320.00 320.00 0.007 M 3 Kayu papan 3/20 ( meranti ) 3,000,000.00 21,000.00 21,000.00 0.100 Oh Tukang kayu 85,000.00 8,500.00 8,500.00 0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00 0.010 Oh Kepala tukang kayu 90,000.00 900.00 900.00 0.005 Oh Mandor 95,000.00 475.00 475.00 Total : 63,320.00 16,375.00 79,695.00 II PEKERJAAN TANAH 1 1.000 M 3 Galian tanah biasa sedalam 1 meter 0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00 0.040 Oh Mandor 95,000.00 3,800.00 3,800.00 Total : 29,800.00 29,800.00 2 1.000 M 3 Urugan kembali 0.192 Oh Pekerja 65,000.00 12,480.00 12,480.00 0.019 Oh Mandor 95,000.00 1,805.00 1,805.00 Total : 14,285.00 14,285.00 3 1.000 M 3 Pemadatan tanah 0.500 Oh Pekerja 65,000.00 32,500.00 32,500.00 0.050 Oh Mandor 95,000.00 4,750.00 4,750.00 Total : 37,250.00 37,250.00 4 1.000 M 3 Urugan pasir 3 ANALISA HARGA SATUAN NO URAIAN 4 1.000 M Urugan pasir 1.200 M 3 Pasir urug 50,000.00 60,000.00 60,000.00 0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.010 Oh Mandor 95,000.00 950.00 950.00 Total : 60,000.00 20,450.00 80,450.00 5 1.000 M 3 Urugan sirtu 1.200 M 3 Sirtu di bawah lantai 70,728.00 84,873.60 84,873.60 0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00 0.025 Oh Mandor 95,000.00 2,375.00 2,375.00 Total : 84,873.60 18,625.00 103,498.60 6 1.000 M 3 Urugan tanah 1.200 M 3 Tanah urug 40,000.00 48,000.00 48,000.00 0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00 0.010 Oh Mandor 95,000.00 950.00 950.00 Total : 48,000.00 20,450.00 68,450.00

Upload: igung-asta

Post on 27-Sep-2015

3 views

Category:

Documents


1 download

DESCRIPTION

tugas rab

TRANSCRIPT

  • HARGA SATUAN HARGA BAHAN HARGA UPAH JUMLAH( Rp.) (Rp.) (Rp.) HARGA (Rp.)

    1 4 5 6 7

    1 1.000 M' Pengukuran & pemasangan bouwplank

    0.012 M3

    Kayu usuk 5/7 ( kruwing ) 3,500,000.00 42,000.00 42,000.000.020 Kg Paku reng 16,000.00 320.00 320.00

    0.007 M3

    Kayu papan 3/20 ( meranti ) 3,000,000.00 21,000.00 21,000.000.100 Oh Tukang kayu 85,000.00 8,500.00 8,500.000.100 Oh Pekerja 65,000.00 6,500.00 6,500.000.010 Oh Kepala tukang kayu 90,000.00 900.00 900.000.005 Oh Mandor 95,000.00 475.00 475.00

    Total : 63,320.00 16,375.00 79,695.00II PEKERJAAN TANAH1 1.000 M

    3Galian tanah biasa sedalam 1 meter

    0.400 Oh Pekerja 65,000.00 26,000.00 26,000.000.040 Oh Mandor 95,000.00 3,800.00 3,800.00

    Total : 29,800.00 29,800.00

    2 1.000 M3

    Urugan kembali0.192 Oh Pekerja 65,000.00 12,480.00 12,480.000.019 Oh Mandor 95,000.00 1,805.00 1,805.00

    Total : 14,285.00 14,285.00

    3 1.000 M3

    Pemadatan tanah0.500 Oh Pekerja 65,000.00 32,500.00 32,500.000.050 Oh Mandor 95,000.00 4,750.00 4,750.00

    Total : 37,250.00 37,250.00

    4 1.000 M3

    Urugan pasir

    3

    ANALISA HARGA SATUAN

    NO URAIAN

    4 1.000 M3

    Urugan pasir

    1.200 M3

    Pasir urug 50,000.00 60,000.00 60,000.000.300 Oh Pekerja 65,000.00 19,500.00 19,500.000.010 Oh Mandor 95,000.00 950.00 950.00

    Total : 60,000.00 20,450.00 80,450.005 1.000 M

    3Urugan sirtu

    1.200 M3

    Sirtu di bawah lantai 70,728.00 84,873.60 84,873.600.250 Oh Pekerja 65,000.00 16,250.00 16,250.000.025 Oh Mandor 95,000.00 2,375.00 2,375.00

    Total : 84,873.60 18,625.00 103,498.60

    6 1.000 M3

    Urugan tanah

    1.200 M3

    Tanah urug 40,000.00 48,000.00 48,000.000.300 Oh Pekerja 65,000.00 19,500.00 19,500.000.010 Oh Mandor 95,000.00 950.00 950.00

    Total : 48,000.00 20,450.00 68,450.00

  • HARGA SATUAN HARGA BAHAN HARGA UPAH JUMLAH( Rp.) (Rp.) (Rp.) HARGA (Rp.)

    1 4 5 6 73

    NO URAIAN

    III PEKERJAAN PONDASI

    1 1.000 M3

    Pasang pondasi batu kali 1 Pc : 5 Ps

    1.100 M3

    Batu kali 110,000.00 121,000.00 121,000.00136.000 Kg Semen portland 1,020.00 138,720.00 138,720.00

    0.544 M3

    Pasir pasangan 135,000.00 73,440.00 73,440.001.500 Oh Pekerja 65,000.00 97,500.00 97,500.000.600 Oh Tukang batu 85,000.00 51,000.00 51,000.000.060 Oh Kepala Tukang 90,000.00 5,400.00 5,400.000.075 Oh Mandor 95,000.00 7,125.00 7,125.00

    Total : 333,160.00 161,025.00 494,185.00

    2 1.000 M3

    Pasangan pondasi batu kosong

    1.200 M3

    Batu kali 110,000.00 132,000.00 132,000.00

    0.300 M3

    Pasir urug 50,000.00 15,000.00 15,000.000.780 Oh Pekerja 65,000.00 50,700.00 50,700.000.390 Oh Tukang batu 85,000.00 33,150.00 33,150.000.039 Oh Kepala Tukang 90,000.00 3,510.00 3,510.000.039 Oh Mandor 95,000.00 3,705.00 3,705.00

    Total : 147,000.00 91,065.00 238,065.00

    3 1.000 M2

    Pasang bekisting untuk pondasi

    0.040 M3

    Kayu terentang (Albesia) 1,112,500.00 44,500.00 44,500.000.300 Kg Paku usuk 16,000.00 4,800.00 4,800.000.100 Ltr Minyak bekisting 23,287.50 2,328.75 2,328.750.300 Oh Pekerja 65,000.00 19,500.00 19,500.000.260 Oh Tukang kayu 85,000.00 22,100.00 22,100.000.026 Oh Kepala Tukang 90,000.00 2,340.00 2,340.000.005 Oh Mandor 95,000.00 475.00 475.00

    Total : 51,628.75 44,415.00 96,043.750.005 Oh Mandor 95,000.00 475.00 475.00

    Total : 51,628.75 44,415.00 96,043.75

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

  • HARGA SATUAN HARGA BAHAN HARGA UPAH JUMLAH( Rp.) (Rp.) (Rp.) HARGA (Rp.)

    1 4 5 6 73

    NO URAIAN

  • Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

  • Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

  • Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

  • Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

  • Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

  • Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI

    Denpasar, 9 Maret 2015Dibuat oleh,

    SETIAWAN ZEBUADONI