wurster studio608 portfolio

Post on 07-Apr-2016

224 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

Max Wurster - Studio 608 Portfolio - Fall 2014

`

8th

STR

EET

RED

EVLO

PMEN

T

8th East

Continued from phase two the 8th Street Redevelopment seeks to integrated required program into the downtown fabric of Lawrence Kansas. The site, located between Massachusetts and Vermont Street along the new pedestrian zoned 8th Street, is in a high traffic area. The problem statement left open 3000 sqft to be assigned as seen fit. The 8th Street Redevelopment contains a ‘Maker’s Space’ as the open program. This program compliments the 9th Street Corridor Project currently under development and also supports the Warehouse Arts district of Lawrence. The main idea of the proposal is to incorporate passive and active ‘green’ strategies, provide a conditioned exterior space, and to create a dialogue between the adjacent buildings mainly the revamped Fire Station.

1 | Wurster

Axis Plaza Two Story Bar

PRECEDENTS

WMS BOATHOUSE

USINA DEL ARTE

BOMBAY SAPPHIRE

SITE PLAN

AXIS GENESIS AXIS DEVELOPMENT TRAFFIC CALMING

Wurster | 2

Office Axis Conditioned Space

FIRST FLOORTHIRD FLOOR OF 123 W. 8TH

SECOND FLOOR

SPLIT FORM

SAWTOOTH GENERATION

FOLDED SAWTOOTH

3 | Wurster

8TH STREET ELEVATION

AXIS ELEVATION - SOUTH

VERMONT ELEVATION

Wurster | 4EXPLODED AXON - LOBBY CORNER

5 | Wurster

STEEL FRAME

Wurster | 6

PASSIVE AND ACTIVE ‘GREEN’ SYSTEMSGEOTHERMALSOLAR PANELS & LOUVERS

7 | Wurster

EAST WEST SECTION - SOUTH

NORTH SOUTH SECTION - WEST

NORTH SOUTH SECTION - EAST

Wurster | 8Maker’s Space

9 | Wurster

PHASE II - 8TH STREET CORRIDOR

Wurster | 10

PHASE III - CLOSE UP OF BUILDING

11 | Wurster

PHASE III - GREEN SPACE

Wurster | 12

PHASE III - OVERALL

13 | Wurster

PHASE III - SECTION MODEL

Wurster | 14

13 | Wurster

Wurster | 14

`

Phase II was completed by Allison Wilke and Max Wurster. The design was a combined effort of both parties. We divided the production on the final work such that Allison created the board layout and the content with help by Max. The model was generated, laser cut, and assembled by Max with help by Allison.LA

WR

ENC

E M

AST

ER P

LAN

NIN

G

PHASE II - FIRE STATION REVAMP

PHASE II - CASE STUDY

`

PHASE II - CASE STUDY

PHASE II - RESEARCH

`

PHASE II - PLAN

PHASE II - 8TH STREET

`

PHASE II - RENDERINGS

`

`

top related