workover rig fbu20 - gasoil · pdf fileworkover workover rig fbu20 ... workover rig, but...

Post on 04-Feb-2018

354 Views

Category:

Documents

9 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Workover

Workover Rig FBU2020t Flush By Unit

Well ServicesWorkover operations and well stimulations

• controlled working unit• safer

• faster• more cost-effective

designed to perform well repairs and well stimulation

20t Flush By Unit

The Workover Unit „ FBU20 “ is designed to perform well repairs and well stimulations and is used for the following operations:

• General w orkover operations

• Well stimulations

• Assembling/ disassembling of piping and pump supports

• Preparation of production w ells for special treatment (e.g. Frac)

• Pump and circulation operations

The advantages of the Flush By Unit FBU20 • The Flush By Unit is typically used to perform

the same function as a fully outf itted w orkover rig, but limited to shallow w ells.

• The unit is much easier and faster to move and set up, and are typically manned by few er operators then conventional w orkoverrigs.

• Flush By Units are much more adaptable to customer’s unique requirements.

C.A.T. Flush By Unit

Technical Data

• Mast w ith crow nblock• Draw w orks winch• Auxiliary w inch• Triplex High Pressure Pump• Booster pump and circulation pump• High and Low Pressure Manifold• 2 Fluid tanks (2 x 3 m³)• Working platform and operator panel• Cable braces to the chassis• Additional 400l diesel tank

Carrier VehicleDaimler ACTROS 4141 AK 8x8/4Engine pow er (V6) 408 PSMax. technical axle load: 9/9/13/13 tWeight variant: 44,0 t

DimensionsLength 11,5 mWidth 2,65 mHeight 4,0 mTotal Weight 33,8 tMast overhang 1,54m Mast

Telescopic mastMast length (extended): 14,0 mFree height over ground: 16,9 mMax. w orking length: 13,5 m

Hook LoadMax. Hook Load 200 KN

hydraulically driven

MastThe mast consists of tw o parts – an exterior bottom section and an internal top section. Mast grade: 9°

DrawworkSlow Forw ard SpeedMax. rope speed: 1,32 m/s

High Forw ard or Backup SpeedMax. rope speed: 6,2 m/s

Main Components

Operator Control Panel

Controls:Signal: Telescoping mast lockedSignal: Crow n saver ONSignal: Failure plunger lubrication

Indications:DrillometerPump rate „Triplex Pump“Pressure „Triplex Pump“Truck RPM Truck oil pressureTruck w ater temperature

Operation:Lighting system On/OffTongs (hydraulic) On/OffSelector: Pow er SPM Pump and Main Winch (100% -60%/40%-100%)Truck RPM (+/-)Throttle Triplex Pump RPMThrottle Booster Pump RPM Throttle Circulation Pump RPM Emergency stop sw itchDraw w orks winchDraw w ork winch slow/fastAuxiliary w inch

Working Platform

workover operations

Carrier VehicleThe w hole w orkover unit w ith the mast is mounted on a 4-axle chassis of “Mercedes-Benz ACTROS 4141 AK.Dimensions and axle loads allow an easy moving on public roads, as w ell as in the f ield.

Power UnitThe diesel engine of the Mercedes truck is used to drive the w orkover unit. The diesel engine pow ers the hydraulic pumps by means of the PTO (via cardan shaft). The hydraulic pumps drive all hydraulic components.

Triplex PumpSPM TWS 600Plunger diameter: 3”Drive hydraulicMax. input pow er: 600 BHP / 447 KWStroke: 6” / 152.4 mmLubrication: Fluid and Pow er End

Loading PumpGear pumpQ max. 800l/minp max. 7 bar

Booster PumpCentrifugal pumpQ max. 1000l/minp max. 5 bar

Fluid TanksTanks: 2 pcs.Material: Stainless steelCapacity: 2850 lTotal capacity: 5700 l

Discharge PipingPipe diameter: 2”Pressure resistance: 10000 psi2” Relief valve 3500 psi2” Plug valves2” Safety valve

Suction Piping4“ Pipes w ith 4“ butterf ly valves

Well Stimulation- Workover Operationmore cost-effective

Bro

chur

eF

lush

By

Uni

t

FB

U20

O

ct.

2009

ProblemSeveral problems can arise at w ell sites. Rods can break dow n-hole due to additional torque caused by sand or corrosion, leaks can develop, or pumps need to be replaced. Service rigs can be very expense, so you need a cost-effective, yet versatile solution to provide various dow n-hole w ell services.

C.A.T. Engineering

Consulting-Agency-TradeC.A.T. GmbH Phone: +49 (0)5141-9895 0

Vorbruch 6 Fax: +49 (0)5141-9895 6029227 Celle info@consulting-agency-trade.de

Germany w ww.consulting-agency-trade.de

AdvantageEffective Workover operations and well stimulationsThe C.A.T. Flush By Unit FBU20 includes a holding tank and triplex pump; contaminants (sand) can be circulated out of the w ell. The unit also used extensively to circulate solvents or other chemicals, to remove paraff in and asphaltene.

The Flush By Unit can f ix rod breaks, replace polish rods, pack leaks, trip rods and pump out of the w ell, also the tubings, f lush sanded-off or w axed-off wells, change pumps or drive units as w ell as various w ell trouble-shooting that can maximize your w ell production.

• European Chassis w ith licence

• CE conformity

• 4 axle 8x8

• compact, strong

• fast

solutions

top related