workover rig fbu20 - gasoil · pdf fileworkover workover rig fbu20 ... workover rig, but...

6
Workover Workover Rig FBU20 20t Flush By Unit Well Services Workover operations and well stimulations controlled working unit • safer • faster • more cost-effective

Upload: hoangkiet

Post on 04-Feb-2018

354 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: Workover Rig FBU20 - Gasoil  · PDF fileWorkover Workover Rig FBU20 ... workover rig, but limited to ... Germany   Advantage Effective Workover operationsandwell

Workover

Workover Rig FBU2020t Flush By Unit

Well ServicesWorkover operations and well stimulations

• controlled working unit• safer

• faster• more cost-effective

Page 2: Workover Rig FBU20 - Gasoil  · PDF fileWorkover Workover Rig FBU20 ... workover rig, but limited to ... Germany   Advantage Effective Workover operationsandwell

designed to perform well repairs and well stimulation

20t Flush By Unit

The Workover Unit „ FBU20 “ is designed to perform well repairs and well stimulations and is used for the following operations:

• General w orkover operations

• Well stimulations

• Assembling/ disassembling of piping and pump supports

• Preparation of production w ells for special treatment (e.g. Frac)

• Pump and circulation operations

The advantages of the Flush By Unit FBU20 • The Flush By Unit is typically used to perform

the same function as a fully outf itted w orkover rig, but limited to shallow w ells.

• The unit is much easier and faster to move and set up, and are typically manned by few er operators then conventional w orkoverrigs.

• Flush By Units are much more adaptable to customer’s unique requirements.

Page 3: Workover Rig FBU20 - Gasoil  · PDF fileWorkover Workover Rig FBU20 ... workover rig, but limited to ... Germany   Advantage Effective Workover operationsandwell

C.A.T. Flush By Unit

Technical Data

• Mast w ith crow nblock• Draw w orks winch• Auxiliary w inch• Triplex High Pressure Pump• Booster pump and circulation pump• High and Low Pressure Manifold• 2 Fluid tanks (2 x 3 m³)• Working platform and operator panel• Cable braces to the chassis• Additional 400l diesel tank

Carrier VehicleDaimler ACTROS 4141 AK 8x8/4Engine pow er (V6) 408 PSMax. technical axle load: 9/9/13/13 tWeight variant: 44,0 t

DimensionsLength 11,5 mWidth 2,65 mHeight 4,0 mTotal Weight 33,8 tMast overhang 1,54m Mast

Telescopic mastMast length (extended): 14,0 mFree height over ground: 16,9 mMax. w orking length: 13,5 m

Hook LoadMax. Hook Load 200 KN

hydraulically driven

Page 4: Workover Rig FBU20 - Gasoil  · PDF fileWorkover Workover Rig FBU20 ... workover rig, but limited to ... Germany   Advantage Effective Workover operationsandwell

MastThe mast consists of tw o parts – an exterior bottom section and an internal top section. Mast grade: 9°

DrawworkSlow Forw ard SpeedMax. rope speed: 1,32 m/s

High Forw ard or Backup SpeedMax. rope speed: 6,2 m/s

Main Components

Operator Control Panel

Controls:Signal: Telescoping mast lockedSignal: Crow n saver ONSignal: Failure plunger lubrication

Indications:DrillometerPump rate „Triplex Pump“Pressure „Triplex Pump“Truck RPM Truck oil pressureTruck w ater temperature

Operation:Lighting system On/OffTongs (hydraulic) On/OffSelector: Pow er SPM Pump and Main Winch (100% -60%/40%-100%)Truck RPM (+/-)Throttle Triplex Pump RPMThrottle Booster Pump RPM Throttle Circulation Pump RPM Emergency stop sw itchDraw w orks winchDraw w ork winch slow/fastAuxiliary w inch

Working Platform

workover operations

Page 5: Workover Rig FBU20 - Gasoil  · PDF fileWorkover Workover Rig FBU20 ... workover rig, but limited to ... Germany   Advantage Effective Workover operationsandwell

Carrier VehicleThe w hole w orkover unit w ith the mast is mounted on a 4-axle chassis of “Mercedes-Benz ACTROS 4141 AK.Dimensions and axle loads allow an easy moving on public roads, as w ell as in the f ield.

Power UnitThe diesel engine of the Mercedes truck is used to drive the w orkover unit. The diesel engine pow ers the hydraulic pumps by means of the PTO (via cardan shaft). The hydraulic pumps drive all hydraulic components.

Triplex PumpSPM TWS 600Plunger diameter: 3”Drive hydraulicMax. input pow er: 600 BHP / 447 KWStroke: 6” / 152.4 mmLubrication: Fluid and Pow er End

Loading PumpGear pumpQ max. 800l/minp max. 7 bar

Booster PumpCentrifugal pumpQ max. 1000l/minp max. 5 bar

Fluid TanksTanks: 2 pcs.Material: Stainless steelCapacity: 2850 lTotal capacity: 5700 l

Discharge PipingPipe diameter: 2”Pressure resistance: 10000 psi2” Relief valve 3500 psi2” Plug valves2” Safety valve

Suction Piping4“ Pipes w ith 4“ butterf ly valves

Well Stimulation- Workover Operationmore cost-effective

Page 6: Workover Rig FBU20 - Gasoil  · PDF fileWorkover Workover Rig FBU20 ... workover rig, but limited to ... Germany   Advantage Effective Workover operationsandwell

Bro

chur

eF

lush

By

Uni

t

FB

U20

O

ct.

2009

ProblemSeveral problems can arise at w ell sites. Rods can break dow n-hole due to additional torque caused by sand or corrosion, leaks can develop, or pumps need to be replaced. Service rigs can be very expense, so you need a cost-effective, yet versatile solution to provide various dow n-hole w ell services.

C.A.T. Engineering

Consulting-Agency-TradeC.A.T. GmbH Phone: +49 (0)5141-9895 0

Vorbruch 6 Fax: +49 (0)5141-9895 6029227 Celle [email protected]

Germany w ww.consulting-agency-trade.de

AdvantageEffective Workover operations and well stimulationsThe C.A.T. Flush By Unit FBU20 includes a holding tank and triplex pump; contaminants (sand) can be circulated out of the w ell. The unit also used extensively to circulate solvents or other chemicals, to remove paraff in and asphaltene.

The Flush By Unit can f ix rod breaks, replace polish rods, pack leaks, trip rods and pump out of the w ell, also the tubings, f lush sanded-off or w axed-off wells, change pumps or drive units as w ell as various w ell trouble-shooting that can maximize your w ell production.

• European Chassis w ith licence

• CE conformity

• 4 axle 8x8

• compact, strong

• fast

solutions