what it’s all about

Post on 19-Jan-2016

23 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Multimodal Integrated Corridor Management. What It’s All About. More Than CSMPs. Overview. CSMP Background – How We Got Here CSMP Status – Where We Are The Challenge Ahead – What It Takes To Get Where We Need To Be. GM’s FUTURAMA Stretching the Horizon. 42 Mile Loop. 1971. - PowerPoint PPT Presentation

TRANSCRIPT

Multimodal Integrated Corridor Management

More Than CSMPsMore Than CSMPs

OverviewOverview

CSMP CSMP BackgroundBackground – How – How We Got HereWe Got Here

CSMP CSMP StatusStatus – Where We – Where We AreAre

The The Challenge AheadChallenge Ahead – – What It Takes To Get What It Takes To Get Where We Need To BeWhere We Need To Be

GM’s FUTURAMA

Stretching the Horizon

42 Mile Loop42 Mile Loop

19711971

District 7 TMCDistrict 7 TMC

Los Angeles

1971 (42 Miles) 1998 (750 Miles)

District 7 New TMCDistrict 7 New TMC

Beware CSMPs Ahead

•Conducted congestion summits in cooperation with the four regional AASHTO meetings.

• Identified innovative strategies and initiatives that states were adopting for dealing with the congestion challenge

• To learn from one another about what was possible, and how state DOT leadership could make a difference in improving transportation system performance

AASHTO SummitsAASHTO Summits

Summit ThemesSummit ThemesThere is no Single Solution

Performance Measurement is a Key to Overcoming Limited Resources

The Extent of the Congestion Challenge Goes Beyond One Jurisdiction’s Boundaries and Requires Collaboration

Performance PoetryPerformance PoetryHow can you manage if you How can you manage if you don’t know what’s happeningdon’t know what’s happening

How can you show people what How can you show people what to invest in if they can’t to invest in if they can’t visualize that return on visualize that return on investmentinvestment

How do you challenge people to How do you challenge people to improve without a visionimprove without a vision

BackgroundBackground

CSMPs – High Octane CSMPs – High Octane System PlanningSystem PlanningCaltrans – The Caltrans – The Mobility CompanyMobility CompanyNew Tools – New Tools – Performance, Performance, Simulation, and moreSimulation, and more

Corridor Corridor Management Management

PlansPlans

Performance

AllJurisdictions All

Modes

Commitment

Plan

CMPCMP

Critical Themes

Plan ComponentsPlan Components

PerformanceAssessment

CorridorDescription

CorridorTeam

ImprovementsProposal

Ongoing

UnderstandingAnalytics

Modern MetricsModern MetricsPerformance

Mobility ProductivityReliability Safety

Arterial networkArterial network

• 40 miles of arterials

• Approximately 250 signalized intersections

• 12 major connectors to I-880 Freeway

• Traffic signals controlled and maintained by respective local agencies

• Different signal control systems

Development Development MilestonesMilestones

Corridor definitionCorridor definitionStakeholder teamStakeholder teamPreliminary performance assessmentPreliminary performance assessmentDetection in placeDetection in placeComprehensive performance assessmentComprehensive performance assessmentIdentify causes of congestionIdentify causes of congestionTest improvement scenariosTest improvement scenariosPrioritize recommendationsPrioritize recommendations

CSMP StatusCSMP Status26 Corridors Underway26 Corridors Underway7 Detection Projects Moving7 Detection Projects MovingPrimitive StagePrimitive StageJanuary Meeting to January Meeting to Determine Future DirectionDetermine Future Direction

The ChallengeThe Challenge

What are we really going What are we really going to doto do

WhenWhenConcept of OperationsConcept of OperationsManaging Across Modes, Managing Across Modes, Jurisdictions & StrategiesJurisdictions & Strategies

What Does It Mean To What Does It Mean To ManageManage

Building a House vs Building a House vs Managing a HomeManaging a Home

Integrate vs Co-ordinateIntegrate vs Co-ordinateSoviet Collectives Soviet Collectives RevisitedRevisited

More Active ManagementMore Active Management

top related