wexner medical center inpatient hospital programming update · the ohio state university wexner...

Post on 08-Jul-2020

11 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Wexner Medical Center Inpatient Hospital Programming Update

Master Planning & Facilities CommitteeFebruary 2018

2

*Bed clearances shown are progressive care bed clearances.

DOAN – PRIVATE RHODES – PRIVATE PROPOSED PATIENT ROOM

Patient Room 132 NSFToilet Room 29 NSFCeiling Height : 7’-6”

Patient Room 162 NSFToilet Room 15 NSFCeiling Height : 7’-6”

Proposed Patient Room 276 NSF Toilet Room 43

NSF Ceiling Height : 9’-6”

Patient Rooms

3

TYPICAL RHODES OPERATING ROOM PROPOSED OPERATING ROOM

Total Area 485 NSF (range of 402 – 685 NSF)With Adjacent Scrub Room

Mechanical Booms: 0 Ceiling Height:’ 8’-0” – 9’-0”

Proposed Total Area 650-750 NSFWith Adjacent Scrub Room & Equipment/Flex-Room

Mechanical Booms: 2Ceiling Heights: 10’-0”

Operating Rooms

4

B i g F o u r S e r v i c e s

Central Sterile

NutritionPharmacy

Laboratory

Support Services

Site Plan

Rhodes

Doan

RossHeartHospital

James Cancer Center

New Hospital Tower

HardingHospital

Brain &Spine

Davis & Dodd

PriorHall

McCampbellHall

Davis Heart & Lung

top related