west broadway reconstruction september 29, 2015iowa.apwa.net/content/chapters/iowa.apwa.net/file...w...

Post on 24-Sep-2020

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Matthew S. Cox, P.E.

Terry Smith, P.E.

West Broadway

Reconstruction

September 29, 2015

Please log into kahoot.it for survey Game Pin:46211

1946 Paving Plans

Converted 47’ B-B Grouted brick over 6” PCC to 47’ B-B 8” PCC

Profile grade = 0.10%

1977 Pavement Widening

Widened Roadway to 60’ B-B (Still 80’ ROW)

Poor drainage with deteriorated pavement

Transfer of Jurisdiction by IDOT

The addition of storm sewers was essential, along with the necessary rehabilitation of the pavement

Segment 1, 2017 Segment 2, 2018 Segment 3, 2019

Segment 3, 2019 Segment 4, 2020 Segment 5, 2021

Survey Question: Go to your smartphones enter Website kahoot.it Game Pin:46211

Incentivizing Private Property Landscapes on the West Broadway Corridor

Segment 1 view from the south

NEXT STEPS…

Survey Question: Go to your smartphones

top related