Video Production White Paper and File System and Planning and Reporting Templates from Guy W Wallace - www.eppic.biz - from 1979-1981 work at Wickes Lumber - and at RAS (SWI) in a 1983 White Paper.

TRANSCRIPT

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

1

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

2

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

3

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

4

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

5

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

6

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

7

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

8

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

9

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

10

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

11

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

12

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

13

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

14

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

15

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

16

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

17

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

18

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

19

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

20

Steve was our Project Manager – and John did camerawork on this shoot. We three rotated Project Management roles project by project.

John on camera.

One take Tom – our talent.The entire Training Services team checks out a “take.”

Wickes Lumber Training Services Video Shoot – Saginaw MI ‐ 1980

Guy W. Wallace   www.eppic.biz

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

21

INSTRUCTIONS FOR COMPLETION OF WEEKLYAND MONTHLY MAN-HOUR REPORTS

Objective: To recap man-hour util ization weekly andmonthly of both personnel and by project.

Due: Weekly: Monday, 10 a.m.Monthly: First day of the month, 10 a~m.

Distribution:

Weekly: Project LeadersAudio-Visual Manager

Monthly: Audio-Visual ManagerDirector, Training Services

Directions:

Weekly: To be updated daily. Using key onform, designate hours util ized foreach program.

Example: 6S, 2G designates sixhours of scripting and two ongraphics

LOST TIME

The total hours for each day shouldequal or exceed eight. Vacation,sick leave, personal business shouldbe accounted for in lost time category.DO NOT INCLUDE HOLIDAYS

SKILLS DEVELOPMENT

Include all time spent in cross-training.

OTHER

Include all time spent in meetingsand miscellaneous activities. Designateactivity.

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

22

ON SECOND PAGE DESIGNATE PLANNEDACTIVITIES FOR UPCOMING WEEK.ALSO LIST ACCOMPLISHMENTS FORPAST WEEK.

Monthly: Using weekly reports, recap hours avail-able; total hours worked; percentage ofhours worked to hours available; totalhours spent in program development,scripting, graphics, etc. List eachproject worked on.

KEY

Production Development Production Post Production

CI ient ContactBrainstormTreatments, Outl inesScriptingGraphicsDevelopment of

Written Materials

StoryboardingLogistics:

TalentSets/LocationsPropsMusics

RehersalShootingEditing

Dupl icationPackagingDistribution

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

23

w~~c:~s[Pffi3@[Q)(lJJ©uO@~PROJECT I.EADERSWEEKI.Y REPORT

PROGRAM _

PROJECT LEADER WEEK OF _

PROGRAM PRODUCTION POSTSTAFF DEVELOPMENT HOURS

PRODUCTION OTHERHOURS HOURS

~•••;Io,;"jr:Io,;"j

~••TOTAL HOURS THIS WEEK

TOTAL HOURS THIS PROGRAM

% COMPLETE % I TOTAL HOURS TO DATE

BU DGET INFORMATIONPROGRAM BUDGET $

APROX. COST INCURED TO DATE s% TO BUDGET %

NOTE: Retain copies of all receipts in project file.

On first of month subm it written report on project status i.e. progress; budget; man-hours; concerns, etc.ltsWickes lumber Training Services 2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

24

w~~:~s[F)~@[Q)(!JJ~UO@~MONTH!. Y REPORT

NAME: MONTH: _

HOURS AVAILABLE HOURS WORKED % _

HOURLY RECAPPROGRAM DEVELOPM ENT I I EDITING I ISCRIPTING D POST PRODUCTION DGRAPHICS D SKILLS DEVELOPMENT DSTORYBOARDING D LOST TIME DPRODUCTION D OTHER DLOGISTICS D

PROGRAMS / PROJECTS *y

~:!

~LI

;•••••':.•...

~•••••••!,•••••

!SubmitTo Audio / Visual Mgr. on first of month

·Check if project leader

It§Wickes lumber Training Services~~ --------------

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

25

· NAME WEEKOF _

""--P-ROJ-ECT-/P-ROG-RA-M---IMON TUE WED THU FRI 5 A T 5 UN I--=-::PRO~JECT~TOTALS

SKILLSDEVELOPMENT

LOSTTIME

OTHER (Specify)

KEY 0 PROGRAM DEVELOPMENT® GRAPHICS ® PRODUCTION @ STORYBOARDING® EDITING® POST PRODUCTION CD LOGISTICS

MONDAY COPY DISTRIBUTION: Project leader, A/V Manager. Retain original for Monthly Report use. 2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

26

:w:u.Ju.J~•....VI-<..oJVI•....Zu.J~::z::!a..oJIlL~0uu-e

y.,

0:w:wu.J~!!!::z::•....VIu.J•....::;•....u-<

:E l- s: l- LL en en 2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

27

VIDEO "

SCENE# __

CAMERA"POSITION

PROPS:

PAGE__

VIDEO:

SCENE# __

CAMERAPOSITION

PROPS:

,.------------. LIV VO

VIDEO: 2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

28

VIDEO PRODUCTION

PROJECT:PROJECT # -------------------------------PROJECT lEADER:--------------------------

PROGRAM BUDGET: $ -------------

EXPENSE rAllY

Cost Incurred Reason

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

29

VIDEO PRODUCTION

PROJECT:.

PROJECT # _

PROJECT LEADER ~_----

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

30

VIDEO PRODUCTION

Project:

Project Leader: ----~------------Project # ----------------------

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

31

VIDEO PRODUCTION

PROJECT:Project # _

Project Leader:

Client Contact

Script Writer:

Cl ient Final Sign-Off Authority:

Start-End Dates

Treatment

Outl ine

Brainstorm Session

Script Development

. Rough Drafts/Revisions

FINAL SIGN OFF:

Script Approval Date:

To Production:

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

32

••••

Completed

VIDEO PRODUCTION

Item

Storyboard

Assigned To:

Due Date

Location Survey

Shot Sheet

Talent Contact

Sets

Props

Video Director

Video Editor

SCHEDULE

Pre-Production Logistics

Video Shooting"

Video Editing

Dupl ication

Packaging

TO IMPLEMENTATION

Personnel/Due Dates

Start-End Dates

2010 Guy W. Wallace EPPIC Inc. www.eppic.biz

33

VIDEO PRODUCTION

PROJECT: _PROJECT # _

PROJECT LEADER: _

DEVELOPER(S) ASSIGNED:

· OUTLINE· LEADERS GUIDE· JOB AIDS· OTHER: