Transit Gas Pipeline Transit Gas Pipeline EuRoPol GAZ s.a.EuRoPol GAZ s.a.
The Yamal - Europe Transit The Yamal - Europe Transit Gas Pipeline section Gas Pipeline section
on on the territory of Polandthe territory of Poland
Key elements Key elements
General description of the system
Viability assessment of the Polish section of the Yamal-Europe Pipeline
EuRoPol GazEuRoPol Gaz m maiain eventsn events
1993, EuRoPol Gaz S.A. foundation
1994, the European Union priority project
1998, beginning of construction
2000, the system partly in operation
2005, the first pipeline reached the target capacity
General description of the sectionGeneral description of the section
Kondratki
ZambrówCiechanów
Szamotuły
Gdansk
Szczecin
Frankfurt
Białystok
Białoruś rz. Warta
rz.S
krwa
rz.NarewNiemcy
Górzyca
LwówekБрест
Lwów
Litwa
rz.Bug
rz. O
dra
Ukraina
rz. W
is3a
Berlin
Rosja
Słowacja
Kraków
Wrocłwaw
morze Ba3tyckie
rz.Bug
Czechy
Praha
545 km
368 km
244 km 128 km2 km
Włocławek
Ruś
Sta
ra
rz. Notec Wsch.Poznań
Warszawa
ENTRY
EXIT
EXIT
EXIT
Technical ParametersTechnical Parameters
Total length of the Pipeline - 685 km
Pipeline Diameter of pipe: 1420 mm
Maximum operating pressure: 8.4 MPa
5 Compressor Stations
Total installed power of 5 compressor stations: 600 MW
Total capacity of the existing first line: 32.3 billion cubic meters per year
VIABILITY ASSESSMENT
ISSUE CASE A CASE B CASE C
Availability of capacity YES YES YES
Contractual requirement YES YES YES
Regulation adequacy YES YES YES
Tariff level and transparency 1 1 1
Conflict resolution adequacy YES YES YES
Availability of upstream gas YES YES YES
Downstream price regulation problems
N/A N/A N/A
Balancing requirement problems NO NO NO
Availability of storage and flexibility services
NO NO NO
This concludes my presentationThis concludes my presentation