Transit Gas Pipeline Transit Gas Pipeline EuRoPol GAZ s.a. EuRoPol GAZ s.a. The Yamal - Europe The Yamal - Europe Transit Gas Pipeline Transit Gas Pipeline section section on on the territory of the territory of Poland Poland

Upload: leigh

Post on 02-Feb-2016

68 views

Category:

Documents


0 download

DESCRIPTION

Transit Gas Pipeline EuRoPol GAZ s.a. The Yamal - Europe Transit Gas Pipeline section on the territory of Poland. Key elements. General description of the system Viability assessment of the Polish section of the Yamal-Europe Pipeline. EuRoPol Gaz m ai n events. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Transit Gas Pipeline  EuRoPol GAZ s.a

Transit Gas Pipeline Transit Gas Pipeline EuRoPol GAZ s.a.EuRoPol GAZ s.a.

The Yamal - Europe Transit The Yamal - Europe Transit Gas Pipeline section Gas Pipeline section

on on the territory of Polandthe territory of Poland

Page 2: Transit Gas Pipeline  EuRoPol GAZ s.a

Key elements Key elements

General description of the system

Viability assessment of the Polish section of the Yamal-Europe Pipeline

Page 3: Transit Gas Pipeline  EuRoPol GAZ s.a

EuRoPol GazEuRoPol Gaz m maiain eventsn events

1993, EuRoPol Gaz S.A. foundation

1994, the European Union priority project

1998, beginning of construction

2000, the system partly in operation

2005, the first pipeline reached the target capacity

Page 4: Transit Gas Pipeline  EuRoPol GAZ s.a

General description of the sectionGeneral description of the section

Kondratki

ZambrówCiechanów

Szamotuły

Gdansk

Szczecin

Frankfurt

Białystok

Białoruś rz. Warta

rz.S

krwa

rz.NarewNiemcy

Górzyca

LwówekБрест

Lwów

Litwa

rz.Bug

rz. O

dra

Ukraina

rz. W

is3a

Berlin

Rosja

Słowacja

Kraków

Wrocłwaw

morze Ba3tyckie

rz.Bug

Czechy

Praha

545 km

368 km

244 km 128 km2 km

Włocławek

Ruś

Sta

ra

rz. Notec Wsch.Poznań

Warszawa

ENTRY

EXIT

EXIT

EXIT

Page 5: Transit Gas Pipeline  EuRoPol GAZ s.a

Technical ParametersTechnical Parameters

Total length of the Pipeline - 685 km

Pipeline Diameter of pipe: 1420 mm

Maximum operating pressure: 8.4 MPa

5 Compressor Stations

Total installed power of 5 compressor stations: 600 MW

Total capacity of the existing first line: 32.3 billion cubic meters per year

Page 6: Transit Gas Pipeline  EuRoPol GAZ s.a

VIABILITY ASSESSMENT

ISSUE CASE A CASE B CASE C

Availability of capacity YES YES YES

Contractual requirement YES YES YES

Regulation adequacy YES YES YES

Tariff level and transparency 1 1 1

Conflict resolution adequacy YES YES YES

Availability of upstream gas YES YES YES

Downstream price regulation problems

N/A N/A N/A

Balancing requirement problems NO NO NO

Availability of storage and flexibility services

NO NO NO

Page 7: Transit Gas Pipeline  EuRoPol GAZ s.a

This concludes my presentationThis concludes my presentation