top level smart metering solutions - ahk …suedafrika.ahk.de/.../8_landis_gyr_tost.pdfenergy meter...
Post on 29-Apr-2018
220 Views
Preview:
TRANSCRIPT
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
The Energy Industry is Changing
To be successful, it is key to understand today’s investments in the context of tomorrow’s needs and capabilities
New technologies allow for a new dimension of data driven sophisticated command and control functionalities
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
Landis+Gyr is…
…the global smart metering leader and a smart grid pioneer
3Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
Active in over 30 countries
Over 5,000 Employees
Different competence centers for
energy products, solution, infrastructure
Comprehensive solutions for electricity, heat/cooling and gas
Advance Metering Infrastructure
Industries largest R&D resources - 1,200+ engineers in 22 R&D centers
“Made in Germany” –
own development, manufacturing and sales of thermal energy meters
Pioneer in ultrasound technology
Operations on all five continents
State-approved test center
Service Center for revisions and repairs
Solid an established partner network
Landis+Gyr Global Center of Competence HEAT
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
We Help You to Manage Energy better
4
Strategic B
usin
ess Field
s
MeteringHeat, Cooling, Electricity, Gas
Smart CommunicationModules, Concentrators, System Software
Key Strategic Drivers
Smart Metering SolutionsSolution Software, Services, Planning, Support
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
What is a Thermal Energy Meter?
Calculator Flow Part Temperature Sensors+ +
Energy Calculation = xVolume
ΔT temperature difference
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
Portfolio of Ultrasonic Meters
• Qp 0.6 – 60 (150)• For Metering, Billing
or System regulation
• Qp 0.6 – 2.5• For Sub-Metering
Cost Allocation
• Qp 0.6 – 2.5• For Sub-Metering
Cost Allocation
• Qp 0.6 – 60 (150)• For Metering, Billing
or System regulation
Direction of flow
• Qp 0.6 – 2.5• For Sub-Metering
Cost Allocation
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
Our Portfolio and Offering
Measure Communicate Data acquisition Processing Operate
UltraAssist Parameterization Software L+G Advance Software
Communication Modules
Heat / Cooling Meters
wired
Stationary Readout 868MHz
Mobile Readout868MHz / 433 MHz
M-Bus Master/ Extenderwless Concentrator
TCP/IP orGPRS
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
World Leader in Smart Metering
Smart Metering goes far beyond the simple reading of a meter
Available and correct data for analysis and billing
Measurement, data collection and monitoring
Meter data management
System monitoring and management
Customer system connection
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
Smart Metering Solution
Metering Data collection Data processing and billingLocal Area Network Wide Area Network
Ultrasonic thermal energy meter
Mobile or stationary via different communication possibilities
L+G ADVANCE software integrated in customers specific system
))))))
Smart Metering | © Landis+Gyr | May 2017 | Roman Tost
Who Benefits from AMI
Utilities Customers
Environment
Consumption based billing Fair Invoices Improved customer service Increased awareness
of energy consumption
Reduced energy consumption Reduced CO2 emissions Preserve resources Energy savings
System Control Secure Investment ROI Earn Money Influence customer
behaviour Satisfied customers
Barwa Commercial AvenueDoha / Qatar
Project Info 2,000 metering pointsShops, offices
Technology Ultrasonic Cooling MetersType T550 (UH50…)
Data-read-out AMR – Automatic Meter ReadoutM-Bus-Master / TCP/IP and L+G ADVANCE Software
Requirements Precise consumption based meteringCustomer-specific invoicingAlarm-function
I
N
S
T
A
L
L
A
T
I
O
N
Barwa CityDoha / Qatar
Project Info 6,300 metering pointsApartments
Technology Ultrasonic Cooling MetersType T350 (2WR6…)
Data-read-out AMR – Automatic Meter ReadoutM-Bus-Master / TCP/IP and L+G ADVANCE Software
Requirements Precise consumption based meteringCustomer-specific invoicing
I
N
S
T
A
L
L
A
T
I
O
N
Shoreline ApartmentsDubai / UAE
Project Info 300 metering pointsApartments
Technology Ultrasonic Cooling MetersType T350 (2WR6…)
Data-read-out AMR – Automatic Meter ReadoutM-Bus, M-Bus-Master
Requirements Precise consumption based metering
I
N
S
T
A
L
L
A
T
I
O
N
River CityToronto / Canada
Project Info 600 metering pointsApartments
Technology Ultrasonic Cooling MetersType T350 (2WR6…)
Data-read-out AMR – Automatic Meter ReadoutM-Bus, RS 485 Converter and RD500
Requirements Precise consumption based metering
I
N
S
T
A
L
L
A
T
I
O
N
UtilityNRW / Germany
Project Info 1,500 metering points
Technology Ultrasonic Heat MetersType T550 (UH50…)
Data-read-out AMR – Automatic Meter Readout with PLCRadio Communication 868 MHz (OMS – Open Metering Standard)
Requirements Precise meteringSystem Control
I
N
S
T
A
L
L
A
T
I
O
N
Prepayment ProjectsAFYON, SANDIKLI / Turkey
Project Info 7,200 metering points
Technology Ultrasonic Heat and Cooling MetersType T350 (2WR6…)
Data-read-out AMR – Automatic Meter ReadoutPulse, M-Bus and Radio CommunicationWalk-by/ drive-by Prepayment system with pulse output
Requirements Precise metering forgeothermal heating system
I
N
S
T
A
L
L
A
T
I
O
N
Smart Metering SolutionVeitur/ Iceland
Project Info 6,000 metering points
Technology Ultrasonic Heat MetersType T550 (UH50…)
Data-read-out Communication infrastructure:- wireless M-Bus (OMS)- Elvaco CMiBoxes with GPRS- Advance Software Systemwith integration into the customer’s EPR system
Requirements Integration of L+G electricity meters with wireless M-Bus (OMS) in 2017
I
N
S
T
A
L
L
A
T
I
O
N
Radio 868 MHz solutionSerres/ Greece
Project Info 4,000 metering points
Technology Ultrasonic Heat MetersType T230
Data-read-out AMR – Automatic Meter ReadoutRadio Communication 868 MHzWalk-by/ drive-by
Requirements Bi-weekly read-out by co-partner company Dach
I
N
S
T
A
L
L
A
T
I
O
N
Heating plantHamburg/ Germany
Project Info 4 x DN 150 heat meters
Technology Ultrasonic Heat MetersType T550 (UH50…)
Data-read-out M-Bus Communication
Requirements Installation of spacer during construction time and retrofit the measuring insert upon project completion.
I
N
S
T
A
L
L
A
T
I
O
N
top related