to whom it may concern we, n.p.e co. the provider of technical services and man-power to the most...

Post on 21-Jan-2016

218 Views

Category:

Documents

5 Downloads

Preview:

Click to see full reader

TRANSCRIPT

No 86.Kheyrandish Alley, Dr Heshmat St. Rasht IRAN

TEL: +98 13 33344037 & +98 13 33325295FAX :+98 13 33344037 & +98 13 33333960

Mobile :+98 911 131 4803Email :info@npecompany.net &

npecompany@yahoo.comWebsite : www.npecompany.net

Industrial Company

TO WHOM IT MAY CONCERN

• We, N.P.E Co. the provider of technical services and man-power to the most power plant and factories in Iran with over 18 year experience are ready to provide different activities such as :

• Installation, operation and maintenance of all mechanical and electrical Equipments

(Gas & Steam Turbine power generators, Diesel power generator, Power distribution panel)

• Installation, operation and maintenance of HVAC system (Air condition & Air handling units)

• Piping & cabling• Insulation of pipe & Equipment & spray insulation

Sincerely YoursN.P.E Co

N.P.E Industrial CoNo 86. Kheyrandish alley, Dr Heshmat st. Rasht – IranTEL : +98 13 33344037 & +98 13 33325295FAX : +98 13 33344037 & +98 13 33333960MOB : +98 911 131 4803E-Mail : info@npecompany.net & npecompany@yahoo.com

Confirmations

Sample Photographs

Blow out pipingPrecomitioning - GEA PART

1170 MW GCCPP

HP piping weldingLBA PIPING – SIEMENS PART

1170 MW GCCPP

Conversion ProjectRelocation Work (PHASE-1)Aryan Mahtab Gostar Co.

Piping and equipment erectionUGD BUILDING - GEA PART

Gilan 1170 MW CCPP

Change of damage compensator GEA PART

Gilan 1170 MW CCPP

Change of damage compensator with new type

d = 4800mm for all unitsACC SYSTEM – GEA PART

Gilan 1170 MW CCPP

Piping and equipment erectionUQC BUILDING – SIEMENS PART

Gilan 1170 MW CCPP

Tank erectionUQC BUILDING (ROOF)

SIEMENS PARTGilan 1170 MW CCPP

Piping and equipment erectionUEL BUILDING – SIEMENS PART

Gilan 1170 MW CCPP

Piping and equipment erectionULD BUILDING – SIEMENS PART

Gilan 1170 MW CCPP

Switching area panel erection and cabling UAC – SIEMENS PART Gilan 1170 MW CCPP

BAT & BBT transformer installation Gilan 1170 MW CCPP

Damage gearboxes repair (maintenance)GEA PART

Gilan 1170 MW CCPP

Sand blasting & paintingACC structure – GEA PART

Gilan 1170 MW CCPP

Turbine spray InsulationNeka CCPP

Turbine Hall piping InsulationSIEMENS PART

Gilan 1170 MW CCPP

Main gas pipe line repairSIEMENS PART

Gilan 1170 MW CCPP

Insulation WorkLBA , LBB PIPING - SIEMENS PART

Gilan 1170 MW CCPP

Touch up and final paintingACC – GEA PART

Gilan 1170 MW CCPP

Fan ring installationACC SYSTEM – GEA PART

Gilan 1170 MW CCPP

Fan ring installationACC SYSTEM – GEA PART

Gilan 1170 MW CCPP

Manufacturing LOUSHAN ‘s Power plant cooling tower ( Cell 2 Unit 2 ) & ( Cell 3 Unit 2 )

Installation and commissioning of swirl flash system in RASHT combined cycle power plant

Erection & Replacement Of 84 PCs Gearboxes of Air Cooled Condenser System

(200KW) In Guilan CCPP

Projects Overview

Seyed Mostafa MadaniDirector ManagerElectrical Engineer B.S.32 Year ExperienceSupervisory Of Welding WorksDistrict Superintendent Of Electrical & Mechanical Equipments Project Manager

Farzin BagheriPerson Of Board Of Directors

Mechanic Engineer B.S.22 Year Experience

Technical Office ManagerSite Manager

Project Manager

top related