to whom it may concern we, n.p.e co. the provider of technical services and man-power to the most...
TRANSCRIPT
No 86.Kheyrandish Alley, Dr Heshmat St. Rasht IRAN
TEL: +98 13 33344037 & +98 13 33325295FAX :+98 13 33344037 & +98 13 33333960
Mobile :+98 911 131 4803Email :[email protected] &
[email protected] : www.npecompany.net
Industrial Company
TO WHOM IT MAY CONCERN
• We, N.P.E Co. the provider of technical services and man-power to the most power plant and factories in Iran with over 18 year experience are ready to provide different activities such as :
• Installation, operation and maintenance of all mechanical and electrical Equipments
(Gas & Steam Turbine power generators, Diesel power generator, Power distribution panel)
• Installation, operation and maintenance of HVAC system (Air condition & Air handling units)
• Piping & cabling• Insulation of pipe & Equipment & spray insulation
Sincerely YoursN.P.E Co
N.P.E Industrial CoNo 86. Kheyrandish alley, Dr Heshmat st. Rasht – IranTEL : +98 13 33344037 & +98 13 33325295FAX : +98 13 33344037 & +98 13 33333960MOB : +98 911 131 4803E-Mail : [email protected] & [email protected]
Confirmations
Sample Photographs
Blow out pipingPrecomitioning - GEA PART
1170 MW GCCPP
HP piping weldingLBA PIPING – SIEMENS PART
1170 MW GCCPP
Conversion ProjectRelocation Work (PHASE-1)Aryan Mahtab Gostar Co.
Piping and equipment erectionUGD BUILDING - GEA PART
Gilan 1170 MW CCPP
Change of damage compensator GEA PART
Gilan 1170 MW CCPP
Change of damage compensator with new type
d = 4800mm for all unitsACC SYSTEM – GEA PART
Gilan 1170 MW CCPP
Piping and equipment erectionUQC BUILDING – SIEMENS PART
Gilan 1170 MW CCPP
Tank erectionUQC BUILDING (ROOF)
SIEMENS PARTGilan 1170 MW CCPP
Piping and equipment erectionUEL BUILDING – SIEMENS PART
Gilan 1170 MW CCPP
Piping and equipment erectionULD BUILDING – SIEMENS PART
Gilan 1170 MW CCPP
Switching area panel erection and cabling UAC – SIEMENS PART Gilan 1170 MW CCPP
BAT & BBT transformer installation Gilan 1170 MW CCPP
Damage gearboxes repair (maintenance)GEA PART
Gilan 1170 MW CCPP
Sand blasting & paintingACC structure – GEA PART
Gilan 1170 MW CCPP
Turbine spray InsulationNeka CCPP
Turbine Hall piping InsulationSIEMENS PART
Gilan 1170 MW CCPP
Main gas pipe line repairSIEMENS PART
Gilan 1170 MW CCPP
Insulation WorkLBA , LBB PIPING - SIEMENS PART
Gilan 1170 MW CCPP
Touch up and final paintingACC – GEA PART
Gilan 1170 MW CCPP
Fan ring installationACC SYSTEM – GEA PART
Gilan 1170 MW CCPP
Fan ring installationACC SYSTEM – GEA PART
Gilan 1170 MW CCPP
Manufacturing LOUSHAN ‘s Power plant cooling tower ( Cell 2 Unit 2 ) & ( Cell 3 Unit 2 )
•
Installation and commissioning of swirl flash system in RASHT combined cycle power plant
Erection & Replacement Of 84 PCs Gearboxes of Air Cooled Condenser System
(200KW) In Guilan CCPP
Projects Overview
Seyed Mostafa MadaniDirector ManagerElectrical Engineer B.S.32 Year ExperienceSupervisory Of Welding WorksDistrict Superintendent Of Electrical & Mechanical Equipments Project Manager
Farzin BagheriPerson Of Board Of Directors
Mechanic Engineer B.S.22 Year Experience
Technical Office ManagerSite Manager
Project Manager