the marshmallow challenge - workshop at miniiad trento 2014

Post on 01-Dec-2014

156 Views

Category:

Leadership & Management

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

a few slides to support the delivery of a Marshmallow Challenge ( http://marshmallowchallenge.com ) based workshop in Trento, in July, 2014, during the miniIAD event ( http://agileday.it/mini/2014/trento/ )

TRANSCRIPT

The Marshmallow Challenge – The goal

Build the tallest free-standing structure …

1

The Marshmallow Challenge – The ingredients

2

The Marshmallow Challenge – The rules

Build the tallest free-standing structure

The entire marshmallow must be on top

Use as much or as little of the kit Break up the spaghetti, string or tape

The challenge lasts 18 minutes

After the 18 minutes the structure has to stand at least 60 seconds

3

18’

The Marshmallow Challenge – Let’s play!

4

The Marshmallow Challenge – Time to measure … and award the winners ;-)

5

Post-it time III !

6

At least 2 obs. on how things went per team (1 obs. per post-it)

5’

The Marshmallow Challenge – Things observed

Common pattern

7

The Marshmallow Challenge – Things observed

Common pattern

8

The Marshmallow Challenge – Things observed

Children rule!

9

The Marshmallow Challenge – Things observed

Prototyping matters!

10

The Marshmallow Challenge – Lessons learned

11

top related