the digital oobeya at the european lean it summit
Post on 29-Nov-2014
5.176 Views
Preview:
DESCRIPTION
TRANSCRIPT
Copyright © Institut Lean France 2012
22 & 23 November, 2012 Paris, France
Digital Oobeya
By Takashi Tanaka, 3DS
3DS
.CO
M ©
Das
saul
t Sys
tèm
es
| C
onfid
entia
l Inf
orm
atio
n |
03/
12/2
012
ref
.: D
ocum
ent_
Ref
eren
ce |
Digital Oobeya
Takashi Tanaka
Time Location Detail Vice
President
Project
Leader Member
1985
1990
2000
2010
Japan
• Toyota: RAV4, Estima, E-com
• Shimazu: MRI, CT, System
• Mitsubishi Chemical: Central Lab
Y
Y
Y
Y
Y
Y
Germany
France
Italy
USA
• Ford Europe: Sales, After sales
• Volvo: Car and Truck
• GM: Global platform, Factory
• Design Studio
• Harley Davidson: 5-Platform
Y
Y Y Y
Y
Y Y Y Y Y
USA
• Boeing: Project A
Project B
Project C
Engineering VPs
Y
Y
Y
Y
Y
Y
Y
Projects used Physical Oobeya
Physical Oobeya: Basic Layout
Objective:
• Front loading
• Collaboration
• Bottle-neck solution
3- Layers for Oobeya
CE Chief Engineer CE
Body
----
VP Marketing, Sales
Chassis
VP Engineering
Cost Quality Delivery
Project A
-20% DOK 80%
On time Dec 15
Project B ---
VP Production
Chief Engieer of Toyota
Under -10%
DOK 90%
1st proto May 1
Matrix & Metrics Target break down
Co
st R
ed
uct
ion
New navigation system committee
Platform Standardized committee
Executives lead cross-functinal committee
. . .
CEO
Oobeya: Engineering VP
Company Target
Engineering
Production
Sales
----
Week Issues
Metrics Month
Matrix & Metrics
Cost
Quality
Jan Feb Mar--- Dec
Target
Actual
Achievable
Target
Actual
Achievable
Jan Feb Mar--- Dec
IT
Schedule
Engineering
Cost
Quality
Jan Feb Mar--- Dec
Target
Actual
Achievable
Target
Actual
Achievable
Jan Feb Mar--- Dec
Production
Program central (PRG)
プロジェクトX
タスク1
タスク2
タスク3
タスク3.1
タスク1.1
タスク1.2
タスク2.1
タスク2.2
タスク定義 担当者 WBS
Program central (PRG)
ENOVIA VPM central
IGES
STEP
Live Collaboration(CPF)
Why using IT? • Secret and too many data • Cauterized & common information
Oobeya: Engineering VP
Oobeya: Projects
Program central (PRG)
プロジェクトX
タスク1
タスク2
タスク3
タスク3.1
タスク1.1
タスク1.2
タスク2.1
タスク2.2
タスク定義 担当者 WBS
Live Collaboration(CPF)
Requirements Central (RMT)
Designer Central (DEC) Live Collaboration (CPF)
ENOVIA VPM Central
ENOVIA V6
PCB.Part6
Elec.PART1
Elec.PART2
PART1.1
PART2
PART3
PART4
PCB.Part6
Elec.PART1
Elec.PART2
PART1
PART2
PART3
PART4
ASSY1
MODEL3
MODEL3
ECAD.PCB6
ECAD.SCM6
外部ファイル読込み
L
0 1
2
2 1
Name
PRODXX
ASSYX PARTX PARTY
ASSYY
R
6
4 3 1
2
Num.
12000 12300
12341
12369 12400
Attr.
- - - - -- - - - -
- -- - -
- - -
CAD/EBOM同期
既存構成コピー
CADの構成 既存の構成
CSVファ イル
PROD.CONFIG1.1
PROD.CONFIG1
外部のPDM/PLMシステム
アダプレット or WEBサービス
Oobeya: Demo
Product Complexity Software: Lines of code
Sources: IEEE Automotive designline http://spectrum.ieee.org/green-tech/advanced-cars/this-car-runs-on-code
Lexus LS
787
F-35 5.7M
6.5M
100M
Prius Hybrid
Inspection Delivery
Concept of “Quality into Process”
1 2 3 4
Occurrence prevention
No defect
No defect
No defect
No defect
Outflow prevention
Occurrence prevention
Outflow prevention at each gate
7. Check sheet
Production Delivery Planning Design Test
“Quality into Process” Tools
Customer
3. Standardization • Product Design
5. Design Review
6. Personnel Training • Multi-skilled engineer
8. Feedback System
Right on time First time
2. Requirement
1. Oobeya
4. Standardization • Working Process
Copyright © Institut Lean France 2012
22 & 23 November, 2012 Paris, France
More Lean IT presentations and videos on www.lean-it-summit.com
top related