Sponsored by

Cedar Rapids Area Chamber of Commerce

and the

The Greater Cedar Rapids Community Foundation

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

What is the feasibility of regularly scheduled

passenger rail service and/or special event

excursion rail service?

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Feasibility Study Investors…

• Cedar Rapids• Hiawatha• Marion• Coralville• Iowa City• North Liberty• Tiffin• University Heights

• Linn County• Johnson County• University of Iowa

• CRANDIC Railroad• Iowa Interstate Railroad

• Consultant: RL Banks

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

OPPORTUNITIES:

• Cooperating Railroads• Very Well Located Trackage• Community Interest

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Task 1

INFRASTRUCTURE

& CAPITAL EXPENSE

• Track• Stations• Parking Lots• Layover Tracks• Rolling Stock

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Task 2

SERVICE PLAN

& POTENTIAL CONFLICTS

• Work around existing freight operations• From ADM to north is congested• Maximum existing speed is 30 mph

• Special event excursion service• Eastern Iowa Airport to Iowa City• North Liberty to Iowa City

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Task 3

DEMAND ESTIMATION

• Special event excursions• Daily commute• Year 2000 and Year 2030• Transit Oriented Development (TOD)

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

HAWKEYE EXPRESS

Cedar-Iowa River Rail Transit Project Feasibility Study

Corridor Events…

Cedar-Iowa River Rail Transit Project Feasibility Study

Special Event & Attraction Locations…

Cedar-Iowa River Rail Transit Project Feasibility Study

Peak Event Calendar…

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Cedar-Iowa River Rail Transit Project Feasibility Study

Chicago Transit-Oriented Development…

Cedar-Iowa River Rail Transit Project Feasibility Study

Proposed Iowa City/CoralvilleTOD’s….

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Cedar-Iowa River Rail Transit Project Feasibility Study

Proposed Cedar Rapids TOD…

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Task 4

INVESTMENT REQUIREMENTS

• Capital• Operating & Maintenance• Funding Options

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

CONCLUSIONS

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

WHAT IS FEASIBLE TODAY?

• Special Event Excursions• Vintage Excursions

– Equipment is Available

– Equipment is Affordable

COSTS: $3,000 -40,000 to rent

$440,000 to own

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

WHAT IS FEASIBLE IN 3-5 YEARS?

• North Liberty to Downtown Iowa City– Would require special earmark funding

– Could replace some bus routes

– “Park & Ride” possibilities in North Liberty and UI Oakdale Campus

CAPITAL COSTS (Cadillac Version): $18.6 million

ANNUAL OPERATIONAL COSTS: $4 million

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

WHAT IS FEASIBLE IN 6-20 YEARS?

• Eastern Iowa Airport to Downtown IC*– Express Bus Links to Downtown CR &

Kirkwood Community College

• Transit Oriented Developments (TODs)– Coralville, Iowa City, North Liberty,

Cedar Rapids

– Consistent Community Plans

*CAPITAL COSTS: $35.2 million

*ANNUAL OPERATIONAL COSTS: $11.9 million

Cedar-Iowa River Rail Transit Project Feasibility Study

07 December 2006

Total Cost of High Speed Commuter Rail to/from Cedar Rapids & Iowa City: $70 Million $70 MILLION DOLLARS? (includes new CR ADM Right of Way)

Things to Remember…Estimated Cost of adding 1 additional lane To I-380 (between CR & Coralville): $400 Million

Tiffin to Dodge Street I-80 Improvements: $75 Million