Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
SIX MONTHLY COMPLIANCE
REPORT
JUNE- 2015
Group Housing Complex
“Mahagun Moderne”
AT
Plot no. 02, Sector-78, Noida, GB Nagar, UP.
Being developed by
M/s Mahagun Real Estates Pvt. Ltd. A-19, Sector-63, Noida - 201306
Prepared by M/s Perfact Services
(ISO9001:2008& ISO14001:2004 Certified) 501-507, 5th Floor, NN Mall,
Mangalam Palace, Sector 3 Rohini, New Delhi Ph No. 47528467, Fax No. 47528434
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
List of Annexure
Annexure Details
Annexure -I Copy of Granted Environmental Clearance
Annexure – II Copy of CTE Granted
Annexure - III Monitoring reports of Air, Water , Soil, Noise & Stack
Annexure - IV Health Certificates of few workers engaged during
construction work
Annexure - V PUC Certificate of few Vehicles hired for costruction
work
Annexure-VI Copy of Height Clearance from AAI
Annexure - VII Site Photographs
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Name of the project
Introduction:-
The proposed Group Housing Complex “Mahagun Moderne” is located Plot no. 02, Sectoer-78,
Noida, GB Nagar, UP. being developed by M/s Mahagun Real Estates Pvt. Ltd.
Group Housing Complex “Mahagun Moderne”
Site address Plot no. 02, Sectoer-78, Noida, GB Nagar, UP.
Developed By M/s Mahagun Real Estates Pvt. Ltd.
Environment Clearance Letter No. 1124/ SEAC/ 545/2010/ DD(S) dated 10.05.2011.
Period of Compliance Six monthly compliance for the period October,2014 to March,2015 submission due in JUNE- 2015
Project Description Project involves construction of Group Housing complex on a total plot area of 100238.430 m2. Proposed built-up area is 465279 m2.
Construction Status Construction under progress.
Proposed Year of Commencement 2011
Proposed year of completion 2016
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Particulars
1. Project Description
The proposed Group Housing Complex “Mahagun Moderne” is located Plot no. 02, Sectoer-78, Noida,
GB Nagar, UP. Proposed project is being developed by M/s Mahagun Real Estates Pvt. Ltd. The total
plot area is 100238.430 sq. mt. The Complex has the following salient features:-
Details
Total Plot Area 100238.430 m2
Ground Coverage allowed (40 %) 40095.37 m2
Ground Coverage achieved (20.44 %) 23675.40 m2
FAR (2.75) 289438.47 m2
First basement 73590.45 m2
Second Basement 63017.45 m2
Total Basement Area 136607.10 m2
Non FAR area 37664.82 m2
Built up Area 465279 m2
Green Area (27.39 %) 49500.41 m2
Commercial Area 2676.84 m2
No. of Floors G+28
No. of Blocks 40 nos.
Total Population 1255.43
Parking facilities 4808 ECS
Max. Height of Building 128 m.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Construction Progress Status:
S No.
Component
Status as per June-2015
1 Civil Construction (Structural Work, Brick Work & Plaster Work)
86% work completed
2 Plumbing
72 % work Completed
3 Electrical work
62% work Completed
4 Fire Fighting
Phase-2 75% completed
5 Optional Sewage Treatment Plant
Permanent STP Structure work 80% completed
6 Rain Water Harvesting
Phase 1 completed & Handed Over to Facility Management & PH-2 work started
7 Sewerage, Drainage etc
Phase 1 completed & Handed Over to Facility Management & PH-2 work 30% completed
8 Green Area Development PH-I completed & handed over to FM. PH-2 30% work completed.
9 Finishing work PH-1 completed & handed over to FM. PH-2 80% completed & 68% Flats handed over to FM. PH-3 50% finishing work completed.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Current Status of point – wise compliance of the stipulated environmental conditions/ safeguards.
S.
No
General Conditions: Reply
1. It shall be ensured that all standards related to
ambient environmental quality and the
emission/ effluent standards as prescribed by
the MOEF are strictly compiled with.
We are complying with all the standards
related to ambient environment quality &
emission / effluent standards prescribed by the
MOEF.
Test reports are enclosed as Annexure-III.
2. It shall be ensured that obtain the no objection
certificate from the U.P. Pollution Control
Board before start of construction.
We have obtained NOC certificate from UP
Pollution Control Board vide No. F 80171/C-
1/N/NOC-690/2011/4 dated 1-02-2011.
Copy of CTE is enclosed as Annexure-II.
3. It shall be ensured that no construction work or
preparation of land by the project management
except for securing the land is started on the
project or the activity without the prior
environmental clearance.
We had obtained Environmental Clearance for
our project and construction started only after
obtaining Environmental Clearance.
Copy of EC granted is enclosed as Annexure-I
4.
The proposed land use shall be in accordance to
the prescribed land use. A land use certificate
issued by the competent authority shall be
obtained in this regards.
Land has been allotted by Noida Development
Authority. Land papers had already submitted.
5.
All trees felling in the project area shall be as
permitted by the forest department under the
prescribed rules. Suitable clearance in this
regard shall be obtained from the competent
Not applicable as no tree felling in the project
site.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
authority.
6. Impact of drainage pattern on environment
should be provided.
No impact on drainage pattern due to
construction of the project.
7. A suitable plan for providing shelter, light and
fuel, water and waste disposal for construction
labour during the construction phase shall be
provided along with the number of proposed
workers.
Workers engaged for construction purpose are
from nearby area and no worker is allowed to
stay at the site during night time. Necessary
arrangements have been made for drinking
water supply and waste water disposal during
construction phase.
8. It shall be ensured to obtain proper permission
from competent authorities regarding enhanced
traffic during and due to construction and
operation of project.
Necessary permission from competent
authorities shall be taken regarding enhanced
traffic during and due to construction and
operation of project. Traffic movement plan
and Parking plan in this regard has already
submitted.
9. It shall be ensured to obtain necessary
clearances from the competent authority on the
abstraction and use of ground water during the
construction and operation phases.
During construction, water is being taken
through tanker supply. Clearance for the
abstraction of ground water is under process.
10. Hazardous/inflammable/ Explosive materials
likely to be stored during the construction and
operation phases shall be as per standard
procedure as prescribed under law, Necessary
clearances in this regards shall be obtained.
Only hazardous waste generated during
construction phase is used oil from D.G sets
which is being given to approved recyclers.
11. Suitable rainwater harvesting systems as per
designs of groundwater department shall be
installed. Complete proposals in this regard
should be submitted.
Rainwater harvesting & Ground water
recharging is being done with oil & Grease
trap to remove oil & Grease from the surface
runoff suspended matter will be removed in a
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
settling tank before its utilization for rainwater
harvesting.
12. The emissions and effluents etc. from machines,
Instruments and transport during construction
and operation phases should be according to the
prescribed standards. Necessary plans in this
regard shall be submitted.
Necessary care is being taken to control
emissions & effluents etc. from machines
instruments & transport during construction
phase & will be taken during operation phase
also.
13. Water sprinklers and other dust control
measures should be undertaken to take care of
dust generated during the construction and
operation phases. Necessary plans in this regard
shall be submitted.
Water sprinkling and other necessary dust
control measures are being taken to control
dust generated during the construction &
necessary measures will be taken during
operation phase also.
Construction material stored at site is being covered with the cloth.
Wheel wash arrangements have been provided for the Construction Vehicles.
14. Suitable noise abatement measures shall be
adopted during the construction and operation
phases in order to ensure that the noise
emissions do not violate the prescribed ambient
noise standards. Necessary plans in this regard
shall be submitted.
All suitable noise abatement measures are
being adopted during construction phase. The
DG sets is being used during construction phase
are acoustically enclosed according to Central
Pollution Control Board norms.
15. Separate stockpiles shall be maintained for
excavated topsoil and the topsoil should be
utilized for preparation of green belt.
Top soil excavated during construction activities are being properly stored under tarpaulin cover and shall be used in horticulture/ landscape & road develop.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
16. Sewage effluents shall be kept separate from
rainwater collection and storage system and
separately disposed. Other effluents should not
be allowed to mix with domestic effluents.
Separate lines for sewage effluents & carrying
storm water are being laying down. No other
effluent shall be allowed to mix with Domestic
effluent.
17. Hazardous/ Solid wastes generated during
construction and operation phases should be
disposed off as prescribed under law. Necessary
clearances in this regard shall be obtained.
Except used oil from DG Sets, No hazardous
waste is generated during construction. Used oil
is being sold to the approve recycler.
18. Pavements shall be so constructed as to allow
infiltration of surface run-off of rain water.
Fully impermeable pavements shall not be
constructed. Construction of pavements around
trees shall be as per scientifically accepted
principles in order to provide suitable watering,
aeration and nutrition to the tree.
Pavements shall be constructed so as to allow
infiltration of surface run off of rainwater. All
necessary cares shall be taken.
19. The Green building Concept suggested by
Indian Green Building Council, which is a part
of CII-Godrej GBC, shall be studied and
followed as far as possible.
Green building concepts are being followed as
far as possible.
20. Compliance with the safety procedures, norms
and guidelines as outlined in National Building
Code 2005 shall be compulsorily ensured.
We are complying with all safety procedures
norms & and guidelines as per National
Building Code 2005.
21. It is to ensure use of measures for reducing
water demand for landscaping and using
xeriscaping, efficient irrigation equipments &
controlled watering systems.
Necessary measures have been taken to reduce
the water demand during construction phase.
22. Educate citizens and other stake-holders by
putting up hoardings at different places to create
Necessary hoardings have been provided at
different places to create environmental
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
environmental awareness. awareness..
23. Traffic congestion near the entry and exit points
from the roads adjoining the proposed project
site must be avoided. Parking should be fully
internalized and no public space should be
utilized.
Proper measure like road width, entry width
etc shall be taken care, so that there is no
Traffic congestion near the entry and exit
points from the roads adjoining the project site.
Parking shall be fully internalized and no
public space shall be utilized.
24. Fly ash should be used as building material in
the construction as per the provision of fly ash
notification of September, 1999 and amended as
on August, 2003 (The above condition is
applicable only if the project lies within 100 km
of Thermal Power Station).
Fly ash mix is being used in the construction as
per the provisions of Fly ash Notification of
September, 1999 and amended as on 27th
August, 2003.
25. The DG sets to be used during construction
phase should use low sulphur diesel type and
should conform to E.P. rules prescribed for air
and noise emission standards.
Acoustically enclosed DG set of 1X125 KVA ,
1X500 KVA & 1X400 KVA has been installed
during construction phase which use low
sulphur diesel and conforms to E.P. rules
prescribed for air and noise emission
standards.
26. The green belt design along the periphery of the
plot shall achieve attenuation factor conforming
to the day and night noise standards prescribed
for residential land use. The open spaces inside
the plot should be suitably landscaped and
covered with vegetation of indigenous variety.
Green area of 49500.41 m2 is proposed to be
developed in and around the project. Thick and
dense green belt shall be raised along the
periphery of the plot to provide protection
against particulates and noise.
27. The construction of the building and the
consequent increased traffic load should be
such that the microclimate of the area is not
All adequate measures have been taken to
ensure that microclimate of the area is not
adversely affected
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
adversely affected.
28. The building should be designed so as to take
sufficient safeguards regarding seismic zone
sensitivity.
Adequate measures are being taken for
structural stability of the building for seismic
zone sensitivity.
29. High rise buildings should obtain clearance
from aviation department or concerned
authority.
We have obtained building height approval
from Airport Authority of India vide letter no.
AAI/RHQ/NR/ATM/NOC/2014/396/8138-41
dated 30.09.2014. Copy is enclosed as Annexure
-VI
30. It is suggested that literacy program for weaker
sections of society/ women/ adults (including
domestic help) and under privileged children
could be provided in a formal way.
We shall have literacy program for Women
/adults & children in a formal way.
31. Treated effluents shall be maximally reused to
aim for zero discharge. Where ever not
possible, a detailed management plan for
disposal should be provided with quantities and
quality of waste water.
Treated effluents shall be maximally reused to
aim for zero discharge.
32. Construction activities including movements of
vehicles should be so managed so that no
disturbance is caused to nearby residents.
Necessary care has been taken to ensure that no
disturbance is caused to nearby residents.
Movement of vehicles is being done during non-
peak hours.
33. Parking areas should be in accordance with the
norms of MOEF, Government of India. Plans
may be drawn up accordingly and submitted.
Parking area to be provided is in accordance
with the norms of MOEF, GOI.
34. The location of the STP should be such that it is
away from human habilitation and does not
cause problem of odor. Odorless technology
STP will be located in the basement, hence no
odour problem is expected.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
options should be examined and a report
submitted.
35. The Environment Management plan should also
include the break up costs on various activities
and the management issues also so that the
residents also participate in the implementation
of the environment management plan.
Environment Management plan including
break up costs on various activities has already
been submitted.
36. Detailed plans for safe disposal of STP sludge
shall be provided along with ultimate disposal
location, quantitative estimates and measures
proposed.
STP sludge will pass though filter press &
hence will be form in cakes. The cakes will be
kept for drying & used for manure. In case of
excess sludge the cakes will be given to nearest
nursery.
37. Status of the project as on date shall be
submitted along with photographs from North,
South, West and East side facing camera and
adjoining areas should be provided.
Photographs showing the status of the project
are enclosed in the report as Annexure
38. The DG sets shall be so installed so as to
conform to prescribed stack heights and
regulations and also to the noise standards as
prescribed. Details should be submitted.
During Operation phase, D.G Sets shall be
installed with adequate stack height as per
norms for construction purpose.
39. Dispensary for first aid shall be provided. Well maintained first aid facility has been
provided during construction phase and it will
be provided during operational phase too.
Regular health checkup or workers are being
done. Medical Certificate of few workers are
enclosed as Annexure -IV
40. Ground Water downstream of Rain Water
Harvesting pit nearest to STP should be
Ground Water downstream of Rain Water
Harvesting pit nearest to STP shall be
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
monitored for bacterial contamination.
Necessary Hand Pumps should be provided for
sampling. The monitoring is to be done in pre
and post monsoon, seasons.
monitored for bacterial contamination.
41. The green belt shall consist of 50% trees, 25%
shrubs and 25% grass as per MOEF norms.
Proper Green belt shall be maintained as per
MOEF norms
SPECIFIC CONDITIONS
1. Parking facilities should be calculated on the
basis of New State Bylaws and the higher
should be provided.
Parking shall be provided accordingly
2. Dedicated visitors parking within the premises
should be at least 10 % over and above the
parking required for residents as per Noida
Authority norms.
Noted.
3. Separate club parking shall be provided. It shall be provided.
4. All vehicles should have PUC certificates and
should be periodically monitored.
Vehicles hired are having valid PUC
certificates.
PUC certificates certificate is enclosed as
Annexure-V
5. Stack height should be calculated based on
combined DG sets capacity as per CPCB
guidelines and should be higher than the tallest
building height in the project.
It will be maintained as per CPCB norms.
6. Proposed green belt and landscaping should be
as per CPCB guidelines.
Noted. Green area shall be developed as per the
plan submitted.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
7. All Internal roads should not be minimum 9 mt
wide.
All internal and peripheral roads shall be
minimum 9 mt. wide.
8. Proposals for Social, Corporate and
Environmental responsibility shall be submitted
within 03 months of receipt of this letter.
Noted.
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Annexure-I
Copy of Environment Clearance
Six Monthly Compliance Report – December-2014 Group Housing Complex “Mahagun Moderne”
ANNEXURE-II
COPY OF CTE GRANTED
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Annexure-III
Monitoring reports of Air, Water , Soil, Noise &
Stack
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Annexure-IV
Copy of Health Certificates of few workers
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Annexure-V
Copy of PUC Certificate of few vehicles
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Annexure-VI
Copy of Height Clearance from AAI
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Annexure-VII
Copy of Site Photographs
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Green Area
Covered Construction Material
Six Monthly Compliance Report – JUNE-2015 Group Housing Complex “Mahagun Moderne”
Fly Ash Blocks at the Site