DESCRIPTION

SCENARIO 2 PRESENTATION. 345KV HVDC ALTERNATIVE ROBERT LONA SENIOR CONSULTANT ERCOT SYSTEM PLANNING 3/10//2008. HVDC COST ASSUMPTIONS. $250/KW HVDC RATING(MW) COST $M 1000 $789 1500 $1,039 - PowerPoint PPT Presentation

TRANSCRIPT

SCENARIO 2 PRESENTATION

345KV HVDC ALTERNATIVEROBERT LONA

SENIOR CONSULTANTERCOT SYSTEM PLANNING

3/10//2008

2

HVDC COST ASSUMPTIONS• $250/KW HVDC RATING(MW) COST $M 1000 $789 1500 $1,039 2000 $1,289 2500 $1,539 3000 $1,789 4000 $2,289

• $1.05 MILLION/MILE(APPROXIMATELY 70% OF AC LINE COST)

3

3000MW HVDC ALTERNATIVES

• BLUFF CRK 345KV BUS – EVERMAN 345KV BUS• PANHANDLE – NAVARRO 345KV BUS• ODESSA 345KV BUS – W.A.PARISH 345KV BUS• OTHERS?

4

BLUFF CRK – EVERMAN 3000MW HVDC

• ~ 165 MILES• ESTIMATED TRANSMISSION COST $173 MILLION• HVDC COST $1,500 MILLION• TOTAL HVDC COST $1.673 BILLION

5

6

HVDC: BLUFCRK5 – EVERMAN5

SALADO5

KENDALL

7

CURRENT STATUS OF BLFCRK – EVERMAN HVDC

4 – MONTH WIND CURTAILMENT

MCCAMEY CENTRAL PANHANDLE OVERALL 3.21% 5.62% 11.12% 6.93%

TRANSMISSION COST COMPARABLE TO FULL 345KV AC CASESWITH 2% CURTAILMENT

8

PANHANDLE – NAVARRO 3000MW HVDC

• ~ 275 MILES• ESTIMATED TRANSMISSION COST $289 MILLION• HVDC COST $1,500 MILLION• TOTAL HVDC COST $1,789

9

3000MW HVDC: PANHANDLE – NAVARRO

10

NAVARRO

SALADO

KENDALL

11

CURRENT STATUS OF PANHANDLE - NAVARRO HVDC

4- MONTH WIND CURTAILMENT

MCCAMEY CENTRAL PANHANDLE OVERALL 8.61% 20.12% 3.28% 12.45%