route from amersham to little missenden - drawing number...

Post on 08-Dec-2018

220 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 7 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05007 3.0

As Shown

/ /2212 11 CO MP CL

For Coordination

2.0

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5007.d

gn

Approved

Approved

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

10010

0

120

120

120

120

120

120

120

120

120

120

120

120

120

120120

120

120

120

120

120

120

120

120

120

120 120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

160

160

160160

160

160

160

160

160

160

160

160

160

160

160160

160

160

160 160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

38+000

39+000

40+000

41+000

42+000

43+000

44+000

45+000

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0

Chainage

38+400

38+500

38+600

38+700

38+800

38+900

39+000

39+100

39+200

39+300

39+400

39+500

39+600

39+700

39+800

39+900

40+000

40+100

40+200

40+300

40+400

40+500

40+600

40+700

40+800

40+900

41+000

41+100

41+200

41+300

41+400

41+500

41+600

41+700

41+800

41+900

42+000

42+100

42+200

42+300

42+400

42+500

42+600

42+700

42+800

42+900

43+000

43+100

43+200

43+300

43+400

43+500

43+600

43+700

43+800

43+900

44+000

44+100

44+200

44+300

44+400

44+500

44+600

44+700

44+800

Horizontal Alignment

R=5400.0

L=1264.2L=8820.3

Vertical Alignment L=6610.0

G=0.39%

L=791.5

R=-37500.0

L=2564.9G=2.50%

Existing Level 126.8

127.2

135.2

144.2

151.2

153.8

155.1

157.6

162.6

163.9

156.1

144.5

136.0

127.7

131.6

127.7

109.7

102.1

112.4

124.3

133.1

138.3

140.9

142.3

141.7

140.9

139.3

132.8

115.3

104.6

103.7

111.3

114.4

113.1

108.5

105.5

102.3

99.8

100.0

100.2

100.2

101.1

104.8

109.7

112.8

112.0

115.3

121.5

126.6

129.0

127.0

121.6

129.6

136.1

143.5

147.1

151.7

154.6

156.7

161.7

165.0

165.3

164.3

154.9

139.7

Proposed Level 63.8

64.2

64.6

65.0

65.3

65.7

66.1

66.5

66.9

67.3

67.7

68.1

68.5

68.8

69.2

69.6

70.0

70.4

70.8

71.2

71.6

72.0

72.3

72.7

73.1

73.5

73.9

74.3

74.7

75.1

75.5

75.8

76.2

76.6

77.0

77.4

77.8

78.2

78.6

79.1

79.8

80.9

82.2

83.8

85.6

87.7

90.1

92.6

95.1

97.6

100.1

102.6

105.1

107.6

110.1

112.6

115.1

117.6

120.1

122.6

125.1

127.6

130.1

132.6

135.1

Cut and Fill -63.0

-63.0

-70.6

-79.2

-85.9

-88.1

-89.0

-91.1

-95.7

-96.6

-88.4

-76.4

-67.5

-58.9

-62.4

-58.1

-39.7

-31.7

-41.6

-53.1

-61.5

-66.3

-68.6

-69.6

-68.6

-67.4

-65.4

-58.5

-40.6

-29.5

-28.2

-35.5

-38.2

-36.5

-31.5

-28.1

-24.5

-21.6

-21.4

-21.1

-20.4

-20.2

-22.6

-25.9

-27.2

-24.3

-25.2

-28.9

-31.5

-31.4

-26.9

-19.0

-24.5

-28.5

-33.4

-34.5

-36.6

-37.0

-36.6

-39.1

-39.9

-37.7

-34.2

-22.3

-4.6

Design Speed 320km/h

Ch.4

2204.4

26

TP.7

8.5

80

Ch.4

2995.8

90

TP.9

0.0

10

L=375.0

400km/h

New HS2 Twin Bore 8.9Ø Tunnel M25 to Little Missenden 13325m

Possible Tunnel

Shaft LocationPossible Tunnel

Shaft Location

New HS2 Tunnel

Portal

Possible Tunnel

Shaft LocationPossible Tunnel

Shaft Location

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For

Continuation R

efer

To H

S2-A

RP-D

R-R

W-0

5008 F

or C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5006

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting

top related