Request for Proposal RFP (19-08-SSP)
Central Energy Plant Infrastructure Upgrade and Replacement
Design Build Team Services
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page2
The Project Moffitt’sMagnoliaCampusisseekingadesignbuildfirmupgradeandreplacemuchoftheexistinginfrastructureinthecentralenergyplan.Theprojectisanticipatedtobecompletedoverthecourseofseveralyearsinphasesasfollowswhichinclude:
• Phase1:o Sufficientdesignandpreconstructionservicestoestablishtotalprojectcostestimates
byphasewithcashflowprojections.o GMPforphase2o Establishprojectgoals,successmeasures,andrisksassociatedwitheachphase.This
includesdocumentingbaselineCEPPerformance.• Phase2:
o Provide(4)newcoolingtowercellsintheloadingdock,removeexistingcoolingtowers,construct(2)floorelectricalroomontopofdrainagepit,installrequiredelectricaldistributiongeartosetupphase3mechanicalequipment,install(1)newgeneratoronthesecondflooroftheelectricalbuilding,upgradeportionofexistingAHUcontrolvalves,andupgradefueloilsystemcapacityanddistribution.
• Phase3:o IncludestheremovalofexistingchillerX-CH-5.Provide(2)newchillers,(2)newprimary
CHWpumps,(2)newsecondaryCHWpumps.Install(5)newcoolingtowers.Removeair-cooledchillersforCSBandtieCSBCHWintoCEPplant.Extensivecondenserwaterupgradesrequired.ContinueAHUcontrolvalveandBASupgradeworkfromphase2asrequired.Provideelectricalswitchgeartoservicetheremainingequipmentinthefuturephases.
• Phase4:o Includes:Install(2)newchillers.Add(3)remaininghotwaterboilers.Installremaining
chilledwaterandheatinghotwaterpumpswithsupportingelectrical.CutoverSRBmainchilledwaterfromexistingsecondarychilledwaterpumpstonewsecondarychilledwaterpumps.Replaceallprimaryandsecondarychilledwaterpumpsexistingintheenergyplant(12intotal).RemoveFOBair-cooledchillerplantaftertyingexistingchilledwaterpipingintopipesuppliedbytheCSBexpansion.ContinueAHUcontrolvalveandBASupgradeworkfromasrequired.
• Phase5:o Includes:RemoveexistingchillersX-CH-1,X-CH-2andX-CH-3.InstallnewchillersCH-1,
CH-2andCH-3.CompleteAHUcontrolsupgrade.CompleteBASupgradesasrequired• Phase6:
o Includes:Replaceexistingsteamboilerswithsmaller,moreenergyefficientboilers.• Phase7:
o Includes:Cleanupworkfrompreviousyears.Potentialworkincludes:Upgradeboilerplantandchillerplantventilationsystems.UpgradeCEPlighting.
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page3
Thetotalprojectedvalueforallphasesoftheprojectisexpectedtobebetween$50and$58MM.Theentireprojectwillbeconceived,plannedanddesigned,butonlythefirstphasewillbeauthorizedandcontractedatthistime.
The Team Talentedprofessionalsarecentraltoaccomplishingthesegoals,andtheircollaborativeinteractionswillbekeytotheproject’ssuccess.TheprincipalteamswillconsistoftheDesignBuildTeam,CommissioningAgent,andMoffittTeamMembers/ProgramManager.Theseteamswillbeintegratedtoenableprojectcollaboration,whileeachteammaintainingtheirownresponsibilityandauthority.Respondentsshouldpresenttheconstructionmanagementandarchitecturalfirmsonly.Subconsultantstothismainteamwillbeselectedseparately.DuetotheimportanceoftheMEPengineeronthisprojecttheprojectteamwillmakethisselectionoutsideofthisRFPinacollaborativemanner.
Representativesfromtheseprincipalpartieswillinteroperateattwocriticallevelswithinthebroaderteam:generally,theProjectExecutiveTeamandspecifically,theProjectManagementTeamtomaintainclearcommunicationsandresolveissues.Moffittaspiresfortheteamtointeroperateregularlyandincloseproximity.ItisMoffitt’sintenttobuildacultureofenduringtrustamongtheteamandsub-teams,framingconstructiveattitudesandrequiringleadershipfinessebyallparties.
Inthespiritofopennessandcollaboration,thegeneralandsalientresponsibilitiesforeachoftheseprincipalteammembersfollow.SpecificresponsibilitieswillbedefinedbyindividuallyexecutedowneragreementsbasedonthestandardcoordinatedAIAsuiteofcontracts.Allprincipalteammemberswillbeexpectedtomaintainabalancedfocusonforwardprogressandvaluecreationfortheproject,whilemaintainingpressureoneachothertocontrolcost,quality,andschedule.
TheDesignBuildFirmistoleadalldesignandconstructioneffortsincluding:
• Research,ideation,anddesignauthorshipinordertosolvetheprojectrequirements,bythedesign,technicaldocumentation,andconfirmingconstructionconformity.
• Continuouscostmodeling,constructionplanning/execution,procurementoflaborandmaterials,installation.
TheCommissioningAgentistoleadallcommissioningeffortsbeginningearlyinthedesignandcontinuingthroughuntilalldeliverablesareachieved.
Moffitt/OwnersRepresentativeistodrivetherapidanddependableinternaldecision-makingandbi-directionalreportingbetweenthedesignandconstructionteamsandMoffittleadership.ActasaMoffittTeammemberincoordinatingactivitiesandcommunicatingwithstaff.
Oncetheprincipalteamsarecombined,theywillcollaborativelyaddothertalentasrequired,suchas:
• Buildingservices(MEPFPLV)engineers• Structuralengineer• Civilengineers• Legalcounsel• Traffic/parkingconsultant• Geotechnicalconsultant
• Environmentalconsultant• Landscapearchitect• EnvironmentalGraphicsconsultant• Radio-physicist• Acousticalconsultant• Lightingconsultant
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page4
• Buildingenvelopeconsultant• Commissioningagent• Safety&Securityconsultant• Data/Telecommunicationsconsultant• Constructioncostestimator(3rd-party)• Schedulingconsultant
• Modelmaker&Renderer• Riskmanagement/Insuranceconsultant• Hazardousmaterialsconsultant• Materialstestingconsultants• Testingandbalanceconsultant• Industrialhygienist
Request for Proposal Contents ThisRequestforProposalpackageincludesthefollowingdocuments,whichrequireresponsesaspartofyourproposalasindicated:
1. CoverLetter(e-mail)2. ProjectDescription3. TeamOverview4. ProposalRequirements,whichrequiresaresponse5. SupplierDiversityUtilizationandSubcontractingPlan,whichrequiresaresponse6. PresentationInformation7. ExhibitA:FirmAcknowledgementForm–IntenttoPropose,whichrequiresaresponse8. ExhibitB:AboutH.LeeMoffittCancerCenter
Design Build Proposal Requirements Ingeneralterms,theroleoftheDesignBuildTeamistoleaddesign,continuouscostmodeling,constructionplanning/execution,procurementoflaborandmaterials,installation,andcommissioningintheexecutionoftheprojectintent,maintainabalancedfocusonforwardprogressandvaluecreationfortheproject,andbemutuallyresponsibletotheotherprincipalteammemberstocontrolcostandschedule.
Yourproposalshallbeorganizedtoillustratethemostsignificantqualitiesofyourfirmanditspeople.
ExecutiveStyleSummarythatclearlyandconciselyillustratesthatyourproposedprimaryteammembersdomeetallthefollowingminimumqualifications:
¨ PossessingsuccessfulpriorexperiencewiththedesignandorconstructionofaCentralEnergyPlant.(majorretrofittingofanexistinghospitalCEPexperiencepreferred)
¨ PossessingsuccessfulpriorexperiencewithaCEPmorethan$50MM.(previousteammemberworkingexperiencepreferred)
¨ PastprojectCEPperformanceimprovementresults
¨ Providingevidenceofyourabilitytoprovideaccuratecostmodeling
¨ Providingexamplesofhowyouwilldrivevaluetotheproject
¨ Demonstrateyourabilitytodeliverasafeproject
¨ Commitmentandabilityfortheprojecttomeetorexceededthe15%diversitygoal.
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page5
StatementsandExhibitsrespondingtothefollowing:
1. Describeyourunderstandingoftheproject’spurpose.
2. DescribehowMoffittmaybestaccomplishthisproject,thekeyfactorsforitssuccess,andhowyou’veachievedtheseinthepast.Includeconceptssuchasreportingrelationships,communication,minordisputeresolution,decisioncontrol,understandingtheentirevaluestream,etc.
3. Describethepriorexperienceofyourproposedteamconsistentwiththequalitiesofthisprojectdescribedabovewithfiveexamples.Includeexperiencewithhospitals,largeandmulti-phaseprojects,integrateddeliverymethods,LEANdecisionfacilitation,andthird-partycertificationsofskillsandotherpertinentqualifications.
Inclarifyingtheseexperiences,identifytheotherprimaryteammembers(MEPEngineeringFirms,CommissioningAgents,ProgramManagers),theaccountsofyourinteractionswiththem,andhowtheyhavedevelopedandsustainedtrust.
4. Describeandprovideevidenceforyourorganization’sfinancialstabilityandinsurancestoperformyourworkonthisproject.Moffittiscurrentlycontemplatingseparateproject-basedliabilitycoveragesbuthasnotconcludedthatinvestigationtodate.(IE.ProjectspecificE&OPolicies)
5. Describeyourfirm’sclaimshistoryandhowallclaimswereresolved.IdentifyArchitects,Engineers,andOwnersRepresentativesalsoinvolved.
6. Citeyourfirm’sprioryearnetservicerevenuesandnumberofstafftoaccomplishit.Describehowyouexpectthistochangeinthenextfewyears.Confirmyouroutstandingbondcapacity.
7. Provideatargetfeeandanot-to-exceedvalueforreimbursableexpensesforphase1(subjecttoMEPfirmfinalselection).
8. Provideatargetscheduleforthecompletionofphase1.
9. Providethreereferencesforyourleadprojectteammembersforsimilarprojects.
10. Confirmyourteam’sabilitytofullyengageinphase1andshowastaffingplanalignedtothetargetschedule.
11. Describeyourfirm’sapproachtoengagingadiverseteamandconfirmthatyourfirmcomplieswiththeSupplierDiversityUtilizationandSubcontractingPlanrequirement.
12. Thissubmissionistobeconciseandnotexceedtwenty8½x11pagesinlegiblefont.
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page6
Communication
Allproposals, communications,andcorrespondence requiredduring theRequest forProposalprocessmustbedirectedto:
Ms.LoriPerksSourcingAnalystMoffittCancerCenterrfp@Moffitt.orgt:813-745-8706f:813-449-8277
Failuretoadheretothisrequirementmayresultinyourorganizationnotbeingconsidered.
Timeline
ThisRequestforProposalshallbeconductedunderthefollowingtimeline,whichissubjecttochangeonlyuponpriorapprovalbyPurchasingandgrantedtoallvendors.
IssuanceofBid 05/10/2019ReturnofIntenttoRespond 05/20/2019VendorConferenceCall 05/23/2019BidPackagesDuefromVendors 06/10/2019AwardofBid TBD
InterestedteamsmustsubmitaFirmAcknowledgementForm–IntenttoRespond(ExhibitA)viae-mailnolaterthan2:00PMESTonMay20,2019.
Pre-SubmissionTeleconference
MoffittCancerCenterwillconductaPre-SubmissionTeleconferencetofurtherclarifyanddiscusstherequirementsofthisRFPat10:00AMESTonMay23,2019.Thecall-innumberis:800-206-6032.ConferenceID:7457113.
Proposals
Interestedteam’sproposalsaredueinPDFformviae-mailnolaterthan2:00PMESTonJune10,2019.
AwardandOtherCriteria
TheawardofthisRequestforProposalissubjecttotermsandconditionscontainedhereinandanythatwillbedevelopedbyMoffittCancerCenterduringtheRequestforProposalprocesstoaugmentconditionsofengagement.
Qualityofservice,pricing,products,SupplierDiversityandothertermsofpurchasewillbeanintegralpartofthedecisionselectionprocess.
Ifyourfirmisawardedthisproject,aguidelinewillbedevelopedthatwillquantify,monitor,andprovideaplanforcureofdeficiencieswhichshallinclude,butnotbelimitedto,reimbursementof
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page7
personnelandadministrativecosts,monetaryassessmentforcontinualdeficiencies,andpossiblecancellationofagreement.
H.LeeMoffittCancerCenterreservestherighttoawardthisagreementinwholeorinparttothefirmthatcanbestmeetMoffitt’sbusinessneeds.
H.LeeMoffittCancerCenterassumesnoresponsibilityandbearsnoliabilityforcostsincurredbyaCompanyinthepreparationandsubmittalofaproposalinresponsetothisRequestforProposal.
Supplier Diversity Utilization and Subcontracting Plan Requirement MoffittCancerCenterrecognizestheimportanceofsupplierdiversityinallaspectsofourbusinessandprocurementpracticesandactivelyencouragesthedevelopment,utilizationandeconomicgrowthofcertifiedMinority,Women,VeteranandServiceDisabledVeteran-ownedBusinessEnterprise(MBE/WBE/VBE/SDVBE).CentraltothisinitiativeistheinclusionandparticipationofadiversegroupofvendorsdoingbusinesswithMoffittCancerCenterandassuch,MoffittencouragestheparticipationofcertifiedMBE/WBE/VBE/SDVBEsinitsprocurementprocessbothattheprimevendorlevelaswellasatthesubcontractorlevelofitsprimecontracts.MoffittCancerCenteriscommittedtoacomprehensiveSupplierDiversityProgramthatensuresmaximumopportunitiesexistforsuchdiversebusinesses
RFPresponsesshouldincludethefirm’sabilitytoprovidefifteenpercent(15%)spendwithcertifiedMinority,Women,VeteranandServiceDisabledVeteran-ownedBusinessEnterprises(“MBE/WBE/VBE/SDVBE”)relatedtothespecificcommodityorservicesidentifiedintheproposal.MoffittCancerCenterisanequalopportunitycorporation,and,assuch,stronglyencouragesthelawfuluseofcertifiedMBE/WBE/VBE/SDVBEsintheprovisionofservicesbyprovidingafairandequalopportunitytocompetefor,orforparticipationin,providingservices.MoffittCancerCenterbelievesinequalopportunitypracticeswhichconformtoboththespiritandtheletterofalllawsagainstdiscrimination,andiscommittedtonon-discriminationbecauseofrace,creed,color,sex,age,nationalorigin,orreligion.TobeconsideredforinclusionthepotentialfirmcommitstoMBE/WBE/VBE/SDVBEsParticipation.
Thesuccessfulfirmshallendeavortoprovidefifteenpercent(15%)spendwithcertifiedMBE/WBE/VBE/SDVBErelatedtothespecificcommodityorservicesidentifiedintheproposal.Acertificationletterfromanyofthefollowingagencieswillberequiredofanyfirmand/oridentifiedsubcontractorclaimingMBE/WBE/VBE/SDVBEstatusatthetimeoftheRFPresponse.
MoffittacceptsallLocal,StateandFederalGovernmentagenciesMBE/WBEcertifications,includingthefollowing:
• CityofTampa• HillsboroughCounty• StateofFlorida• SmallBusinessAdministration(SBA)8AProgramCertification
OtherMBE/WBEcertificationsacceptedinclude:
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page8
• FloridaStateMinoritySupplierDevelopmentCouncil(FSMSDC)• NationalMinoritySupplierDevelopmentCouncil(NMSDC)®ionalaffiliates• Women’sBusinessEnterpriseNationalCouncil(WBENC)• NationalWomenBusinessOwnersCorporation(NWBOC)
Veteran&ServiceDisabledVeteran(VBE/SDVBE)Certification/Verificationaccepted:
• DepartmentofVeteransAffairs• StateofFloridaOfficeofSupplierDiversity
Pleaserespondtothesectionbelow:
SupplierDiversityUtilizationandSubcontractingPlanRequirement:MoffittCancerCenterrecognizestheimportanceofsupplierdiversityinallaspectsofourbusinessandprocurementpracticesandactivelyencouragesthedevelopment,utilizationandeconomicgrowthofcertifiedMinority,Women,VeteranandServiceDisabledVeteran-ownedBusinessEnterprise(MBE/WBE/VBE/SDVBEs).CentraltothisinitiativeistheinclusionandparticipationofadiversegroupoffirmsdoingbusinesswithMoffittCancerCenterandassuch,MoffittencouragestheparticipationofcertifiedMBE/WBE/VBE/SDVBEsinitsprocurementprocessbothattheprimefirmlevelaswellasatthesubcontractorlevelofitsprimecontracts.MoffittCancerCenteriscommittedtoacomprehensiveSupplierDiversityProgramthatensuresmaximumopportunitiesexistforsuchdiversebusinesses.
SupplierDiversityUtilizationandSubcontractingPlan-FirmsrespondingtothisRFParerequiredtosubmitaSupplierDiversityUtilizationandSubcontractingPlanfordiversesupplieropportunityandparticipationofcertifiedMBE/WBE/VBE/SDVBEswiththeirproposal.TheSupplierDiversityUtilizationandSubcontractingPlansubmittedmustincludethefollowing:
• ProvideSupplierDiversityUtilizationandSubcontractingPlanandDescriptionofyourSupplierDiversityProgram.SupplierDiversityUtilizationandSubcontractingPlanandDescriptionofyourSupplierDiversityProgramsubmitted:___Yes___No
• WhatpercentageofspendwithMBE/WBE/VBE/SDVBEsisprojectedforthespecificcommodityorserviceoutlinedinthisRequestforProposal(RFP):___________________(%).
• Outlinetheplanforachieving1sttierspendwithMBE/WBE/VBE/SDVBEsandidentifythepercentageofspend:___________________(%).
• Outlinetheplanforachieving2ndtierspendwithMBE/WBE/VBE/SDVBEsandidentifythepercentageofspend:___________________(%).
• AlistofthecertifiedMBE/WBE/VBE/SDVBEsthatwillbeutilizedas2ndtiersubcontract(s)
Wasalistingprovided:___Yes___No
**Note:YourRFPsubmittalmustincludeyourresponsethataddressestheSupplierDiversityUtilizationandSubcontractingPlanoutlinedabove.
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page9
Reports-ThesuccessfulfirmwillberequiredtoprovidemonthlySubcontractExpenditureReportstoMoffittCancerCenteridentifyingcertifiedMBE/WBE/VBE/SDVBEparticipationthatliststotalpaymentsmadetosubcontractor(s)until100%completion/deliveryofthespecificcommodityorservicesoutlinedinthisRFPfinalized.Thereportshallincludethenames,addresses,typeofserviceorcommodityprovided,dollaramountpaid,paymentdate,FEID#,nameofcertificationentity,businessclassification,andcopyoffirmcertificationforeachfirmidentifiedinthereport.AllSubcontractorExpenditurereportsarealsorequiredtobeturnedinwithallpayapplications/invoicesandacopysenttoDesireeHanson,Manager,SupplierDiversityProgramviaemailDesiree.Hanson@moffitt.org.
• FirmagreestoprovidemonthlySubcontractExpenditureReportswithsubmittalofeverypayapplication/invoice:___Yes___No
Interview Information Shouldtheselectioncommitteedetermineinterviewsarerequired;shortlistedfirmswillbeinvitedtodiscusstheirproposalinpersonwiththeSelectionCommittee.Thepurposeoftheinterviewistodemonstratethecredibility,trustworthinessandleadershipofyourteammembers.Onlypreviouslyproposedandrelevantteammemberswillbeallowedtopresent.
TheSelectionCommitteewillhavealreadyreviewedanddigestedyourproposalinformation,andthereisnoneedtorepeatthatinformation.Pleaseremainfocusedonthespecificchallengesandopportunitiesofthisprojectandyourteam’suniqueabilitiestobestachievethem.
Yourteamwillbeallowedatotalof60minutesfortheinterviewwhichshalltakeplaceasaninteractivediscussionratherthanapresentation.Youwillalsobegiven5minutestosetuppriortotheinterviewand5minutesaftertoremoveyoursetup.
ItisMoffitt’sintenttonotifythesuccessfulfirmwithinaweekfollowingthelastinterview.
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page10
Exhibit A: Firm Acknowledgement Form – Intent to Respond
SUBMITTO:LoriPerksrfp@Moffitt.org813-745-8706813-449-8277(Fax)
RFPNUMBER:19-08-SSP
RFPTITLE:CentralEnergyPlantInfrastructureUpgradeandReplacement–DesignBuildTeamServices
VENDORNAMEandMAILINGADDRESS:
INTENTTOBID:Yes______________No_______________(Ifunabletobid,indicatereasonbelow)
TELEPHONENUMBERFACSIMILENUMBER
VENDOR’SAUTHORIZEDCONTACTFORRFPNAMEE-MAIL
PleaseletusknowhowyouheardaboutthisRFP:
__NotifiedbyPurchasing__CommunityorMWBEOrganization__MonitoringMoffittWebsite___Advertisement___Other:
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page11
SUPPLIERDIVERSITYINFORMATIONIsyourfirmacertified“Minority,Women-Owned,Veteran,ServiceDisabledVeteran-OwnedBusinessEnterprise”definedasabusinessconcernengagedincommercialtransactionsandisaleastfifty-one(51%)percentminority,woman,veteran,service-disabledveteran-owned,andwhosemanagementanddailyoperationsarecontrolledbysuchpersons?Yes________________________No____________________Ifyourfirmiscertifiedasa“Minority,Woman,Veteran,orServiceDisabledVeteran-OwnedBusinessEnterprise,”youmustprovideacurrentcopyofyourcertificatewiththisform,andprovidethenameofthecertifyingentityandcertificationdatesbelow:NameofCertifyingEntity______________________________________________________________CertificationDateBegins_____________________________Ends_____________________________Icertifythatthisresponseismadewithoutpriorunderstanding,agreement,orconnectionwithanycorporation,firm,orpersonsubmittingaresponseforthesamematerials,suppliesorequipment,andisinallrespectsfairandwithoutcollusionorfraud.IagreetoabidebyallconditionsofthisresponseandcertifythatIamauthorizedtosignthisresponseforthevendorandthatthevendorisincompliancewithallrequirementsoftheRequestforQualifications.________________________________________________Signature________________________________________________PrintedNameandDate
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page12
Exhibit B: About H. Lee Moffitt Cancer Center TheH.LeeMoffittCancerCenter&ResearchInstitute(MCC),locatedinTampa,Florida,beganoperationsin1986.Asanacademicandresearchmedicalcenter,MCCistheonlyNationalCancerInstitute-designatedoncologyresearchinstituteinFloridaandoneoftheSoutheast'sleadingcancercenters.Comprisedofaninpatientfacility,ambulatoryoutpatientsurgerycenter,ambulatoryclinics,acancerscreeningfacilityandresearchlaboratories,MCCoffersasophisticatednetworkofservicesandtechnologiesthatassurethecitizensofitsregionconvenient,cost-effective,highqualityhealthcare.Moffitt’sworkforceiscurrentlycomprisedofapproximately5300employees,700medicalresidents,600volunteers,and1000studentsandinterns.
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG Page13
MOFFITT CANCER CENTER 12902 USF MAGNOLIA DRIVE, TAMPA, FL 33612-9416 I 1-888-MOFFITT I MOFFITT.ORG
top related