pt. mairodi mandiri sejahteramairodi-training.com/wp-content/uploads/2017/05/agenda-bandung... ·...

Post on 22-Feb-2018

215 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Agenda Training Bandung 2017No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING1 SAFETY INSTRUMENTED SYSTEM (SIS) AND

CONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000

2 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000

3 Statistical Process Control BERBASIS MINITAB14 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 21-24 19-22 17-20 14-17 19-22 7.950.000

4 BASIC CIVIL 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 05-08 7.950.0005 CARTOGRAFI 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 04-07 7.950.000

6 CATHODIC PROTECTION CORROSION CONTROLAND PREVENTION 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 12-15 7.950.000

7 CIVIL CONSTRUCTION OBSERVATION ofEXECUTION BUILDING 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 18-21 7.950.000

8 CIVIL CONSTRUCTION PENGAWASANPELAKSANAAN BANGUNAN 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 04-07 7.950.000

9 CONTROL VALVE AND VALVE OPERATION ANDSIZING 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000

10 DOKUMEN KONTROL 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 18-21 7.950.00011 FUZZY LOGIC CONTROL 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 05-08 7.950.00012 GAS AND LIQUID FLOW MEASUREMENT 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000

13 PROCESS CONTROL SYSTEMS APPLICATION,DESIGN, AND TUNING 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000

14 SUPERVISORY CONTROL AND DATAACQUISITION (SCADA) 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000

15 Survey & Mapping 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.000

16 PRESSURE SAFETY VALVE SELECTION ANDSIZING 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000

17 CHOKE AND CONTROL VALVE 4 17-20 14-17 27-02 18-21 15-18 05-08 18-21 21-24 19-22 17-20 30-02 11-14 7.950.000

18 MARINE CORROSION AND PREVENTION FOROFFSHORE STRUCTURE 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.500.000

19 ADVANCED FLOW MEASUREMENT 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.00020 ADVANCED PID CONTROLLER 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.00021 CONTROL AND CHOKE VALVES 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

PT. MAIRODI MANDIRI SEJAHTERATRAINING, CONSULTING & ENGINEERING SERVICES

Alamat: Gedung Dapenpos Lt.2, Jl. PH.H. Mustofa No.35 , Bandung, Indonesia, 40124Telp/Fax: +62-22- 7215416 / 7215668 Homepage: www.mairodi-training.com

2

22 CONTROL SYSTEM FUNDAMENTALS 4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 8.500.000

23 FIELDBUS AND INDUSTRIAL DATACOMMUNICATION 4 03-06 31-03 21-24 04-07 02-05 13-16 04-07 01-04 05-08 03-06 21-24 18-21 8.500.000

24 FISCAL AND CUSTODY METERING 4 09-12 06-09 28-31 10-13 08-11 06-09 10-13 07-10 11-14 09-12 28-01 04-07 8.500.00025 FLOW ASSURANCE IN PIPING SYSTEMS 4 16-19 13-16 27-02 17-20 15-18 12-15 17-20 21-24 18-21 16-19 30-02 12-15 8.500.000

26 FLUID FLOW – GAS METERING AND CUSTODYTRANSFER 5 23-27 20-24 06-10 24-28 29-02 05-09 24-28 31-04 25-29 23-27 06-10 18-22 9.500.000

27 HUMAN MACHINE INTERFACE (HMI) 4 02-05 30-02 13-16 03-06 02-05 13-16 03-06 28-31 04-07 02-05 13-16 05-08 8.500.00028 OPC (OPEN PROCESS CONTROL) 4 10-13 07-10 20-23 10-13 09-12 05-08 11-14 08-11 12-15 10-13 20-23 11-14 8.500.00029 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 03-06 31-03 06-09 04-07 02-05 13-16 04-07 31-03 05-08 03-06 06-09 12-15 8.500.00030 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 09-12 06-09 14-17 10-13 08-11 05-08 10-13 07-10 11-14 09-12 14-17 19-22 8.500.00031 SCADA SYSTEMS 4 16-19 13-16 21-24 17-20 15-18 12-15 17-20 21-24 18-21 16-19 21-24 05-08 8.500.00032 Ultrasonic Gas Flow Meter 5 23-27 20-24 27-31 24-28 29-02 05-09 24-28 31-04 25-29 23-27 27-01 11-15 9.500.000

33 WELLHEAD INSTRUMENTATION ANDHYDRAULIC CONTROL SYSTEMS 4 02-05 30-02 27-02 03-06 02-05 13-16 03-06 28-31 04-07 02-05 30-02 18-21 8.500.000

34 WIRELESS LAN IN INDUSTRIAL AUTOMATION &ISA 100.11a 4 10-13 07-10 07-10 10-13 09-12 05-08 11-14 08-11 12-15 10-13 07-10 04-07 8.500.000

35 CALIBRATION ISO IEC 17025 4 17-20 14-17 13-16 18-21 16-19 12-15 18-21 22-25 19-22 17-20 13-16 11-14 8.500.000

36 DESIGN OF EXPRIMENTS (DOE) FUNDAMENTALCONCEPT AND APPLICATION 4 16-19 13-16 13-16 17-20 15-18 05-08 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000

37 Electrical Test Instrumentation dan SistemPengukuran (Measurements) 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

38 Instrumentation Systems 4 02-05 30-02 27-30 03-06 02-05 06-09 03-06 31-03 04-07 02-05 27-30 11-14 8.500.00039 Measurements Systems 4 09-12 06-09 27-02 10-13 08-11 13-16 10-13 07-10 11-14 09-12 30-02 19-22 8.500.00040 Energy Audit and Application 4 23-26 20-23 13-16 24-27 29-01 12-15 24-27 28-31 25-28 23-26 13-16 11-14 8.500.00041 STATISTIK INDUSTRI 4 02-05 30-02 20-23 03-06 29-01 05-08 03-06 28-31 04-07 02-05 20-23 11-14 7.950.000

42CATHODIC PROTECTION FOR MINE STEELSTRUCTURE AND MINING SUPORTINGFACILITIES

4 23-26 20-23 13-16 24-27 15-18 05-08 24-27 21-24 25-28 23-26 13-16 04-07 8.750.000

43 Cathodic Protection for Onshore and OffshoreStructure 4 02-05 30-02 20-23 03-06 29-01 12-15 03-06 28-31 04-07 02-05 20-23 11-14 8.750.000

44 CORROSION AND SCALING PREVENTION 4 16-19 13-16 27-02 17-20 08-11 13-16 17-20 07-10 18-21 16-19 30-02 05-08 8.750.000

45 Corrosion Engineering for Non CorrosionEngineers 4 24-27 21-24 06-09 25-28 16-19 05-08 25-28 22-25 26-29 24-27 06-09 12-15 8.750.000

46INTERNAL AND EXTERNAL CORROSIONCONTROL AND MONITORING FOR PIPELINEAND SURFACE FACILITY

4 23-26 20-23 28-03 24-27 15-18 05-08 24-27 21-24 25-28 23-26 31-03 18-21 8.750.000

47 CCTV INSTALASI, PEMROGRAMAN DANPERAWATAN 3 02-04 30-01 13-15 03-05 22-24 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000

3

48 ADVANCED CCTV Perencanaan, Desain danImplementasi 3 09-11 06-08 06-08 10-12 10-12 19-21 10-12 09-11 11-13 09-11 06-08 13-15 5.950.000

49 INSTRUMENTATION AND CONTROL SYSTEM 4 24-27 21-24 27-30 25-28 02-05 12-15 25-28 01-04 26-29 24-27 27-30 12-15 7.950.00050 Scale In Oilfield Water 4 02-05 30-02 28-31 03-06 08-11 05-08 03-06 07-10 04-07 02-05 28-01 05-08 7.950.000

51 SIMULASI PROSES TEKNIK KIMIAMENGGUNAKAN HYSYS 4 09-12 06-09 27-02 10-13 15-18 13-16 10-13 21-24 11-14 09-12 30-02 12-15 7.950.000

52 PERHITUNGAN KETIDAKPASTIAN HASILPENGUKURAN DAN PENGUJIAN 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 18-20 5.950.000

53 BASIC FUZZY LOGIC CONTROL AND ITS SIMULATIONWITH SPREADSHEET APPLICATION PROGRAM 4 02-05 30-02 06-09 03-06 15-18 12-15 03-06 07-10 04-07 02-05 06-09 04-07 8.500.000

54 APPLICATION STATISTIC IN ENGINEERINGINDUSTRY 4 02-05 30-02 20-23 03-06 08-11 06-09 03-06 31-03 04-07 02-05 20-23 05-08 7.950.000

55 CALLIBRATION OF MEASURING TOOL 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 28-31 26-29 24-27 07-10 04-07 7.950.000

56 CONTROL VALVE OPERATION, MAINTENANCE,AND TROUBLESHOOTING 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 21-24 18-21 16-19 28-01 05-08 7.950.000

57 FINITE ELEMENT METHODS (FEM) 4 03-06 31-03 28-03 04-07 09-12 06-09 04-07 01-04 05-08 03-06 31-03 05-08 7.950.00058 Flow Measurement and Control Element 4 09-12 06-09 07-10 10-13 15-18 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.00059 INDUSTRIAL METROLOGY 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 08-11 12-15 10-13 30-02 18-21 7.950.00060 Inspeksi dan Korosi 4 17-20 14-17 06-09 18-21 30-02 05-08 18-21 22-25 19-22 17-20 06-09 05-08 7.950.00061 MEASUREMENT SYSTEM ANALYSIS 4 03-06 31-03 06-09 04-07 09-12 06-09 04-07 01-04 05-08 03-06 06-09 11-14 7.950.000

62 ADVANCE PROCESS CONTROL,INSTRUMENTATION AND METERING 4 23-26 20-23 27-02 24-27 08-11 05-08 24-27 31-03 25-28 23-26 30-02 11-14 8.500.000

63 OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM) 4 02-05 30-02 06-09 03-06 15-18 12-15 03-06 07-10 04-07 02-05 06-09 18-21 8.500.000

64 PROCESS CONTROL AND INSTRUMENTATION 4 09-12 06-09 13-16 10-13 29-01 06-09 10-13 21-24 11-14 09-12 13-16 04-07 8.500.000

65 SAFETY INSTRUMENTED SYSTEM (SIS) ANDCONTROL 4 16-19 13-16 20-23 17-20 02-05 13-16 17-20 28-31 18-21 16-19 20-23 12-15 8.500.000

66 SAFETY RELIEF VALVE FUNDAMENTALCONCEPTS, SIZING AND SELECTION 4 24-27 21-24 27-30 25-28 09-12 05-08 25-28 01-04 26-29 24-27 27-30 19-22 8.500.000

67 FLUID FLOW MEASUREMENT AND METERPROVING IN OIL AND GAS INDUSTRY 4 24-27 21-24 14-17 25-28 09-12 06-09 25-28 01-04 26-29 24-27 14-17 11-14 7.950.000

68 GPS(Global Positioning System) for mining andPetroleum 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 18-21 8.500.000

69 INDUSTRIAL COMBUSTION AND BURNER 4 16-19 13-16 27-02 17-20 02-05 12-15 17-20 28-31 18-21 16-19 30-02 04-07 8.500.00070 WATER TREATMENT 4 16-19 13-16 20-23 17-20 08-11 13-16 17-20 07-10 18-21 16-19 20-23 19-22 8.750.00071 LIFE CYCLE COSTING 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 6.500.000

4

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MECHANICAL1 Gas, Oil and Water Pipeline Design and

Maintenance 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 11-14 8.750.000

2 WELDING SAFETY 2 02-03 30-31 02-03 03-04 02-03 12-13 03-04 28-29 04-05 02-03 02-03 27-28 3.950.000

3 Electric motor Operation, Maintenance &Troubleshooting 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 04-07 7.950.000

4 BOILER CONTROL SYSTEMS ENGINEERING 4 23-26 20-23 27-30 24-27 02-05 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.0005 PLUMBING SYSTEM AND MAINTENANCE 3 16-18 13-15 13-15 17-19 22-24 19-21 17-19 14-16 18-20 16-18 13-15 27-29 6.500.000

6SISTEM KONTROL RHVAC (REFRIGERATIONHEATING VENTILATING AND AIRCONDITIONING)

5 23-27 20-24 20-24 24-28 29-02 12-16 24-28 21-25 25-29 23-27 20-24 04-08 9.500.000

7 REFRIGERATION RETROFIT 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 28-31 04-07 02-05 27-30 11-14 8.500.0008 Pipeline Risk & Integrity Management 3 23-25 20-22 13-15 24-26 15-17 12-14 24-26 14-16 25-27 23-25 13-15 27-29 6.950.000

9 Piping & Pipeline System Design, Specification,Installation & Maintenance 4 02-05 30-02 20-23 03-06 29-01 05-08 03-06 21-24 04-07 02-05 20-23 04-07 8500000

10 PLANT LIFE MANAGEMENT THROUGHRELIABILITY BASED INSPECTION 5 09-13 06-10 27-31 17-21 08-12 12-16 10-14 31-04 11-15 09-13 27-01 11-15 9.500.000

11 QC for Water Network (Pipeline) Construction 3 18-20 15-17 01-03 11-13 22-24 19-21 19-21 28-30 20-22 18-20 01-03 20-22 6.950.00012 Risk Based Inspection 3 04-06 01-03 15-17 05-07 17-19 07-09 05-07 14-16 06-08 04-06 15-17 06-08 6.950.00013 Basic CNC 3 02-04 30-01 06-08 03-05 08-10 05-07 03-05 07-09 04-06 02-04 06-08 04-06 7.250.000

14COMPRESSOR OPERATION, MAINTENANCE,TROUBLESHOOTING AND DIAGNOSTIC OFFAILURE ANALYSIS

4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 21-24 11-14 09-12 13-16 11-14 7.950.000

15 MACHINERY FLUID MECHANICS 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 18-21 7.950.00016 PELUMAS DAN SISTEM PELUMASAN 4 23-26 20-23 27-30 24-27 02-05 13-16 24-27 31-03 25-28 23-26 27-30 04-07 7.950.000

17 ELECTRIC CHARGING SYSTEM AND STARTINGSYSTEM OF HEAVY DUTY EQUIPMENT 4 09-12 06-09 06-09 10-13 15-18 12-15 10-13 21-24 11-14 09-12 06-09 18-21 7.950.000

18 ELECTRO-PNEUMATICS SYSTEM PRINCIPLESAND APPLICATION 4 16-19 13-16 13-16 17-20 29-01 05-08 17-20 28-31 18-21 16-19 13-16 04-07 7.950.000

19 INSTRUMENTATION AND CONTROL SYSTEM 4 23-26 20-23 20-23 24-27 02-05 13-16 24-27 31-03 25-28 23-26 20-23 11-14 7.950.00020 KONTROL ELEKTRIK 4 02-05 30-02 27-30 03-06 08-11 06-09 03-06 07-10 04-07 02-05 27-30 19-22 7.950.00021 MECHATRONICS APPLICATION IN INDUSTRY 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 22-25 12-15 10-13 30-02 05-08 7.950.00022 Mekatronika 4 17-20 14-17 07-10 18-21 30-02 05-08 18-21 28-31 19-22 17-20 07-10 12-15 7.950.00023 PNEUMATIC SYSTEM AND APPLICATION 4 24-27 21-24 14-17 25-28 02-05 13-16 25-28 01-04 26-29 24-27 14-17 18-21 7.950.00024 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 03-06 31-03 21-24 04-07 09-12 06-09 04-07 08-11 05-08 03-06 21-24 04-07 7.950.00025 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 09-12 06-09 28-31 10-13 15-18 12-15 10-13 21-24 11-14 09-12 28-01 11-14 7.950.00026 REKAYASA HIDROLIK AND APLIKASI 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 28-31 18-21 16-19 31-03 19-22 7.950.00027 INSTRUMENTATION AND BASIC CONTROL 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.000

5

SYSTEM28 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 30-02 27-30 03-06 29-01 12-15 03-06 28-31 04-07 02-05 27-30 04-07 7.950.00029 MANAJEMEN MATERIAL 4 16-19 13-16 06-09 17-20 08-11 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.00030 Manajemen Perbengkelan 4 23-26 20-23 13-16 24-27 15-18 06-09 24-27 21-24 25-28 23-26 13-16 05-08 7.950.000

31 PENGETAHUAN MATERIAL HANDLING &APLIKASI 4 03-06 31-03 20-23 04-07 30-02 12-15 04-07 28-31 05-08 03-06 20-23 12-15 7.950.000

32 AC & REFRIGERATION PRINCIPLES, OPERATIONAND TROUBLESHOOTING 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 31-03 04-07 02-05 27-30 11-14 7.950.000

33 ADVANCED VIBRATION MONITORINGTECHNIQUE 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 21-24 18-21 16-19 06-09 04-07 7.950.000

34 BEARING TECHNOLOGY AND LUBRICATIONSYSTEM 4 24-27 21-24 07-10 25-28 30-02 13-16 25-28 28-31 26-29 24-27 07-10 18-21 7.950.000

35 CENTRIFUGAL GAS COMPRESSOR Anti SurgeControl 4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 19-22 7.950.000

36 CENTRIFUGAL GAS COMPRESSOR OPERATION &MAINTENANCE 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 05-08 7.950.000

37 CENTRIFUGAL PUMP OPERATION ANDMAINTENANCE 4 03-06 31-03 06-09 04-07 02-05 05-08 04-07 01-04 05-08 03-06 06-09 11-14 7.950.000

38 COLD STORAGE PRINCIPLE, OPERATION &TROUBLESHOOTING 4 24-27 21-24 28-31 25-28 30-02 13-16 25-28 28-31 26-29 24-27 28-01 12-15 7.950.000

39 DIESEL ENGINES OPERATION ANDMAINTENANCE 4 16-19 13-16 14-17 17-20 15-18 06-09 17-20 21-24 18-21 16-19 14-17 11-14 7.950.000

40 GAS TURBINE OPERATION, PERFORMANCE &TROUBLESHOOTING 4 09-12 06-09 28-31 10-13 08-11 12-15 10-13 07-10 11-14 09-12 28-01 18-21 7.950.000

41 HYDRAULICS SYSTEMS Engineering Applications 4 03-06 31-03 14-17 04-07 02-05 05-08 04-07 01-04 05-08 03-06 14-17 19-22 7.950.000

42 HYDRAULICS SYSTEMS MAINTENANCE &TROUBLESHOOTING 4 10-13 07-10 21-24 10-13 09-12 12-15 11-14 08-11 12-15 10-13 21-24 05-08 7.950.000

43 MATERIAL ATTITUDE USES AND PROBLEMS 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 01-04 05-08 03-06 31-03 11-14 7.950.00044 MATERIAL IDENTIFICATION 4 10-13 07-10 07-10 10-13 09-12 12-15 11-14 08-11 12-15 10-13 07-10 18-21 7.950.00045 METALLURGY FOR NON METALLURGIST 4 24-27 21-24 21-24 25-28 30-02 13-16 25-28 28-31 26-29 24-27 21-24 12-15 7.950.000

46 MOTOR CONTROL CENTER OPERATION &MAINTENANCE 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 31-03 04-07 02-05 27-30 19-22 7.950.000

47 OPERATING AND MAINTENANCE OF HEAVYDUTY EQUIPMENTS 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 21-24 18-21 16-19 06-09 11-14 7.950.000

48 PIPING SYSTEM MATERIAL DESIGN ANDMAINTENANCE 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 12-15 7.950.000

49 PRACTICAL WELDING 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 18-21 7.950.00050 PRACTICE CONSIDERATIONS OF ARC WELDING 4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 04-07 7.950.00051 ROTOR BALANCING AND SHAFT ALIGNMENT 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 05-08 7.950.00052 Welding 4 17-20 14-17 06-09 18-21 16-19 06-09 18-21 22-25 19-22 17-20 06-09 04-07 7.950.000

6

53 Welding Joint Inspection 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 12-15 7.950.00054 Welding Metallurgy 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 19-22 7.950.00055 Welding Oxy Acetylene 4 09-12 06-09 28-31 10-13 08-11 12-15 10-13 07-10 11-14 09-12 28-01 05-08 7.950.00056 MANAJEMEN BENGKEL 4 02-05 30-02 13-16 03-06 02-05 05-08 03-06 31-03 04-07 02-05 13-16 04-07 7.950.00057 THERMAL SPRAY COATING 4 09-12 06-09 13-16 10-13 02-05 05-08 10-13 31-03 11-14 09-12 13-16 11-14 8.500.00058 MATERIAL HANDLING & PACKAGING 4 23-26 20-23 20-23 24-27 02-05 05-08 24-27 31-03 25-28 23-26 20-23 18-21 7.950.00059 AEROENGINE BEARING INSPECTION 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 6.500.00060 AIR COMPRESSOR 3 23-25 20-22 13-15 24-26 22-24 19-21 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000

61 ALIGNMENT AND BALANCING IN ROTATINGEQUIPMENT 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000

62 BEARING LUBRICATION TECHNOLOGY 4 09-12 06-09 27-30 10-13 08-11 12-15 10-13 07-10 11-14 09-12 27-30 04-07 7.950.000

63 Compressor and Prime Mover Operation &Maintenance 3 25-27 22-24 08-10 26-28 22-24 19-21 26-28 14-16 27-29 25-27 08-10 27-29 6.500.000

64 GAS TURBINE OPERATION & MAINTENANCE 4 10-13 07-10 21-24 10-13 29-01 13-16 11-14 28-31 12-15 10-13 21-24 18-21 7.950.00065 Machinery Diagnostic 4 16-19 13-16 28-31 17-20 02-05 06-09 17-20 31-03 18-21 16-19 28-01 05-08 7.950.000

66 MANAGING THE INTEGRITY OF GAS PIPELINESYSTEM 3 23-25 20-22 01-03 24-26 22-24 19-21 24-26 14-16 25-27 23-25 01-03 27-29 6.500.000

67 PIPELINE PIGGING OPERATIONS ANDEQUIPMENT 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000

68 Vibration Monitoring & Control System 3 11-13 08-10 08-10 11-13 22-24 19-21 12-14 14-16 13-15 11-13 08-10 27-29 6.500.000

69 MANAJEMEN POST WELD HEAT TREATMENTTEORI, STANDARD PROSEDUR DAN APLIKASI 3 09-11 06-08 27-01 10-12 02-04 19-21 10-12 31-02 11-13 09-11 30-01 11-13 6.500.000

70 MATERIAL CERTIFICATION REQUIREMENT FOROIL AND GAS INDUSTRY 3 23-25 20-22 13-15 24-26 15-17 12-14 24-26 14-16 25-27 23-25 13-15 27-29 6.500.000

71 PROTECTIVE COATING TECHNOLOGY FORCORROSION CONTROL 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 21-23 06-08 04-06 20-22 04-06 6.500.000

72 ROTATING EQUIPMENTS 3 18-20 15-17 29-31 19-21 31-02 19-21 19-21 29-31 20-22 18-20 29-01 20-22 6.500.00073 ANALISIS VIBRASI 4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 21-24 11-14 09-12 13-16 11-14 8.500.00074 PIPING SYSTEM 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 18-21 8.500.000

75 MOTOR DIESEL PRINSIP DASAR, OPERASI DANPERAWATAN 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 7.950.000

76 PELUMASAN MESIN 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 7.950.00077 PEMBANGKIT UAP (BOILER) 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 7.950.00078 PENGGERAK MULA (PRIME MOVER) 4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 7.950.00079 TURBIN GAS 4 10-13 07-10 27-02 10-13 09-12 05-08 11-14 08-11 12-15 10-13 30-02 19-22 7.950.00080 TURBIN UAP 4 17-20 14-17 07-10 18-21 16-19 12-15 18-21 22-25 19-22 17-20 07-10 05-08 7.950.000

81 PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING 4 09-12 06-09 13-16 10-13 02-05 06-09 10-13 31-03 11-14 09-12 13-16 12-15 8.750.000

82 Chiller and Cooling Tower Design and Operation 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6.500.000

7

83 DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM 5 02-06 30-03 27-03 03-07 15-19 05-09 03-07 21-25 04-08 02-06 30-03 04-08 9.500.000

84 HVAC SYSTEM Operation & Maintenance 4 09-12 06-09 06-09 10-13 29-01 12-15 10-13 28-31 11-14 09-12 06-09 11-14 8.500.000

85 PETROLEUM INDUSTRIAL REFRIGERATIONOPERATION AND MAINTENANCE 4 16-19 13-16 13-16 17-20 02-05 05-08 17-20 31-03 18-21 16-19 13-16 18-21 8.500.000

86 Practical and Advanced Course on HVAC Systems 4 24-27 21-24 20-23 25-28 08-11 13-16 25-28 07-10 26-29 24-27 20-23 04-07 8.500.000

87 CENTRIFUGAL PUMP Selection, Operation, andMaintenance 5 02-06 30-03 27-31 03-07 15-19 05-09 03-07 21-25 04-08 02-06 27-01 11-15 9.500.000

88 Gas Compressor Operation, Maintenance &Troubleshooting 4 09-12 06-09 27-02 10-13 29-01 12-15 10-13 28-31 11-14 09-12 30-02 18-21 8.500.000

89 Hydraulics Power System 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 31-04 18-22 16-20 06-10 04-08 9.500.000

90 KOMPRESOR SENTRIFUGAL OPERASI,PEMELIHARAAN, DAN TROUBLESHOOTING 4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 07-10 25-28 23-26 13-16 11-14 8.500.000

91 PUMP AND COMPRESSOR OPERATION,MAINTENANCE & TROUBLESHOOTING 5 02-06 30-03 20-24 03-07 15-19 05-09 03-07 21-25 04-08 02-06 20-24 18-22 9.500.000

92 SISTEM HIDROLIK DAN PNEUMATIK 4 10-13 07-10 27-30 10-13 30-02 12-15 11-14 28-31 12-15 10-13 27-30 04-07 8.500.00093 NON DESTRUCTIVE TEST(NDT) 4 09-12 06-09 13-16 10-13 15-18 05-08 10-13 21-24 11-14 09-12 13-16 11-14 7.950.00094 ASME PTC 4 – 1 4 23-26 20-23 27-30 24-27 29-01 12-15 24-27 28-31 25-28 23-26 27-30 04-07 7.950.00095 BASIC GAS ENGINE 4 02-05 30-02 27-02 03-06 02-05 05-08 03-06 31-03 04-07 02-05 30-02 11-14 7.950.000

96 Belt Conveyor Technology, Design Cacilationand Troubleshooting 4 09-12 06-09 06-09 10-13 08-11 13-16 10-13 07-10 11-14 09-12 06-09 18-21 7.950.000

97 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 16-19 13-16 13-16 17-20 15-18 06-09 17-20 21-24 18-21 16-19 13-16 05-08 7.950.000

98 COAL FIRED POWER PLANT COMBUSTIONOPERATION & MAINTENANCE 4 24-27 21-24 20-23 25-28 30-02 12-15 25-28 28-31 26-29 24-27 20-23 12-15 7.950.000

99 DIESEL ENGINE OPERATION AND MAINTENANCE 4 03-06 31-03 28-31 04-07 02-05 05-08 04-07 01-04 05-08 03-06 28-01 19-22 7.950.000100 DIESEL GUNSET OPERATION AND MAINTENANCE 4 10-13 07-10 28-03 10-13 09-12 13-16 11-14 08-11 12-15 10-13 31-03 04-07 7.950.000

101 GAS TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 17-20 14-17 07-10 18-21 16-19 06-09 18-21 22-25 19-22 17-20 07-10 11-14 7.950.000

102 OPERATION & MAINTENANCE OF BOILER 4 23-26 20-23 14-17 24-27 29-01 12-15 24-27 28-31 25-28 23-26 14-17 18-21 7.950.000

103 OPERATION, MAINTENANCE ANDTROUBLESHOOTING OF GAS TURBINE 4 02-05 30-02 21-24 03-06 02-05 05-08 03-06 31-03 04-07 02-05 21-24 05-08 7950000

104 Perawatan Belt Conveyor 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 14-16 11-13 09-11 27-29 27-29 5.950.000

105 STEAM GENERATOR AND TURBINE OPERATION ANDMAINTENANCE 4 16-19 13-16 27-02 17-20 08-11 13-16 17-20 07-10 18-21 16-19 30-02 12-15 7.950.000

106 TRANSMISI DAYA MEKANIK (MECHANICALPOWER TRANSMISSION) 4 03-06 31-03 13-16 04-07 30-02 12-15 04-07 28-31 05-08 03-06 13-16 04-07 7.950.000

107 VALVE 4 10-13 07-10 20-23 10-13 02-05 05-08 11-14 01-04 12-15 10-13 20-23 11-14 7.950.000

108 Turbomachinery Operation, Maintenance andTroubleshooting 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 18-21 7.950.000

8

109 PRESSURE VESSEL DESIGN, OPERATION &MAINTENANCE 4 23-26 20-23 28-03 24-27 16-19 06-09 24-27 22-25 25-28 23-26 31-03 05-08 7.950.000

110 ALIGNMENT AND VIBRATION INSPECTIONSYSTEM 4 16-19 13-16 20-23 17-20 29-01 12-15 17-20 21-24 18-21 16-19 20-23 18-21 7.950.000

111 AUTOMOTIVE (CARS) AIR CONDITIONING (AC)SYSTEM 4 23-26 20-23 27-30 24-27 02-05 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.000

112 BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 02-05 30-02 27-02 03-06 08-11 13-16 03-06 31-03 04-07 02-05 30-02 11-14 7.950.000

113 POMPA DAN KOMPRESOR OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 24-27 21-24 21-24 25-28 02-05 05-08 25-28 28-31 26-29 24-27 21-24 12-15 7.950.000

114 Pump Operation, Maintenance &Troubleshooting 4 10-13 07-10 28-03 10-13 16-19 06-09 11-14 08-11 12-15 10-13 31-03 04-07 7.950.000

115 OPERATION AND MAINTENANCE OF HEAVYDUTY EQUIPMENT 4 16-19 13-16 27-02 17-20 29-01 12-15 17-20 21-24 18-21 16-19 30-02 18-21 7.950.000

116 ALIGNMENT, LEVELLING AND ROTORBALANCING 3 09-11 06-08 13-15 10-12 15-17 05-07 10-12 14-16 11-13 09-11 13-15 11-13 5950000

117 BEARING AND OIL LUBRICATION FORMACHINERY 3 16-18 13-15 20-22 17-19 22-24 12-14 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000

118 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 02-05 30-02 27-02 03-06 02-05 12-15 03-06 31-03 04-07 02-05 30-02 11-14 8.500.000

119 COMPRESSOR Operation, Maintenance andTroubleshooting 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 27-29 6.750.000

120 GAS AND STEAM TURBINE Operation,Maintenance And Troubleshooting 4 16-19 13-16 13-16 17-20 15-18 05-08 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000

121GAS TURBINE PRINCIPLES, INSPECTION,OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 23-26 20-23 20-23 24-27 29-01 13-16 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

122 HEAT EXCHANGERS Operation, maintenanceand troubleshooting 4 03-06 31-03 27-30 04-07 02-05 06-09 04-07 01-04 05-08 03-06 27-30 12-15 8.500.000

123 HIGH PRESSURE PUMP (HPP) OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 10-13 07-10 28-03 10-13 09-12 12-15 11-14 08-11 12-15 10-13 31-03 19-22 8.500.000

124 Lubrication and Bearing Technology 4 17-20 14-17 07-10 18-21 16-19 05-08 18-21 22-25 19-22 17-20 07-10 05-08 8.500.000125 LUBRIKASI Prinsip Dasar dan Aplikasi 3 25-27 22-24 15-17 26-28 22-24 19-21 26-28 14-16 27-29 25-27 15-17 27-29 6.500.000

126 OIL FILM BEARING (JOURNAL DAN THRUSTBEARING HYDRODYNAMIC BEARINGS) 4 02-05 30-02 21-24 03-06 30-02 13-16 03-06 28-31 04-07 02-05 21-24 11-14 8.500.000

127 PIPELINE Design, Testing, Inspection AndMaintenance 4 09-12 06-09 28-31 10-13 02-05 06-09 10-13 31-03 11-14 09-12 28-01 18-21 8.500.000

128 Pressure Vessel Calculation, Codes, Production,Operation, Control & Safeties 4 16-19 13-16 27-02 17-20 08-11 12-15 17-20 07-10 18-21 16-19 30-02 04-07 8.500.000

9

129 PUMP OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 23-26 20-23 06-09 24-27 15-18 05-08 24-27 21-24 25-28 23-26 06-09 12-15 8.500.000

130 PUMP AND COMPRESSOR OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 03-06 31-03 13-16 04-07 29-01 13-16 04-07 28-31 05-08 03-06 13-16 19-22 8.500.000

131 Refractory and Heat Insulation 4 10-13 07-10 20-23 10-13 02-05 06-09 11-14 01-04 12-15 10-13 20-23 05-08 8.500.000

132 REFRIGERATION OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 17-20 14-17 27-30 18-21 09-12 12-15 18-21 08-11 19-22 17-20 27-30 11-14 8.500.000

133 ROTATING EQUIPMENT 4 24-27 21-24 28-03 25-28 16-19 05-08 25-28 22-25 26-29 24-27 31-03 18-21 8.500.000

134 STEAM TURBINE OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 02-05 30-02 07-10 03-06 30-02 13-16 03-06 28-31 04-07 02-05 07-10 04-07 8.500.000

135 ELECTROPLATING 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 9.250.000136 FAILURE ANALYSIS METHODS AND CASES 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 11-14 7.950.000

137 PROSES PENGERJAAN AKHIR DENGAN PELAPISLOGAM (ELECTROPLATING) 4 09-12 06-09 27-02 10-13 08-11 06-09 10-13 31-03 11-14 09-12 30-02 18-21 9.250.000

138 ALAT PENUKAR KALOR (HEAT EXCHANGER)OPERASI DAN PERAWATAN 4 16-19 13-16 06-09 17-20 29-01 05-08 17-20 21-24 18-21 16-19 06-09 11-14 7.950.000

139ANALISIS DAN PENGUKURAN GETARANMEKANIK (ANALYSIS AND MEASURING OFVIBRATION MACHINERY)

4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000

140 BEARING AND OIL LUBRICATION FORMACHINERY 4 10-13 07-10 27-30 10-13 16-19 12-15 11-14 08-11 12-15 10-13 27-30 12-15 7.950.000

141 COATING SYSTEM AND PROTECTIONCORROSION 4 03-06 31-03 14-17 04-07 09-12 06-09 04-07 01-04 05-08 03-06 14-17 11-14 7.950.000

142 CONVEYOR OPERASI DAN PERAWATAN 4 23-26 20-23 27-02 24-27 02-05 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000

143 DISAIN ALAT BANTU CEKAM DAN PEGANG(DESIGN OF JIGS AND FIXTURES) 4 02-05 30-02 06-09 03-06 08-11 06-09 03-06 31-03 04-07 02-05 06-09 19-22 7.950.000

144 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 10-13 07-10 13-16 10-13 16-19 12-15 11-14 08-11 12-15 10-13 13-16 04-07 7.950.000

145 DISAIN KONSTRUKSI MESIN DAN PERALATANINDUSTRI 4 17-20 14-17 20-23 18-21 30-02 05-08 18-21 22-25 19-22 17-20 20-23 11-14 7.950.000

146 DYNAMIC OF MACHINE TOOLS 4 24-27 21-24 27-30 25-28 02-05 13-16 25-28 28-31 26-29 24-27 27-30 18-21 7.950.000147 HAND TOOL UTILIZATION 4 16-19 13-16 14-17 17-20 29-01 05-08 17-20 21-24 18-21 16-19 14-17 19-22 7.950.000148 HEAVY DUTY EQUIPMENT 4 23-26 20-23 21-24 24-27 02-05 13-16 24-27 28-31 25-28 23-26 21-24 04-07 7.950.000149 HYDRAULIC CONTROL SYSTEM 4 02-05 30-02 28-31 03-06 08-11 06-09 03-06 31-03 04-07 02-05 28-01 11-14 7.950.000

150 KINEMATIKA DAN DINAMIKA MESIN (KINEMATICSAND DYNAMICS OF MACHINERIES) 4 03-06 31-03 20-23 04-07 09-12 06-09 04-07 01-04 05-08 03-06 20-23 19-22 7.950.000

151 MACHINERY NOISE AND PROBLEM SOLVING 4 09-12 06-09 27-30 10-13 15-18 12-15 10-13 07-10 11-14 09-12 27-30 04-07 7.950.000

152 MANUFACTURING PROCESS TO USE CNC MACHINING 4 10-13 07-10 21-24 10-13 16-19 12-15 11-14 08-11 12-15 10-13 21-24 12-15 7.950.000

153 MANUFACTURING PROCESSES TO USE CASTING 4 17-20 14-17 28-31 18-21 30-02 05-08 18-21 22-25 19-22 17-20 28-01 19-22 7.950.000

10

154 MANUFACTURING PROCESSES TO USE METALFORMING 4 24-27 21-24 27-02 25-28 02-05 13-16 25-28 28-31 26-29 24-27 30-02 04-07 7.950.000

155 MEASUREMENT TECHNIQUE FOR MAINTENANCEAND OPERATION LATHE MACHINE 4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 07-10 11-14 09-12 13-16 18-21 7.950.000

156 NON DESTRUCTIVE TEST 4 23-26 20-23 27-30 24-27 02-05 13-16 24-27 28-31 25-28 23-26 27-30 12-15 7.950.000157 OXY ACETYLENE WELDING 4 17-20 14-17 14-17 18-21 30-02 05-08 18-21 22-25 19-22 17-20 14-17 11-14 8.500.000

158 PEMILIHAN MATERIAL KOMPONEN MESIN(MATERIAL SELECTION) 4 24-27 21-24 21-24 25-28 02-05 13-16 25-28 28-31 26-29 24-27 21-24 18-21 7.950.000

159 PENGEMBANGAN TEKNOLOGI DAN STANDARMATERIAL 4 03-06 31-03 28-31 04-07 09-12 06-09 04-07 01-04 05-08 03-06 28-01 05-08 7.950.000

160 PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST) 4 09-12 06-09 27-02 10-13 15-18 12-15 10-13 07-10 11-14 09-12 30-02 12-15 7.950.000

161 PERLAKUAN PANAS LOGAM (HEAT TREATMENTFOR METAL) 4 02-05 30-02 20-23 03-06 08-11 06-09 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000

162 PNEUMATIC CONTROL SYSTEM 4 10-13 07-10 27-30 10-13 16-19 12-15 11-14 08-11 12-15 10-13 27-30 18-21 7.950.000163 PRODUCTION OF HELICAL GEAR 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 21-24 18-21 16-19 28-01 11-14 7.950.000164 PROSES PEMESINAN (MACHINING) 4 10-13 07-10 13-16 10-13 16-19 12-15 11-14 08-11 12-15 10-13 13-16 12-15 7.950.000165 PUMP OPERATION AND MAINTENANCE 4 17-20 14-17 20-23 18-21 30-02 05-08 18-21 22-25 19-22 17-20 20-23 19-22 7.950.000166 SISTEM PEMIPAAN (PIPING) 4 16-19 13-16 14-17 17-20 29-01 05-08 17-20 21-24 18-21 16-19 14-17 05-08 7.950.000167 TESTING OF MACHINE TOOLS 4 17-20 14-17 06-09 18-21 30-02 05-08 18-21 22-25 19-22 17-20 06-09 11-14 7.950.000

168 Transmisi Daya Mekanik (Mechanical PowerTransmission) 4 03-06 31-03 20-23 04-07 09-12 06-09 04-07 01-04 05-08 03-06 20-23 05-08 7.950.000

169 TROUBLE SHOOTING, INSPECTION, ANDMONITORING OF MACHINERY 4 09-12 06-09 27-30 10-13 15-18 12-15 10-13 07-10 11-14 09-12 27-30 12-15 7.950.000

170 BASIC WELDING 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 21-24 25-28 23-26 20-23 04-07 8.950.000171 GAS METAL ARC WELDING (LAS MIGMAG) 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 28-31 04-07 02-05 27-30 11-14 8.950.000172 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 09-12 06-09 27-02 10-13 08-11 13-16 10-13 31-03 11-14 09-12 30-02 18-21 8.950.000173 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 07-10 18-21 16-19 06-09 05-08 8.950.000174 OXY ACETYLENE WELDING (LAS ASETILIN) 4 24-27 21-24 13-16 25-28 30-02 12-15 25-28 22-25 26-29 24-27 13-16 12-15 8.950.000175 WELDING INSPECTION 4 03-06 31-03 21-24 04-07 02-05 05-08 04-07 28-31 05-08 03-06 21-24 19-22 9.500.000176 WELDING METALLURGY 4 10-13 07-10 28-31 10-13 09-12 13-16 11-14 01-04 12-15 10-13 28-01 04-07 8.950.000177 WELDING SAFETY 3 18-20 15-17 01-03 19-21 22-24 19-21 19-21 14-16 20-22 18-20 01-03 27-29 6.950.000178 WELDING TECHNOLOGY 4 23-26 20-23 07-10 24-27 16-19 06-09 24-27 08-11 25-28 23-26 07-10 11-14 8.950.000

179 ANALISIS GETARAN DALAM PERAWATANROTARY EQUIPMENT 4 02-05 30-02 27-02 03-06 15-18 12-15 03-06 07-10 04-07 02-05 30-02 04-07 7.950.000

180 BENGKEL ALAT BERAT 4 09-12 06-09 06-09 10-13 29-01 05-08 10-13 21-24 11-14 09-12 06-09 11-14 7.950.000181 BOILER WATER TREATMENT 4 16-19 13-16 13-16 17-20 02-05 13-16 17-20 28-31 18-21 16-19 13-16 18-21 7.950.000182 CENTRIFUGAL COMPRESSOR 4 23-26 20-23 20-23 24-27 08-11 06-09 24-27 31-03 25-28 23-26 20-23 05-08 7.950.000

11

183 CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE 4 03-06 31-03 27-30 04-07 16-19 12-15 04-07 08-11 05-08 03-06 27-30 12-15 7.950.000

184 CENTRIFUGAL PUMP AND SEAL 4 10-13 07-10 28-03 10-13 30-02 05-08 11-14 22-25 12-15 10-13 31-03 19-22 7.950.000185 CORROSION AND CATHODIC PROTECTION 4 17-20 14-17 07-10 18-21 02-05 13-16 18-21 28-31 19-22 17-20 07-10 04-07 7.950.000186 HEAVY EQUIPMENT MANAGEMENT 4 02-05 30-02 21-24 03-06 15-18 12-15 03-06 07-10 04-07 02-05 21-24 18-21 7.950.000

187 HYDRAULIC PNEUMATIC & ELECTRIC CONTROLSYSTEM 4 09-12 06-09 28-31 10-13 29-01 05-08 10-13 21-24 11-14 09-12 28-01 05-08 7.950.000

188 NON DESTRUCTIVE TESTING (NDT) 4 16-19 13-16 27-02 17-20 02-05 13-16 17-20 28-31 18-21 16-19 30-02 12-15 7.950.000

189 OPERASI DAN PEMELIHARAAN TURBIN GASDAN GENERATOR 4 23-26 20-23 06-09 24-27 08-11 06-09 24-27 31-03 25-28 23-26 06-09 19-22 7.950.000

190 POMPA OPERASI DAN PERAWATAN 4 03-06 31-03 13-16 04-07 16-19 12-15 04-07 08-11 05-08 03-06 13-16 04-07 7.950.000191 ROTATING EQUIPMENTS 4 24-27 21-24 28-03 25-28 09-12 06-09 25-28 01-04 26-29 24-27 31-03 05-08 7.950.000192 TURBIN & GENERATOR OPERATION 4 16-19 13-16 21-24 17-20 02-05 13-16 17-20 28-31 18-21 16-19 21-24 04-07 7.950.000193 VALVE (CHOKE & CONTROL VALVE) 4 23-26 20-23 28-31 24-27 08-11 06-09 24-27 31-03 25-28 23-26 28-01 11-14 7.950.000194 WELDING INSPECTION 4 03-06 31-03 27-02 04-07 16-19 12-15 04-07 08-11 05-08 03-06 30-02 18-21 7.950.000195 LIQUID PENETRANT TESTING 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 31-04 18-22 16-20 06-10 04-08 11.500.000196 MAGNETIC PARTICLE TESTING 5 23-27 20-24 13-17 24-28 15-19 12-16 24-28 07-11 25-29 23-27 13-17 11-15 11.500.000

197 PENGENDALIAN MOTOR LISTRIK SECARAELEKTRONIK 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000

198 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000199 SISTEM KONTROL MOTOR LISTRIK 4 02-05 30-02 07-10 03-06 15-18 12-15 03-06 07-10 04-07 02-05 07-10 12-15 7.950.000

200 TRAFO PRINCIPLES, APPLICATION ANDMAINTENANCE 4 09-12 06-09 14-17 10-13 29-01 05-08 10-13 21-24 11-14 09-12 14-17 19-22 7.950.000

201 ENGINEERING MATERIAL KNOWLEDGE FORWAREHOUSE PEOPLE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 6.500.000

202 PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.950.000

203PEMBANGKITAN ALIRAN PERMUKAAN UNTUKOIL SPILL (OIL FENCE) SEBAGAI PENGUMPULTUMPAHAN MINYAK

4 17-20 14-17 13-16 18-21 30-02 12-15 18-21 22-25 19-22 17-20 13-16 05-08 7.950.000

204 Oil Transportation Piping 4 02-05 30-02 28-03 03-06 08-11 06-09 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000205 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MAINTENANCE

1 RELIABILITY, AVAILABILITY & MAINTAINABILITYANALYSIS 3 25-27 22-24 08-10 26-28 02-04 19-21 26-28 09-11 27-29 25-27 08-10 27-29 6.950.000

2 RELIABILITY ENGINEERING (TEKNIKKEANDALAN) 2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000

12

3 ADVANCED MAINTENANCE MANAGEMENT 4 09-12 06-09 27-02 10-13 08-11 12-15 10-13 07-10 11-14 09-12 30-02 18-21 7.950.000

4 MACHINERY CONDITION MONITORING FORPREDICTIVE AND PREVENTIVE MAINTENANCE 4 16-19 13-16 20-23 17-20 15-18 06-09 17-20 21-24 18-21 16-19 20-23 19-22 7.950.000

5 MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING 4 23-26 20-23 28-31 24-27 29-01 13-16 24-27 28-31 25-28 23-26 28-01 05-08 7.950.000

6 MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR 4 23-26 20-23 06-09 24-27 29-01 12-15 24-27 28-31 25-28 23-26 06-09 18-21 7.950.000

7 MAINTENANCE AND SPARE PARTMANAGEMENT 4 09-12 06-09 06-09 10-13 15-18 05-08 10-13 21-24 11-14 09-12 06-09 04-07 7.950.000

8 FAULT FINDING SKILLS TECHNICALTROUBLESHOOTING 3 04-06 01-03 15-17 05-07 22-24 19-21 05-07 14-16 06-08 04-06 15-17 27-29 6.500.000

9 Production Optimization and Minimize DownTime 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6.500.000

10 RELIABILITY CENTERED MAINTENANCE (RCM) 3 25-27 22-24 27-29 26-28 22-24 19-21 26-28 14-16 27-29 25-27 27-29 27-29 6.500.000

11RELIABILITY CENTERED MAINTENANCE (RCM)Increasing Safety & Reliability in Gas PipelineSystem

3 04-06 01-03 27-01 05-07 22-24 19-21 05-07 14-16 06-08 04-06 30-01 27-29 6.500.000

12 MAINTENANCE MANAGEMENT 3 16-18 13-15 15-17 17-19 22-24 19-21 17-19 14-16 18-20 16-18 15-17 27-29 6.500.000

13 EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 21-23 06-08 04-06 22-24 27-29 5.950.000

14 MAINTENANCE CONTROL AND MONITORING 3 02-04 30-01 15-17 03-05 17-19 19-21 03-05 14-16 04-06 02-04 15-17 27-29 6.500.000

15 THE ECONOMICS OF MAINTENANCEMANAGEMENT 3 02-04 30-01 01-03 03-05 02-04 19-21 03-05 31-02 04-06 02-04 01-03 06-08 5.950.000

16 MAINTENANCE PLANNING AND SCHEDULING 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 6.500.000

17 PREVENTIVE & PREDICTIVE MAINTENANCE(PPM) 4 02-05 30-02 13-16 03-06 15-18 06-09 03-06 21-24 04-07 02-05 13-16 04-07 8.500.000

18 RELIABILITY CENTERED MAINTENANCE 3 11-13 08-10 20-22 11-13 22-24 14-16 12-14 14-16 13-15 11-13 20-22 13-15 6.500.00019 Integrated Maintenance Management 4 10-13 07-10 21-24 10-13 29-01 06-09 11-14 22-25 12-15 10-13 21-24 12-15 7.950.000

20 Effective and Efficient of MaintenanceManagement 3 18-20 15-17 29-31 19-21 22-24 19-21 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000

21 Total Productive Maintenance (TPM) 4 24-27 21-24 06-09 25-28 15-18 06-09 25-28 21-24 26-29 24-27 06-09 19-22 7.950.000

22 PREVENTIVE MAINTENANCE (SCHEDULE &PREDICTIVE MAINTENANCE) 4 03-06 31-03 28-31 04-07 09-12 13-16 04-07 01-04 05-08 03-06 28-01 18-21 7.950.000

23TEKNIK PEMELIHARAAN KENDARAAN(PREVENTIVE MAINTENANCE UNTUKKENDARAAN)

4 23-26 20-23 14-17 24-27 02-05 05-08 24-27 28-31 25-28 23-26 14-17 19-22 7.950.000

24 TEKNIK PERAWATAN MEKANIK 4 02-05 30-02 20-23 03-06 08-11 13-16 03-06 31-03 04-07 02-05 20-23 05-08 7.950.00025 MAINTENANCE OF MACHINE TOOLS 4 23-26 20-23 27-30 24-27 29-01 06-09 24-27 28-31 25-28 23-26 27-30 04-07 7950000

26 COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT 4 09-12 06-09 27-02 10-13 08-11 05-08 10-13 07-10 11-14 09-12 30-02 18-21 7.950.000

13

27 Maintenance Strategic Planning 4 24-27 21-24 07-10 25-28 09-12 06-09 25-28 08-11 26-29 24-27 07-10 05-08 7.950.00028 MAINTENANCE SYSTEM AND DOCUMENTATION 4 03-06 31-03 14-17 04-07 16-19 13-16 04-07 22-25 05-08 03-06 14-17 12-15 7.950.00029 MANAGING MAINTENANCE RESOURCES 4 09-12 06-09 21-24 10-13 30-02 05-08 10-13 28-31 11-14 09-12 21-24 18-21 7.950.000

30 RELIABILITY CENTERED MAINTENANCE & RISKBASED INSPECTION 5 02-06 30-03 06-10 03-07 08-12 05-09 03-07 07-11 04-08 02-06 06-10 04-08 8.950.000

31 ROOT CAUSE ANALYSIS 4 10-13 07-10 13-16 10-13 15-18 13-16 11-14 21-24 12-15 10-13 13-16 11-14 7.950.00032 Spare Part Management 4 17-20 14-17 20-23 18-21 29-01 05-08 18-21 28-31 19-22 17-20 20-23 19-22 7.950.00033 ADVANCED MAINTENANCE MANAGEMENT 4 09-12 06-09 27-02 10-13 15-18 12-15 10-13 07-10 11-14 09-12 30-02 04-07 7.950.000

34 CONDITIONS BASE INSPECTION ANDMAINTENANCE 4 09-12 06-09 21-24 10-13 15-18 12-15 10-13 07-10 11-14 09-12 21-24 18-21 7.950.000

35 MAINTENANCE MANAGEMENT 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 21-24 18-21 16-19 31-03 11-14 7.950.00036 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 20-23 07-10 24-27 02-05 13-16 24-27 28-31 25-28 23-26 07-10 18-21 7.950.00037 MAINTENANCE SYSTEM AND COST 4 02-05 30-02 14-17 03-06 08-11 06-09 03-06 31-03 04-07 02-05 14-17 05-08 7.950.00038 MODERN MAINTENANCE MANAGEMENT 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 21-24 18-21 16-19 20-23 05-08 7.950.000

39PERENCANAAN DAN PENJADWALANPERAWATAN (MAINTENANCE PLANNING ANDSCHEDULING)

4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 28-31 25-28 23-26 13-16 04-07 7.950.000

40 PREDICTIVE MAINTENANCE 4 17-20 14-17 28-03 18-21 30-02 05-08 18-21 22-25 19-22 17-20 31-03 05-08 7.950.00041 RELIABILITY CENTERED MAINTENANCE (RCM) 4 09-12 06-09 07-10 10-13 15-18 12-15 10-13 07-10 11-14 09-12 07-10 18-21 7.950.00042 TEKNOLOGI PERAWATAN MESIN 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 08-11 12-15 10-13 30-02 04-07 7.950.00043 Total Productive Maintenance (TPM) 4 24-27 21-24 13-16 25-28 02-05 13-16 25-28 28-31 26-29 24-27 13-16 18-21 7.950.00044 PREVENTIVE MAINTENANCE 4 10-13 07-10 20-23 10-13 30-02 05-08 11-14 22-25 12-15 10-13 20-23 11-14 7.950.00045 PREVENTIVE MAINTENANCE GENERATOR 4 17-20 14-17 27-30 18-21 02-05 13-16 18-21 28-31 19-22 17-20 27-30 18-21 7.950.000

46 CULTURE CHANGE FOR MAINTENANCE ANDRELIABILITY IMPROVEMENT 3 09-11 06-08 27-29 10-12 29-31 05-07 10-12 28-30 11-13 09-11 27-29 11-13 6.500.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - ELECTRICAL1 PENGENDALIAN MOTOR LISTRIK SECARA

ELEKTRONIK 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000

2 GENSET TEKNOLOGI, PERAWATAN DANOPERASI 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000

3 SISTEM KONTROL MOTOR LISTRIK 4 02-05 30-02 07-10 03-06 15-18 12-15 03-06 07-10 04-07 02-05 07-10 12-15 7.950.000

4 TRAFO PRINCIPLES, APPLICATION ANDMAINTENANCE 4 09-12 06-09 14-17 10-13 29-01 05-08 10-13 21-24 11-14 09-12 14-17 19-22 7.950.000

5 ADVANCED CONTROL FOUNDATION 4 16-19 13-16 20-23 17-20 29-01 12-15 17-20 21-24 18-21 16-19 20-23 18-21 7.950.0006 FLOWMETERING AND CUSTODY TRANSFER 4 02-05 30-02 27-02 03-06 08-11 13-16 03-06 31-03 04-07 02-05 30-02 11-14 7.950.0007 PRACTICAL PROCESS CONTROL 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000

14

8 Implementasi DSP (digital signal processing)Dalam Sistem Komunikasi 4 02-05 30-02 13-16 03-06 02-05 12-15 03-06 31-03 04-07 02-05 13-16 04-07 7.950.000

9 INDUSTRIAL ROBOTICS SENSING, PLANNING,AND CONTROL 4 16-19 13-16 27-02 17-20 08-11 12-15 17-20 07-10 18-21 16-19 30-02 04-07 7.950.000

10 AUTOMATIC VOLTAGE REGULATOR(AVR)OPERATION AND MAINTENANCE 4 03-06 31-03 20-23 04-07 02-05 05-08 04-07 01-04 05-08 03-06 20-23 19-22 7.950.000

11 GENERATOR OPERATION, MAINTENANCE &TROUBLESHOOTING 4 16-19 13-16 28-03 17-20 15-18 06-09 17-20 21-24 18-21 16-19 31-03 04-07 7.950.000

12 PLC ( Tingkat dasar ) 4 17-20 14-17 28-03 18-21 16-19 06-09 18-21 22-25 19-22 17-20 31-03 19-22 7.950.00013 PLC (TINGKAT MAHIR) 4 24-27 21-24 07-10 25-28 30-02 13-16 25-28 28-31 26-29 24-27 07-10 05-08 7.950.00014 POWER FACTOR IMPROVEMENT 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 11-14 7.950.000

15 PROTEKSI TERHADAP GANGGUAN SAMBARANPETIR 4 03-06 31-03 06-09 04-07 02-05 05-08 04-07 01-04 05-08 03-06 06-09 19-22 7.950.000

16 SISTEM INSTALASI DAN PROTEKSI JARINGANTENAGA LISTRIK 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 11-14 7.950.000

17 SISTEM INSTALASI TENAGA LISTRIK 4 24-27 21-24 28-31 25-28 30-02 13-16 25-28 28-31 26-29 24-27 28-01 18-21 7.950.00018 TRANFORMER OPERATION & MAINTENANCE 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 05-08 7.950.00019 Uninterupted Power Suply 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 11-14 7.950.000

20PERFORMANCE ANALISYS AND MAINTENANCEOF ELECTRICAL DISTRIBUTION NETWORKS FORSUPERVISOR

4 09-12 06-09 20-23 10-13 08-11 13-16 10-13 07-10 11-14 09-12 20-23 11-14 8.500.000

21PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR ANDENGINEER

4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 19-22 8.500.000

22PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATORAND JUNIOR SUPERVISOR

4 24-27 21-24 27-02 25-28 30-02 12-15 25-28 28-31 26-29 24-27 30-02 05-08 8.500.000

23DISTRIBUTED CONTROL SYSTEM (DCS)PRINCIPLES, MAINTENANCE, OPERATION,PROGRAMMING & TROUBLESHOOTING

5 09-13 06-10 27-03 17-21 08-12 05-09 10-14 07-11 11-15 09-13 30-03 18-22 9.500.000

24 DISTRIBUTED CONTROL SYSTEMS (DCS)FUNDAMENTAL 4 17-20 14-17 07-10 10-13 16-19 12-15 18-21 22-25 19-22 17-20 07-10 05-08 8.500.000

25 Electrical Control Wiring 4 24-27 21-24 14-17 25-28 30-02 05-08 25-28 28-31 26-29 24-27 14-17 11-14 8.500.00026 PLC COMMUNICATION AND LAN 4 17-20 14-17 27-30 18-21 16-19 12-15 18-21 22-25 19-22 17-20 27-30 18-21 8.500.000

27 PLC OPERATION, PROGRAMMING,TROUBLESHOOTING AND MAINTENANCE 4 23-26 20-23 28-03 24-27 29-01 06-09 24-27 28-31 25-28 23-26 31-03 04-07 8.500.000

28 ACDC ELECTRICAL MOTOR CONTROL 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 7.950.00029 BASIC ELECTRICAL 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 5.950.00030 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 09-12 06-09 27-02 10-13 02-05 12-15 10-13 31-03 11-14 09-12 30-02 11-14 7.950.000

15

31 DISTRIBUTION SYSTEM PROTECTION 4 16-19 13-16 06-09 17-20 08-11 06-09 17-20 07-10 18-21 16-19 06-09 18-21 7.950.00032 Electric Installation In Hazardous Area 4 24-27 21-24 13-16 25-28 15-18 13-16 25-28 22-25 26-29 24-27 13-16 05-08 7.950.00033 ELECTRICAL CALIBRATION 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 14-16 06-08 04-06 22-24 27-29 5.950.000

34 ELECTRICAL EQUIPMENT SYSTEM ANDMAINTENANCE 4 10-13 07-10 28-31 10-13 30-02 05-08 11-14 28-31 12-15 10-13 28-01 12-15 7.950.000

35 ELECTRICAL POWER GENERATOR OPERATION,PROTECTION AND MAINTANANCE 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 31-04 18-22 16-20 30-03 18-22 8.950.000

36 ELECTRICAL POWER SYSTEM ANALYSIS 4 23-26 20-23 07-10 24-27 02-05 06-09 24-27 08-11 25-28 23-26 07-10 04-07 7.950.000

37 ELECTRICAL POWER SYSTEM ANALYSIS USINGSOFTWARE APPLICATION 4 02-05 30-02 14-17 03-06 16-19 12-15 03-06 21-24 04-07 02-05 14-17 11-14 7.950.000

38 ELECTRICAL POWER SYSTEM PROTECTION 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 28-31 11-14 09-12 20-23 18-21 7.950.00039 ELECTRICAL SYSTEM GENERATORSET 4 16-19 13-16 27-30 17-20 02-05 13-16 17-20 31-03 18-21 16-19 27-30 05-08 7.950.00040 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 24-27 21-24 27-02 25-28 08-11 06-09 25-28 07-10 26-29 24-27 30-02 12-15 7.950.00041 GENERATOR EXCITATION SYSTEM 4 03-06 31-03 06-09 04-07 15-18 12-15 04-07 22-25 05-08 03-06 06-09 19-22 7.950.000

42 GROUNDING SYSTEM AND LIGHTNINGPROTECTION 4 10-13 07-10 13-16 10-13 30-02 05-08 11-14 28-31 12-15 10-13 13-16 04-07 7.950.000

43 High Voltage Electrical Equipmment Operation,Maintenance and Repair 5 16-20 13-17 20-24 17-21 08-12 12-16 17-21 31-04 18-22 16-20 20-24 11-15 8.950.000

44 INSTRUMENTATION ELECTRIC Operation andMaintenance 4 23-26 20-23 28-31 24-27 02-05 06-09 24-27 08-11 25-28 23-26 28-01 18-21 7.950.000

45 LV AND MV GENERATOR 4 02-05 30-02 28-03 03-06 16-19 12-15 03-06 21-24 04-07 02-05 31-03 05-08 7.950.00046 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 09-12 06-09 07-10 10-13 29-01 05-08 10-13 28-31 11-14 09-12 07-10 11-14 7.950.000

47 LV SWITCHGEAR MAINTENANCE ANDCOORDINATION 4 16-19 13-16 14-17 17-20 02-05 13-16 17-20 31-03 18-21 16-19 14-17 19-22 7.950.000

48 POWER ELECTRICAL INSTALLATION SYSTEM 4 24-27 21-24 20-23 25-28 08-11 06-09 25-28 07-10 26-29 24-27 20-23 04-07 7.950.00049 POWER ELECTRONICS 4 03-06 31-03 27-30 04-07 15-18 12-15 04-07 22-25 05-08 03-06 27-30 12-15 7.950.00050 POWER PROTECTION RELAY SYSTEM 4 10-13 07-10 27-02 10-13 30-02 05-08 11-14 28-31 12-15 10-13 30-02 18-21 7.950.00051 POWER TRANSFORMER 4 17-20 14-17 06-09 18-21 02-05 13-16 18-21 01-04 19-22 17-20 06-09 05-08 7.950.00052 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 23-26 20-23 13-16 24-27 09-12 06-09 24-27 08-11 25-28 23-26 13-16 11-14 7.950.000

53 Soft Starter (Operation, Protection andMaintanance) 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 14-16 04-06 02-04 22-24 27-29 5.950.000

54 TRANSMISSION AND DISTRIBUTION OPERATIONAND MAINTENANCE 4 09-12 06-09 28-31 10-13 16-19 12-15 10-13 21-24 11-14 09-12 28-01 19-22 7.950.000

55 Uninterruptible Power Suply Operation andMaintenance 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 28-31 18-21 16-19 31-03 04-07 7.950.000

56 VARIABLE FREQUENCY DRIVES 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 31-03 26-29 24-27 07-10 12-15 7.950.00057 VARIABLE SPEED DRIVES 4 03-06 31-03 14-17 04-07 08-11 06-09 04-07 07-10 05-08 03-06 14-17 18-21 7.950.00058 POWER DISTRIBUTION TRANSFORMER 4 10-13 07-10 20-23 10-13 15-18 12-15 11-14 22-25 12-15 10-13 20-23 05-08 7.950.00059 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 17-20 14-17 27-30 18-21 30-02 05-08 18-21 28-31 19-22 17-20 27-30 11-14 7.950.000

16

60 TRANSFORMATOR DAYA OPERASI DANPEMELIHARAAN 3 23-25 20-22 27-01 24-26 22-24 19-21 24-26 14-16 25-27 23-25 30-01 27-29 5.950.000

61 ELECTRONIC SWITCHBOARD RESCUE 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.00062 GARDU INDUK 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 5.950.000

63 TEKNIK KONSERVASI ENERGI MELALUI AUDITENERGI PADA BANGUNAN GEDUNG 4 16-19 13-16 07-10 17-20 29-01 12-15 17-20 21-24 18-21 16-19 07-10 11-14 7.950.000

64 Data Akuisisi, Interfacing, dan SistemMonitoring 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 21-23 25-27 23-25 20-22 27-29 6.750.000

65 Pemrograman Mikrokontroler AVR denganCodeVisionAVR 3 02-04 30-01 27-29 03-05 29-31 05-07 03-05 28-30 04-06 02-04 27-29 04-06 6.750.000

66 Pemrograman Mikrokontroler untuk Robotika 3 09-11 06-08 27-01 10-12 02-04 12-14 10-12 31-02 11-13 09-11 30-01 11-13 6.750.000

67 ADVANCE COURSE ON LIGHTNING PROTECTIONAND GROUNDING SYSTEM 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 31-04 18-22 16-20 30-03 18-22 9.500.000

68Lightning Protection and Grounding System forOil & Gas Refinery and PetrochemicalInstallation

3 23-25 20-22 06-08 24-26 02-04 19-21 24-26 07-09 25-27 23-25 06-08 27-29 6.950.000

69LIGHTNING PROTECTION AND GROUNDINGSYSTEM FOR POWER PLANT, TRANSMISSION,DISTRIBUTION AND LARGE INDUSTRY

3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 04-06 6.950.000

70 ADVANCED PLC PROGRAMMING ANDIMPLEMENTATION 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.000

71 PLC INTEGRATION TO LOCAL AREA NETWORK(LAN) 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000

72 PLC (ROGRAMMABLE LOGIC CONTROLLER)PRINCIPLES, OPERATION AND PROGRAMMING 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

73SCADA (SUPERVISORY CONTROL AND DATAACQUISITION) PRINCIPLES, HARDWARESYSTEM, OPERATION & PROGRAMMING

4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 8.500.000

74 NUMERICAL CONTROL AND ROBOTIC 4 16-19 13-16 06-09 17-20 15-18 12-15 17-20 07-10 18-21 16-19 06-09 04-07 7.950.00075 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 02-05 30-02 06-09 03-06 08-11 06-09 03-06 31-03 04-07 02-05 06-09 05-08 7.950.000

76 Electric motor Operation, Maintenance &Troubleshooting 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 04-07 7.950.000

77Electrical Panel Design 3 02-04 30-01 13-15 03-05 15-17 05-07 03-05 14-16 04-06 02-04 13-15 04-06 5.950.000

78Electrical Safety For Electrical TechnicianTrainer

4 09-12 06-09 20-23 10-13 29-01 12-15 10-13 21-24 11-14 09-12 20-23 11-14 7.950.000

79 Motor Rewinding 3 16-18 13-15 27-29 17-19 22-24 19-21 17-19 28-30 18-20 16-18 27-29 18-20 5.950.000

80 Perhitungan Perkiraan Biaya Proyek Mekanikal 2 23-24 20-21 27-28 24-25 02-03 08-09 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000

17

Elektrikal Untuk Bangunan Gedung

81Power Transformer (Operation, Testing,Asessment And Maintenance)

4 03-06 31-03 06-09 04-07 08-11 13-16 04-07 07-10 05-08 03-06 06-09 05-08 7.950.000

ENGINEERING - IT

1PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWERPOINT)

2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.000

2 IT AUDIT PRACTICES 3 11-13 08-10 27-29 10-12 29-31 19-21 12-14 28-30 13-15 11-13 27-29 11-13 5.950.0003 IT HELPDESK 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.0004 AUTOCAD COSTUMIZATION 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 12-15 7.950.000

5 INFORMATION TECHNOLOGY &TELECOMUNICATION 4 24-27 21-24 27-02 25-28 30-02 13-16 25-28 28-31 26-29 24-27 30-02 18-21 7.950.000

6 Holistic Information Security 3 23-25 20-22 27-01 24-26 02-04 05-07 24-26 31-02 25-27 23-25 30-01 27-29 5.950.0007 Information Security System 3 02-04 30-01 06-08 03-05 08-10 12-14 03-05 07-09 04-06 02-04 06-08 04-06 5.950.0008 OPTIMALISASI CYBER PUBLIC RELATION 3 09-11 06-08 13-15 10-12 15-17 19-21 10-12 14-16 11-13 09-11 13-15 11-13 5.950.000

9 PENGEMBANGAN KONTEN SITUS WEBPERUSAHAAN 3 16-18 13-15 20-22 17-19 22-24 07-09 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000

10 TEKNIK DESAIN GRAFIS PADA WEB 3 25-27 22-24 27-29 26-28 29-31 14-16 26-28 28-30 27-29 25-27 27-29 27-29 5.950.00011 TEKNIK DESAIN WEB 3 04-06 01-03 01-03 05-07 03-05 19-21 05-07 02-04 06-08 04-06 01-03 06-08 5.950.00012 ADVANCE MICROSOFT EXCEL 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.00013 ADVANCE MICROSOFT POWERPOINT 3 11-13 08-10 06-08 11-13 08-10 07-09 12-14 07-09 13-15 11-13 06-08 11-13 5.950.00014 ADVANCE MICROSOFT WORD 3 18-20 15-17 13-15 19-21 15-17 14-16 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000

15 BASIC AUTOCAD 2D (2D TECHNICAL DRAWINGWITH AUTOCAD) 5 23-27 20-24 27-03 24-28 08-12 05-09 24-28 31-04 25-29 23-27 30-03 04-08 8.950.000

16 BASIC AUTOCAD 3D (3D TECHNICAL DRAWINGWITH AUTOCAD) 2 02-03 30-31 06-07 03-04 02-03 12-13 03-04 07-08 04-05 02-03 06-07 27-28 3.950.000

17 BASIC TELECOMMUNICATION PABX 3 16-18 13-15 27-01 17-19 22-24 19-21 17-19 14-16 18-20 16-18 30-01 27-29 5.950.00018 BASIC VSAT SYSTEM 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.00019 FIBER OPTIC SYSTEM 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 14-16 11-13 09-11 20-22 27-29 6.500.000

20 Fraud Management in telecommunication business 3 18-20 15-17 27-29 19-21 22-24 19-21 19-21 14-16 20-22 18-20 27-29 27-29 5.950.000

21 INTERNETWORKING DENGAN TCP IP 3 25-27 22-24 01-03 26-28 02-04 19-21 26-28 31-02 27-29 25-27 01-03 27-29 5.950.000

22 IPTV - TEKNOLOGI, PELUANG BISNIS DANREGULASI 3 04-06 01-03 08-10 05-07 08-10 19-21 05-07 07-09 06-08 04-06 08-10 27-29 5.950.000

23 NETWORK MANAGEMENT AND OPERATIONSSUPPORT SYSTEM 3 11-13 08-10 15-17 11-13 15-17 19-21 12-14 14-16 13-15 11-13 15-17 11-13 5.950.000

24 POWER LINE CARRIER 3 16-18 13-15 22-24 17-19 22-24 19-21 17-19 21-23 18-20 16-18 22-24 18-20 5.950.000

18

25 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000

26 MANAJEMEN KABEL PADA JARINGANTELEKOMUNIKASI 4 02-05 30-02 27-02 03-06 02-05 05-08 03-06 01-04 04-07 02-05 30-02 04-07 8.500.000

27 MIKROTIK FUNDAMENTAL 3 18-20 15-17 13-15 19-21 17-19 12-14 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00028 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 25-27 22-24 20-22 26-28 22-24 19-21 26-28 23-25 27-29 25-27 20-22 27-29 6.500.000

29 INFORMATION TECHNOLOGY INFRASTRUCTURELIBRARY (I T I L) VERSION 3.1 4 17-20 14-17 27-02 18-21 02-05 06-09 18-21 31-03 19-22 17-20 30-02 19-22 7.950.000

30 MASTERING MICROSOFT EXCEL 2007 2 16-17 13-14 30-31 17-18 01-02 12-13 17-18 30-31 18-19 16-17 30-01 18-19 3.950.000

31 CAD BIDANG TEKNIK MESIN (CAD FORMECHANICAL AUTOCAD OR CATIA) 4 17-20 14-17 28-03 18-21 30-02 05-08 18-21 22-25 19-22 17-20 31-03 19-22 7.950.000

32 Teknologi CAD CAM 4 02-05 30-02 28-31 03-06 08-11 06-09 03-06 31-03 04-07 02-05 28-01 19-22 7.950.00033 PENGEMBANGAN SITUS WEB 3 23-25 20-22 27-01 24-26 22-24 19-21 24-26 14-16 25-27 23-25 30-01 27-29 5.950.000

34 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 04-06 01-03 27-01 05-07 02-04 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000

ENGINEERING - MINING1 BATUBARA 3 02-04 30-01 27-01 03-05 02-04 05-07 03-05 31-02 04-06 02-04 30-01 04-06 6.500.0002 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 09-12 06-09 06-09 10-13 08-11 12-15 10-13 07-10 11-14 09-12 06-09 11-14 7.950.0003 GEOLOGY FOR NON GEOLOGIST 4 16-19 13-16 13-16 17-20 15-18 06-09 17-20 21-24 18-21 16-19 13-16 18-21 7.950.000

4 PEMBORAN DAN PELEDAKAN UNTUKPERTAMBANGAN 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.000

5 PEMINDAHAN TANAH MEKANIS 3 04-06 01-03 27-29 05-07 29-31 14-16 05-07 28-30 06-08 04-06 27-29 06-08 5.950.0006 VENTILASI TAMBANG 3 11-13 08-10 01-03 10-12 03-05 19-21 12-14 02-04 13-15 11-13 01-03 13-15 6.500.000

7 EVALUASI STUDI KELAYAKAN DALAM USAHAPERTAMBANGAN 3 18-20 15-17 08-10 19-21 10-12 05-07 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000

8 PERENCANAAN TAMBANG TERBUKA 3 25-27 22-24 15-17 26-28 17-19 12-14 26-28 14-16 27-29 25-27 15-17 27-29 5.950.0009 PEMBORAN EKSPLORASI BATUBARA 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 23-25 04-06 02-04 22-24 04-06 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MIGAS1 PETROLEUM PLANT & PIPELINE SECURITY

MANAGEMENT 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.950.000

2PEMBANGKITAN ALIRAN PERMUKAAN UNTUKOIL SPILL (OIL FENCE) SEBAGAI PENGUMPULTUMPAHAN MINYAK

4 17-20 14-17 13-16 18-21 30-02 12-15 18-21 22-25 19-22 17-20 13-16 05-08 7.950.000

3 Oil Transportation Piping 4 02-05 30-02 28-03 03-06 08-11 06-09 03-06 31-03 04-07 02-05 31-03 19-22 7.950.0004 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.0005 H2S AWARENESS 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 14-16 06-08 04-06 20-22 27-29 5.950.000

19

6 GAS PROCESSING AND EQUIPMENT 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 31-03 11-14 09-12 30-02 11-14 8.500.000

7 BASIC OF SURFACE OPERATION ANDMAINTENANCE FOR OIL AND GAS INDUSTRIES 4 17-20 14-17 28-03 18-21 16-19 06-09 18-21 22-25 19-22 17-20 31-03 11-14 7.950.000

8 PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL 4 03-06 31-03 20-23 04-07 02-05 05-08 04-07 01-04 05-08 03-06 20-23 04-07 7.950.000

9 Oil and Gas Measurements 4 17-20 14-17 06-09 18-21 16-19 05-08 18-21 22-25 19-22 17-20 06-09 05-08 8.500.000

10 GAS DEHYDRATION AND GLYCOLREGENERATION 4 03-06 31-03 14-17 04-07 30-02 12-15 04-07 28-31 05-08 03-06 14-17 19-22 8.750.000

11 GAS SWEETENING H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS 4 10-13 07-10 21-24 10-13 02-05 06-09 11-14 01-04 12-15 10-13 21-24 04-07 8.750.000

12 GAS HANDLING, CONDITIONING, ANDPROCESSING FACILITIES 4 23-26 20-23 27-02 24-27 02-05 12-15 24-27 31-03 25-28 23-26 30-02 04-07 7.950.000

13 OIL AND GAS HANDLING FACILITIES 4 03-06 31-03 28-03 04-07 09-12 05-08 04-07 08-11 05-08 03-06 31-03 19-22 7.950.000

14 OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATION 4 10-13 07-10 07-10 10-13 16-19 13-16 11-14 22-25 12-15 10-13 07-10 04-07 7.950.000

15 Drilling operations for operator in oil and gasindustries 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 11-14 8.500.000

16 NATURAL GAS PROCESSING - FRACTINATIONAND REFREGERATION 4 09-12 06-09 27-30 10-13 08-11 06-09 10-13 31-03 11-14 09-12 27-30 04-07 8.500.000

17 PETROLEUM ENGINEERING FOR NONPETROLEUM EMPLOYEE 4 16-19 13-16 27-02 17-20 15-18 13-16 17-20 07-10 18-21 16-19 30-02 12-15 8.500.000

18 PRACTICAL ASPECT OF ARTIFIAL LIFT METHODSFOR PETROLEUM PRODUCTION SYSTEM 4 03-06 31-03 14-17 04-07 02-05 12-15 04-07 28-31 05-08 03-06 14-17 05-08 8.500.000

19 PRODUCTION LOGGING 4 10-13 07-10 21-24 10-13 09-12 06-09 11-14 01-04 12-15 10-13 21-24 11-14 8.500.000

20 SUPPLY CHAIN MANAGEMENT IN THEUPSTREAM OIL & GAS INDUSTRY 3 18-20 15-17 29-31 19-21 22-24 19-21 19-21 14-16 20-22 18-20 29-01 27-29 6.500.000

21 WATER FLOODING 4 23-26 20-23 28-03 24-27 16-19 13-16 24-27 08-11 25-28 23-26 31-03 18-21 8.500.00022 WP&B, AFE and POD 4 02-05 30-02 07-10 03-06 29-01 05-08 03-06 21-24 04-07 02-05 07-10 04-07 8.500.00023 ARTIFICIAL LIFT 4 09-12 06-09 13-16 10-13 02-05 12-15 10-13 28-31 11-14 09-12 13-16 12-15 8.500.000

24 OFFSHORE WELLHEAD FUNCTION ANDTROUBLESHOOTING 4 16-19 13-16 20-23 17-20 08-11 06-09 17-20 31-03 18-21 16-19 20-23 19-22 8.500.000

25 Advanced Oil and Gas Production System 4 16-19 13-16 13-16 17-20 02-05 12-15 17-20 28-31 18-21 16-19 13-16 18-21 8.950.000

26 BASIC DRILLING ENGINEERING AND HEALTH,SAFETY & ENVIRONMENTAL CONSIDERATION 4 23-26 20-23 20-23 24-27 08-11 05-08 24-27 31-03 25-28 23-26 20-23 04-07 8.950.000

27 Basic Petroleum Engineering 4 02-05 30-02 27-30 03-06 15-18 13-16 03-06 07-10 04-07 02-05 27-30 11-14 8.950.000

28 Basic Reservoir Engineering for Non PetroleumEngineer 4 09-12 06-09 27-02 10-13 29-01 06-09 10-13 21-24 11-14 09-12 30-02 19-22 8.950.000

29ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCEAND TROUBLESHOOTING

4 24-27 21-24 14-17 25-28 09-12 05-08 25-28 01-04 26-29 24-27 14-17 12-15 8.950.000

20

30 FORMATION DAMAGE AND WELLSTIMULATION 4 03-06 31-03 21-24 04-07 16-19 13-16 04-07 08-11 05-08 03-06 21-24 18-21 8.950.000

31 NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS 4 10-13 07-10 28-31 10-13 30-02 06-09 11-14 22-25 12-15 10-13 28-01 04-07 8.950.000

32 Oil & Gas Production System 4 16-19 13-16 28-03 17-20 02-05 12-15 17-20 28-31 18-21 16-19 31-03 11-14 8.950.00033 OIL & GAS MEASUREMENT AND CALCULATION 4 23-26 20-23 07-10 24-27 08-11 05-08 24-27 31-03 25-28 23-26 07-10 19-22 8.950.00034 OIL AND GAS HANDLING FACILITIES 4 02-05 30-02 13-16 03-06 15-18 13-16 03-06 07-10 04-07 02-05 13-16 05-08 8.950.000

35 OIL AND GAS WELLS STIMULATION BYACIDIZING AND HYDRAULIC FRACTURING 4 09-12 06-09 20-23 10-13 29-01 06-09 10-13 21-24 11-14 09-12 20-23 12-15 8.950.000

36 Oil Field, and 100 Methods to Maintain andIncrease Production 4 17-20 14-17 27-30 18-21 02-05 12-15 18-21 28-31 19-22 17-20 27-30 18-21 8.950.000

37 PETROLEUM ENGINEERING FOR NONPETROLEUM ENGINEERS 4 24-27 21-24 27-02 25-28 09-12 05-08 25-28 01-04 26-29 24-27 30-02 04-07 8.950.000

38 PRODUCTION DOWNHOLE AND SUBSURFACEEQUIPMENTS 4 03-06 31-03 06-09 04-07 16-19 13-16 04-07 08-11 05-08 03-06 06-09 11-14 8.950.000

39 PRODUCTION OPERATION MANAGEMENT FORMANAGERS 4 10-13 07-10 14-17 10-13 30-02 06-09 11-14 22-25 12-15 10-13 14-17 19-22 8.950.000

40 Pump Selection, Design and Operation for Oiland Gas Surface Production Facilities 4 16-19 13-16 21-24 17-20 02-05 12-15 17-20 28-31 18-21 16-19 21-24 05-08 8.950.000

41 SUCKER ROD PUMP DESIGN, OPERATION ANDTROUBLESHOOTING 4 23-26 20-23 28-31 24-27 08-11 05-08 24-27 31-03 25-28 23-26 28-01 12-15 8.950.000

42 Surface Production Operation and Equipments 4 02-05 30-02 28-03 03-06 15-18 13-16 03-06 07-10 04-07 02-05 31-03 18-21 8.950.00043 WELL COMPLETION AND WORK OVER 4 09-12 06-09 07-10 10-13 29-01 06-09 10-13 21-24 11-14 09-12 07-10 04-07 8.950.00044 BLOWOUT PREVENTION AND WELL CONTROL 4 17-20 14-17 13-16 18-21 02-05 12-15 18-21 28-31 19-22 17-20 13-16 11-14 8.950.00045 ARUS MINYAK KORPORATE 3 25-27 22-24 20-22 26-28 22-24 19-21 26-28 14-16 27-29 25-27 20-22 27-29 7.950.000

46MODERN HYDROCARBON WELL PRODUCTIONLOGGING DATA ANALYSIS ANDINTERPRETATION

4 03-06 31-03 27-30 04-07 09-12 05-08 04-07 01-04 05-08 03-06 27-30 19-22 8.950.000

47 OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT 4 02-05 30-02 07-10 03-06 29-01 12-15 03-06 28-31 04-07 02-05 07-10 05-08 8.750.000

48 BASIC SURFACE SAFETY SYSTEM 4 17-20 14-17 06-09 18-21 02-05 12-15 18-21 28-31 19-22 17-20 06-09 05-08 8.950.000

49PETROLEUM FINANCE, COST CONTROL &RESERVOIR MANAJEMEN (PetroleumEconomics)

4 24-27 21-24 06-09 25-28 30-02 05-08 25-28 22-25 26-29 24-27 06-09 19-22 8.500.000

50 Gas, Oil and Water Pipeline Design andMaintenance 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 11-14 8.750.000

HSE1 OIL SPILL - OIL BOOM AND ENVIRONMENTAL

MANAGEMENT 4 02-05 30-02 07-10 03-06 29-01 12-15 03-06 28-31 04-07 02-05 07-10 05-08 8.750.000

21

2 BASIC SURFACE SAFETY SYSTEM 4 17-20 14-17 06-09 18-21 02-05 12-15 18-21 28-31 19-22 17-20 06-09 05-08 8.950.0003 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.0004 WATER TREATMENT 4 16-19 13-16 20-23 17-20 08-11 13-16 17-20 07-10 18-21 16-19 20-23 19-22 8.750.0005 MANAJEMEN LINGKUNGAN 4 02-05 30-02 27-02 03-06 08-11 05-08 03-06 07-10 04-07 02-05 30-02 11-14 7.950.0006 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 16-20 13-17 06-10 17-21 08-12 12-16 17-21 07-11 18-22 16-20 06-10 18-22 8.950.000

7 AMDAL ( ENVIRONMENTAL AND SOCIALIMPACT ASSESSMENT) FOR EXECUTIVE 4 23-26 20-23 13-16 24-27 15-18 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

8 APPLIED ERGONOMICS AT WORKPLACE 4 02-05 30-02 20-23 03-06 29-01 12-15 03-06 28-31 04-07 02-05 20-23 11-14 7.950.0009 AUTHORISED GAS TESTING 4 09-12 06-09 27-30 10-13 02-05 06-09 10-13 31-03 11-14 09-12 27-30 18-21 8.500.000

10 BASIC SAFETY ORIENTATION FORCONTRACTORS 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 07-11 18-22 16-20 30-03 04-08 9.250.000

11 CANTEEN HYGIENE 2 26-27 23-24 06-07 27-28 22-23 19-20 27-28 14-15 28-29 26-27 06-07 27-28 3.950.000

12 CONTRACTOR SAFETY MANAGEMENT SYSTEM(CSMS) 4 03-06 31-03 14-17 04-07 16-19 05-08 04-07 22-25 05-08 03-06 14-17 12-15 7.950.000

13 ELECTRICAL SAFETY 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 14-16 13-15 11-13 22-24 27-29 6.500.00014 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 16-18 13-15 29-31 17-19 31-02 19-21 17-19 28-30 18-20 16-18 29-01 20-22 5.950.00015 HEALTH IMPACT ASSESSMENT (HIA) 4 23-26 20-23 27-02 24-27 02-05 12-15 24-27 01-04 25-28 23-26 30-02 04-07 7.950.000

16 INCIDENT INVESTIGATION, PREVENTION ANDPROACTIVE IMPROVEMENT 3 02-04 30-01 08-10 03-05 08-10 19-21 03-05 07-09 04-06 02-04 08-10 27-29 6.500.000

17 JOB SAFETY ANALYSIS (JSA) 2 09-10 06-07 13-14 12-13 15-16 19-20 10-11 14-15 11-12 09-10 13-14 11-12 3.950.00018 K3 RUMAH SAKIT 2 19-20 16-17 20-21 20-21 22-23 08-09 20-21 21-22 21-22 19-20 20-21 18-19 3.950.00019 LOCKOUT TAGOUT (LOTO) 2 26-27 23-24 27-28 27-28 29-30 15-16 27-28 30-31 28-29 26-27 27-28 27-28 3.950.00020 MANAGING SAFE WORK 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 31-03 05-08 03-06 31-03 05-08 7.950.00021 MATERIAL SAFETY DATA SHEETS (MSDS) 2 11-12 08-09 06-07 10-11 11-12 20-21 12-13 10-11 13-14 11-12 06-07 13-14 3.950.00022 MODERN SAFETY MANAGEMENT (MSM) 4 16-19 13-16 14-17 17-20 16-19 12-15 17-20 22-25 18-21 16-19 14-17 19-22 7.950.00023 OHSAS 180012007 AUDITOR 5 23-27 20-24 20-24 24-28 29-02 05-09 24-28 31-04 25-29 23-27 20-24 04-08 9.250.00024 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 30-31 29-30 03-04 23-24 19-20 03-04 15-16 04-05 02-03 29-30 28-29 3.950.000

25 PANITIA PEMBINA KESELAMATAN DANKESEHATAN KERJA (P2K3) 4 10-13 07-10 27-02 10-13 02-05 13-16 11-14 28-31 12-15 10-13 30-02 12-15 7.950.000

26 PENERAPAN PENGENDALIAN BISING TERPADUDITEMPAT KERJA 3 18-20 15-17 08-10 19-21 08-10 19-21 19-21 07-09 20-22 18-20 08-10 18-20 6.500.000

27 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 23-25 20-22 13-15 24-26 15-17 05-07 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000

28 PERLINDUNGAN LINGKUNGAN DANPENGELOLAAN LIMBAH B3 4 03-06 31-03 20-23 04-07 29-01 12-15 04-07 21-24 05-08 03-06 20-23 04-07 7.950.000

29 PERMIT TO WORK (PTW) 2 09-10 06-07 30-31 10-11 22-23 19-20 10-11 28-29 11-12 09-10 30-01 11-12 3.950.00030 Process Hazard Analysis (PHA) 3 16-18 13-15 01-03 17-19 02-04 07-09 17-19 31-02 18-20 16-18 01-03 20-22 5.950.00031 Process Hazard Analysis (PHA) for Facilitator 4 24-27 21-24 06-09 25-28 09-12 13-16 25-28 08-11 26-29 24-27 06-09 05-08 7.950.00032 Process Safety Management 3 02-04 30-01 15-17 03-05 17-19 19-21 03-05 14-16 04-06 02-04 15-17 27-29 5.950.00033 PROJECT HSE MANAGEMENT 3 11-13 08-10 22-24 11-13 22-24 05-07 12-14 23-25 13-15 11-13 22-24 13-15 6.500.000

22

34 RISK ASSESSMENT AND OPTIMAL RISKMANAGEMENT BASED ON ISO 31000 2 19-20 16-17 27-28 20-21 01-02 12-13 20-21 30-31 21-22 19-20 27-28 18-19 3.950.000

35 SAFETY AUDITS AND SITE INSPECTION 3 23-25 20-22 27-01 24-26 03-05 19-21 24-26 02-04 25-27 23-25 30-01 27-29 5.950.00036 SAFETY OfficeR DEVELOPMENT PROGRAM 5 02-06 30-03 06-10 03-07 08-12 05-09 03-07 07-11 04-08 02-06 06-10 04-08 9.250.00037 SAFETY TRAINING FOR THE LABORATORY 3 09-11 06-08 13-15 10-12 15-17 14-16 10-12 14-16 11-13 09-11 13-15 11-13 6.500.000

38 SELF CONTAINED BREATHINGAPPARATUS(SCBA) 1 16-16 13-13 20-20 17-17 22-22 19-19 17-17 21-21 18-18 16-16 20-20 20-20 2.950.000

39 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 23-27 20-24 27-31 24-28 29-02 05-09 24-28 31-04 25-29 23-27 27-01 04-08 9.250.00040 WORKING AT HEIGHT 2 12-13 09-10 06-07 12-13 08-09 20-21 13-14 07-08 14-15 12-13 06-07 14-15 3.950.00041 PENERAPAN HACCP 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 22-25 19-22 17-20 14-17 19-22 7.950.000

42IDENTIFICASI BAHAYA, PENILAIAN,PENGENDALIAN RESIKO (HIRAC) DAN ANALISABAHAYA DIPEKERJAAN (JSA)

4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 04-07 7.950.000

43 FIRE ALARMS & PROTECTION 4 17-20 14-17 06-09 18-21 16-19 06-09 18-21 22-25 19-22 17-20 06-09 19-22 7.950.00044 HAZARDOUS MATERIAL HANDLING 4 23-26 20-23 07-10 24-27 29-01 13-16 24-27 28-31 25-28 23-26 07-10 12-15 7.950.00045 INDUSTRIAL POLLUTION CONTROL 4 17-20 14-17 27-30 18-21 16-19 06-09 18-21 22-25 19-22 17-20 27-30 11-14 7.950.00046 JOB SAFETY ANALYSIS TRAINING 4 02-05 30-02 06-09 03-06 02-05 05-08 03-06 31-03 04-07 02-05 06-09 04-07 7.950.000

47 LINGKUNGAN KERJA YANG BERSIH DAN AMANPADA INDUSTRI KIMIA 4 09-12 06-09 13-16 10-13 08-11 12-15 10-13 07-10 11-14 09-12 13-16 12-15 7.950.000

48 Water Treatment 4 10-13 07-10 27-02 10-13 09-12 12-15 11-14 08-11 12-15 10-13 30-02 18-21 7.950.000

49 AMDAL ( ENVIRONMENTAL AND SOCIALIMPACT ASSESSMENT) FOR EXECUTIVE 4 16-19 13-16 27-02 17-20 15-18 05-08 17-20 21-24 18-21 16-19 30-02 11-14 7.950.000

50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 02-05 30-02 27-02 03-06 08-11 12-15 03-06 07-10 04-07 02-05 30-02 18-21 7.950.000

51 SYSTEM SAFETY ENGINEERING ANDMANAGEMENT 4 16-19 13-16 13-16 17-20 29-01 13-16 17-20 28-31 18-21 16-19 13-16 11-14 7.950.000

52 BEHAVIOR BASED SAFETY (BBS) 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 18-20 6.500.00053 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 8.500.00054 HAZARDOUS MATERIALS SAFE HANDLING 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 11-14 8.500.000

55 HEALTH, SAFETY & ENVIRONMENT (HSE)ASPECTS IN LOGISTICS ACTIVITIES 4 09-12 06-09 27-02 10-13 08-11 06-09 10-13 31-03 11-14 09-12 30-02 19-22 8.500.000

56 Hot Works 3 18-20 15-17 06-08 19-21 22-24 19-21 19-21 07-09 20-22 18-20 06-08 27-29 6.500.00057 HSE MANAGEMENT SYSTEM 4 24-27 21-24 14-17 25-28 16-19 13-16 25-28 22-25 26-29 24-27 14-17 05-08 8.500.00058 HSE WORK PRACTICES AT CONFINED SPACE 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 14-16 06-08 04-06 22-24 27-29 6.500.000

59 JOB SAFETY ANALYSIS (JSA) ANALISAKESELAMATAN PEKERJAAN 3 11-13 08-10 29-31 10-12 31-02 19-21 12-14 28-30 13-15 11-13 29-01 13-15 6.500.000

60 MANAGING CONTRACTOR SAFETY 3 16-18 13-15 01-03 17-19 02-04 19-21 17-19 02-04 18-20 16-18 01-03 18-20 6.500.000

61 MODERN SAFETY AND LOSS CONTROLMANAGEMENT 4 23-26 20-23 07-10 24-27 09-12 05-08 24-27 08-11 25-28 23-26 07-10 04-07 8.500.000

62 OCCUPATIONAL HEALTH, SAFETY ANDENVIRONMENT (HSE) AUDITING 5 02-06 30-03 13-17 03-07 15-19 12-16 03-07 21-25 04-08 02-06 13-17 11-15 9.250.000

23

63 Occupational Health, Safety and Environment(HSE) on Paper and Pulp Industry 4 09-12 06-09 20-23 10-13 29-01 06-09 10-13 28-31 11-14 09-12 20-23 19-22 8.500.000

64 ONSHORE DRILLING SAFETY OPERATIONS HSEASPECTS IN ONSHORE DRILLING OPERATIONS 4 17-20 14-17 27-30 18-21 02-05 12-15 18-21 31-03 19-22 17-20 27-30 05-08 8.500.000

65ONSHORE DRILLING SAFETY OPERATIONS HSEASPECTS IN ONSHORE DRILLING OPERATIONSFOR MANAGERS AND SUPERINTENDENTS

3 25-27 22-24 27-01 26-28 22-24 19-21 26-28 14-16 27-29 25-27 30-01 27-29 6.500.000

66 PENCEGAHAN DAN PENANGGULANGANKEBAKARAN (FIRE PREVENTION & PROTECTION) 3 02-04 30-01 06-08 03-05 08-10 19-21 03-05 07-09 04-06 02-04 06-08 27-29 6.500.000

67 PRODUCTION SAFETY SYSTEM 5 09-13 06-10 13-17 17-21 15-19 05-09 10-14 21-25 11-15 09-13 13-17 11-15 8.500.000

68 PROFESSIONAL ACCIDENT INCIDENTINVESTIGATION 3 16-18 13-15 22-24 10-12 22-24 19-21 17-19 14-16 18-20 16-18 22-24 18-20 6.500.000

69 SAFETY MANAGEMENT FOR SUPERVISORS ANDMANAGERS 4 23-26 20-23 28-31 24-27 30-02 13-16 24-27 28-31 25-28 23-26 28-01 04-07 8.500.000

70 TRANSPORTATION SAFETY MANAGEMENTSYSTEM 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 01-04 05-08 03-06 31-03 11-14 8.500.000

71 WAREHOUSE SAFETY MANAGEMENT 4 09-12 06-09 07-10 10-13 09-12 12-15 10-13 08-11 11-14 09-12 07-10 19-22 8.500.00072 HIRADC 3 18-20 15-17 13-15 17-19 15-17 19-21 19-21 14-16 20-22 18-20 13-15 27-29 6.500.00073 PROCESS SAFETY MANAGEMENT 4 24-27 21-24 20-23 25-28 29-01 06-09 25-28 21-24 26-29 24-27 20-23 05-08 8.500.000

74 Chemical Hazard Safety in Mining andWorkplace 4 09-12 06-09 27-30 10-13 02-05 06-09 10-13 31-03 11-14 09-12 27-30 18-21 8.750.000

75 HAZARDOUS MATERIAL HANDLING 4 02-05 30-02 06-09 03-06 08-11 05-08 03-06 07-10 04-07 02-05 06-09 11-14 7.950.00076 HAZID (HAZARD IDENTIFICATON) 4 09-12 06-09 13-16 10-13 15-18 13-16 10-13 21-24 11-14 09-12 13-16 18-21 7.950.00077 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 16-19 13-16 20-23 17-20 29-01 06-09 17-20 28-31 18-21 16-19 20-23 05-08 7.950.00078 WASTE WATER TREATMENT & MANAGEMENT 4 16-19 13-16 06-09 17-20 29-01 06-09 17-20 28-31 18-21 16-19 06-09 19-22 7.950.00079 Water Treating and Chemicals 4 24-27 21-24 13-16 25-28 02-05 12-15 25-28 01-04 26-29 24-27 13-16 04-07 7.950.00080 PENGENDALIAN PENCEMARAN AIR 3 11-13 08-10 27-29 10-12 22-24 19-21 12-14 14-16 13-15 11-13 27-29 27-29 6.500.00081 PENGENDALIAN PENCEMARAN UDARA 3 18-20 15-17 01-03 19-21 22-24 19-21 19-21 14-16 20-22 18-20 01-03 27-29 6.500.00082 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 02-05 30-02 13-16 03-06 15-18 12-15 03-06 07-10 04-07 02-05 13-16 18-21 7.950.000

83 ISU PEMENUHAN KUALITAS DAN KEAMANANPANGAN 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 21-24 11-14 09-12 20-23 04-07 7.950.000

84 PEMENUHAN PERSYARATAN PERIZINAN 4 16-19 13-16 27-30 17-20 02-05 13-16 17-20 28-31 18-21 16-19 27-30 11-14 7.950.000

85 POTENSI DAN PERKEMBANGAN INDUSTRIPANGAN 4 23-26 20-23 27-02 24-27 08-11 06-09 24-27 31-03 25-28 23-26 30-02 19-22 7.950.000

86 HSE MANAGEMENT SYSTEM INTERNALAUDITOR 4 02-05 30-02 20-23 03-06 02-05 12-15 03-06 28-31 04-07 02-05 20-23 18-21 8.500.000

87 PRODUCTION SYSTEM SAFETY 4 23-26 20-23 27-02 24-27 02-05 13-16 24-27 28-31 25-28 23-26 30-02 18-21 7.950.00088 FIT FOR DUTY 2 09-10 06-07 06-07 10-11 22-23 19-20 10-11 14-15 11-12 09-10 06-07 27-28 3.950.00089 SURVEILANS KESEHATAN PEKERJA 2 16-17 13-14 13-14 17-18 23-24 20-21 17-18 15-16 18-19 16-17 13-14 28-29 3.950.00090 APLIKASI PROGRAM PERLINDUNGAN 2 23-24 20-21 20-21 24-25 22-23 19-20 24-25 14-15 25-26 23-24 20-21 27-28 4.500.000

24

PERNAFASAN91 FOOD HYGIENE SANITATION AND MONITORING 2 02-03 30-31 27-28 03-04 23-24 20-21 03-04 15-16 04-05 02-03 27-28 28-29 4.500.00092 HEARING CONSERVATION PROGRAM 2 11-12 08-09 27-28 12-13 22-23 19-20 12-13 14-15 13-14 11-12 30-31 27-28 4.500.00093 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 18-19 15-16 08-09 19-20 23-24 20-21 19-20 15-16 20-21 18-19 08-09 28-29 4.500.000

94 CATERING SERVICE, HYGIENE & SANITATION(INCLUDING PERSONAL HYGIENE) 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 6.500.000

95 Penerapan Hazard Analysis Critical ControlPoint (HACCP) pada Pengelolaan Makanan 3 04-06 01-03 15-17 05-07 22-24 19-21 05-07 14-16 06-08 04-06 15-17 27-29 5.950.000

96 BEHAVIOR BASED SAFETY 2 23-24 20-21 27-28 24-25 22-23 19-20 24-25 14-15 25-26 23-24 27-28 27-28 4.500.00097 CSMS AWARENESS 2 02-03 30-31 27-28 03-04 02-03 20-21 03-04 31-01 04-05 02-03 30-31 28-29 4.500.00098 HSE LEADERSHIP 2 09-10 06-07 06-07 10-11 08-09 19-20 10-11 07-08 11-12 09-10 06-07 27-28 4.500.00099 INCIDENT INVESTIGATION 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 27-29 6.500.000

100 AMDAL (ENVIRONMENTAL IMPACTASSESMENT) FOR EXECUTIVES 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 6.500.000

101 EMERGENCY PREPAREDNESS 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6.500.000

102 ENVIRONMENTAL LEGISLATION (ANTICIPATINGCONFLICS) 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 27-29 6.500.000

103 ENVIRONMENTAL MONITORING KEY TOPOLUTION FREE 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6.500.000

104 HSE AUDIT TECHNIQUES 3 04-06 01-03 27-01 05-07 22-24 19-21 05-07 14-16 06-08 04-06 30-01 27-29 6.500.000

105 OCCUPATIONAL HEALTH, SAFETY ANDENVIRONMENTAL IN THE OIL & GAS INDUSTRY 3 11-13 08-10 08-10 11-13 22-24 19-21 12-14 14-16 13-15 11-13 08-10 27-29 6.500.000

106 WASTE HANDLING & TREATMENT IN THE OIL &GAS INDUSTRIES 3 18-20 15-17 15-17 19-21 22-24 19-21 19-21 14-16 20-22 18-20 15-17 27-29 6.500.000

107 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 6.950.000

108 HANDLING OF DANGEROUS GOODS IN AIRTRANSPORT 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000

109 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000

110 SAFETY INSTRUMENTED SYSTEM (SIS) ANDCONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000

111 CATERING & ACCOMMODATIONMANAGEMENT (INCLUDING TABLE MANNER) 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

112 WELDING SAFETY 2 02-03 30-31 02-03 03-04 02-03 12-13 03-04 28-29 04-05 02-03 02-03 27-28 3.950.000113 H2S AWARENESS 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 14-16 06-08 04-06 20-22 27-29 5.950.000

114Higiene Sanitasi Makanan Berbasis HACCP 2 09-10 06-07 27-28 10-11 29-30 05-06 10-11 28-29 11-12 09-10 27-28 11-12 4.500.000

MANAJEMEN1 STRESS & CONFLICT MANAGEMENT 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000

25

2 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 02-06 30-03 27-31 03-07 08-12 05-09 03-07 31-04 04-08 02-06 27-01 11-15 8.950.000

3 CORPORATE BUILIDNG DALAM MEMBANGUNKULTUR DAN ETIKA INTERNAL ORGANISASI 4 16-19 13-16 06-09 17-20 02-05 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.000

4 MODEL PEMBINAAN ANGGOTA YANGEXCELLENT DALAM DUNIA KERJA PERUSAHAAN 3 16-18 13-15 27-29 17-19 31-02 19-21 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000

5 Office COMMUNICATION AND BEHAVIOR ETHIC 3 04-06 01-03 06-08 05-07 08-10 19-21 05-07 07-09 06-08 04-06 06-08 04-06 5.950.000

6 CHANGE & CONFLICT MANAGEMENT ANDDEALING WITH DIFFICULT PEOPLE 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000

7 SPEED AND INNOVATION 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000

8 HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP 2 09-10 06-07 27-28 10-11 23-24 20-21 10-11 15-16 11-12 09-10 30-31 28-29 3.950.000

9 CONTEMPORARY COMMUNICATION &LEADERSHIP 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000

10 TALENT MANAGEMENT 4 03-06 31-03 28-31 04-07 29-01 05-08 04-07 28-31 05-08 03-06 28-01 05-08 7.950.000

11 COMMUNICATION, ASSERTIVENESS ANDCONFLICT MANAGEMENT 2 12-13 09-10 29-30 12-13 22-23 19-20 13-14 30-31 14-15 12-13 29-30 14-15 3.950.000

12 INNER SUCCESS TRAINING 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

13PETROLEUM FINANCE, COST CONTROL &RESERVOIR MANAJEMEN (PetroleumEconomics)

4 24-27 21-24 06-09 25-28 30-02 05-08 25-28 22-25 26-29 24-27 06-09 19-22 8.500.000

14 ENGINEERING MATERIAL KNOWLEDGE FORWAREHOUSE PEOPLE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 6.500.000

15 CULTURE CHANGE FOR MAINTENANCE ANDRELIABILITY IMPROVEMENT 3 09-11 06-08 27-29 10-12 29-31 05-07 10-12 28-30 11-13 09-11 27-29 11-13 6.500.000

16 CATERING & ACCOMMODATIONMANAGEMENT (INCLUDING TABLE MANNER) 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

17 LIFE CYCLE COSTING 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 6.500.00018 ACCOUNT RECEIVABLE MANAGEMENT 2 09-10 06-07 27-28 10-11 29-30 05-06 10-11 28-29 11-12 09-10 27-28 11-12 3.950.00019 Accounting Information Systems 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 5.950.00020 Asset Management 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

21 BALANCED SCORECARD (BSC) CONCEPT ANDIMPLEMENTATION 2 02-03 30-31 13-14 03-04 15-16 07-08 03-04 14-15 04-05 02-03 13-14 04-05 3.950.000

22 BASIC ACCOUNTING 3 11-13 08-10 20-22 11-13 22-24 14-16 12-14 21-23 13-15 11-13 20-22 13-15 5.950.00023 BASIC AUDIT FINANCE 3 18-20 15-17 29-31 19-21 31-02 19-21 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000

24 BASIC KNOWLEDGE ABOUT FINANCIALMANAGEMENT 3 25-27 22-24 01-03 26-28 03-05 07-09 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000

25 BUDGET PLANNING, CONTROLLING &ANALYSING 3 04-06 01-03 08-10 05-07 10-12 12-14 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

26 BUDGETING AND PROJECT COST CONTROL 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 11-13 5.950.00027 BUDGETING AND REPORTING 3 16-18 13-15 22-24 17-19 22-24 05-07 17-19 23-25 18-20 16-18 22-24 18-20 5.950.000

26

28 CASH MANAGEMENT 2 23-24 20-21 27-28 24-25 29-30 15-16 24-25 28-29 25-26 23-24 27-28 27-28 3.950.00029 CUSTOMER RELATION MANAGEMENT(CRM) 3 18-20 15-17 13-15 19-21 15-17 12-14 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00030 Export import 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 18-20 5.950.000

31 FINANCE FOR NON FINANCE FOR OIL & GASINDUSTRY 3 25-27 22-24 15-17 26-28 17-19 07-09 26-28 14-16 27-29 25-27 15-17 27-29 5.950.000

32 FINANCE FOR NON FINANCE MANAGER 3 04-06 01-03 22-24 05-07 22-24 12-14 05-07 23-25 06-08 04-06 22-24 06-08 5.950.00033 Financial Planning and Budgeting for Banking 3 11-13 08-10 29-31 11-13 31-02 19-21 12-14 28-30 13-15 11-13 29-01 13-15 5.950.000

34 Holistic CSR and Sustainable CommunityDevelopment 2 19-20 16-17 02-03 20-21 02-03 05-06 20-21 03-04 21-22 19-20 02-03 21-22 3.950.000

35 HR Based On Competency for Recruitment 2 02-03 30-31 13-14 03-04 15-16 19-20 03-04 14-15 04-05 02-03 13-14 04-05 3.950.00036 INTERMEDIATE ACCOUNTING 3 09-11 06-08 20-22 10-12 22-24 07-09 10-12 21-23 11-13 09-11 20-22 11-13 5.950.00037 Key Account Management 2 16-17 13-14 27-28 17-18 29-30 12-13 17-18 30-31 18-19 16-17 27-28 18-19 3.950.000

38 LAPORAN KEUANGAN PEMAHAMAN DANPENGGUNAANNYA 3 25-27 22-24 27-01 26-28 03-05 19-21 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000

39 Managing Training Function 3 04-06 01-03 08-10 05-07 10-12 05-07 05-07 09-11 06-08 04-06 08-10 06-08 5.950.00040 OUTSOURCING MANAGEMENT 3 11-13 08-10 15-17 11-13 17-19 14-16 12-14 14-16 13-15 11-13 15-17 13-15 5.950.000

41 PETTY CASH MANAGEMENT &ADMINISTRATION 2 18-19 15-16 23-24 19-20 22-23 19-20 19-20 24-25 20-21 18-19 23-24 20-21 3.950.000

42 PROBLEM SOLVING AND DECISION MAKING 4 02-05 30-02 28-03 03-06 02-05 12-15 03-06 01-04 04-07 02-05 31-03 04-07 7.950.000

43 PROFIT PLANNING COST - VOLUME - PROFITRELATIONSHIP ANALYSIS 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 11-13 5.950.000

44 Project Cost Estimation & Cost Control 3 18-20 15-17 13-15 19-21 15-17 05-07 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000

45 Standard Operational Procedure, Accounting &Finance 3 25-27 22-24 20-22 26-28 22-24 14-16 26-28 21-23 27-29 25-27 20-22 27-29 5.950.000

46 Total Quality Management 3 16-18 13-15 08-10 17-19 10-12 12-14 17-19 09-11 18-20 16-18 08-10 18-20 5.950.000

47 TRAINING EVALUATION AND MEASUREMENTMETHOD 2 23-24 20-21 16-17 24-25 18-19 20-21 24-25 14-15 25-26 23-24 16-17 27-28 3.950.000

48 TRAINING NEED ANALYSIS 2 02-03 30-31 23-24 03-04 22-23 05-06 03-04 24-25 04-05 02-03 23-24 04-05 3.950.000

49 Training untuk pegawai persiapan masapensiun (training pra-purnabakti) 5 09-13 06-10 27-31 17-21 29-02 12-16 10-14 31-04 11-15 09-13 27-01 11-15 8.950.000

50 ACCOUNT PAYABLE MANAGEMENT 2 19-20 16-17 01-02 10-11 04-05 19-20 20-21 28-29 21-22 19-20 01-02 21-22 3.950.00051 COST ACCOUNTING 3 25-27 22-24 06-08 26-28 08-10 07-09 26-28 07-09 27-29 25-27 06-08 27-29 5.950.00052 FIXED ASSET 3 04-06 01-03 13-15 05-07 15-17 12-14 05-07 14-16 06-08 04-06 13-15 06-08 5.950.00053 ANALISIS KEEKONOMISAN PROYEK 3 09-11 06-08 20-22 11-13 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.000

54 SISTEM INFORMASI MANAJEMEN DANAKUNTANSI 3 16-18 13-15 27-29 17-19 29-31 05-07 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000

55 COST VOLUME PROFIT ANALYSIS 3 23-25 20-22 01-03 24-26 02-04 14-16 24-26 31-02 25-27 23-25 01-03 27-29 5.950.000

56 INTERNATIONAL FINANCIAL REPORTINGSTANDARD (IFRS) 2 02-03 30-31 09-10 03-04 11-12 19-20 03-04 10-11 04-05 02-03 09-10 04-05 4.500.000

57 TREASURY AND CASH FLOW MANAGEMENT 2 12-13 09-10 16-17 10-11 18-19 08-09 13-14 14-15 14-15 12-13 16-17 14-15 4.500.000

27

58 ADVANCE SECURITY MANAGEMENT 4 09-12 06-09 13-16 10-13 29-01 05-08 10-13 21-24 11-14 09-12 13-16 11-14 7.950.00059 ANALISIS BEBAN KERJA 2 09-10 06-07 20-21 10-11 22-23 12-13 10-11 21-22 11-12 09-10 20-21 11-12 3.950.00060 ANALITYCAL HIERARCHY PROCESS 2 16-17 13-14 27-28 17-18 29-30 19-20 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000

61IMPLEMENTASI BALANCED SCORE CARD (BSC)SEBAGAI ALAT UKUR PERFORMANSIKARYAWAN

3 02-04 30-01 06-08 03-05 08-10 14-16 03-05 07-09 04-06 02-04 06-08 04-06 5.950.000

62 KESEIMBANGAN LINTAS PRODUKSI (LINEBALANCING) 2 11-12 08-09 13-14 12-13 15-16 20-21 12-13 14-15 13-14 11-12 13-14 13-14 3.950.000

63 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 18-19 15-16 22-23 19-20 23-24 07-08 19-20 23-24 20-21 18-19 22-23 20-21 3.950.00064 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 25-26 22-23 29-30 26-27 31-01 12-13 26-27 30-31 27-28 25-26 29-30 28-29 3.950.00065 MANAJEMEN LOGISTIK 3 04-06 01-03 01-03 05-07 03-05 19-21 05-07 02-04 06-08 04-06 01-03 06-08 5.950.00066 MANAJEMEN PENGEMBANGAN PRODUK 3 11-13 08-10 08-10 10-12 10-12 07-09 12-14 09-11 13-15 11-13 08-10 13-15 5.950.000

67 MANAJEMEN PERGUDANGAN DANPERSEDIAAN 2 19-20 16-17 15-16 20-21 17-18 14-15 20-21 15-16 21-22 19-20 15-16 21-22 3.950.000

68 MANAJEMEN PROYEK 3 25-27 22-24 22-24 26-28 22-24 19-21 26-28 23-25 27-29 25-27 22-24 27-29 5.950.00069 OPERATION MANAGEMENT 2 02-03 30-31 30-31 03-04 01-02 05-06 03-04 28-29 04-05 02-03 30-01 04-05 3.950.00070 PEMILIHAN PEMASOK (VENDOR) 2 09-10 06-07 27-28 12-13 02-03 15-16 10-11 31-01 11-12 09-10 30-31 11-12 3.950.00071 STANDARD OPERATING PROCEDURE 2 23-24 20-21 16-17 24-25 18-19 07-08 24-25 14-15 25-26 23-24 16-17 27-28 3.950.00072 STUDI KELAYAKAN PROYEK 2 04-05 01-02 20-21 05-06 22-23 12-13 05-06 21-22 06-07 04-05 20-21 06-07 3.950.000

73 TANGGUNG JAWAB SOSIAL PERUSAHAAN(CORPORATE SOCIAL RESPONSIBILITY) 2 11-12 08-09 27-28 10-11 29-30 20-21 12-13 30-31 13-14 11-12 27-28 13-14 3.950.000

74 VALUE ENGINEERING (REKAYASA NILAI) 2 18-19 15-16 01-02 19-20 04-05 08-09 19-20 02-03 20-21 18-19 01-02 20-21 3.950.00075 Sistem Informasi manajemen Pergudangan 2 25-26 22-23 08-09 26-27 10-11 14-15 26-27 09-10 27-28 25-26 08-09 28-29 395000076 Sistem Life Cycle Costing 2 05-06 02-03 13-14 06-07 15-16 19-20 06-07 15-16 07-08 05-06 13-14 07-08 395000077 ANALISIS KEPUTUSAN 2 12-13 09-10 22-23 12-13 23-24 05-06 13-14 23-24 14-15 12-13 22-23 14-15 3.950.00078 MANAJEMEN PRODUKSI 2 19-20 16-17 29-30 20-21 31-01 15-16 20-21 28-29 21-22 19-20 29-30 21-22 3.950.00079 METODE PENGAMBILAN KEPUTUSAN 2 26-27 23-24 02-03 27-28 02-03 20-21 27-28 03-04 28-29 26-27 02-03 27-28 3.950.00080 BUSINESS PROCESS REENGINEERING 2 16-17 13-14 27-28 17-18 23-24 20-21 17-18 15-16 18-19 16-17 27-28 28-29 3.950.000

81 LOGISTICS AND SUPPLY CHAIN MANAGEMENTCONCEPT, STRATEGY AND IMPLEMENTATION 4 02-05 30-02 06-09 03-06 08-11 05-08 03-06 07-10 04-07 02-05 06-09 11-14 7.950.000

82 MANAJEMEN STRATEGI 3 11-13 08-10 13-15 11-13 15-17 19-21 12-14 14-16 13-15 11-13 13-15 27-29 5.950.000

83 PRACTICAL PROJECT EVALUATION ANDFINANCING 2 18-19 15-16 22-23 19-20 23-24 19-20 19-20 21-22 20-21 18-19 22-23 18-19 3.950.000

84PROJECT MANAGEMENT WITH MICROSOFTPROJECT APPLICATION,Win QSB & MONTECARLO SIMULATION

3 25-27 22-24 29-31 26-28 29-31 19-21 26-28 28-30 27-29 25-27 29-01 27-29 5.950.000

85 RISK-BASED MANAGEMENT 3 04-06 01-03 01-03 05-07 02-04 19-21 05-07 31-02 06-08 04-06 01-03 04-06 5.950.00086 STRATEGI PENGEMBANGAN BISNIS 3 09-11 06-08 08-10 10-12 10-12 12-14 10-12 09-11 11-13 09-11 08-10 13-15 5.950.00087 SUPPLY CHAIN MANAGEMENT 3 18-20 15-17 15-17 19-21 17-19 19-21 19-21 14-16 20-22 18-20 15-17 20-22 5.950.00088 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 31-03 11-14 09-12 30-02 11-14 7.950.000

28

89 PROJECT MANAGEMENT 4 10-13 07-10 28-31 10-13 02-05 05-08 11-14 01-04 12-15 10-13 28-01 19-22 7.950.00090 ACCOUNT OfficeR 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.00091 AUDITING SDM 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.00092 BUSINESS STRATEGY FOR MANAGERS 3 25-27 22-24 27-01 26-28 02-04 05-07 26-28 31-02 27-29 25-27 30-01 27-29 5.950.00093 COSTUMER SERVICE(CS) 3 18-20 15-17 22-24 19-21 22-24 07-09 19-21 23-25 20-22 18-20 22-24 20-22 5.950.000

94 KEPEMIMPINAN (LEADERSHIP HIGH LEVELMANAGER) 5 09-13 06-10 06-10 17-21 08-12 05-09 10-14 07-11 11-15 09-13 06-10 11-15 8.950.000

95 KEPEMIMPINAN (LEADERSHIP LOWER LEVELMANAGER) 3 16-18 13-15 13-15 10-12 15-17 12-14 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000

96 KEPEMIMPINAN (LEADERSHIP MIDDLE LEVELMANAGER) 4 24-27 21-24 20-23 25-28 29-01 05-08 25-28 21-24 26-29 24-27 20-23 04-07 7.950.000

97 KEWIRANIAGAAN (SALESMANSHIP) 3 04-06 01-03 27-29 05-07 22-24 19-21 05-07 28-30 06-08 04-06 27-29 27-29 5.950.000

98 MANAJEMEN PERUBAHAN (CHANGEMANAGEMENT) 3 09-11 06-08 27-01 11-13 02-04 14-16 10-12 31-02 11-13 09-11 30-01 11-13 5.950.000

99 MANAJEMEN SDM (PERSONALIA ATAUTENAGA KERJA) 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 07-11 18-22 16-20 06-10 18-22 8.950.000

100MANAJEMEN PERILAKU DALAMORGANISASI(MANAGEMENT OFORGANIZATION BEHAVIOR)

4 23-26 20-23 14-17 24-27 16-19 12-15 24-27 22-25 25-28 23-26 14-17 05-08 7.950.000

101 MANAJEMEN STRATEGI 5 02-06 30-03 20-24 03-07 29-02 05-09 03-07 31-04 04-08 02-06 20-24 11-15 8.950.000102 MANUSIA DALAM KERJA (MEN IN WORK) 2 12-13 09-10 30-31 10-11 22-23 19-20 13-14 14-15 14-15 12-13 30-01 27-28 3.950.000

103 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR(SUPERVISORY MANAGEMENT) 4 16-19 13-16 28-03 17-20 02-05 13-16 17-20 28-31 18-21 16-19 31-03 18-21 7.950.000

104PENGANTAR KONSEPMANAJEMEN(INTRODUCTION TOMANAGEMENT)

4 24-27 21-24 06-09 25-28 08-11 05-08 25-28 07-10 26-29 24-27 06-09 04-07 7.950.000

105 RAPAT YANG PRODUKTIF (PRODUCTIVEMEETING) 2 23-24 20-21 27-28 24-25 02-03 20-21 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000

106 TEAM DEVELOPMENT 3 25-27 22-24 29-31 26-28 29-31 05-07 26-28 29-31 27-29 25-27 29-01 27-29 5.950.000107 TEKNIK NEGOSIASI 3 02-04 30-01 01-03 03-05 03-05 14-16 03-05 02-04 04-06 02-04 01-03 04-06 5.950.000108 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 24-27 21-24 13-16 25-28 15-18 05-08 25-28 22-25 26-29 24-27 13-16 05-08 7.950.000109 GOOD CORPORATE GOVERNANCE 3 23-25 20-22 08-10 24-26 08-10 07-09 24-26 09-11 25-27 23-25 08-10 27-29 5.950.000110 HOW TO IMPROVE BUSINESS PERFORMANCE 3 04-06 01-03 15-17 05-07 17-19 14-16 05-07 14-16 06-08 04-06 15-17 04-06 5.950.000111 KEMADYAAN 5 16-20 13-17 27-31 17-21 29-02 05-09 17-21 31-04 18-22 16-20 27-01 18-22 8.500.000

112 MANAGEMENT PROJECT STRATEGI DANIMPLEMENTASI 4 24-27 21-24 27-02 25-28 02-05 12-15 25-28 28-31 26-29 24-27 30-02 05-08 7.950.000

113 MANAJEMEN OPERASI – PRODUKSI 3 02-04 30-01 06-08 03-05 10-12 19-21 03-05 07-09 04-06 02-04 06-08 27-29 5.950.000114 PERFORMANCE MANAGEMENT 3 11-13 08-10 13-15 11-13 15-17 05-07 12-14 14-16 13-15 11-13 13-15 11-13 5.950.000115 SIX SIGMA CHAMPIONS 4 16-19 13-16 21-24 17-20 29-01 13-16 17-20 22-25 18-21 16-19 21-24 18-21 7.950.000116 HANDLING CUSTOMER COMPLAINT 2 05-06 02-03 02-03 06-07 02-03 08-09 06-07 31-01 07-08 05-06 02-03 04-05 3.950.000

29

117 PELAYANAN PRIMA BAGI APARATURPEMERINTAHAN 3 09-11 06-08 08-10 10-12 08-10 12-14 10-12 09-11 11-13 09-11 08-10 13-15 5.950.000

118 MARKETING MANAGEMENT 4 24-27 21-24 20-23 25-28 30-02 13-16 25-28 28-31 26-29 24-27 20-23 05-08 7.950.000119 MANAJEMEN PERPUSTAKAAN 3 02-04 30-01 29-31 03-05 22-24 19-21 03-05 14-16 04-06 02-04 29-01 27-29 5.950.000120 COST CONTROL AND ESTIMATING 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 05-08 7.950.000121 FEASIBILITY STUDY & PROJECT EVALUATION 4 10-13 07-10 27-02 10-13 09-12 12-15 11-14 08-11 12-15 10-13 30-02 12-15 7.950.000122 MATERIAL MANAGEMENT 4 17-20 14-17 14-17 18-21 16-19 06-09 18-21 22-25 19-22 17-20 14-17 04-07 7.950.000123 Office MANAGEMENT AND FILING SYSTEM 4 09-12 06-09 27-02 10-13 08-11 12-15 10-13 07-10 11-14 09-12 30-02 05-08 7.950.000124 QA & QC Inspection Program 3 18-20 15-17 20-22 19-21 22-24 19-21 19-21 14-16 20-22 18-20 20-22 27-29 6.500.000125 CONTEMPORARY LEADERSHIP 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000126 CUSTOMER SERVICE IN CREDIT UNION 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 27-29 5.950.000127 KEWIRAUSAHAAN PRA PURNA BAKTI 4 23-26 20-23 07-10 24-27 09-12 12-15 24-27 08-11 25-28 23-26 07-10 11-14 8.500.000128 MOSSAD STRATEGY ON BUSINESS 3 25-27 22-24 27-01 26-28 03-05 19-21 26-28 02-04 27-29 25-27 30-01 27-29 5.950.000129 PERSUASIVE MARKETING 3 18-20 15-17 22-24 19-21 22-24 19-21 19-21 21-23 20-22 18-20 22-24 20-22 5.950.000130 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000131 MANAJEMEN PERPAJAKAN 3 02-04 30-01 27-01 03-05 22-24 19-21 03-05 14-16 04-06 02-04 30-01 27-29 5.950.000

132 INDONESIA TAX OUTLOOK 2015-2016 DAN TAXAMNESTY 2 09-10 06-07 06-07 10-11 22-23 19-20 10-11 14-15 11-12 09-10 06-07 27-28 4.500.000

133 CUSTOMER LOYALITY STRATEGY 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5950000134 Crisis Management 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.000

135 INTERVIEWING SKILL FOR RECRUITMENTPROMOTION 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000

136 QUALITY MANAGEMENT SYSTEM ISO 90012008 STANDARD (SISTEM MANAJEMEN MUTU) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000

137 SECURITY MANAGEMENT SYSTEM 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 5.950.000138 BASIC LEADERSHIP 3 25-27 22-24 13-15 26-28 22-24 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.000

139DINAMIKA SERIKAT PEKERJA DALAMPERUSAHAAN TERKAIT MENGHADAPI ERAGLOBALISASI

2 05-06 02-03 23-24 06-07 22-23 19-20 06-07 14-15 07-08 05-06 23-24 27-28 3.950.000

140 HOUR OF CHANGE MANAGEMENT 3 11-13 08-10 29-31 11-13 29-31 19-21 12-14 28-30 13-15 11-13 29-01 27-29 5.950.000141 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 18-20 5.950.000

142 HUKUM KEIMIGRASIAN TERKAIT PEMBERIANIJIN MEMPERKERJAKAN TENAGA KERJA ASING 3 23-25 20-22 08-10 24-26 08-10 19-21 24-26 07-09 25-27 23-25 08-10 27-29 5.950.000

143 LOBBYING AND SCHEDULLING 3 02-04 30-01 15-17 03-05 15-17 19-21 03-05 14-16 04-06 02-04 15-17 04-06 5.950.000144 MAN POWER PLANNING 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.000145 PROBLEM SOLVING & DECISION MAKING 3 16-18 13-15 27-29 17-19 31-02 05-07 17-19 29-31 18-20 16-18 27-29 20-22 5.950.000146 STRATEGI MEMBANGUN IMAGE CORPORATE 3 25-27 22-24 27-01 26-28 03-05 12-14 26-28 02-04 27-29 25-27 30-01 27-29 5.950.000147 TRANSFORMATION LEADERSHIP 3 04-06 01-03 06-08 05-07 10-12 19-21 05-07 09-11 06-08 04-06 06-08 06-08 5.950.000148 MANAJEMEN RESIKO 3 11-13 08-10 13-15 11-13 17-19 07-09 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000149 INTELLIGENT AND INVESTIGATION SKILLS 3 18-20 15-17 22-24 19-21 22-24 14-16 19-21 23-25 20-22 18-20 22-24 18-20 5.950.000

30

150 ASSET SECURITY MANAGEMENT 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000151 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 02-04 30-01 01-03 03-05 02-04 05-07 03-05 31-02 04-06 02-04 01-03 04-06 5.950.000152 MEASURING CUSTOMER SATISFACTION 3 09-11 06-08 08-10 10-12 08-10 12-14 10-12 07-09 11-13 09-11 08-10 11-13 5.950.000153 CREATIVE ACCOUNTING DAN DISCLOSURE 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 27-29 5.950.000154 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.000155 ASSET MANAGEMENT 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 14-16 11-13 09-11 27-29 27-29 5.950.000156 ASSET MANAGEMENT BERBASIS ICT 3 16-18 13-15 27-01 17-19 02-04 19-21 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000

157 DOCUMENT CONTROL ( VERIFICATION ANDCLASSIFICATION ) 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

158 DOCUMENT MANAGEMENT SYSTEM ANDELECTRONIC FILING 3 04-06 01-03 13-15 05-07 15-17 05-07 05-07 14-16 06-08 04-06 13-15 04-06 5.950.000

159 MANAGEMENT INFORMATION SYSTEM 3 11-13 08-10 22-24 11-13 22-24 12-14 12-14 21-23 13-15 11-13 22-24 11-13 5.950.000

160 MANAGEMENT OF DOCUMENT CONTROL &MODERN LIBRARY 3 18-20 15-17 29-31 19-21 29-31 19-21 19-21 28-30 20-22 18-20 29-01 20-22 5.950.000

161 Office MANAGEMENT AND ELECTRONIC FILINGSYSTEM 3 25-27 22-24 01-03 26-28 03-05 07-09 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000

162 Office MODERN FILING MANAGEMENT 3 02-04 30-01 08-10 03-05 10-12 14-16 03-05 09-11 04-06 02-04 08-10 06-08 5.950.000163 EFFECTIVE REPORT WRITING TECHNIQUE 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000164 Office AUTOMATION SKILL 3 16-18 13-15 20-22 17-19 22-24 05-07 17-19 23-25 18-20 16-18 20-22 18-20 5.950.000165 TATACARA PENYUSUNAN SILABUS DIKLAT 3 23-25 20-22 27-29 24-26 31-02 12-14 24-26 29-31 25-27 23-25 27-29 27-29 5.950.000

166 COMERCIAL CONTRACT DRAFTING ANDMANAGEMENT 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.000

167 CONTRACT MANAGEMENT 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 27-29 5.950.000168 Cost control 3 18-20 15-17 13-15 19-21 15-17 19-21 19-21 14-16 20-22 18-20 13-15 27-29 5.950.000169 Creative Problem Solving 4 24-27 21-24 21-24 25-28 29-01 05-08 25-28 21-24 26-29 24-27 21-24 04-07 7.950.000170 Effective Business Letters Writing 3 04-06 01-03 29-31 05-07 22-24 19-21 05-07 28-30 06-08 04-06 29-01 27-29 5.950.000

171 Effective Inventory Management and ModernWarehousing for Support Personal 4 10-13 07-10 28-03 10-13 02-05 13-16 11-14 01-04 12-15 10-13 31-03 11-14 7.950.000

172 Excellent Supervisory 4 02-05 30-02 20-23 03-06 30-02 06-09 03-06 22-25 04-07 02-05 20-23 05-08 7.950.000173 Integrated and Effective Logistic Management 4 17-20 14-17 27-02 18-21 02-05 12-15 18-21 31-03 19-22 17-20 30-02 18-21 7.950.000

174 Leadership Skill How Become a More EffectiveLeader 3 25-27 22-24 06-08 26-28 08-10 19-21 26-28 07-09 27-29 25-27 06-08 27-29 5.950.000

175 Modern Office Administration and FillingSystem 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 28-31 18-21 16-19 28-01 19-22 7.950.000

176 PROJECT MANAGEMENT DARI KONSEPTUALSAMPAI OPERASIONAL 4 02-05 30-02 07-10 03-06 09-12 13-16 03-06 08-11 04-07 02-05 07-10 05-08 7.950.000

177 PRODUCTION PLANNING AND INVENTORYCONTROL (PPIC) 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000

31

178TRAINING NEEDS ANALYSIS(TNA),TRAININGPLAN, TRAINING BUDGET AND TRAININGIMPACT EVALUATION(TIE)

3 04-06 01-03 27-01 05-07 03-05 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000

179 MANAJEMEN ARSIP DINAMIS DANPERPUSTAKAAN BERBASIS TI 2 23-24 20-21 27-28 24-25 02-03 19-20 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000

180 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 02-04 30-01 06-08 03-05 08-10 19-21 03-05 07-09 04-06 02-04 06-08 27-29 5.950.000181 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 23-25 20-22 13-15 24-26 22-24 19-21 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000182 CAREER MANAGEMENT 3 23-25 20-22 06-08 24-26 08-10 12-14 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

183 COMPREHENSIVE TRAINING MANAGEMENTSYSTEM 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 04-06 5.950.000

184 ESSENTIAL SKILL FOR SECRETARY ANDADMINISTRATION PROFESSIONAL 4 17-20 14-17 28-31 18-21 29-01 13-16 18-21 28-31 19-22 17-20 28-01 19-22 7.950.000

185 INTEGRATED HUMAN RESOURCESMANAGEMENT 3 16-18 13-15 22-24 17-19 22-24 19-21 17-19 23-25 18-20 16-18 22-24 18-20 5.950.000

186 LEADERSHIP AND EFFECTIVE SUPERVISORY 4 23-26 20-23 27-30 24-27 30-02 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.000

187 PELAKSANAAN DAN PERMASALAHANPENGADAAN TANAH PEMBEBASAN LAHAN 3 02-04 30-01 27-01 03-05 02-04 14-16 03-05 31-02 04-06 02-04 30-01 27-29 5.950.000

188 PENERAPAN EKONOMI TEKNIK DALAM PROSESPENGAMBILAN KEPUTUSAN BISNIS 4 10-13 07-10 06-09 10-13 08-11 06-09 11-14 07-10 12-15 10-13 06-09 11-14 7.950.000

189 PLANNING AND ORGANIZE TRAINING 3 18-20 15-17 13-15 19-21 15-17 19-21 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000190 TRAINING DEVELOPMENT MANAGEMENT 3 09-11 06-08 01-03 10-12 03-05 19-21 10-12 02-04 11-13 09-11 01-03 13-15 5.950.000191 Salesmanship Skills 2 16-17 13-14 09-10 17-18 11-12 15-16 17-18 10-11 18-19 16-17 09-10 18-19 4.500.000

192 BASIC RELATIONSHIP MANAGEMENT FORLEADERS 3 23-25 20-22 13-15 24-26 15-17 07-09 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000

193 COMPREHENSIVE MANAGERIAL SKILLS &LEADERSHIP TRAINING 3 18-20 15-17 01-03 19-21 03-05 05-07 19-21 02-04 20-22 18-20 01-03 20-22 5.950.000

194 DEVELOVING HIGH PERFORMANCE TEAMS 2 26-27 23-24 09-10 27-28 11-12 12-13 27-28 10-11 28-29 26-27 09-10 27-28 3.950.000195 EFFECTIVE EXECUTIVE SECRETARY 2 02-03 30-31 16-17 03-04 18-19 20-21 03-04 14-15 04-05 02-03 16-17 04-05 3.950.000196 FILLING SYSTEM FOR SECRETARY 3 16-18 13-15 29-31 17-19 29-31 14-16 17-19 28-30 18-20 16-18 29-01 18-20 5.950.000197 HR MANAGEMENT 2 04-05 01-02 06-07 05-06 08-09 05-06 05-06 07-08 06-07 04-05 06-07 06-07 3.950.000198 HR MANAGEMENT OF CHANGE 3 11-13 08-10 13-15 11-13 15-17 12-14 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000

199 INTEGRATED DOCUMENT & ELECTRONIC FILINGSYSTEM 2 19-20 16-17 20-21 20-21 22-23 19-20 20-21 21-22 21-22 19-20 20-21 21-22 3.950.000

200 INVENTORY MANAGEMENT AND COSTINVESTMENT RECOVERY 4 03-06 31-03 28-03 04-07 02-05 13-16 04-07 01-04 05-08 03-06 31-03 05-08 7.950.000

201 Logistic Management 2 09-10 06-07 08-09 10-11 10-11 20-21 10-11 09-10 11-12 09-10 08-09 11-12 3.950.000

202 LOGISTIC MANAGEMENT & SUPPLY CHAINMANAGEMENT 3 16-18 13-15 15-17 17-19 17-19 07-09 17-19 14-16 18-20 16-18 15-17 18-20 5.950.000

203 MAN POWER PLANNING 3 23-25 20-22 22-24 24-26 22-24 12-14 24-26 23-25 25-27 23-25 22-24 27-29 5.950.000204 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 02-05 30-02 28-31 03-06 29-01 05-08 03-06 28-31 04-07 02-05 28-01 04-07 7.950.000

32

205 MATERIAL MANAGEMENT FOR PROJECT 4 10-13 07-10 27-02 10-13 02-05 13-16 11-14 31-03 12-15 10-13 30-02 12-15 7.950.000

206 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR 2 19-20 16-17 09-10 20-21 11-12 19-20 20-21 10-11 21-22 19-20 09-10 21-22 3.950.000

207 PLAN LAY OUT Office 3 25-27 22-24 13-15 26-28 15-17 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.000208 SERVICE EXCELLENT 3 04-06 01-03 20-22 05-07 22-24 07-09 05-07 21-23 06-08 04-06 20-22 06-08 5.950.000

209 SUPERVISORY LEADERSHIP AND DECISSIONMAKING 3 09-11 06-08 27-29 10-12 31-02 12-14 10-12 28-30 11-13 09-11 27-29 11-13 5.950.000

210 WAREHOUSE MANAGEMENT OPERATION ANDCONTROL 2 23-24 20-21 06-07 24-25 08-09 19-20 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

211 Warehousing & Distribution Management 3 02-04 30-01 15-17 03-05 17-19 14-16 03-05 14-16 04-06 02-04 15-17 04-06 5.950.000212 TAX ACCOUNTING 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

213 RESTITUSI PAJAK, PEMERIKSAAN PAJAK,KEBERATAN, BANDING DAN GUGATAN 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000

214 MANAJEMEN MUTU TERPADU 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 21-22 11-12 09-10 20-21 11-12 3.950.000

215 TOTAL QUALITY MANAGEMENT SERIESMANAJEMEN MUTU TERPADU 2 16-17 13-14 27-28 17-18 29-30 20-21 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000

216 BUILDING A TEAM 2 02-03 30-31 06-07 03-04 22-23 19-20 03-04 14-15 04-05 02-03 06-07 27-28 3.950.000217 CAREER PLANNING SYSTEM 2 09-10 06-07 13-14 10-11 23-24 20-21 10-11 15-16 11-12 09-10 13-14 28-29 3.950.000218 COMPENSATION SYSTEM DEVELOPMENT 2 23-24 20-21 27-28 24-25 29-30 20-21 24-25 28-29 25-26 23-24 27-28 28-29 3.950.000

219 COMPETENCY-BASED HUMAN RESOURCESMANAGEMENT 2 04-05 01-02 27-28 05-06 02-03 19-20 05-06 31-01 06-07 04-05 30-31 27-28 3.950.000

220 EFFECTIVE PERFORMANCE APPRAISAL 2 18-19 15-16 15-16 19-20 15-16 19-20 19-20 15-16 20-21 18-19 15-16 18-19 3.950.000221 EFFECTIVE TRAINING MANAGEMENT 3 25-27 22-24 22-24 26-28 22-24 12-14 26-28 21-23 27-29 25-27 22-24 27-29 5.950.000

222 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 2 05-06 02-03 29-30 06-07 31-01 20-21 06-07 30-31 07-08 05-06 29-30 04-05 3.950.000

223 JOB COMPETENCY PROFILING 2 12-13 09-10 01-02 10-11 04-05 05-06 13-14 02-03 14-15 12-13 01-02 13-14 3.950.000224 MEASURING TRAINING IMPACT 2 19-20 16-17 09-10 20-21 10-11 15-16 20-21 09-10 21-22 19-20 09-10 20-21 3.950.000225 PERFORMANCE BASED PAY 2 23-24 20-21 16-17 24-25 17-18 19-20 24-25 14-15 25-26 23-24 16-17 27-28 3.950.000

226STRATEGIC HUMAN RESOURCESMANAGEMENT FOR GLOBAL COMPETITIVEADVANTAGE

2 09-10 06-07 30-31 12-13 01-02 12-13 10-11 28-29 11-12 09-10 30-01 14-15 3.950.000

227 WORKLOAD ANALYSIS 2 16-17 13-14 02-03 17-18 02-03 20-21 17-18 03-04 18-19 16-17 02-03 21-22 3.950.000228 ACTIVITY BASED MANAGEMENT 2 23-24 20-21 06-07 24-25 08-09 05-06 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

229NEGOTIATION IMPROVE YOUR NEGOTIATINGSKILLS AND MAKE YOU MORE EFFECTIVENEGOTIATOR

2 02-03 30-31 13-14 03-04 15-16 12-13 03-04 14-15 04-05 02-03 13-14 04-05 3.950.000

230 STRATEGIC MANAGEMENT 3 25-27 22-24 27-01 26-28 02-04 14-16 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000231 Supply Chain Management (SCM) 2 04-05 01-02 08-09 05-06 10-11 20-21 05-06 09-10 06-07 04-05 08-09 06-07 3.950.000232 Supplier Management 2 11-12 08-09 15-16 12-13 17-18 08-09 12-13 15-16 13-14 11-12 15-16 13-14 3.950.000233 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 09-12 06-09 27-30 10-13 15-18 05-08 10-13 07-10 11-14 09-12 27-30 11-14 7.950.000

33

234 ASPEK HUKUM DAN PENYELESAIAN KONFLIKPERTANAHAN 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.000

235 ANTI MONOPOLI 3 02-04 30-01 13-15 03-05 22-24 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000236 HUKUM KEPAILITAN 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 14-16 11-13 09-11 20-22 27-29 5.950.000

237 HUKUM KETENAGAKERJAAN & HUBUNGANINDUSTRIAL 3 16-18 13-15 27-29 17-19 22-24 19-21 17-19 28-30 18-20 16-18 27-29 27-29 5.950.000

238 HUKUM PERLINDUNGAN KONSUMEN DANPERSAINGAN BISNIS 3 25-27 22-24 27-01 26-28 02-04 19-21 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000

239 HUKUM TINDAK PIDANA KORUPSI 3 04-06 01-03 08-10 05-07 08-10 19-21 05-07 07-09 06-08 04-06 08-10 04-06 5.950.000

240 STRATEGI MENGANTISIPASI RISIKO TINDAKPIDANA (KORUPSI) 3 11-13 08-10 15-17 11-13 15-17 19-21 12-14 14-16 13-15 11-13 15-17 11-13 5.950.000

241 TINDAK PIDANA PENCUCIAN UANG DANPERANAN BANK UNTUK MENCEGAHNYA 3 18-20 15-17 22-24 19-21 22-24 05-07 19-21 21-23 20-22 18-20 22-24 18-20 5.950.000

242 TIPIKOR DALAM PENGELOLAAN KEUANGANPERUSAHAAN & PERBANKAN 3 23-25 20-22 29-31 24-26 29-31 12-14 24-26 29-31 25-27 23-25 29-01 27-29 5.950.000

243 BERITA ACARA PEMERIKSAAN 3 02-04 30-01 01-03 03-05 03-05 19-21 03-05 02-04 04-06 02-04 01-03 06-08 5.950.000244 MARITIME & SHIPPING LAW IN INDONESIA 3 09-11 06-08 06-08 10-12 10-12 07-09 10-12 09-11 11-13 09-11 06-08 13-15 5.950.000245 HUKUM DAN KONTRAK KONSTRUKSI 3 16-18 13-15 13-15 17-19 17-19 14-16 17-19 14-16 18-20 16-18 13-15 20-22 5.950.000246 BASIC OF SUPPLY CHAIN MANAGEMENT 2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000247 EFFECTIVE LINE BALANCING 2 23-24 20-21 13-14 24-25 15-16 05-06 24-25 14-15 25-26 23-24 13-14 27-28 3.950.000

248 FILLING MANAGEMENT FOR SECRETARY ANDADMINISTRATION STAFF 3 02-04 30-01 20-22 03-05 22-24 12-14 03-05 21-23 04-06 02-04 20-22 04-06 5.950.000

249INFORMATION SYSTEMS AND INFORMATIONTECHNOLOGIES FOR SUPPLY CHAINMANAGEMENT

3 09-11 06-08 27-29 10-12 29-31 19-21 10-12 28-30 11-13 09-11 27-29 11-13 5.950.000

250 ISO WAREHOUSING 2 25-26 22-23 08-09 26-27 10-11 15-16 26-27 09-10 27-28 25-26 08-09 28-29 3.950.000251 KOMPUTERISASI PERGUDANGAN 2 05-06 02-03 15-16 06-07 17-18 19-20 06-07 15-16 07-08 05-06 15-16 07-08 3.950.000

252 MAINTENANCE MANAGEMENT (FORMANUFACTURE AND OIL & GAS COMPANY) 3 11-13 08-10 22-24 11-13 22-24 05-07 12-14 23-25 13-15 11-13 22-24 13-15 6.500.000

253 MEASURING AND MANAGING COSTESCALATION IN PROJECT 2 26-27 23-24 02-03 27-28 02-03 20-21 27-28 03-04 28-29 26-27 02-03 27-28 3.950.000

254 MODERN WAREHOUSE DESIGN 2 02-03 30-31 09-10 03-04 11-12 08-09 03-04 10-11 04-05 02-03 09-10 04-05 3.950.000255 NEGOTIATION SKILL FOR PURCHASING STAFF 3 09-11 06-08 15-17 10-12 17-19 14-16 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000

256 OPERATING SYSTEMS TECHNOLOGIES ANDINSTALLATION PROCEDURES 3 18-20 15-17 20-22 19-21 22-24 19-21 19-21 21-23 20-22 18-20 20-22 20-22 5.950.000

257 PLANNING AND MANAGING INVENTORIES IN ASUPPLY CHAIN 3 23-25 20-22 27-29 24-26 29-31 05-07 24-26 28-30 25-27 23-25 27-29 27-29 5.950.000

258 PLANNING DEMAND AND SUPPLY IN A SUPPLYCHAIN 3 04-06 01-03 27-01 05-07 03-05 12-14 05-07 31-02 06-08 04-06 30-01 06-08 5.950.000

259 PROJECT EVALUATION AND FINANCING 3 16-18 13-15 13-15 17-19 15-17 07-09 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000

34

260 PROJECT MANAGEMENT USING MICROSOFTPROJECT 3 25-27 22-24 22-24 26-28 22-24 14-16 26-28 23-25 27-29 25-27 22-24 27-29 5.950.000

261 PROJECT MANAGEMENT(PM) WITHPRIMAVERA V6 3 02-04 30-01 29-31 03-05 31-02 19-21 03-05 29-31 04-06 02-04 29-01 04-06 5.950.000

262 RFID for WAREHOUSE 2 09-10 06-07 02-03 10-11 02-03 05-06 10-11 03-04 11-12 09-10 02-03 11-12 3.950.000

263 STRATEGI SISTEM INFORMASI KESEHATAN DIRUMAH SAKIT 3 18-20 15-17 08-10 19-21 10-12 12-14 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000

264 STUDI KELAYAKAN INVESTASI MENGGUNAKANAPLIKASI MICROSOFT EXCEL 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000

265 TRANSPORTATION AND FACILITY DECISIONS INA SUPPLY CHAIN 3 04-06 01-03 20-22 05-07 22-24 07-09 05-07 21-23 06-08 04-06 20-22 06-08 5.950.000

266 VENDOR MANAGED INVENTORY 2 11-12 08-09 27-28 12-13 29-30 15-16 12-13 28-29 13-14 11-12 27-28 13-14 3.950.000267 Workload Analysis 2 16-17 13-14 27-28 17-18 04-05 19-20 17-18 31-01 18-19 16-17 30-31 18-19 3.950.000268 ENTERPRISE RESOURCES PLANNING (ERP) 4 24-27 21-24 06-09 25-28 08-11 05-08 25-28 07-10 26-29 24-27 06-09 04-07 7950000269 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 02-04 30-01 13-15 03-05 15-17 12-14 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000270 PROJECT COST MANAGEMENT 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 23-25 13-15 11-13 22-24 13-15 5.950.000

271 PROJECT MANAGEMENT IN ENGINEERING,PROCUREMENT & CONSTRUCTION 3 18-20 15-17 29-31 19-21 31-02 07-09 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000

272 ADVANCED LAND TRANSPORT 3 23-25 20-22 01-03 24-26 02-04 14-16 24-26 02-04 25-27 23-25 01-03 27-29 5.950.000

273 HUMAN RESOURCE PLANNING ANDPRODUCTIVITY 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6500000

274 JOB DESCRIPTION ANALYSIS, DEVELOPMENT,AND DESIGN 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000

275 Project Management (3 Hr) 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6500000276 PROJECT MANAGEMENT (PM) (5Hr) 5 02-06 30-03 27-03 03-07 08-12 05-09 03-07 31-04 04-08 02-06 30-03 11-15 9500000277 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 11-13 08-10 06-08 11-13 02-04 19-21 12-14 07-09 13-15 11-13 06-08 27-29 6500000

278 STRATEGIC HUMAN RESOURCE MANAGEMENTAND ORGANIZATION DEVELOPMENT 3 18-20 15-17 15-17 19-21 15-17 19-21 19-21 14-16 20-22 18-20 15-17 18-20 6500000

279 Strategic Performance Management 3 25-27 22-24 22-24 26-28 22-24 19-21 26-28 21-23 27-29 25-27 22-24 27-29 6500000280 Strategic Planning 5 02-06 30-03 27-31 03-07 29-02 12-16 03-07 31-04 04-08 02-06 27-01 04-08 9500000281 CRYSTALL BALL 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 28-31 11-14 09-12 30-02 11-14 7.950.000

282DECISION MAKING BY USING STRATEGICTHINKING (PENDEKATAN SISTEMIK DAN NEW 7TOOLS APPROACH)

2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000

283 INOVASI DAN KREATIFITAS MENUJUORGANISASI PEMBELAJARAN 2 02-03 30-31 20-21 03-04 22-23 20-21 03-04 14-15 04-05 02-03 20-21 27-28 3.950.000

284 LEADERSHIP FOR MANAGER 4 10-13 07-10 27-30 10-13 29-01 06-09 11-14 28-31 12-15 10-13 27-30 12-15 7.950.000285 ADMINISTRASI KEPABEANAN 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 21-24 11-14 09-12 20-23 11-14 7.950.000

286 Custom facility, Shipping Documents & ExportImport Procedure 2 16-17 13-14 27-28 17-18 22-23 12-13 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000

35

287 EFFECTIVE PUBLIC RELATIONS SKILL 3 23-25 20-22 27-01 24-26 02-04 19-21 24-26 31-02 25-27 23-25 30-01 27-29 5.950.000288 Export-Import 3 02-04 30-01 06-08 03-05 08-10 07-09 03-05 07-09 04-06 02-04 06-08 04-06 5.950.000289 Export-Import and Incoterm 3 11-13 08-10 13-15 10-12 15-17 14-16 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000290 FREIGHT FORWARDING 2 18-19 15-16 23-24 19-20 23-24 19-20 19-20 24-25 20-21 18-19 23-24 20-21 3.950.000291 Incoterm 2010 2 26-27 23-24 29-30 27-28 01-02 05-06 27-28 30-31 28-29 26-27 29-30 27-28 3.950.000

292 PEMAHAMAN SHIPPING DOCUMENT &PROSEDUR KEPABEANAN 3 04-06 01-03 01-03 05-07 03-05 12-14 05-07 02-04 06-08 04-06 01-03 06-08 5.950.000

293 INFORMATION TECHNOLOGY PROJECTMANAGEMENT 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

294 INVENTORY MANAGEMENT FOR RAWMATERIAL 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000

295 Office Automation 2 16-17 13-14 30-31 17-18 22-23 19-20 17-18 14-15 18-19 16-17 30-01 27-28 3.950.000296 PROBLEM SOLVING & DECISION MAKING 3 23-25 20-22 27-01 24-26 03-05 12-14 24-26 02-04 25-27 23-25 30-01 27-29 5.950.000

297 STRATEGIC PLANNING FOR INFORMATIONSYSTEMS 3 25-27 22-24 27-29 26-28 22-24 19-21 26-28 14-16 27-29 25-27 27-29 27-29 5.950.000

298 SUPPLY MARKET ANALYSIS 4 02-05 30-02 28-03 03-06 02-05 12-15 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000299 TOTAL COST OF OWNERSHIP ANALYSIS 3 16-18 13-15 15-17 17-19 17-19 19-21 17-19 14-16 18-20 16-18 15-17 18-20 5.950.000300 CONTRACT MANAGEMENT 4 23-26 20-23 27-30 24-27 15-18 12-15 24-27 07-10 25-28 23-26 27-30 04-07 7.950.000301 PAJAK DAN PROSEDUR IMPLEMENTASI 4 02-05 30-02 27-02 03-06 29-01 05-08 03-06 21-24 04-07 02-05 30-02 11-14 7.950.000302 TAX AND FINANCIAL CONTROL 3 09-11 06-08 06-08 10-12 22-24 19-21 10-12 14-16 11-13 09-11 06-08 27-29 5.950.000303 Inventory Management Manufacturing Industry 4 24-27 21-24 13-16 25-28 02-05 13-16 25-28 28-31 26-29 24-27 13-16 12-15 7.950.000304 OPTIMIZATION FOR PRODUCTION SYSTEM 4 10-13 07-10 07-10 10-13 16-19 12-15 11-14 08-11 12-15 10-13 07-10 04-07 7.950.000305 Perancangan Tata Letak Pabrik 4 16-19 13-16 06-09 17-20 29-01 05-08 17-20 21-24 18-21 16-19 06-09 19-22 7.950.000306 PRODUCTION AND OPERATION MANAGEMENT 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 28-31 26-29 24-27 07-10 12-15 7.950.000307 PRODUCTION AND PLANNING CONTROL 4 03-06 31-03 14-17 04-07 09-12 06-09 04-07 01-04 05-08 03-06 14-17 19-22 7.950.000

308 Production Handling Separation andMeasurement 4 09-12 06-09 21-24 10-13 15-18 12-15 10-13 07-10 11-14 09-12 21-24 04-07 7.950.000

309 QUALITY CONTROL OF PRODUCT 4 24-27 21-24 27-30 25-28 02-05 13-16 25-28 28-31 26-29 24-27 27-30 04-07 7.950.000310 QUALITY SYSTEM ENGINEERING 4 03-06 31-03 28-03 04-07 09-12 06-09 04-07 01-04 05-08 03-06 31-03 11-14 7.950.000311 SYSTEM AND COST PRODUCTION 4 23-26 20-23 21-24 24-27 02-05 13-16 24-27 28-31 25-28 23-26 21-24 12-15 7.950.000312 ANALISA KEUANGAN 2 09-10 06-07 27-28 10-11 22-23 19-20 10-11 14-15 11-12 09-10 30-31 27-28 4.500.000

313 ANALISA KREDIT MODAL KERJA KONTRAKTORDAN STANDBY KREDIT 2 16-17 13-14 06-07 17-18 23-24 20-21 17-18 15-16 18-19 16-17 06-07 28-29 4.500.000

314 ANALISA PERKREDITAN 4 23-26 20-23 13-16 24-27 02-05 12-15 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000315 BASIC ACCOUNTING 4 02-05 30-02 20-23 03-06 08-11 05-08 03-06 31-03 04-07 02-05 20-23 04-07 7.950.000

316 PEMBERIAN KREDIT DENGAN PENDEKATANLAPORAN ARUS KAS_CASH FLOW 2 11-12 08-09 27-28 12-13 22-23 19-20 12-13 14-15 13-14 11-12 27-28 27-28 4.500.000

317 PENILAIAN KELAYAKAN PROYEK (FEASIBILITYSTUDY) 2 18-19 15-16 01-02 19-20 23-24 20-21 19-20 15-16 20-21 18-19 01-02 28-29 4.500.000

36

318 PENYELESAIAN KREDIT BERMASALAH 2 26-27 23-24 08-09 27-28 22-23 19-20 27-28 07-08 28-29 26-27 08-09 27-28 4.500.000319 PENYUSUNAN DAN ANALISA SCORING RATING 2 05-06 02-03 16-17 06-07 15-16 20-21 06-07 14-15 07-08 05-06 16-17 28-29 4.500.000

320 PENYUSUNAN PERATURAN INTERNALPERKREDITAN BANK 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 21-23 13-15 11-13 22-24 27-29 5.950.000

321 GOOD CORPORATE GOVERNANCE 3 18-20 15-17 29-31 19-21 29-31 19-21 19-21 28-30 20-22 18-20 29-01 27-29 5.950.000322 COST MANAGEMENT 3 16-18 13-15 27-01 17-19 22-24 19-21 17-19 14-16 18-20 16-18 30-01 27-29 5.950.000323 DASAR-DASAR PERBENDAHARAAN 4 23-26 20-23 06-09 24-27 29-01 05-08 24-27 21-24 25-28 23-26 06-09 18-21 7.950.000324 MANAJEMEN RISIKO INVESTASI 4 02-05 30-02 13-16 03-06 02-05 12-15 03-06 28-31 04-07 02-05 13-16 04-07 7.950.000

325 MANAJEMEN KEUANGAN UNTUK NONMANAJER KEUANGAN 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 14-15 11-12 09-10 20-21 27-28 3.950.000

326 STUDY KELAYAKAN BISNIS 2 16-17 13-14 27-28 17-18 23-24 20-21 17-18 15-16 18-19 16-17 27-28 28-29 3.950.000

327 CUSTOMER RELATIONSHIP MANAGEMENT(CRM) 4 09-12 06-09 27-30 10-13 02-05 12-15 10-13 28-31 11-14 09-12 27-30 11-14 7.950.000

328 FINANCING CONDOTEL HOTEL OPERATION 4 16-19 13-16 27-02 17-20 08-11 06-09 17-20 31-03 18-21 16-19 30-02 18-21 7.950.000

329 MANAGEMENT OF OUTSOURCE STAFFHOUSING AND CATERING SERVICES 4 24-27 21-24 06-09 25-28 15-18 13-16 25-28 07-10 26-29 24-27 06-09 05-08 7.950.000

330 Service Recovery Create Loyal Customers forLife 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 14-16 13-15 11-13 22-24 27-29 5.950.000

331 MEMBEDAH PROFESI SEKRETARISPROFESSIONAL 4 09-12 06-09 27-30 10-13 29-01 05-08 10-13 21-24 11-14 09-12 27-30 18-21 7.950.000

332PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWERPOINT)

2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.000

333 IT AUDIT PRACTICES 3 11-13 08-10 27-29 10-12 29-31 19-21 12-14 28-30 13-15 11-13 27-29 11-13 5.950.000334 IT HELPDESK 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.000

335 Change & conflict management and dealingwith difficult people 2 02-03 30-31 27-28 03-04 02-03 19-20 03-04 31-01 04-05 02-03 30-31 04-05 3.950.000

336 Strategic and Systematic Thinking 2 05-06 02-03 27-28 06-07 29-30 19-20 06-07 30-31 07-08 05-06 27-28 07-08 3.950.000337 THE LEADERSHIP CHALLENGE 2 12-13 09-10 27-28 12-13 02-03 08-09 13-14 31-01 14-15 12-13 30-31 14-15 3.950.000338 COACHING & CONSELING DI PERUSAHAAN 3 11-13 08-10 15-17 11-13 17-19 19-21 12-14 14-16 13-15 11-13 15-17 13-15 5.950.000339 COACHING AND COUNSELING ( MONITORING) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 28-30 11-13 09-11 30-01 27-29 5.950.000340 PERFORMANCE COACHING FOR MANAGER 2 02-03 30-31 27-28 03-04 22-23 19-20 03-04 14-15 04-05 02-03 27-28 27-28 3.950.000

341 EFFECTIVE PRESENTATION AND REPORTWRITING 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 20-22 5.950.000

342 Effective Time Management 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000

343 HANDLING CONFLICT AND COMPLAINTEFFECTIVELY 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 29-31 11-13 09-11 27-29 13-15 5.950.000

344 Strategic Time Management 3 18-20 15-17 20-22 19-21 22-24 07-09 19-21 23-25 20-22 18-20 20-22 18-20 5.950.000345 TIME MANAGEMENT 4 16-19 13-16 28-03 17-20 02-05 05-08 17-20 01-04 18-21 16-19 31-03 18-21 7.950.000346 HOW TO HANDLE CRITICISM AND COMPLAIN 2 23-24 20-21 06-07 24-25 08-09 15-16 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

37

347 Pengendalian Dokumen ISO 9001 20154 02-05 30-02 27-02 03-06 02-05 05-08 03-06 31-03 04-07 02-05 30-02 04-07 7.950.000

348Akuntansi Perpajakan pada Badan Usaha MilikNegara (BUMN)

3 02-04 30-01 27-01 03-05 02-04 05-07 03-05 31-02 04-06 02-04 30-01 04-06 5.950.000

349Fraud Prevention, Detection And InvestigationAudit

3 09-11 06-08 06-08 10-12 08-10 12-14 10-12 07-09 11-13 09-11 06-08 11-13 5.950.000

350General Affairs Management 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000

351Hubungan Industrial Dan Tenaga Kerja 3 23-25 20-22 20-22 24-26 22-24 07-09 24-26 21-23 25-27 23-25 20-22 27-29 5.950.000

352ISO 26000 UNDERSTANDING ANDIMPLEMENTING CSR

3 04-06 01-03 27-29 05-07 29-31 14-16 05-07 28-30 06-08 04-06 27-29 06-08 5.950.000

353Legal Due Diligence (LC Perdagangan) 3 11-13 08-10 01-03 11-13 03-05 19-21 12-14 02-04 13-15 11-13 01-03 13-15 5.950.000

354Keterampilan Pengelolaan Hubungan IndustrialSampai Dengan Penyelesaian Perselisihan

3 18-20 15-17 08-10 19-21 10-12 05-07 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000

355Merger Dan Akuisisi 2 26-27 23-24 16-17 27-28 18-19 12-13 27-28 14-15 28-29 26-27 16-17 27-28 3.950.000

356Pengendalian Kinerja Bisnis Dan Aliran Kas 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 23-25 04-06 02-04 22-24 04-06 5.950.000

357Rekonsiliasi Fiskal & Penyusunan SPT TahunanPPH Badan

3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000

358Training Analysis Program 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MANAJEMEN - PROCUREMENT

1 Prinsip dasar dan prosedur pengadaan barang& jasa 3 23-25 20-22 29-31 24-26 31-02 07-09 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000

2 HARGA PERKIRAAN SENDIRI (HPS) 2 23-24 20-21 27-28 24-25 02-03 05-06 24-25 31-01 25-26 23-24 30-31 27-28 3.950.0003 ASPEK TKDN 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 14-15 11-12 09-10 20-21 27-28 3.950.0004 INTEGRATED PROCUREMENT MANAGEMENT 2 23-24 20-21 27-28 24-25 22-23 19-20 24-25 14-15 25-26 23-24 30-31 27-28 3.950.000

5TEKNIK DAN METODE PENYUSUNAN HPS OE(HARGA PERKIRAAN SENDIRI) ATASPENGADAAN BARANG DAN JASA

3 23-25 20-22 22-24 24-26 22-24 07-09 24-26 23-25 25-27 23-25 22-24 27-29 5.950.000

6 BASIC PROCUREMENT & PURCHASING 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 5.950.0007 PROCUREMENT MANAGEMENT 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 21-22 11-12 09-10 20-21 11-12 3.950.000

38

8 PROCUREMENT STRATEGY 2 16-17 13-14 27-28 17-18 29-30 07-08 17-18 28-29 18-19 16-17 27-28 18-19 3.950.0009 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 04-06 01-03 08-10 05-07 10-12 19-21 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

10 E-PROCUREMENT (E-Proc) 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 5.950.00011 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 13-15 5.950.000

12 SUSTAINABLE PROCUREMENT IN RELATIONWITH QUALITY ASSURANCE 4 17-20 14-17 28-31 18-21 30-02 05-08 18-21 22-25 19-22 17-20 28-01 12-15 7.950.000

MOTIVASI DAN PERSONALDEVELOPMENT

1 Communication SKILL 2 12-13 09-10 06-07 12-13 08-09 08-09 13-14 07-08 14-15 12-13 06-07 14-15 3.950.0002 Dynamic Interpersonal & Comunication Skills 2 25-26 22-23 20-21 26-27 22-23 20-21 26-27 21-22 27-28 25-26 20-21 28-29 3.950.000

3 EFFECTIVE PRESENTATION & NEGOTIATIONSKILLS 2 04-05 01-02 29-30 05-06 31-01 05-06 05-06 30-31 06-07 04-05 29-30 06-07 3.950.000

4 Effective public speaking and businesspresentation 2 09-10 06-07 01-02 10-11 04-05 15-16 10-11 02-03 11-12 09-10 01-02 11-12 3.950.000

5 CARA MENYENANGKAN MEMBANGUN TIMIMPIAN 4 16-19 13-16 20-23 17-20 02-05 12-15 17-20 31-03 18-21 16-19 20-23 18-21 7.950.000

6 Constructive Anger Management 3 02-04 30-01 27-01 03-05 22-24 19-21 03-05 14-16 04-06 02-04 30-01 27-29 5.950.0007 Menjadi pribadi yang asertif 3 04-06 01-03 13-15 05-07 15-17 19-21 05-07 14-16 06-08 04-06 13-15 04-06 5.950.0008 Menjadi pribadi yang berpengaruh 3 11-13 08-10 22-24 11-13 22-24 19-21 12-14 21-23 13-15 11-13 22-24 11-13 5.950.0009 Motivating staff for excellent performance 3 23-25 20-22 01-03 24-26 02-04 19-21 24-26 02-04 25-27 23-25 01-03 27-29 5.950.000

10 BOOST YOUR CREATIVITY IN THINKING MINDMAP 2 09-10 06-07 27-28 10-11 22-23 19-20 10-11 14-15 11-12 09-10 27-28 27-28 3.950.000

11 BRAIN DEVELOPMENT FOR PERSONALASSISTANT & SECRETARY 3 16-18 13-15 27-01 17-19 02-04 19-21 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000

12 EFFECTIVE MASTER OF CEREMONY (MC) 3 11-13 08-10 20-22 11-13 22-24 05-07 12-14 21-23 13-15 11-13 20-22 11-13 5.950.00013 ACHIEVEMENT MOTIVATION 2 02-03 30-31 27-28 03-04 29-30 05-06 03-04 28-29 04-05 02-03 27-28 04-05 3.950.00014 Advance Negotiation Skill 3 09-11 06-08 27-01 10-12 02-04 12-14 10-12 31-02 11-13 09-11 30-01 11-13 5.950.00015 CHANGE YOUR MINDSET 4 03-06 31-03 20-23 04-07 30-02 13-16 04-07 21-24 05-08 03-06 20-23 05-08 7.950.00016 MC (MASTER OF CEREMONY) 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000

17 COMMUNICATION, ASSERTIVENESS ANDCONFLICT MANAGEMENT 2 12-13 09-10 29-30 12-13 22-23 19-20 13-14 30-31 14-15 12-13 29-30 14-15 3.950.000

18 INNER SUCCESS TRAINING 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.00019 TOTOK AURA MENUJU TOTAL BEAUTY 3 09-11 06-08 08-10 10-12 10-12 19-21 10-12 09-11 11-13 09-11 08-10 11-13 5.950.00020 SPEED AND INNOVATION 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000

21 HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP 2 09-10 06-07 27-28 10-11 23-24 20-21 10-11 15-16 11-12 09-10 30-31 28-29 3.950.000

22 CONTEMPORARY COMMUNICATION &LEADERSHIP 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000

39

23 TALENT MANAGEMENT 4 03-06 31-03 28-31 04-07 29-01 05-08 04-07 28-31 05-08 03-06 28-01 05-08 7.950.00024 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 16-17 13-14 13-14 17-18 22-23 19-20 17-18 14-15 18-19 16-17 13-14 27-28 3.950.00025 ASSERTIVE TRAINING 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.00026 BRAIN POWER 3 16-18 13-15 27-29 17-19 29-31 19-21 17-19 28-30 18-20 16-18 27-29 18-20 5.950.000

27 CAPACITY BUILDING(MEMBANGUN KAPASITASDAN KEMAMPUAN) 3 04-06 01-03 08-10 05-07 08-10 12-14 05-07 07-09 06-08 04-06 08-10 04-06 5.950.000

28 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 23-25 20-22 29-31 24-26 31-02 14-16 24-26 29-31 25-27 23-25 29-01 27-29 5.950.000

29 INDIVIDUAL DEVELOPMENT (SERVICEPRODUCT) 3 02-04 30-01 01-03 03-05 03-05 19-21 03-05 02-04 04-06 02-04 01-03 06-08 5.950.000

30PENINGKATAN MOTIVASIBERPRESTASI(ACHIEVEMENT MOTIVATIONTRAINING)

3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000

31 PEOPLE SKILL 5 09-13 06-10 20-24 17-21 29-02 12-16 10-14 21-25 11-15 09-13 20-24 11-15 8.950.00032 PRIBADI EFEKTIF 2 19-20 16-17 27-28 12-13 23-24 19-20 20-21 28-29 21-22 19-20 27-28 21-22 3.950.000

33 SENSITIVITY TRAINING (TURNING POINT ATAUNEW BORN) 3 04-06 01-03 08-10 05-07 10-12 07-09 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

34 TEKNIK PRESENTASI 2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.00035 TRAINING OF TRAINER 3 18-20 15-17 13-15 19-21 15-17 07-09 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00036 ACHIEVEMENT MOTIVATION 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 21-24 25-28 23-26 20-23 04-07 7.950.00037 EFFECTIVE COMMUNICATION SKILL 4 02-05 30-02 21-24 03-06 30-02 12-15 03-06 28-31 04-07 02-05 21-24 11-14 7.950.00038 EFFECTIVE PRESENTATION SKILLS 3 11-13 08-10 27-29 11-13 22-24 19-21 12-14 14-16 13-15 11-13 27-29 27-29 5.950.00039 EMOTIONAL QUETIENTS 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.00040 ICE BREAKING AND ENERGIZERS 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 13-15 5.950.00041 TRAINING OF TRAINER (TOT) 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 28-30 25-27 23-25 27-29 27-29 5.950.00042 Train the trainers 4 16-19 13-16 14-17 17-20 15-18 06-09 17-20 21-24 18-21 16-19 14-17 19-22 7.950.00043 ACHIEVEMENT MOTIVATION TRAINING 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.00044 CAPACITY BUILDING SOFT SKILL PROGRAM 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.00045 BREATHING ARTS FOR CREATIVE THINKING 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.00046 EFFECTIVE STRATEGY TO CONTROL STRESS 3 25-27 22-24 13-15 26-28 15-17 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.00047 ESQ FOR PEAK PERFORMANCE 3 11-13 08-10 29-31 11-13 29-31 19-21 12-14 28-30 13-15 11-13 29-01 27-29 5.950.00048 HUMAN PERFORMANCE AND LIMITATION 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 27-29 5.950.000

49 MENGGALI POTENSI DIRI UNTUK MENCAPAIPRIBADI YANG UNGGUL 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 24-25 11-12 09-10 20-21 27-28 3.950.000

50 PERFORMANCE, BEHAVIOR AND STRESSMANAGEMENT 3 11-13 08-10 13-15 11-13 15-17 19-21 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000

51 MANAGING PRESSURE FOR PEAKPERFORMANCE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5950000

52 Stress Management Strategies 3 25-27 22-24 27-29 26-28 31-02 12-14 26-28 28-30 27-29 25-27 27-29 27-29 5.950.000

53 HYPNO-PRESENTATION SKILL UNLOCKINGYOUR POTENTIAL POWER 3 25-27 22-24 01-03 26-28 03-05 19-21 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000

40

54 ICE BREAKER FOR EFFECTIVE TRAININGDELIVERY 3 04-06 01-03 08-10 05-07 10-12 07-09 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

55 IMPROVING PERSONAL SKILL FOR SECRETARY &ADMINISTRATIVE ASSISTANT 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000

56 SEVEN HABITS WITH NLP APPROACH 3 25-27 22-24 20-22 26-28 22-24 12-14 26-28 21-23 27-29 25-27 20-22 27-29 5.950.000

57 EMOTIONAL INTELLIGENCE FOR MENTALATTITUDE 3 09-11 06-08 22-24 10-12 22-24 07-09 10-12 23-25 11-13 09-11 22-24 11-13 5.950.000

58 FINDING YOUR ESSENTIAL SELF 3 23-25 20-22 27-01 24-26 02-04 19-21 24-26 31-02 25-27 23-25 30-01 27-29 5.950.00059 INTERPERSONAL COMMUNICATION SKILL 2 26-27 23-24 27-28 27-28 01-02 07-08 27-28 30-31 28-29 26-27 27-28 27-28 3.950.000

60 DYNAMIC INTERPERSONAL &COMMUNICATION SKILLS 2 11-12 08-09 08-09 12-13 08-09 20-21 12-13 07-08 13-14 11-12 08-09 11-12 3.950.000

61 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 30-31 20-21 03-04 22-23 07-08 03-04 24-25 04-05 02-03 20-21 06-07 3.950.000

62 PERSONALITY DEVELOPMENT BERBASISEMOTIONAL AND SPRITUAL QUETIENTS 4 23-26 20-23 06-09 24-27 08-11 05-08 24-27 31-03 25-28 23-26 06-09 11-14 7.950.000

63 STRESS & CONFLICT MANAGEMENT 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 21-23 18-20 16-18 20-22 18-20 5.950.00064 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 02-06 30-03 27-31 03-07 08-12 05-09 03-07 31-04 04-08 02-06 27-01 11-15 8.950.000

65 CORPORATE BUILIDNG DALAM MEMBANGUNKULTUR DAN ETIKA INTERNAL ORGANISASI 4 16-19 13-16 06-09 17-20 02-05 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.000

66 MODEL PEMBINAAN ANGGOTA YANGEXCELLENT DALAM DUNIA KERJA PERUSAHAAN 3 16-18 13-15 27-29 17-19 31-02 19-21 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000

67 Office COMMUNICATION AND BEHAVIOR ETHIC 3 04-06 01-03 06-08 05-07 08-10 19-21 05-07 07-09 06-08 04-06 06-08 04-06 5.950.000

68 CHANGE & CONFLICT MANAGEMENT ANDDEALING WITH DIFFICULT PEOPLE 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000

69 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 04-06 01-03 27-01 05-07 02-04 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000

70 Change & conflict management and dealingwith difficult people 2 02-03 30-31 27-28 03-04 02-03 19-20 03-04 31-01 04-05 02-03 30-31 04-05 3.950.000

71 Strategic and Systematic Thinking 2 05-06 02-03 27-28 06-07 29-30 19-20 06-07 30-31 07-08 05-06 27-28 07-08 3.950.00072 THE LEADERSHIP CHALLENGE 2 12-13 09-10 27-28 12-13 02-03 08-09 13-14 31-01 14-15 12-13 30-31 14-15 3.950.00073 COACHING & CONSELING DI PERUSAHAAN 3 11-13 08-10 15-17 11-13 17-19 19-21 12-14 14-16 13-15 11-13 15-17 13-15 5.950.00074 COACHING AND COUNSELING ( MONITORING) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 28-30 11-13 09-11 30-01 27-29 5.950.00075 PERFORMANCE COACHING FOR MANAGER 2 02-03 30-31 27-28 03-04 22-23 19-20 03-04 14-15 04-05 02-03 27-28 27-28 3.950.000

76 EFFECTIVE PRESENTATION AND REPORTWRITING 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 20-22 5.950.000

77 Effective Time Management 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000

78 HANDLING CONFLICT AND COMPLAINTEFFECTIVELY 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 29-31 11-13 09-11 27-29 13-15 5.950.000

79 Strategic Time Management 3 18-20 15-17 20-22 19-21 22-24 07-09 19-21 23-25 20-22 18-20 20-22 18-20 5.950.00080 TIME MANAGEMENT 4 16-19 13-16 28-03 17-20 02-05 05-08 17-20 01-04 18-21 16-19 31-03 18-21 7.950.00081 HOW TO HANDLE CRITICISM AND COMPLAIN 2 23-24 20-21 06-07 24-25 08-09 15-16 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

41

Keterangan :

Seluruh judul training yang ada, apabila ada permintaan dapat kami selenggarakan sebagai Inhouse Training Jadwal terupdate dapat dilihat di website kami di http://www.mairodi-training.com atau di www.pelatihan-indonesia.com atau di www.training-bandung.com Venue Training : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci, dll), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll Untuk korespondensi bisa dikirimkan via email : training@mairodi-training.com atau ptmmsbdg@gmail.com

top related