pt. mairodi mandiri sejahteramairodi-training.com/wp-content/uploads/2017/05/agenda-bandung... ·...

41
Agenda Training Bandung 2017 No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga ENGINEERING 1 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000 2 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000 3 Statistical Process Control BERBASIS MINITAB 14 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 21-24 19-22 17-20 14-17 19-22 7.950.000 4 BASIC CIVIL 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 05-08 7.950.000 5 CARTOGRAFI 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 04-07 7.950.000 6 CATHODIC PROTECTION CORROSION CONTROL AND PREVENTION 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 12-15 7.950.000 7 CIVIL CONSTRUCTION OBSERVATION of EXECUTION BUILDING 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 18-21 7.950.000 8 CIVIL CONSTRUCTION PENGAWASAN PELAKSANAAN BANGUNAN 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 04-07 7.950.000 9 CONTROL VALVE AND VALVE OPERATION AND SIZING 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000 10 DOKUMEN KONTROL 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 18-21 7.950.000 11 FUZZY LOGIC CONTROL 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 05-08 7.950.000 12 GAS AND LIQUID FLOW MEASUREMENT 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000 13 PROCESS CONTROL SYSTEMS APPLICATION, DESIGN, AND TUNING 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000 14 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000 15 Survey & Mapping 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.000 16 PRESSURE SAFETY VALVE SELECTION AND SIZING 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000 17 CHOKE AND CONTROL VALVE 4 17-20 14-17 27-02 18-21 15-18 05-08 18-21 21-24 19-22 17-20 30-02 11-14 7.950.000 18 MARINE CORROSION AND PREVENTION FOR OFFSHORE STRUCTURE 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.500.000 19 ADVANCED FLOW MEASUREMENT 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.000 20 ADVANCED PID CONTROLLER 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000 21 CONTROL AND CHOKE VALVES 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000 PT. MAIRODI MANDIRI SEJAHTERA TRAINING, CONSULTING & ENGINEERING SERVICES Alamat: Gedung Dapenpos Lt.2, Jl. PH.H. Mustofa No.35 , Bandung, Indonesia, 40124 Telp/Fax: +62-22- 7215416 / 7215668 Homepage: www.mairodi-training.com

Upload: hoangbao

Post on 22-Feb-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

Agenda Training Bandung 2017No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING1 SAFETY INSTRUMENTED SYSTEM (SIS) AND

CONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000

2 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000

3 Statistical Process Control BERBASIS MINITAB14 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 21-24 19-22 17-20 14-17 19-22 7.950.000

4 BASIC CIVIL 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 05-08 7.950.0005 CARTOGRAFI 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 04-07 7.950.000

6 CATHODIC PROTECTION CORROSION CONTROLAND PREVENTION 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 12-15 7.950.000

7 CIVIL CONSTRUCTION OBSERVATION ofEXECUTION BUILDING 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 18-21 7.950.000

8 CIVIL CONSTRUCTION PENGAWASANPELAKSANAAN BANGUNAN 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 04-07 7.950.000

9 CONTROL VALVE AND VALVE OPERATION ANDSIZING 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000

10 DOKUMEN KONTROL 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 18-21 7.950.00011 FUZZY LOGIC CONTROL 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 05-08 7.950.00012 GAS AND LIQUID FLOW MEASUREMENT 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000

13 PROCESS CONTROL SYSTEMS APPLICATION,DESIGN, AND TUNING 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000

14 SUPERVISORY CONTROL AND DATAACQUISITION (SCADA) 4 02-05 30-02 28-03 03-06 02-05 05-08 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000

15 Survey & Mapping 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.000

16 PRESSURE SAFETY VALVE SELECTION ANDSIZING 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000

17 CHOKE AND CONTROL VALVE 4 17-20 14-17 27-02 18-21 15-18 05-08 18-21 21-24 19-22 17-20 30-02 11-14 7.950.000

18 MARINE CORROSION AND PREVENTION FOROFFSHORE STRUCTURE 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.500.000

19 ADVANCED FLOW MEASUREMENT 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.00020 ADVANCED PID CONTROLLER 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.00021 CONTROL AND CHOKE VALVES 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

PT. MAIRODI MANDIRI SEJAHTERATRAINING, CONSULTING & ENGINEERING SERVICES

Alamat: Gedung Dapenpos Lt.2, Jl. PH.H. Mustofa No.35 , Bandung, Indonesia, 40124Telp/Fax: +62-22- 7215416 / 7215668 Homepage: www.mairodi-training.com

Page 2: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

2

22 CONTROL SYSTEM FUNDAMENTALS 4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 8.500.000

23 FIELDBUS AND INDUSTRIAL DATACOMMUNICATION 4 03-06 31-03 21-24 04-07 02-05 13-16 04-07 01-04 05-08 03-06 21-24 18-21 8.500.000

24 FISCAL AND CUSTODY METERING 4 09-12 06-09 28-31 10-13 08-11 06-09 10-13 07-10 11-14 09-12 28-01 04-07 8.500.00025 FLOW ASSURANCE IN PIPING SYSTEMS 4 16-19 13-16 27-02 17-20 15-18 12-15 17-20 21-24 18-21 16-19 30-02 12-15 8.500.000

26 FLUID FLOW – GAS METERING AND CUSTODYTRANSFER 5 23-27 20-24 06-10 24-28 29-02 05-09 24-28 31-04 25-29 23-27 06-10 18-22 9.500.000

27 HUMAN MACHINE INTERFACE (HMI) 4 02-05 30-02 13-16 03-06 02-05 13-16 03-06 28-31 04-07 02-05 13-16 05-08 8.500.00028 OPC (OPEN PROCESS CONTROL) 4 10-13 07-10 20-23 10-13 09-12 05-08 11-14 08-11 12-15 10-13 20-23 11-14 8.500.00029 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 03-06 31-03 06-09 04-07 02-05 13-16 04-07 31-03 05-08 03-06 06-09 12-15 8.500.00030 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 09-12 06-09 14-17 10-13 08-11 05-08 10-13 07-10 11-14 09-12 14-17 19-22 8.500.00031 SCADA SYSTEMS 4 16-19 13-16 21-24 17-20 15-18 12-15 17-20 21-24 18-21 16-19 21-24 05-08 8.500.00032 Ultrasonic Gas Flow Meter 5 23-27 20-24 27-31 24-28 29-02 05-09 24-28 31-04 25-29 23-27 27-01 11-15 9.500.000

33 WELLHEAD INSTRUMENTATION ANDHYDRAULIC CONTROL SYSTEMS 4 02-05 30-02 27-02 03-06 02-05 13-16 03-06 28-31 04-07 02-05 30-02 18-21 8.500.000

34 WIRELESS LAN IN INDUSTRIAL AUTOMATION &ISA 100.11a 4 10-13 07-10 07-10 10-13 09-12 05-08 11-14 08-11 12-15 10-13 07-10 04-07 8.500.000

35 CALIBRATION ISO IEC 17025 4 17-20 14-17 13-16 18-21 16-19 12-15 18-21 22-25 19-22 17-20 13-16 11-14 8.500.000

36 DESIGN OF EXPRIMENTS (DOE) FUNDAMENTALCONCEPT AND APPLICATION 4 16-19 13-16 13-16 17-20 15-18 05-08 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000

37 Electrical Test Instrumentation dan SistemPengukuran (Measurements) 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

38 Instrumentation Systems 4 02-05 30-02 27-30 03-06 02-05 06-09 03-06 31-03 04-07 02-05 27-30 11-14 8.500.00039 Measurements Systems 4 09-12 06-09 27-02 10-13 08-11 13-16 10-13 07-10 11-14 09-12 30-02 19-22 8.500.00040 Energy Audit and Application 4 23-26 20-23 13-16 24-27 29-01 12-15 24-27 28-31 25-28 23-26 13-16 11-14 8.500.00041 STATISTIK INDUSTRI 4 02-05 30-02 20-23 03-06 29-01 05-08 03-06 28-31 04-07 02-05 20-23 11-14 7.950.000

42CATHODIC PROTECTION FOR MINE STEELSTRUCTURE AND MINING SUPORTINGFACILITIES

4 23-26 20-23 13-16 24-27 15-18 05-08 24-27 21-24 25-28 23-26 13-16 04-07 8.750.000

43 Cathodic Protection for Onshore and OffshoreStructure 4 02-05 30-02 20-23 03-06 29-01 12-15 03-06 28-31 04-07 02-05 20-23 11-14 8.750.000

44 CORROSION AND SCALING PREVENTION 4 16-19 13-16 27-02 17-20 08-11 13-16 17-20 07-10 18-21 16-19 30-02 05-08 8.750.000

45 Corrosion Engineering for Non CorrosionEngineers 4 24-27 21-24 06-09 25-28 16-19 05-08 25-28 22-25 26-29 24-27 06-09 12-15 8.750.000

46INTERNAL AND EXTERNAL CORROSIONCONTROL AND MONITORING FOR PIPELINEAND SURFACE FACILITY

4 23-26 20-23 28-03 24-27 15-18 05-08 24-27 21-24 25-28 23-26 31-03 18-21 8.750.000

47 CCTV INSTALASI, PEMROGRAMAN DANPERAWATAN 3 02-04 30-01 13-15 03-05 22-24 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000

Page 3: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

3

48 ADVANCED CCTV Perencanaan, Desain danImplementasi 3 09-11 06-08 06-08 10-12 10-12 19-21 10-12 09-11 11-13 09-11 06-08 13-15 5.950.000

49 INSTRUMENTATION AND CONTROL SYSTEM 4 24-27 21-24 27-30 25-28 02-05 12-15 25-28 01-04 26-29 24-27 27-30 12-15 7.950.00050 Scale In Oilfield Water 4 02-05 30-02 28-31 03-06 08-11 05-08 03-06 07-10 04-07 02-05 28-01 05-08 7.950.000

51 SIMULASI PROSES TEKNIK KIMIAMENGGUNAKAN HYSYS 4 09-12 06-09 27-02 10-13 15-18 13-16 10-13 21-24 11-14 09-12 30-02 12-15 7.950.000

52 PERHITUNGAN KETIDAKPASTIAN HASILPENGUKURAN DAN PENGUJIAN 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 18-20 5.950.000

53 BASIC FUZZY LOGIC CONTROL AND ITS SIMULATIONWITH SPREADSHEET APPLICATION PROGRAM 4 02-05 30-02 06-09 03-06 15-18 12-15 03-06 07-10 04-07 02-05 06-09 04-07 8.500.000

54 APPLICATION STATISTIC IN ENGINEERINGINDUSTRY 4 02-05 30-02 20-23 03-06 08-11 06-09 03-06 31-03 04-07 02-05 20-23 05-08 7.950.000

55 CALLIBRATION OF MEASURING TOOL 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 28-31 26-29 24-27 07-10 04-07 7.950.000

56 CONTROL VALVE OPERATION, MAINTENANCE,AND TROUBLESHOOTING 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 21-24 18-21 16-19 28-01 05-08 7.950.000

57 FINITE ELEMENT METHODS (FEM) 4 03-06 31-03 28-03 04-07 09-12 06-09 04-07 01-04 05-08 03-06 31-03 05-08 7.950.00058 Flow Measurement and Control Element 4 09-12 06-09 07-10 10-13 15-18 12-15 10-13 07-10 11-14 09-12 07-10 12-15 7.950.00059 INDUSTRIAL METROLOGY 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 08-11 12-15 10-13 30-02 18-21 7.950.00060 Inspeksi dan Korosi 4 17-20 14-17 06-09 18-21 30-02 05-08 18-21 22-25 19-22 17-20 06-09 05-08 7.950.00061 MEASUREMENT SYSTEM ANALYSIS 4 03-06 31-03 06-09 04-07 09-12 06-09 04-07 01-04 05-08 03-06 06-09 11-14 7.950.000

62 ADVANCE PROCESS CONTROL,INSTRUMENTATION AND METERING 4 23-26 20-23 27-02 24-27 08-11 05-08 24-27 31-03 25-28 23-26 30-02 11-14 8.500.000

63 OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM) 4 02-05 30-02 06-09 03-06 15-18 12-15 03-06 07-10 04-07 02-05 06-09 18-21 8.500.000

64 PROCESS CONTROL AND INSTRUMENTATION 4 09-12 06-09 13-16 10-13 29-01 06-09 10-13 21-24 11-14 09-12 13-16 04-07 8.500.000

65 SAFETY INSTRUMENTED SYSTEM (SIS) ANDCONTROL 4 16-19 13-16 20-23 17-20 02-05 13-16 17-20 28-31 18-21 16-19 20-23 12-15 8.500.000

66 SAFETY RELIEF VALVE FUNDAMENTALCONCEPTS, SIZING AND SELECTION 4 24-27 21-24 27-30 25-28 09-12 05-08 25-28 01-04 26-29 24-27 27-30 19-22 8.500.000

67 FLUID FLOW MEASUREMENT AND METERPROVING IN OIL AND GAS INDUSTRY 4 24-27 21-24 14-17 25-28 09-12 06-09 25-28 01-04 26-29 24-27 14-17 11-14 7.950.000

68 GPS(Global Positioning System) for mining andPetroleum 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 18-21 8.500.000

69 INDUSTRIAL COMBUSTION AND BURNER 4 16-19 13-16 27-02 17-20 02-05 12-15 17-20 28-31 18-21 16-19 30-02 04-07 8.500.00070 WATER TREATMENT 4 16-19 13-16 20-23 17-20 08-11 13-16 17-20 07-10 18-21 16-19 20-23 19-22 8.750.00071 LIFE CYCLE COSTING 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 6.500.000

Page 4: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

4

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MECHANICAL1 Gas, Oil and Water Pipeline Design and

Maintenance 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 11-14 8.750.000

2 WELDING SAFETY 2 02-03 30-31 02-03 03-04 02-03 12-13 03-04 28-29 04-05 02-03 02-03 27-28 3.950.000

3 Electric motor Operation, Maintenance &Troubleshooting 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 04-07 7.950.000

4 BOILER CONTROL SYSTEMS ENGINEERING 4 23-26 20-23 27-30 24-27 02-05 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.0005 PLUMBING SYSTEM AND MAINTENANCE 3 16-18 13-15 13-15 17-19 22-24 19-21 17-19 14-16 18-20 16-18 13-15 27-29 6.500.000

6SISTEM KONTROL RHVAC (REFRIGERATIONHEATING VENTILATING AND AIRCONDITIONING)

5 23-27 20-24 20-24 24-28 29-02 12-16 24-28 21-25 25-29 23-27 20-24 04-08 9.500.000

7 REFRIGERATION RETROFIT 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 28-31 04-07 02-05 27-30 11-14 8.500.0008 Pipeline Risk & Integrity Management 3 23-25 20-22 13-15 24-26 15-17 12-14 24-26 14-16 25-27 23-25 13-15 27-29 6.950.000

9 Piping & Pipeline System Design, Specification,Installation & Maintenance 4 02-05 30-02 20-23 03-06 29-01 05-08 03-06 21-24 04-07 02-05 20-23 04-07 8500000

10 PLANT LIFE MANAGEMENT THROUGHRELIABILITY BASED INSPECTION 5 09-13 06-10 27-31 17-21 08-12 12-16 10-14 31-04 11-15 09-13 27-01 11-15 9.500.000

11 QC for Water Network (Pipeline) Construction 3 18-20 15-17 01-03 11-13 22-24 19-21 19-21 28-30 20-22 18-20 01-03 20-22 6.950.00012 Risk Based Inspection 3 04-06 01-03 15-17 05-07 17-19 07-09 05-07 14-16 06-08 04-06 15-17 06-08 6.950.00013 Basic CNC 3 02-04 30-01 06-08 03-05 08-10 05-07 03-05 07-09 04-06 02-04 06-08 04-06 7.250.000

14COMPRESSOR OPERATION, MAINTENANCE,TROUBLESHOOTING AND DIAGNOSTIC OFFAILURE ANALYSIS

4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 21-24 11-14 09-12 13-16 11-14 7.950.000

15 MACHINERY FLUID MECHANICS 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 18-21 7.950.00016 PELUMAS DAN SISTEM PELUMASAN 4 23-26 20-23 27-30 24-27 02-05 13-16 24-27 31-03 25-28 23-26 27-30 04-07 7.950.000

17 ELECTRIC CHARGING SYSTEM AND STARTINGSYSTEM OF HEAVY DUTY EQUIPMENT 4 09-12 06-09 06-09 10-13 15-18 12-15 10-13 21-24 11-14 09-12 06-09 18-21 7.950.000

18 ELECTRO-PNEUMATICS SYSTEM PRINCIPLESAND APPLICATION 4 16-19 13-16 13-16 17-20 29-01 05-08 17-20 28-31 18-21 16-19 13-16 04-07 7.950.000

19 INSTRUMENTATION AND CONTROL SYSTEM 4 23-26 20-23 20-23 24-27 02-05 13-16 24-27 31-03 25-28 23-26 20-23 11-14 7.950.00020 KONTROL ELEKTRIK 4 02-05 30-02 27-30 03-06 08-11 06-09 03-06 07-10 04-07 02-05 27-30 19-22 7.950.00021 MECHATRONICS APPLICATION IN INDUSTRY 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 22-25 12-15 10-13 30-02 05-08 7.950.00022 Mekatronika 4 17-20 14-17 07-10 18-21 30-02 05-08 18-21 28-31 19-22 17-20 07-10 12-15 7.950.00023 PNEUMATIC SYSTEM AND APPLICATION 4 24-27 21-24 14-17 25-28 02-05 13-16 25-28 01-04 26-29 24-27 14-17 18-21 7.950.00024 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 03-06 31-03 21-24 04-07 09-12 06-09 04-07 08-11 05-08 03-06 21-24 04-07 7.950.00025 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 09-12 06-09 28-31 10-13 15-18 12-15 10-13 21-24 11-14 09-12 28-01 11-14 7.950.00026 REKAYASA HIDROLIK AND APLIKASI 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 28-31 18-21 16-19 31-03 19-22 7.950.00027 INSTRUMENTATION AND BASIC CONTROL 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.000

Page 5: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

5

SYSTEM28 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 30-02 27-30 03-06 29-01 12-15 03-06 28-31 04-07 02-05 27-30 04-07 7.950.00029 MANAJEMEN MATERIAL 4 16-19 13-16 06-09 17-20 08-11 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.00030 Manajemen Perbengkelan 4 23-26 20-23 13-16 24-27 15-18 06-09 24-27 21-24 25-28 23-26 13-16 05-08 7.950.000

31 PENGETAHUAN MATERIAL HANDLING &APLIKASI 4 03-06 31-03 20-23 04-07 30-02 12-15 04-07 28-31 05-08 03-06 20-23 12-15 7.950.000

32 AC & REFRIGERATION PRINCIPLES, OPERATIONAND TROUBLESHOOTING 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 31-03 04-07 02-05 27-30 11-14 7.950.000

33 ADVANCED VIBRATION MONITORINGTECHNIQUE 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 21-24 18-21 16-19 06-09 04-07 7.950.000

34 BEARING TECHNOLOGY AND LUBRICATIONSYSTEM 4 24-27 21-24 07-10 25-28 30-02 13-16 25-28 28-31 26-29 24-27 07-10 18-21 7.950.000

35 CENTRIFUGAL GAS COMPRESSOR Anti SurgeControl 4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 19-22 7.950.000

36 CENTRIFUGAL GAS COMPRESSOR OPERATION &MAINTENANCE 4 23-26 20-23 27-02 24-27 29-01 13-16 24-27 28-31 25-28 23-26 30-02 05-08 7.950.000

37 CENTRIFUGAL PUMP OPERATION ANDMAINTENANCE 4 03-06 31-03 06-09 04-07 02-05 05-08 04-07 01-04 05-08 03-06 06-09 11-14 7.950.000

38 COLD STORAGE PRINCIPLE, OPERATION &TROUBLESHOOTING 4 24-27 21-24 28-31 25-28 30-02 13-16 25-28 28-31 26-29 24-27 28-01 12-15 7.950.000

39 DIESEL ENGINES OPERATION ANDMAINTENANCE 4 16-19 13-16 14-17 17-20 15-18 06-09 17-20 21-24 18-21 16-19 14-17 11-14 7.950.000

40 GAS TURBINE OPERATION, PERFORMANCE &TROUBLESHOOTING 4 09-12 06-09 28-31 10-13 08-11 12-15 10-13 07-10 11-14 09-12 28-01 18-21 7.950.000

41 HYDRAULICS SYSTEMS Engineering Applications 4 03-06 31-03 14-17 04-07 02-05 05-08 04-07 01-04 05-08 03-06 14-17 19-22 7.950.000

42 HYDRAULICS SYSTEMS MAINTENANCE &TROUBLESHOOTING 4 10-13 07-10 21-24 10-13 09-12 12-15 11-14 08-11 12-15 10-13 21-24 05-08 7.950.000

43 MATERIAL ATTITUDE USES AND PROBLEMS 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 01-04 05-08 03-06 31-03 11-14 7.950.00044 MATERIAL IDENTIFICATION 4 10-13 07-10 07-10 10-13 09-12 12-15 11-14 08-11 12-15 10-13 07-10 18-21 7.950.00045 METALLURGY FOR NON METALLURGIST 4 24-27 21-24 21-24 25-28 30-02 13-16 25-28 28-31 26-29 24-27 21-24 12-15 7.950.000

46 MOTOR CONTROL CENTER OPERATION &MAINTENANCE 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 31-03 04-07 02-05 27-30 19-22 7.950.000

47 OPERATING AND MAINTENANCE OF HEAVYDUTY EQUIPMENTS 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 21-24 18-21 16-19 06-09 11-14 7.950.000

48 PIPING SYSTEM MATERIAL DESIGN ANDMAINTENANCE 4 10-13 07-10 28-31 10-13 09-12 12-15 11-14 08-11 12-15 10-13 28-01 12-15 7.950.000

49 PRACTICAL WELDING 4 09-12 06-09 21-24 10-13 08-11 12-15 10-13 07-10 11-14 09-12 21-24 18-21 7.950.00050 PRACTICE CONSIDERATIONS OF ARC WELDING 4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 04-07 7.950.00051 ROTOR BALANCING AND SHAFT ALIGNMENT 4 10-13 07-10 13-16 10-13 09-12 12-15 11-14 08-11 12-15 10-13 13-16 05-08 7.950.00052 Welding 4 17-20 14-17 06-09 18-21 16-19 06-09 18-21 22-25 19-22 17-20 06-09 04-07 7.950.000

Page 6: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

6

53 Welding Joint Inspection 4 24-27 21-24 13-16 25-28 30-02 13-16 25-28 28-31 26-29 24-27 13-16 12-15 7.950.00054 Welding Metallurgy 4 02-05 30-02 20-23 03-06 02-05 05-08 03-06 31-03 04-07 02-05 20-23 19-22 7.950.00055 Welding Oxy Acetylene 4 09-12 06-09 28-31 10-13 08-11 12-15 10-13 07-10 11-14 09-12 28-01 05-08 7.950.00056 MANAJEMEN BENGKEL 4 02-05 30-02 13-16 03-06 02-05 05-08 03-06 31-03 04-07 02-05 13-16 04-07 7.950.00057 THERMAL SPRAY COATING 4 09-12 06-09 13-16 10-13 02-05 05-08 10-13 31-03 11-14 09-12 13-16 11-14 8.500.00058 MATERIAL HANDLING & PACKAGING 4 23-26 20-23 20-23 24-27 02-05 05-08 24-27 31-03 25-28 23-26 20-23 18-21 7.950.00059 AEROENGINE BEARING INSPECTION 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 6.500.00060 AIR COMPRESSOR 3 23-25 20-22 13-15 24-26 22-24 19-21 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000

61 ALIGNMENT AND BALANCING IN ROTATINGEQUIPMENT 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000

62 BEARING LUBRICATION TECHNOLOGY 4 09-12 06-09 27-30 10-13 08-11 12-15 10-13 07-10 11-14 09-12 27-30 04-07 7.950.000

63 Compressor and Prime Mover Operation &Maintenance 3 25-27 22-24 08-10 26-28 22-24 19-21 26-28 14-16 27-29 25-27 08-10 27-29 6.500.000

64 GAS TURBINE OPERATION & MAINTENANCE 4 10-13 07-10 21-24 10-13 29-01 13-16 11-14 28-31 12-15 10-13 21-24 18-21 7.950.00065 Machinery Diagnostic 4 16-19 13-16 28-31 17-20 02-05 06-09 17-20 31-03 18-21 16-19 28-01 05-08 7.950.000

66 MANAGING THE INTEGRITY OF GAS PIPELINESYSTEM 3 23-25 20-22 01-03 24-26 22-24 19-21 24-26 14-16 25-27 23-25 01-03 27-29 6.500.000

67 PIPELINE PIGGING OPERATIONS ANDEQUIPMENT 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.000

68 Vibration Monitoring & Control System 3 11-13 08-10 08-10 11-13 22-24 19-21 12-14 14-16 13-15 11-13 08-10 27-29 6.500.000

69 MANAJEMEN POST WELD HEAT TREATMENTTEORI, STANDARD PROSEDUR DAN APLIKASI 3 09-11 06-08 27-01 10-12 02-04 19-21 10-12 31-02 11-13 09-11 30-01 11-13 6.500.000

70 MATERIAL CERTIFICATION REQUIREMENT FOROIL AND GAS INDUSTRY 3 23-25 20-22 13-15 24-26 15-17 12-14 24-26 14-16 25-27 23-25 13-15 27-29 6.500.000

71 PROTECTIVE COATING TECHNOLOGY FORCORROSION CONTROL 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 21-23 06-08 04-06 20-22 04-06 6.500.000

72 ROTATING EQUIPMENTS 3 18-20 15-17 29-31 19-21 31-02 19-21 19-21 29-31 20-22 18-20 29-01 20-22 6.500.00073 ANALISIS VIBRASI 4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 21-24 11-14 09-12 13-16 11-14 8.500.00074 PIPING SYSTEM 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 18-21 8.500.000

75 MOTOR DIESEL PRINSIP DASAR, OPERASI DANPERAWATAN 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 7.950.000

76 PELUMASAN MESIN 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 7.950.00077 PEMBANGKIT UAP (BOILER) 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 7.950.00078 PENGGERAK MULA (PRIME MOVER) 4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 7.950.00079 TURBIN GAS 4 10-13 07-10 27-02 10-13 09-12 05-08 11-14 08-11 12-15 10-13 30-02 19-22 7.950.00080 TURBIN UAP 4 17-20 14-17 07-10 18-21 16-19 12-15 18-21 22-25 19-22 17-20 07-10 05-08 7.950.000

81 PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING 4 09-12 06-09 13-16 10-13 02-05 06-09 10-13 31-03 11-14 09-12 13-16 12-15 8.750.000

82 Chiller and Cooling Tower Design and Operation 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6.500.000

Page 7: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

7

83 DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM 5 02-06 30-03 27-03 03-07 15-19 05-09 03-07 21-25 04-08 02-06 30-03 04-08 9.500.000

84 HVAC SYSTEM Operation & Maintenance 4 09-12 06-09 06-09 10-13 29-01 12-15 10-13 28-31 11-14 09-12 06-09 11-14 8.500.000

85 PETROLEUM INDUSTRIAL REFRIGERATIONOPERATION AND MAINTENANCE 4 16-19 13-16 13-16 17-20 02-05 05-08 17-20 31-03 18-21 16-19 13-16 18-21 8.500.000

86 Practical and Advanced Course on HVAC Systems 4 24-27 21-24 20-23 25-28 08-11 13-16 25-28 07-10 26-29 24-27 20-23 04-07 8.500.000

87 CENTRIFUGAL PUMP Selection, Operation, andMaintenance 5 02-06 30-03 27-31 03-07 15-19 05-09 03-07 21-25 04-08 02-06 27-01 11-15 9.500.000

88 Gas Compressor Operation, Maintenance &Troubleshooting 4 09-12 06-09 27-02 10-13 29-01 12-15 10-13 28-31 11-14 09-12 30-02 18-21 8.500.000

89 Hydraulics Power System 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 31-04 18-22 16-20 06-10 04-08 9.500.000

90 KOMPRESOR SENTRIFUGAL OPERASI,PEMELIHARAAN, DAN TROUBLESHOOTING 4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 07-10 25-28 23-26 13-16 11-14 8.500.000

91 PUMP AND COMPRESSOR OPERATION,MAINTENANCE & TROUBLESHOOTING 5 02-06 30-03 20-24 03-07 15-19 05-09 03-07 21-25 04-08 02-06 20-24 18-22 9.500.000

92 SISTEM HIDROLIK DAN PNEUMATIK 4 10-13 07-10 27-30 10-13 30-02 12-15 11-14 28-31 12-15 10-13 27-30 04-07 8.500.00093 NON DESTRUCTIVE TEST(NDT) 4 09-12 06-09 13-16 10-13 15-18 05-08 10-13 21-24 11-14 09-12 13-16 11-14 7.950.00094 ASME PTC 4 – 1 4 23-26 20-23 27-30 24-27 29-01 12-15 24-27 28-31 25-28 23-26 27-30 04-07 7.950.00095 BASIC GAS ENGINE 4 02-05 30-02 27-02 03-06 02-05 05-08 03-06 31-03 04-07 02-05 30-02 11-14 7.950.000

96 Belt Conveyor Technology, Design Cacilationand Troubleshooting 4 09-12 06-09 06-09 10-13 08-11 13-16 10-13 07-10 11-14 09-12 06-09 18-21 7.950.000

97 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 16-19 13-16 13-16 17-20 15-18 06-09 17-20 21-24 18-21 16-19 13-16 05-08 7.950.000

98 COAL FIRED POWER PLANT COMBUSTIONOPERATION & MAINTENANCE 4 24-27 21-24 20-23 25-28 30-02 12-15 25-28 28-31 26-29 24-27 20-23 12-15 7.950.000

99 DIESEL ENGINE OPERATION AND MAINTENANCE 4 03-06 31-03 28-31 04-07 02-05 05-08 04-07 01-04 05-08 03-06 28-01 19-22 7.950.000100 DIESEL GUNSET OPERATION AND MAINTENANCE 4 10-13 07-10 28-03 10-13 09-12 13-16 11-14 08-11 12-15 10-13 31-03 04-07 7.950.000

101 GAS TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 17-20 14-17 07-10 18-21 16-19 06-09 18-21 22-25 19-22 17-20 07-10 11-14 7.950.000

102 OPERATION & MAINTENANCE OF BOILER 4 23-26 20-23 14-17 24-27 29-01 12-15 24-27 28-31 25-28 23-26 14-17 18-21 7.950.000

103 OPERATION, MAINTENANCE ANDTROUBLESHOOTING OF GAS TURBINE 4 02-05 30-02 21-24 03-06 02-05 05-08 03-06 31-03 04-07 02-05 21-24 05-08 7950000

104 Perawatan Belt Conveyor 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 14-16 11-13 09-11 27-29 27-29 5.950.000

105 STEAM GENERATOR AND TURBINE OPERATION ANDMAINTENANCE 4 16-19 13-16 27-02 17-20 08-11 13-16 17-20 07-10 18-21 16-19 30-02 12-15 7.950.000

106 TRANSMISI DAYA MEKANIK (MECHANICALPOWER TRANSMISSION) 4 03-06 31-03 13-16 04-07 30-02 12-15 04-07 28-31 05-08 03-06 13-16 04-07 7.950.000

107 VALVE 4 10-13 07-10 20-23 10-13 02-05 05-08 11-14 01-04 12-15 10-13 20-23 11-14 7.950.000

108 Turbomachinery Operation, Maintenance andTroubleshooting 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 18-21 7.950.000

Page 8: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

8

109 PRESSURE VESSEL DESIGN, OPERATION &MAINTENANCE 4 23-26 20-23 28-03 24-27 16-19 06-09 24-27 22-25 25-28 23-26 31-03 05-08 7.950.000

110 ALIGNMENT AND VIBRATION INSPECTIONSYSTEM 4 16-19 13-16 20-23 17-20 29-01 12-15 17-20 21-24 18-21 16-19 20-23 18-21 7.950.000

111 AUTOMOTIVE (CARS) AIR CONDITIONING (AC)SYSTEM 4 23-26 20-23 27-30 24-27 02-05 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.000

112 BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 02-05 30-02 27-02 03-06 08-11 13-16 03-06 31-03 04-07 02-05 30-02 11-14 7.950.000

113 POMPA DAN KOMPRESOR OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 24-27 21-24 21-24 25-28 02-05 05-08 25-28 28-31 26-29 24-27 21-24 12-15 7.950.000

114 Pump Operation, Maintenance &Troubleshooting 4 10-13 07-10 28-03 10-13 16-19 06-09 11-14 08-11 12-15 10-13 31-03 04-07 7.950.000

115 OPERATION AND MAINTENANCE OF HEAVYDUTY EQUIPMENT 4 16-19 13-16 27-02 17-20 29-01 12-15 17-20 21-24 18-21 16-19 30-02 18-21 7.950.000

116 ALIGNMENT, LEVELLING AND ROTORBALANCING 3 09-11 06-08 13-15 10-12 15-17 05-07 10-12 14-16 11-13 09-11 13-15 11-13 5950000

117 BEARING AND OIL LUBRICATION FORMACHINERY 3 16-18 13-15 20-22 17-19 22-24 12-14 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000

118 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 02-05 30-02 27-02 03-06 02-05 12-15 03-06 31-03 04-07 02-05 30-02 11-14 8.500.000

119 COMPRESSOR Operation, Maintenance andTroubleshooting 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 27-29 6.750.000

120 GAS AND STEAM TURBINE Operation,Maintenance And Troubleshooting 4 16-19 13-16 13-16 17-20 15-18 05-08 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000

121GAS TURBINE PRINCIPLES, INSPECTION,OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 23-26 20-23 20-23 24-27 29-01 13-16 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

122 HEAT EXCHANGERS Operation, maintenanceand troubleshooting 4 03-06 31-03 27-30 04-07 02-05 06-09 04-07 01-04 05-08 03-06 27-30 12-15 8.500.000

123 HIGH PRESSURE PUMP (HPP) OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 10-13 07-10 28-03 10-13 09-12 12-15 11-14 08-11 12-15 10-13 31-03 19-22 8.500.000

124 Lubrication and Bearing Technology 4 17-20 14-17 07-10 18-21 16-19 05-08 18-21 22-25 19-22 17-20 07-10 05-08 8.500.000125 LUBRIKASI Prinsip Dasar dan Aplikasi 3 25-27 22-24 15-17 26-28 22-24 19-21 26-28 14-16 27-29 25-27 15-17 27-29 6.500.000

126 OIL FILM BEARING (JOURNAL DAN THRUSTBEARING HYDRODYNAMIC BEARINGS) 4 02-05 30-02 21-24 03-06 30-02 13-16 03-06 28-31 04-07 02-05 21-24 11-14 8.500.000

127 PIPELINE Design, Testing, Inspection AndMaintenance 4 09-12 06-09 28-31 10-13 02-05 06-09 10-13 31-03 11-14 09-12 28-01 18-21 8.500.000

128 Pressure Vessel Calculation, Codes, Production,Operation, Control & Safeties 4 16-19 13-16 27-02 17-20 08-11 12-15 17-20 07-10 18-21 16-19 30-02 04-07 8.500.000

Page 9: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

9

129 PUMP OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 23-26 20-23 06-09 24-27 15-18 05-08 24-27 21-24 25-28 23-26 06-09 12-15 8.500.000

130 PUMP AND COMPRESSOR OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 03-06 31-03 13-16 04-07 29-01 13-16 04-07 28-31 05-08 03-06 13-16 19-22 8.500.000

131 Refractory and Heat Insulation 4 10-13 07-10 20-23 10-13 02-05 06-09 11-14 01-04 12-15 10-13 20-23 05-08 8.500.000

132 REFRIGERATION OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 17-20 14-17 27-30 18-21 09-12 12-15 18-21 08-11 19-22 17-20 27-30 11-14 8.500.000

133 ROTATING EQUIPMENT 4 24-27 21-24 28-03 25-28 16-19 05-08 25-28 22-25 26-29 24-27 31-03 18-21 8.500.000

134 STEAM TURBINE OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 02-05 30-02 07-10 03-06 30-02 13-16 03-06 28-31 04-07 02-05 07-10 04-07 8.500.000

135 ELECTROPLATING 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 9.250.000136 FAILURE ANALYSIS METHODS AND CASES 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 11-14 7.950.000

137 PROSES PENGERJAAN AKHIR DENGAN PELAPISLOGAM (ELECTROPLATING) 4 09-12 06-09 27-02 10-13 08-11 06-09 10-13 31-03 11-14 09-12 30-02 18-21 9.250.000

138 ALAT PENUKAR KALOR (HEAT EXCHANGER)OPERASI DAN PERAWATAN 4 16-19 13-16 06-09 17-20 29-01 05-08 17-20 21-24 18-21 16-19 06-09 11-14 7.950.000

139ANALISIS DAN PENGUKURAN GETARANMEKANIK (ANALYSIS AND MEASURING OFVIBRATION MACHINERY)

4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000

140 BEARING AND OIL LUBRICATION FORMACHINERY 4 10-13 07-10 27-30 10-13 16-19 12-15 11-14 08-11 12-15 10-13 27-30 12-15 7.950.000

141 COATING SYSTEM AND PROTECTIONCORROSION 4 03-06 31-03 14-17 04-07 09-12 06-09 04-07 01-04 05-08 03-06 14-17 11-14 7.950.000

142 CONVEYOR OPERASI DAN PERAWATAN 4 23-26 20-23 27-02 24-27 02-05 13-16 24-27 28-31 25-28 23-26 30-02 12-15 7.950.000

143 DISAIN ALAT BANTU CEKAM DAN PEGANG(DESIGN OF JIGS AND FIXTURES) 4 02-05 30-02 06-09 03-06 08-11 06-09 03-06 31-03 04-07 02-05 06-09 19-22 7.950.000

144 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 10-13 07-10 13-16 10-13 16-19 12-15 11-14 08-11 12-15 10-13 13-16 04-07 7.950.000

145 DISAIN KONSTRUKSI MESIN DAN PERALATANINDUSTRI 4 17-20 14-17 20-23 18-21 30-02 05-08 18-21 22-25 19-22 17-20 20-23 11-14 7.950.000

146 DYNAMIC OF MACHINE TOOLS 4 24-27 21-24 27-30 25-28 02-05 13-16 25-28 28-31 26-29 24-27 27-30 18-21 7.950.000147 HAND TOOL UTILIZATION 4 16-19 13-16 14-17 17-20 29-01 05-08 17-20 21-24 18-21 16-19 14-17 19-22 7.950.000148 HEAVY DUTY EQUIPMENT 4 23-26 20-23 21-24 24-27 02-05 13-16 24-27 28-31 25-28 23-26 21-24 04-07 7.950.000149 HYDRAULIC CONTROL SYSTEM 4 02-05 30-02 28-31 03-06 08-11 06-09 03-06 31-03 04-07 02-05 28-01 11-14 7.950.000

150 KINEMATIKA DAN DINAMIKA MESIN (KINEMATICSAND DYNAMICS OF MACHINERIES) 4 03-06 31-03 20-23 04-07 09-12 06-09 04-07 01-04 05-08 03-06 20-23 19-22 7.950.000

151 MACHINERY NOISE AND PROBLEM SOLVING 4 09-12 06-09 27-30 10-13 15-18 12-15 10-13 07-10 11-14 09-12 27-30 04-07 7.950.000

152 MANUFACTURING PROCESS TO USE CNC MACHINING 4 10-13 07-10 21-24 10-13 16-19 12-15 11-14 08-11 12-15 10-13 21-24 12-15 7.950.000

153 MANUFACTURING PROCESSES TO USE CASTING 4 17-20 14-17 28-31 18-21 30-02 05-08 18-21 22-25 19-22 17-20 28-01 19-22 7.950.000

Page 10: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

10

154 MANUFACTURING PROCESSES TO USE METALFORMING 4 24-27 21-24 27-02 25-28 02-05 13-16 25-28 28-31 26-29 24-27 30-02 04-07 7.950.000

155 MEASUREMENT TECHNIQUE FOR MAINTENANCEAND OPERATION LATHE MACHINE 4 09-12 06-09 13-16 10-13 15-18 12-15 10-13 07-10 11-14 09-12 13-16 18-21 7.950.000

156 NON DESTRUCTIVE TEST 4 23-26 20-23 27-30 24-27 02-05 13-16 24-27 28-31 25-28 23-26 27-30 12-15 7.950.000157 OXY ACETYLENE WELDING 4 17-20 14-17 14-17 18-21 30-02 05-08 18-21 22-25 19-22 17-20 14-17 11-14 8.500.000

158 PEMILIHAN MATERIAL KOMPONEN MESIN(MATERIAL SELECTION) 4 24-27 21-24 21-24 25-28 02-05 13-16 25-28 28-31 26-29 24-27 21-24 18-21 7.950.000

159 PENGEMBANGAN TEKNOLOGI DAN STANDARMATERIAL 4 03-06 31-03 28-31 04-07 09-12 06-09 04-07 01-04 05-08 03-06 28-01 05-08 7.950.000

160 PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST) 4 09-12 06-09 27-02 10-13 15-18 12-15 10-13 07-10 11-14 09-12 30-02 12-15 7.950.000

161 PERLAKUAN PANAS LOGAM (HEAT TREATMENTFOR METAL) 4 02-05 30-02 20-23 03-06 08-11 06-09 03-06 31-03 04-07 02-05 20-23 11-14 7.950.000

162 PNEUMATIC CONTROL SYSTEM 4 10-13 07-10 27-30 10-13 16-19 12-15 11-14 08-11 12-15 10-13 27-30 18-21 7.950.000163 PRODUCTION OF HELICAL GEAR 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 21-24 18-21 16-19 28-01 11-14 7.950.000164 PROSES PEMESINAN (MACHINING) 4 10-13 07-10 13-16 10-13 16-19 12-15 11-14 08-11 12-15 10-13 13-16 12-15 7.950.000165 PUMP OPERATION AND MAINTENANCE 4 17-20 14-17 20-23 18-21 30-02 05-08 18-21 22-25 19-22 17-20 20-23 19-22 7.950.000166 SISTEM PEMIPAAN (PIPING) 4 16-19 13-16 14-17 17-20 29-01 05-08 17-20 21-24 18-21 16-19 14-17 05-08 7.950.000167 TESTING OF MACHINE TOOLS 4 17-20 14-17 06-09 18-21 30-02 05-08 18-21 22-25 19-22 17-20 06-09 11-14 7.950.000

168 Transmisi Daya Mekanik (Mechanical PowerTransmission) 4 03-06 31-03 20-23 04-07 09-12 06-09 04-07 01-04 05-08 03-06 20-23 05-08 7.950.000

169 TROUBLE SHOOTING, INSPECTION, ANDMONITORING OF MACHINERY 4 09-12 06-09 27-30 10-13 15-18 12-15 10-13 07-10 11-14 09-12 27-30 12-15 7.950.000

170 BASIC WELDING 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 21-24 25-28 23-26 20-23 04-07 8.950.000171 GAS METAL ARC WELDING (LAS MIGMAG) 4 02-05 30-02 27-30 03-06 02-05 05-08 03-06 28-31 04-07 02-05 27-30 11-14 8.950.000172 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 09-12 06-09 27-02 10-13 08-11 13-16 10-13 31-03 11-14 09-12 30-02 18-21 8.950.000173 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 16-19 13-16 06-09 17-20 15-18 06-09 17-20 07-10 18-21 16-19 06-09 05-08 8.950.000174 OXY ACETYLENE WELDING (LAS ASETILIN) 4 24-27 21-24 13-16 25-28 30-02 12-15 25-28 22-25 26-29 24-27 13-16 12-15 8.950.000175 WELDING INSPECTION 4 03-06 31-03 21-24 04-07 02-05 05-08 04-07 28-31 05-08 03-06 21-24 19-22 9.500.000176 WELDING METALLURGY 4 10-13 07-10 28-31 10-13 09-12 13-16 11-14 01-04 12-15 10-13 28-01 04-07 8.950.000177 WELDING SAFETY 3 18-20 15-17 01-03 19-21 22-24 19-21 19-21 14-16 20-22 18-20 01-03 27-29 6.950.000178 WELDING TECHNOLOGY 4 23-26 20-23 07-10 24-27 16-19 06-09 24-27 08-11 25-28 23-26 07-10 11-14 8.950.000

179 ANALISIS GETARAN DALAM PERAWATANROTARY EQUIPMENT 4 02-05 30-02 27-02 03-06 15-18 12-15 03-06 07-10 04-07 02-05 30-02 04-07 7.950.000

180 BENGKEL ALAT BERAT 4 09-12 06-09 06-09 10-13 29-01 05-08 10-13 21-24 11-14 09-12 06-09 11-14 7.950.000181 BOILER WATER TREATMENT 4 16-19 13-16 13-16 17-20 02-05 13-16 17-20 28-31 18-21 16-19 13-16 18-21 7.950.000182 CENTRIFUGAL COMPRESSOR 4 23-26 20-23 20-23 24-27 08-11 06-09 24-27 31-03 25-28 23-26 20-23 05-08 7.950.000

Page 11: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

11

183 CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE 4 03-06 31-03 27-30 04-07 16-19 12-15 04-07 08-11 05-08 03-06 27-30 12-15 7.950.000

184 CENTRIFUGAL PUMP AND SEAL 4 10-13 07-10 28-03 10-13 30-02 05-08 11-14 22-25 12-15 10-13 31-03 19-22 7.950.000185 CORROSION AND CATHODIC PROTECTION 4 17-20 14-17 07-10 18-21 02-05 13-16 18-21 28-31 19-22 17-20 07-10 04-07 7.950.000186 HEAVY EQUIPMENT MANAGEMENT 4 02-05 30-02 21-24 03-06 15-18 12-15 03-06 07-10 04-07 02-05 21-24 18-21 7.950.000

187 HYDRAULIC PNEUMATIC & ELECTRIC CONTROLSYSTEM 4 09-12 06-09 28-31 10-13 29-01 05-08 10-13 21-24 11-14 09-12 28-01 05-08 7.950.000

188 NON DESTRUCTIVE TESTING (NDT) 4 16-19 13-16 27-02 17-20 02-05 13-16 17-20 28-31 18-21 16-19 30-02 12-15 7.950.000

189 OPERASI DAN PEMELIHARAAN TURBIN GASDAN GENERATOR 4 23-26 20-23 06-09 24-27 08-11 06-09 24-27 31-03 25-28 23-26 06-09 19-22 7.950.000

190 POMPA OPERASI DAN PERAWATAN 4 03-06 31-03 13-16 04-07 16-19 12-15 04-07 08-11 05-08 03-06 13-16 04-07 7.950.000191 ROTATING EQUIPMENTS 4 24-27 21-24 28-03 25-28 09-12 06-09 25-28 01-04 26-29 24-27 31-03 05-08 7.950.000192 TURBIN & GENERATOR OPERATION 4 16-19 13-16 21-24 17-20 02-05 13-16 17-20 28-31 18-21 16-19 21-24 04-07 7.950.000193 VALVE (CHOKE & CONTROL VALVE) 4 23-26 20-23 28-31 24-27 08-11 06-09 24-27 31-03 25-28 23-26 28-01 11-14 7.950.000194 WELDING INSPECTION 4 03-06 31-03 27-02 04-07 16-19 12-15 04-07 08-11 05-08 03-06 30-02 18-21 7.950.000195 LIQUID PENETRANT TESTING 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 31-04 18-22 16-20 06-10 04-08 11.500.000196 MAGNETIC PARTICLE TESTING 5 23-27 20-24 13-17 24-28 15-19 12-16 24-28 07-11 25-29 23-27 13-17 11-15 11.500.000

197 PENGENDALIAN MOTOR LISTRIK SECARAELEKTRONIK 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000

198 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000199 SISTEM KONTROL MOTOR LISTRIK 4 02-05 30-02 07-10 03-06 15-18 12-15 03-06 07-10 04-07 02-05 07-10 12-15 7.950.000

200 TRAFO PRINCIPLES, APPLICATION ANDMAINTENANCE 4 09-12 06-09 14-17 10-13 29-01 05-08 10-13 21-24 11-14 09-12 14-17 19-22 7.950.000

201 ENGINEERING MATERIAL KNOWLEDGE FORWAREHOUSE PEOPLE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 6.500.000

202 PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.950.000

203PEMBANGKITAN ALIRAN PERMUKAAN UNTUKOIL SPILL (OIL FENCE) SEBAGAI PENGUMPULTUMPAHAN MINYAK

4 17-20 14-17 13-16 18-21 30-02 12-15 18-21 22-25 19-22 17-20 13-16 05-08 7.950.000

204 Oil Transportation Piping 4 02-05 30-02 28-03 03-06 08-11 06-09 03-06 31-03 04-07 02-05 31-03 19-22 7.950.000205 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MAINTENANCE

1 RELIABILITY, AVAILABILITY & MAINTAINABILITYANALYSIS 3 25-27 22-24 08-10 26-28 02-04 19-21 26-28 09-11 27-29 25-27 08-10 27-29 6.950.000

2 RELIABILITY ENGINEERING (TEKNIKKEANDALAN) 2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000

Page 12: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

12

3 ADVANCED MAINTENANCE MANAGEMENT 4 09-12 06-09 27-02 10-13 08-11 12-15 10-13 07-10 11-14 09-12 30-02 18-21 7.950.000

4 MACHINERY CONDITION MONITORING FORPREDICTIVE AND PREVENTIVE MAINTENANCE 4 16-19 13-16 20-23 17-20 15-18 06-09 17-20 21-24 18-21 16-19 20-23 19-22 7.950.000

5 MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING 4 23-26 20-23 28-31 24-27 29-01 13-16 24-27 28-31 25-28 23-26 28-01 05-08 7.950.000

6 MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR 4 23-26 20-23 06-09 24-27 29-01 12-15 24-27 28-31 25-28 23-26 06-09 18-21 7.950.000

7 MAINTENANCE AND SPARE PARTMANAGEMENT 4 09-12 06-09 06-09 10-13 15-18 05-08 10-13 21-24 11-14 09-12 06-09 04-07 7.950.000

8 FAULT FINDING SKILLS TECHNICALTROUBLESHOOTING 3 04-06 01-03 15-17 05-07 22-24 19-21 05-07 14-16 06-08 04-06 15-17 27-29 6.500.000

9 Production Optimization and Minimize DownTime 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6.500.000

10 RELIABILITY CENTERED MAINTENANCE (RCM) 3 25-27 22-24 27-29 26-28 22-24 19-21 26-28 14-16 27-29 25-27 27-29 27-29 6.500.000

11RELIABILITY CENTERED MAINTENANCE (RCM)Increasing Safety & Reliability in Gas PipelineSystem

3 04-06 01-03 27-01 05-07 22-24 19-21 05-07 14-16 06-08 04-06 30-01 27-29 6.500.000

12 MAINTENANCE MANAGEMENT 3 16-18 13-15 15-17 17-19 22-24 19-21 17-19 14-16 18-20 16-18 15-17 27-29 6.500.000

13 EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 21-23 06-08 04-06 22-24 27-29 5.950.000

14 MAINTENANCE CONTROL AND MONITORING 3 02-04 30-01 15-17 03-05 17-19 19-21 03-05 14-16 04-06 02-04 15-17 27-29 6.500.000

15 THE ECONOMICS OF MAINTENANCEMANAGEMENT 3 02-04 30-01 01-03 03-05 02-04 19-21 03-05 31-02 04-06 02-04 01-03 06-08 5.950.000

16 MAINTENANCE PLANNING AND SCHEDULING 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 6.500.000

17 PREVENTIVE & PREDICTIVE MAINTENANCE(PPM) 4 02-05 30-02 13-16 03-06 15-18 06-09 03-06 21-24 04-07 02-05 13-16 04-07 8.500.000

18 RELIABILITY CENTERED MAINTENANCE 3 11-13 08-10 20-22 11-13 22-24 14-16 12-14 14-16 13-15 11-13 20-22 13-15 6.500.00019 Integrated Maintenance Management 4 10-13 07-10 21-24 10-13 29-01 06-09 11-14 22-25 12-15 10-13 21-24 12-15 7.950.000

20 Effective and Efficient of MaintenanceManagement 3 18-20 15-17 29-31 19-21 22-24 19-21 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000

21 Total Productive Maintenance (TPM) 4 24-27 21-24 06-09 25-28 15-18 06-09 25-28 21-24 26-29 24-27 06-09 19-22 7.950.000

22 PREVENTIVE MAINTENANCE (SCHEDULE &PREDICTIVE MAINTENANCE) 4 03-06 31-03 28-31 04-07 09-12 13-16 04-07 01-04 05-08 03-06 28-01 18-21 7.950.000

23TEKNIK PEMELIHARAAN KENDARAAN(PREVENTIVE MAINTENANCE UNTUKKENDARAAN)

4 23-26 20-23 14-17 24-27 02-05 05-08 24-27 28-31 25-28 23-26 14-17 19-22 7.950.000

24 TEKNIK PERAWATAN MEKANIK 4 02-05 30-02 20-23 03-06 08-11 13-16 03-06 31-03 04-07 02-05 20-23 05-08 7.950.00025 MAINTENANCE OF MACHINE TOOLS 4 23-26 20-23 27-30 24-27 29-01 06-09 24-27 28-31 25-28 23-26 27-30 04-07 7950000

26 COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT 4 09-12 06-09 27-02 10-13 08-11 05-08 10-13 07-10 11-14 09-12 30-02 18-21 7.950.000

Page 13: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

13

27 Maintenance Strategic Planning 4 24-27 21-24 07-10 25-28 09-12 06-09 25-28 08-11 26-29 24-27 07-10 05-08 7.950.00028 MAINTENANCE SYSTEM AND DOCUMENTATION 4 03-06 31-03 14-17 04-07 16-19 13-16 04-07 22-25 05-08 03-06 14-17 12-15 7.950.00029 MANAGING MAINTENANCE RESOURCES 4 09-12 06-09 21-24 10-13 30-02 05-08 10-13 28-31 11-14 09-12 21-24 18-21 7.950.000

30 RELIABILITY CENTERED MAINTENANCE & RISKBASED INSPECTION 5 02-06 30-03 06-10 03-07 08-12 05-09 03-07 07-11 04-08 02-06 06-10 04-08 8.950.000

31 ROOT CAUSE ANALYSIS 4 10-13 07-10 13-16 10-13 15-18 13-16 11-14 21-24 12-15 10-13 13-16 11-14 7.950.00032 Spare Part Management 4 17-20 14-17 20-23 18-21 29-01 05-08 18-21 28-31 19-22 17-20 20-23 19-22 7.950.00033 ADVANCED MAINTENANCE MANAGEMENT 4 09-12 06-09 27-02 10-13 15-18 12-15 10-13 07-10 11-14 09-12 30-02 04-07 7.950.000

34 CONDITIONS BASE INSPECTION ANDMAINTENANCE 4 09-12 06-09 21-24 10-13 15-18 12-15 10-13 07-10 11-14 09-12 21-24 18-21 7.950.000

35 MAINTENANCE MANAGEMENT 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 21-24 18-21 16-19 31-03 11-14 7.950.00036 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 20-23 07-10 24-27 02-05 13-16 24-27 28-31 25-28 23-26 07-10 18-21 7.950.00037 MAINTENANCE SYSTEM AND COST 4 02-05 30-02 14-17 03-06 08-11 06-09 03-06 31-03 04-07 02-05 14-17 05-08 7.950.00038 MODERN MAINTENANCE MANAGEMENT 4 16-19 13-16 20-23 17-20 29-01 05-08 17-20 21-24 18-21 16-19 20-23 05-08 7.950.000

39PERENCANAAN DAN PENJADWALANPERAWATAN (MAINTENANCE PLANNING ANDSCHEDULING)

4 23-26 20-23 13-16 24-27 02-05 13-16 24-27 28-31 25-28 23-26 13-16 04-07 7.950.000

40 PREDICTIVE MAINTENANCE 4 17-20 14-17 28-03 18-21 30-02 05-08 18-21 22-25 19-22 17-20 31-03 05-08 7.950.00041 RELIABILITY CENTERED MAINTENANCE (RCM) 4 09-12 06-09 07-10 10-13 15-18 12-15 10-13 07-10 11-14 09-12 07-10 18-21 7.950.00042 TEKNOLOGI PERAWATAN MESIN 4 10-13 07-10 27-02 10-13 16-19 12-15 11-14 08-11 12-15 10-13 30-02 04-07 7.950.00043 Total Productive Maintenance (TPM) 4 24-27 21-24 13-16 25-28 02-05 13-16 25-28 28-31 26-29 24-27 13-16 18-21 7.950.00044 PREVENTIVE MAINTENANCE 4 10-13 07-10 20-23 10-13 30-02 05-08 11-14 22-25 12-15 10-13 20-23 11-14 7.950.00045 PREVENTIVE MAINTENANCE GENERATOR 4 17-20 14-17 27-30 18-21 02-05 13-16 18-21 28-31 19-22 17-20 27-30 18-21 7.950.000

46 CULTURE CHANGE FOR MAINTENANCE ANDRELIABILITY IMPROVEMENT 3 09-11 06-08 27-29 10-12 29-31 05-07 10-12 28-30 11-13 09-11 27-29 11-13 6.500.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - ELECTRICAL1 PENGENDALIAN MOTOR LISTRIK SECARA

ELEKTRONIK 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000

2 GENSET TEKNOLOGI, PERAWATAN DANOPERASI 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000

3 SISTEM KONTROL MOTOR LISTRIK 4 02-05 30-02 07-10 03-06 15-18 12-15 03-06 07-10 04-07 02-05 07-10 12-15 7.950.000

4 TRAFO PRINCIPLES, APPLICATION ANDMAINTENANCE 4 09-12 06-09 14-17 10-13 29-01 05-08 10-13 21-24 11-14 09-12 14-17 19-22 7.950.000

5 ADVANCED CONTROL FOUNDATION 4 16-19 13-16 20-23 17-20 29-01 12-15 17-20 21-24 18-21 16-19 20-23 18-21 7.950.0006 FLOWMETERING AND CUSTODY TRANSFER 4 02-05 30-02 27-02 03-06 08-11 13-16 03-06 31-03 04-07 02-05 30-02 11-14 7.950.0007 PRACTICAL PROCESS CONTROL 4 09-12 06-09 06-09 10-13 15-18 06-09 10-13 07-10 11-14 09-12 06-09 19-22 7.950.000

Page 14: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

14

8 Implementasi DSP (digital signal processing)Dalam Sistem Komunikasi 4 02-05 30-02 13-16 03-06 02-05 12-15 03-06 31-03 04-07 02-05 13-16 04-07 7.950.000

9 INDUSTRIAL ROBOTICS SENSING, PLANNING,AND CONTROL 4 16-19 13-16 27-02 17-20 08-11 12-15 17-20 07-10 18-21 16-19 30-02 04-07 7.950.000

10 AUTOMATIC VOLTAGE REGULATOR(AVR)OPERATION AND MAINTENANCE 4 03-06 31-03 20-23 04-07 02-05 05-08 04-07 01-04 05-08 03-06 20-23 19-22 7.950.000

11 GENERATOR OPERATION, MAINTENANCE &TROUBLESHOOTING 4 16-19 13-16 28-03 17-20 15-18 06-09 17-20 21-24 18-21 16-19 31-03 04-07 7.950.000

12 PLC ( Tingkat dasar ) 4 17-20 14-17 28-03 18-21 16-19 06-09 18-21 22-25 19-22 17-20 31-03 19-22 7.950.00013 PLC (TINGKAT MAHIR) 4 24-27 21-24 07-10 25-28 30-02 13-16 25-28 28-31 26-29 24-27 07-10 05-08 7.950.00014 POWER FACTOR IMPROVEMENT 4 02-05 30-02 14-17 03-06 02-05 05-08 03-06 31-03 04-07 02-05 14-17 11-14 7.950.000

15 PROTEKSI TERHADAP GANGGUAN SAMBARANPETIR 4 03-06 31-03 06-09 04-07 02-05 05-08 04-07 01-04 05-08 03-06 06-09 19-22 7.950.000

16 SISTEM INSTALASI DAN PROTEKSI JARINGANTENAGA LISTRIK 4 17-20 14-17 20-23 18-21 16-19 06-09 18-21 22-25 19-22 17-20 20-23 11-14 7.950.000

17 SISTEM INSTALASI TENAGA LISTRIK 4 24-27 21-24 28-31 25-28 30-02 13-16 25-28 28-31 26-29 24-27 28-01 18-21 7.950.00018 TRANFORMER OPERATION & MAINTENANCE 4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 05-08 7.950.00019 Uninterupted Power Suply 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 11-14 7.950.000

20PERFORMANCE ANALISYS AND MAINTENANCEOF ELECTRICAL DISTRIBUTION NETWORKS FORSUPERVISOR

4 09-12 06-09 20-23 10-13 08-11 13-16 10-13 07-10 11-14 09-12 20-23 11-14 8.500.000

21PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR ANDENGINEER

4 16-19 13-16 27-30 17-20 15-18 06-09 17-20 21-24 18-21 16-19 27-30 19-22 8.500.000

22PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATORAND JUNIOR SUPERVISOR

4 24-27 21-24 27-02 25-28 30-02 12-15 25-28 28-31 26-29 24-27 30-02 05-08 8.500.000

23DISTRIBUTED CONTROL SYSTEM (DCS)PRINCIPLES, MAINTENANCE, OPERATION,PROGRAMMING & TROUBLESHOOTING

5 09-13 06-10 27-03 17-21 08-12 05-09 10-14 07-11 11-15 09-13 30-03 18-22 9.500.000

24 DISTRIBUTED CONTROL SYSTEMS (DCS)FUNDAMENTAL 4 17-20 14-17 07-10 10-13 16-19 12-15 18-21 22-25 19-22 17-20 07-10 05-08 8.500.000

25 Electrical Control Wiring 4 24-27 21-24 14-17 25-28 30-02 05-08 25-28 28-31 26-29 24-27 14-17 11-14 8.500.00026 PLC COMMUNICATION AND LAN 4 17-20 14-17 27-30 18-21 16-19 12-15 18-21 22-25 19-22 17-20 27-30 18-21 8.500.000

27 PLC OPERATION, PROGRAMMING,TROUBLESHOOTING AND MAINTENANCE 4 23-26 20-23 28-03 24-27 29-01 06-09 24-27 28-31 25-28 23-26 31-03 04-07 8.500.000

28 ACDC ELECTRICAL MOTOR CONTROL 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 7.950.00029 BASIC ELECTRICAL 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 5.950.00030 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 09-12 06-09 27-02 10-13 02-05 12-15 10-13 31-03 11-14 09-12 30-02 11-14 7.950.000

Page 15: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

15

31 DISTRIBUTION SYSTEM PROTECTION 4 16-19 13-16 06-09 17-20 08-11 06-09 17-20 07-10 18-21 16-19 06-09 18-21 7.950.00032 Electric Installation In Hazardous Area 4 24-27 21-24 13-16 25-28 15-18 13-16 25-28 22-25 26-29 24-27 13-16 05-08 7.950.00033 ELECTRICAL CALIBRATION 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 14-16 06-08 04-06 22-24 27-29 5.950.000

34 ELECTRICAL EQUIPMENT SYSTEM ANDMAINTENANCE 4 10-13 07-10 28-31 10-13 30-02 05-08 11-14 28-31 12-15 10-13 28-01 12-15 7.950.000

35 ELECTRICAL POWER GENERATOR OPERATION,PROTECTION AND MAINTANANCE 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 31-04 18-22 16-20 30-03 18-22 8.950.000

36 ELECTRICAL POWER SYSTEM ANALYSIS 4 23-26 20-23 07-10 24-27 02-05 06-09 24-27 08-11 25-28 23-26 07-10 04-07 7.950.000

37 ELECTRICAL POWER SYSTEM ANALYSIS USINGSOFTWARE APPLICATION 4 02-05 30-02 14-17 03-06 16-19 12-15 03-06 21-24 04-07 02-05 14-17 11-14 7.950.000

38 ELECTRICAL POWER SYSTEM PROTECTION 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 28-31 11-14 09-12 20-23 18-21 7.950.00039 ELECTRICAL SYSTEM GENERATORSET 4 16-19 13-16 27-30 17-20 02-05 13-16 17-20 31-03 18-21 16-19 27-30 05-08 7.950.00040 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 24-27 21-24 27-02 25-28 08-11 06-09 25-28 07-10 26-29 24-27 30-02 12-15 7.950.00041 GENERATOR EXCITATION SYSTEM 4 03-06 31-03 06-09 04-07 15-18 12-15 04-07 22-25 05-08 03-06 06-09 19-22 7.950.000

42 GROUNDING SYSTEM AND LIGHTNINGPROTECTION 4 10-13 07-10 13-16 10-13 30-02 05-08 11-14 28-31 12-15 10-13 13-16 04-07 7.950.000

43 High Voltage Electrical Equipmment Operation,Maintenance and Repair 5 16-20 13-17 20-24 17-21 08-12 12-16 17-21 31-04 18-22 16-20 20-24 11-15 8.950.000

44 INSTRUMENTATION ELECTRIC Operation andMaintenance 4 23-26 20-23 28-31 24-27 02-05 06-09 24-27 08-11 25-28 23-26 28-01 18-21 7.950.000

45 LV AND MV GENERATOR 4 02-05 30-02 28-03 03-06 16-19 12-15 03-06 21-24 04-07 02-05 31-03 05-08 7.950.00046 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 09-12 06-09 07-10 10-13 29-01 05-08 10-13 28-31 11-14 09-12 07-10 11-14 7.950.000

47 LV SWITCHGEAR MAINTENANCE ANDCOORDINATION 4 16-19 13-16 14-17 17-20 02-05 13-16 17-20 31-03 18-21 16-19 14-17 19-22 7.950.000

48 POWER ELECTRICAL INSTALLATION SYSTEM 4 24-27 21-24 20-23 25-28 08-11 06-09 25-28 07-10 26-29 24-27 20-23 04-07 7.950.00049 POWER ELECTRONICS 4 03-06 31-03 27-30 04-07 15-18 12-15 04-07 22-25 05-08 03-06 27-30 12-15 7.950.00050 POWER PROTECTION RELAY SYSTEM 4 10-13 07-10 27-02 10-13 30-02 05-08 11-14 28-31 12-15 10-13 30-02 18-21 7.950.00051 POWER TRANSFORMER 4 17-20 14-17 06-09 18-21 02-05 13-16 18-21 01-04 19-22 17-20 06-09 05-08 7.950.00052 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 23-26 20-23 13-16 24-27 09-12 06-09 24-27 08-11 25-28 23-26 13-16 11-14 7.950.000

53 Soft Starter (Operation, Protection andMaintanance) 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 14-16 04-06 02-04 22-24 27-29 5.950.000

54 TRANSMISSION AND DISTRIBUTION OPERATIONAND MAINTENANCE 4 09-12 06-09 28-31 10-13 16-19 12-15 10-13 21-24 11-14 09-12 28-01 19-22 7.950.000

55 Uninterruptible Power Suply Operation andMaintenance 4 16-19 13-16 28-03 17-20 29-01 05-08 17-20 28-31 18-21 16-19 31-03 04-07 7.950.000

56 VARIABLE FREQUENCY DRIVES 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 31-03 26-29 24-27 07-10 12-15 7.950.00057 VARIABLE SPEED DRIVES 4 03-06 31-03 14-17 04-07 08-11 06-09 04-07 07-10 05-08 03-06 14-17 18-21 7.950.00058 POWER DISTRIBUTION TRANSFORMER 4 10-13 07-10 20-23 10-13 15-18 12-15 11-14 22-25 12-15 10-13 20-23 05-08 7.950.00059 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 17-20 14-17 27-30 18-21 30-02 05-08 18-21 28-31 19-22 17-20 27-30 11-14 7.950.000

Page 16: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

16

60 TRANSFORMATOR DAYA OPERASI DANPEMELIHARAAN 3 23-25 20-22 27-01 24-26 22-24 19-21 24-26 14-16 25-27 23-25 30-01 27-29 5.950.000

61 ELECTRONIC SWITCHBOARD RESCUE 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 5.950.00062 GARDU INDUK 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 5.950.000

63 TEKNIK KONSERVASI ENERGI MELALUI AUDITENERGI PADA BANGUNAN GEDUNG 4 16-19 13-16 07-10 17-20 29-01 12-15 17-20 21-24 18-21 16-19 07-10 11-14 7.950.000

64 Data Akuisisi, Interfacing, dan SistemMonitoring 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 21-23 25-27 23-25 20-22 27-29 6.750.000

65 Pemrograman Mikrokontroler AVR denganCodeVisionAVR 3 02-04 30-01 27-29 03-05 29-31 05-07 03-05 28-30 04-06 02-04 27-29 04-06 6.750.000

66 Pemrograman Mikrokontroler untuk Robotika 3 09-11 06-08 27-01 10-12 02-04 12-14 10-12 31-02 11-13 09-11 30-01 11-13 6.750.000

67 ADVANCE COURSE ON LIGHTNING PROTECTIONAND GROUNDING SYSTEM 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 31-04 18-22 16-20 30-03 18-22 9.500.000

68Lightning Protection and Grounding System forOil & Gas Refinery and PetrochemicalInstallation

3 23-25 20-22 06-08 24-26 02-04 19-21 24-26 07-09 25-27 23-25 06-08 27-29 6.950.000

69LIGHTNING PROTECTION AND GROUNDINGSYSTEM FOR POWER PLANT, TRANSMISSION,DISTRIBUTION AND LARGE INDUSTRY

3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 04-06 6.950.000

70 ADVANCED PLC PROGRAMMING ANDIMPLEMENTATION 4 09-12 06-09 06-09 10-13 08-11 05-08 10-13 07-10 11-14 09-12 06-09 11-14 8.500.000

71 PLC INTEGRATION TO LOCAL AREA NETWORK(LAN) 4 16-19 13-16 13-16 17-20 15-18 12-15 17-20 21-24 18-21 16-19 13-16 18-21 8.500.000

72 PLC (ROGRAMMABLE LOGIC CONTROLLER)PRINCIPLES, OPERATION AND PROGRAMMING 4 23-26 20-23 20-23 24-27 29-01 06-09 24-27 28-31 25-28 23-26 20-23 04-07 8.500.000

73SCADA (SUPERVISORY CONTROL AND DATAACQUISITION) PRINCIPLES, HARDWARESYSTEM, OPERATION & PROGRAMMING

4 02-05 30-02 27-30 03-06 02-05 13-16 03-06 31-03 04-07 02-05 27-30 12-15 8.500.000

74 NUMERICAL CONTROL AND ROBOTIC 4 16-19 13-16 06-09 17-20 15-18 12-15 17-20 07-10 18-21 16-19 06-09 04-07 7.950.00075 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 02-05 30-02 06-09 03-06 08-11 06-09 03-06 31-03 04-07 02-05 06-09 05-08 7.950.000

76 Electric motor Operation, Maintenance &Troubleshooting 4 03-06 31-03 27-30 04-07 02-05 05-08 04-07 01-04 05-08 03-06 27-30 04-07 7.950.000

77Electrical Panel Design 3 02-04 30-01 13-15 03-05 15-17 05-07 03-05 14-16 04-06 02-04 13-15 04-06 5.950.000

78Electrical Safety For Electrical TechnicianTrainer

4 09-12 06-09 20-23 10-13 29-01 12-15 10-13 21-24 11-14 09-12 20-23 11-14 7.950.000

79 Motor Rewinding 3 16-18 13-15 27-29 17-19 22-24 19-21 17-19 28-30 18-20 16-18 27-29 18-20 5.950.000

80 Perhitungan Perkiraan Biaya Proyek Mekanikal 2 23-24 20-21 27-28 24-25 02-03 08-09 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000

Page 17: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

17

Elektrikal Untuk Bangunan Gedung

81Power Transformer (Operation, Testing,Asessment And Maintenance)

4 03-06 31-03 06-09 04-07 08-11 13-16 04-07 07-10 05-08 03-06 06-09 05-08 7.950.000

ENGINEERING - IT

1PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWERPOINT)

2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.000

2 IT AUDIT PRACTICES 3 11-13 08-10 27-29 10-12 29-31 19-21 12-14 28-30 13-15 11-13 27-29 11-13 5.950.0003 IT HELPDESK 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.0004 AUTOCAD COSTUMIZATION 4 23-26 20-23 13-16 24-27 29-01 13-16 24-27 28-31 25-28 23-26 13-16 12-15 7.950.000

5 INFORMATION TECHNOLOGY &TELECOMUNICATION 4 24-27 21-24 27-02 25-28 30-02 13-16 25-28 28-31 26-29 24-27 30-02 18-21 7.950.000

6 Holistic Information Security 3 23-25 20-22 27-01 24-26 02-04 05-07 24-26 31-02 25-27 23-25 30-01 27-29 5.950.0007 Information Security System 3 02-04 30-01 06-08 03-05 08-10 12-14 03-05 07-09 04-06 02-04 06-08 04-06 5.950.0008 OPTIMALISASI CYBER PUBLIC RELATION 3 09-11 06-08 13-15 10-12 15-17 19-21 10-12 14-16 11-13 09-11 13-15 11-13 5.950.000

9 PENGEMBANGAN KONTEN SITUS WEBPERUSAHAAN 3 16-18 13-15 20-22 17-19 22-24 07-09 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000

10 TEKNIK DESAIN GRAFIS PADA WEB 3 25-27 22-24 27-29 26-28 29-31 14-16 26-28 28-30 27-29 25-27 27-29 27-29 5.950.00011 TEKNIK DESAIN WEB 3 04-06 01-03 01-03 05-07 03-05 19-21 05-07 02-04 06-08 04-06 01-03 06-08 5.950.00012 ADVANCE MICROSOFT EXCEL 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.00013 ADVANCE MICROSOFT POWERPOINT 3 11-13 08-10 06-08 11-13 08-10 07-09 12-14 07-09 13-15 11-13 06-08 11-13 5.950.00014 ADVANCE MICROSOFT WORD 3 18-20 15-17 13-15 19-21 15-17 14-16 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000

15 BASIC AUTOCAD 2D (2D TECHNICAL DRAWINGWITH AUTOCAD) 5 23-27 20-24 27-03 24-28 08-12 05-09 24-28 31-04 25-29 23-27 30-03 04-08 8.950.000

16 BASIC AUTOCAD 3D (3D TECHNICAL DRAWINGWITH AUTOCAD) 2 02-03 30-31 06-07 03-04 02-03 12-13 03-04 07-08 04-05 02-03 06-07 27-28 3.950.000

17 BASIC TELECOMMUNICATION PABX 3 16-18 13-15 27-01 17-19 22-24 19-21 17-19 14-16 18-20 16-18 30-01 27-29 5.950.00018 BASIC VSAT SYSTEM 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.00019 FIBER OPTIC SYSTEM 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 14-16 11-13 09-11 20-22 27-29 6.500.000

20 Fraud Management in telecommunication business 3 18-20 15-17 27-29 19-21 22-24 19-21 19-21 14-16 20-22 18-20 27-29 27-29 5.950.000

21 INTERNETWORKING DENGAN TCP IP 3 25-27 22-24 01-03 26-28 02-04 19-21 26-28 31-02 27-29 25-27 01-03 27-29 5.950.000

22 IPTV - TEKNOLOGI, PELUANG BISNIS DANREGULASI 3 04-06 01-03 08-10 05-07 08-10 19-21 05-07 07-09 06-08 04-06 08-10 27-29 5.950.000

23 NETWORK MANAGEMENT AND OPERATIONSSUPPORT SYSTEM 3 11-13 08-10 15-17 11-13 15-17 19-21 12-14 14-16 13-15 11-13 15-17 11-13 5.950.000

24 POWER LINE CARRIER 3 16-18 13-15 22-24 17-19 22-24 19-21 17-19 21-23 18-20 16-18 22-24 18-20 5.950.000

Page 18: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

18

25 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000

26 MANAJEMEN KABEL PADA JARINGANTELEKOMUNIKASI 4 02-05 30-02 27-02 03-06 02-05 05-08 03-06 01-04 04-07 02-05 30-02 04-07 8.500.000

27 MIKROTIK FUNDAMENTAL 3 18-20 15-17 13-15 19-21 17-19 12-14 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00028 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 25-27 22-24 20-22 26-28 22-24 19-21 26-28 23-25 27-29 25-27 20-22 27-29 6.500.000

29 INFORMATION TECHNOLOGY INFRASTRUCTURELIBRARY (I T I L) VERSION 3.1 4 17-20 14-17 27-02 18-21 02-05 06-09 18-21 31-03 19-22 17-20 30-02 19-22 7.950.000

30 MASTERING MICROSOFT EXCEL 2007 2 16-17 13-14 30-31 17-18 01-02 12-13 17-18 30-31 18-19 16-17 30-01 18-19 3.950.000

31 CAD BIDANG TEKNIK MESIN (CAD FORMECHANICAL AUTOCAD OR CATIA) 4 17-20 14-17 28-03 18-21 30-02 05-08 18-21 22-25 19-22 17-20 31-03 19-22 7.950.000

32 Teknologi CAD CAM 4 02-05 30-02 28-31 03-06 08-11 06-09 03-06 31-03 04-07 02-05 28-01 19-22 7.950.00033 PENGEMBANGAN SITUS WEB 3 23-25 20-22 27-01 24-26 22-24 19-21 24-26 14-16 25-27 23-25 30-01 27-29 5.950.000

34 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 04-06 01-03 27-01 05-07 02-04 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000

ENGINEERING - MINING1 BATUBARA 3 02-04 30-01 27-01 03-05 02-04 05-07 03-05 31-02 04-06 02-04 30-01 04-06 6.500.0002 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 09-12 06-09 06-09 10-13 08-11 12-15 10-13 07-10 11-14 09-12 06-09 11-14 7.950.0003 GEOLOGY FOR NON GEOLOGIST 4 16-19 13-16 13-16 17-20 15-18 06-09 17-20 21-24 18-21 16-19 13-16 18-21 7.950.000

4 PEMBORAN DAN PELEDAKAN UNTUKPERTAMBANGAN 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.000

5 PEMINDAHAN TANAH MEKANIS 3 04-06 01-03 27-29 05-07 29-31 14-16 05-07 28-30 06-08 04-06 27-29 06-08 5.950.0006 VENTILASI TAMBANG 3 11-13 08-10 01-03 10-12 03-05 19-21 12-14 02-04 13-15 11-13 01-03 13-15 6.500.000

7 EVALUASI STUDI KELAYAKAN DALAM USAHAPERTAMBANGAN 3 18-20 15-17 08-10 19-21 10-12 05-07 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000

8 PERENCANAAN TAMBANG TERBUKA 3 25-27 22-24 15-17 26-28 17-19 12-14 26-28 14-16 27-29 25-27 15-17 27-29 5.950.0009 PEMBORAN EKSPLORASI BATUBARA 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 23-25 04-06 02-04 22-24 04-06 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MIGAS1 PETROLEUM PLANT & PIPELINE SECURITY

MANAGEMENT 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 6.950.000

2PEMBANGKITAN ALIRAN PERMUKAAN UNTUKOIL SPILL (OIL FENCE) SEBAGAI PENGUMPULTUMPAHAN MINYAK

4 17-20 14-17 13-16 18-21 30-02 12-15 18-21 22-25 19-22 17-20 13-16 05-08 7.950.000

3 Oil Transportation Piping 4 02-05 30-02 28-03 03-06 08-11 06-09 03-06 31-03 04-07 02-05 31-03 19-22 7.950.0004 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.0005 H2S AWARENESS 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 14-16 06-08 04-06 20-22 27-29 5.950.000

Page 19: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

19

6 GAS PROCESSING AND EQUIPMENT 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 31-03 11-14 09-12 30-02 11-14 8.500.000

7 BASIC OF SURFACE OPERATION ANDMAINTENANCE FOR OIL AND GAS INDUSTRIES 4 17-20 14-17 28-03 18-21 16-19 06-09 18-21 22-25 19-22 17-20 31-03 11-14 7.950.000

8 PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL 4 03-06 31-03 20-23 04-07 02-05 05-08 04-07 01-04 05-08 03-06 20-23 04-07 7.950.000

9 Oil and Gas Measurements 4 17-20 14-17 06-09 18-21 16-19 05-08 18-21 22-25 19-22 17-20 06-09 05-08 8.500.000

10 GAS DEHYDRATION AND GLYCOLREGENERATION 4 03-06 31-03 14-17 04-07 30-02 12-15 04-07 28-31 05-08 03-06 14-17 19-22 8.750.000

11 GAS SWEETENING H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS 4 10-13 07-10 21-24 10-13 02-05 06-09 11-14 01-04 12-15 10-13 21-24 04-07 8.750.000

12 GAS HANDLING, CONDITIONING, ANDPROCESSING FACILITIES 4 23-26 20-23 27-02 24-27 02-05 12-15 24-27 31-03 25-28 23-26 30-02 04-07 7.950.000

13 OIL AND GAS HANDLING FACILITIES 4 03-06 31-03 28-03 04-07 09-12 05-08 04-07 08-11 05-08 03-06 31-03 19-22 7.950.000

14 OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATION 4 10-13 07-10 07-10 10-13 16-19 13-16 11-14 22-25 12-15 10-13 07-10 04-07 7.950.000

15 Drilling operations for operator in oil and gasindustries 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 11-14 8.500.000

16 NATURAL GAS PROCESSING - FRACTINATIONAND REFREGERATION 4 09-12 06-09 27-30 10-13 08-11 06-09 10-13 31-03 11-14 09-12 27-30 04-07 8.500.000

17 PETROLEUM ENGINEERING FOR NONPETROLEUM EMPLOYEE 4 16-19 13-16 27-02 17-20 15-18 13-16 17-20 07-10 18-21 16-19 30-02 12-15 8.500.000

18 PRACTICAL ASPECT OF ARTIFIAL LIFT METHODSFOR PETROLEUM PRODUCTION SYSTEM 4 03-06 31-03 14-17 04-07 02-05 12-15 04-07 28-31 05-08 03-06 14-17 05-08 8.500.000

19 PRODUCTION LOGGING 4 10-13 07-10 21-24 10-13 09-12 06-09 11-14 01-04 12-15 10-13 21-24 11-14 8.500.000

20 SUPPLY CHAIN MANAGEMENT IN THEUPSTREAM OIL & GAS INDUSTRY 3 18-20 15-17 29-31 19-21 22-24 19-21 19-21 14-16 20-22 18-20 29-01 27-29 6.500.000

21 WATER FLOODING 4 23-26 20-23 28-03 24-27 16-19 13-16 24-27 08-11 25-28 23-26 31-03 18-21 8.500.00022 WP&B, AFE and POD 4 02-05 30-02 07-10 03-06 29-01 05-08 03-06 21-24 04-07 02-05 07-10 04-07 8.500.00023 ARTIFICIAL LIFT 4 09-12 06-09 13-16 10-13 02-05 12-15 10-13 28-31 11-14 09-12 13-16 12-15 8.500.000

24 OFFSHORE WELLHEAD FUNCTION ANDTROUBLESHOOTING 4 16-19 13-16 20-23 17-20 08-11 06-09 17-20 31-03 18-21 16-19 20-23 19-22 8.500.000

25 Advanced Oil and Gas Production System 4 16-19 13-16 13-16 17-20 02-05 12-15 17-20 28-31 18-21 16-19 13-16 18-21 8.950.000

26 BASIC DRILLING ENGINEERING AND HEALTH,SAFETY & ENVIRONMENTAL CONSIDERATION 4 23-26 20-23 20-23 24-27 08-11 05-08 24-27 31-03 25-28 23-26 20-23 04-07 8.950.000

27 Basic Petroleum Engineering 4 02-05 30-02 27-30 03-06 15-18 13-16 03-06 07-10 04-07 02-05 27-30 11-14 8.950.000

28 Basic Reservoir Engineering for Non PetroleumEngineer 4 09-12 06-09 27-02 10-13 29-01 06-09 10-13 21-24 11-14 09-12 30-02 19-22 8.950.000

29ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCEAND TROUBLESHOOTING

4 24-27 21-24 14-17 25-28 09-12 05-08 25-28 01-04 26-29 24-27 14-17 12-15 8.950.000

Page 20: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

20

30 FORMATION DAMAGE AND WELLSTIMULATION 4 03-06 31-03 21-24 04-07 16-19 13-16 04-07 08-11 05-08 03-06 21-24 18-21 8.950.000

31 NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS 4 10-13 07-10 28-31 10-13 30-02 06-09 11-14 22-25 12-15 10-13 28-01 04-07 8.950.000

32 Oil & Gas Production System 4 16-19 13-16 28-03 17-20 02-05 12-15 17-20 28-31 18-21 16-19 31-03 11-14 8.950.00033 OIL & GAS MEASUREMENT AND CALCULATION 4 23-26 20-23 07-10 24-27 08-11 05-08 24-27 31-03 25-28 23-26 07-10 19-22 8.950.00034 OIL AND GAS HANDLING FACILITIES 4 02-05 30-02 13-16 03-06 15-18 13-16 03-06 07-10 04-07 02-05 13-16 05-08 8.950.000

35 OIL AND GAS WELLS STIMULATION BYACIDIZING AND HYDRAULIC FRACTURING 4 09-12 06-09 20-23 10-13 29-01 06-09 10-13 21-24 11-14 09-12 20-23 12-15 8.950.000

36 Oil Field, and 100 Methods to Maintain andIncrease Production 4 17-20 14-17 27-30 18-21 02-05 12-15 18-21 28-31 19-22 17-20 27-30 18-21 8.950.000

37 PETROLEUM ENGINEERING FOR NONPETROLEUM ENGINEERS 4 24-27 21-24 27-02 25-28 09-12 05-08 25-28 01-04 26-29 24-27 30-02 04-07 8.950.000

38 PRODUCTION DOWNHOLE AND SUBSURFACEEQUIPMENTS 4 03-06 31-03 06-09 04-07 16-19 13-16 04-07 08-11 05-08 03-06 06-09 11-14 8.950.000

39 PRODUCTION OPERATION MANAGEMENT FORMANAGERS 4 10-13 07-10 14-17 10-13 30-02 06-09 11-14 22-25 12-15 10-13 14-17 19-22 8.950.000

40 Pump Selection, Design and Operation for Oiland Gas Surface Production Facilities 4 16-19 13-16 21-24 17-20 02-05 12-15 17-20 28-31 18-21 16-19 21-24 05-08 8.950.000

41 SUCKER ROD PUMP DESIGN, OPERATION ANDTROUBLESHOOTING 4 23-26 20-23 28-31 24-27 08-11 05-08 24-27 31-03 25-28 23-26 28-01 12-15 8.950.000

42 Surface Production Operation and Equipments 4 02-05 30-02 28-03 03-06 15-18 13-16 03-06 07-10 04-07 02-05 31-03 18-21 8.950.00043 WELL COMPLETION AND WORK OVER 4 09-12 06-09 07-10 10-13 29-01 06-09 10-13 21-24 11-14 09-12 07-10 04-07 8.950.00044 BLOWOUT PREVENTION AND WELL CONTROL 4 17-20 14-17 13-16 18-21 02-05 12-15 18-21 28-31 19-22 17-20 13-16 11-14 8.950.00045 ARUS MINYAK KORPORATE 3 25-27 22-24 20-22 26-28 22-24 19-21 26-28 14-16 27-29 25-27 20-22 27-29 7.950.000

46MODERN HYDROCARBON WELL PRODUCTIONLOGGING DATA ANALYSIS ANDINTERPRETATION

4 03-06 31-03 27-30 04-07 09-12 05-08 04-07 01-04 05-08 03-06 27-30 19-22 8.950.000

47 OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT 4 02-05 30-02 07-10 03-06 29-01 12-15 03-06 28-31 04-07 02-05 07-10 05-08 8.750.000

48 BASIC SURFACE SAFETY SYSTEM 4 17-20 14-17 06-09 18-21 02-05 12-15 18-21 28-31 19-22 17-20 06-09 05-08 8.950.000

49PETROLEUM FINANCE, COST CONTROL &RESERVOIR MANAJEMEN (PetroleumEconomics)

4 24-27 21-24 06-09 25-28 30-02 05-08 25-28 22-25 26-29 24-27 06-09 19-22 8.500.000

50 Gas, Oil and Water Pipeline Design andMaintenance 4 17-20 14-17 28-31 18-21 09-12 13-16 18-21 08-11 19-22 17-20 28-01 11-14 8.750.000

HSE1 OIL SPILL - OIL BOOM AND ENVIRONMENTAL

MANAGEMENT 4 02-05 30-02 07-10 03-06 29-01 12-15 03-06 28-31 04-07 02-05 07-10 05-08 8.750.000

Page 21: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

21

2 BASIC SURFACE SAFETY SYSTEM 4 17-20 14-17 06-09 18-21 02-05 12-15 18-21 28-31 19-22 17-20 06-09 05-08 8.950.0003 GAS DISPERSION ANALYSIS 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 31-02 11-13 09-11 30-01 27-29 6.950.0004 WATER TREATMENT 4 16-19 13-16 20-23 17-20 08-11 13-16 17-20 07-10 18-21 16-19 20-23 19-22 8.750.0005 MANAJEMEN LINGKUNGAN 4 02-05 30-02 27-02 03-06 08-11 05-08 03-06 07-10 04-07 02-05 30-02 11-14 7.950.0006 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 16-20 13-17 06-10 17-21 08-12 12-16 17-21 07-11 18-22 16-20 06-10 18-22 8.950.000

7 AMDAL ( ENVIRONMENTAL AND SOCIALIMPACT ASSESSMENT) FOR EXECUTIVE 4 23-26 20-23 13-16 24-27 15-18 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

8 APPLIED ERGONOMICS AT WORKPLACE 4 02-05 30-02 20-23 03-06 29-01 12-15 03-06 28-31 04-07 02-05 20-23 11-14 7.950.0009 AUTHORISED GAS TESTING 4 09-12 06-09 27-30 10-13 02-05 06-09 10-13 31-03 11-14 09-12 27-30 18-21 8.500.000

10 BASIC SAFETY ORIENTATION FORCONTRACTORS 5 16-20 13-17 27-03 17-21 08-12 12-16 17-21 07-11 18-22 16-20 30-03 04-08 9.250.000

11 CANTEEN HYGIENE 2 26-27 23-24 06-07 27-28 22-23 19-20 27-28 14-15 28-29 26-27 06-07 27-28 3.950.000

12 CONTRACTOR SAFETY MANAGEMENT SYSTEM(CSMS) 4 03-06 31-03 14-17 04-07 16-19 05-08 04-07 22-25 05-08 03-06 14-17 12-15 7.950.000

13 ELECTRICAL SAFETY 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 14-16 13-15 11-13 22-24 27-29 6.500.00014 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 16-18 13-15 29-31 17-19 31-02 19-21 17-19 28-30 18-20 16-18 29-01 20-22 5.950.00015 HEALTH IMPACT ASSESSMENT (HIA) 4 23-26 20-23 27-02 24-27 02-05 12-15 24-27 01-04 25-28 23-26 30-02 04-07 7.950.000

16 INCIDENT INVESTIGATION, PREVENTION ANDPROACTIVE IMPROVEMENT 3 02-04 30-01 08-10 03-05 08-10 19-21 03-05 07-09 04-06 02-04 08-10 27-29 6.500.000

17 JOB SAFETY ANALYSIS (JSA) 2 09-10 06-07 13-14 12-13 15-16 19-20 10-11 14-15 11-12 09-10 13-14 11-12 3.950.00018 K3 RUMAH SAKIT 2 19-20 16-17 20-21 20-21 22-23 08-09 20-21 21-22 21-22 19-20 20-21 18-19 3.950.00019 LOCKOUT TAGOUT (LOTO) 2 26-27 23-24 27-28 27-28 29-30 15-16 27-28 30-31 28-29 26-27 27-28 27-28 3.950.00020 MANAGING SAFE WORK 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 31-03 05-08 03-06 31-03 05-08 7.950.00021 MATERIAL SAFETY DATA SHEETS (MSDS) 2 11-12 08-09 06-07 10-11 11-12 20-21 12-13 10-11 13-14 11-12 06-07 13-14 3.950.00022 MODERN SAFETY MANAGEMENT (MSM) 4 16-19 13-16 14-17 17-20 16-19 12-15 17-20 22-25 18-21 16-19 14-17 19-22 7.950.00023 OHSAS 180012007 AUDITOR 5 23-27 20-24 20-24 24-28 29-02 05-09 24-28 31-04 25-29 23-27 20-24 04-08 9.250.00024 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 30-31 29-30 03-04 23-24 19-20 03-04 15-16 04-05 02-03 29-30 28-29 3.950.000

25 PANITIA PEMBINA KESELAMATAN DANKESEHATAN KERJA (P2K3) 4 10-13 07-10 27-02 10-13 02-05 13-16 11-14 28-31 12-15 10-13 30-02 12-15 7.950.000

26 PENERAPAN PENGENDALIAN BISING TERPADUDITEMPAT KERJA 3 18-20 15-17 08-10 19-21 08-10 19-21 19-21 07-09 20-22 18-20 08-10 18-20 6.500.000

27 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 23-25 20-22 13-15 24-26 15-17 05-07 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000

28 PERLINDUNGAN LINGKUNGAN DANPENGELOLAAN LIMBAH B3 4 03-06 31-03 20-23 04-07 29-01 12-15 04-07 21-24 05-08 03-06 20-23 04-07 7.950.000

29 PERMIT TO WORK (PTW) 2 09-10 06-07 30-31 10-11 22-23 19-20 10-11 28-29 11-12 09-10 30-01 11-12 3.950.00030 Process Hazard Analysis (PHA) 3 16-18 13-15 01-03 17-19 02-04 07-09 17-19 31-02 18-20 16-18 01-03 20-22 5.950.00031 Process Hazard Analysis (PHA) for Facilitator 4 24-27 21-24 06-09 25-28 09-12 13-16 25-28 08-11 26-29 24-27 06-09 05-08 7.950.00032 Process Safety Management 3 02-04 30-01 15-17 03-05 17-19 19-21 03-05 14-16 04-06 02-04 15-17 27-29 5.950.00033 PROJECT HSE MANAGEMENT 3 11-13 08-10 22-24 11-13 22-24 05-07 12-14 23-25 13-15 11-13 22-24 13-15 6.500.000

Page 22: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

22

34 RISK ASSESSMENT AND OPTIMAL RISKMANAGEMENT BASED ON ISO 31000 2 19-20 16-17 27-28 20-21 01-02 12-13 20-21 30-31 21-22 19-20 27-28 18-19 3.950.000

35 SAFETY AUDITS AND SITE INSPECTION 3 23-25 20-22 27-01 24-26 03-05 19-21 24-26 02-04 25-27 23-25 30-01 27-29 5.950.00036 SAFETY OfficeR DEVELOPMENT PROGRAM 5 02-06 30-03 06-10 03-07 08-12 05-09 03-07 07-11 04-08 02-06 06-10 04-08 9.250.00037 SAFETY TRAINING FOR THE LABORATORY 3 09-11 06-08 13-15 10-12 15-17 14-16 10-12 14-16 11-13 09-11 13-15 11-13 6.500.000

38 SELF CONTAINED BREATHINGAPPARATUS(SCBA) 1 16-16 13-13 20-20 17-17 22-22 19-19 17-17 21-21 18-18 16-16 20-20 20-20 2.950.000

39 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 23-27 20-24 27-31 24-28 29-02 05-09 24-28 31-04 25-29 23-27 27-01 04-08 9.250.00040 WORKING AT HEIGHT 2 12-13 09-10 06-07 12-13 08-09 20-21 13-14 07-08 14-15 12-13 06-07 14-15 3.950.00041 PENERAPAN HACCP 4 17-20 14-17 14-17 18-21 16-19 05-08 18-21 22-25 19-22 17-20 14-17 19-22 7.950.000

42IDENTIFICASI BAHAYA, PENILAIAN,PENGENDALIAN RESIKO (HIRAC) DAN ANALISABAHAYA DIPEKERJAAN (JSA)

4 23-26 20-23 21-24 24-27 29-01 13-16 24-27 28-31 25-28 23-26 21-24 04-07 7.950.000

43 FIRE ALARMS & PROTECTION 4 17-20 14-17 06-09 18-21 16-19 06-09 18-21 22-25 19-22 17-20 06-09 19-22 7.950.00044 HAZARDOUS MATERIAL HANDLING 4 23-26 20-23 07-10 24-27 29-01 13-16 24-27 28-31 25-28 23-26 07-10 12-15 7.950.00045 INDUSTRIAL POLLUTION CONTROL 4 17-20 14-17 27-30 18-21 16-19 06-09 18-21 22-25 19-22 17-20 27-30 11-14 7.950.00046 JOB SAFETY ANALYSIS TRAINING 4 02-05 30-02 06-09 03-06 02-05 05-08 03-06 31-03 04-07 02-05 06-09 04-07 7.950.000

47 LINGKUNGAN KERJA YANG BERSIH DAN AMANPADA INDUSTRI KIMIA 4 09-12 06-09 13-16 10-13 08-11 12-15 10-13 07-10 11-14 09-12 13-16 12-15 7.950.000

48 Water Treatment 4 10-13 07-10 27-02 10-13 09-12 12-15 11-14 08-11 12-15 10-13 30-02 18-21 7.950.000

49 AMDAL ( ENVIRONMENTAL AND SOCIALIMPACT ASSESSMENT) FOR EXECUTIVE 4 16-19 13-16 27-02 17-20 15-18 05-08 17-20 21-24 18-21 16-19 30-02 11-14 7.950.000

50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 02-05 30-02 27-02 03-06 08-11 12-15 03-06 07-10 04-07 02-05 30-02 18-21 7.950.000

51 SYSTEM SAFETY ENGINEERING ANDMANAGEMENT 4 16-19 13-16 13-16 17-20 29-01 13-16 17-20 28-31 18-21 16-19 13-16 11-14 7.950.000

52 BEHAVIOR BASED SAFETY (BBS) 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 18-20 6.500.00053 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 23-26 20-23 20-23 24-27 29-01 05-08 24-27 21-24 25-28 23-26 20-23 04-07 8.500.00054 HAZARDOUS MATERIALS SAFE HANDLING 4 02-05 30-02 27-30 03-06 02-05 12-15 03-06 28-31 04-07 02-05 27-30 11-14 8.500.000

55 HEALTH, SAFETY & ENVIRONMENT (HSE)ASPECTS IN LOGISTICS ACTIVITIES 4 09-12 06-09 27-02 10-13 08-11 06-09 10-13 31-03 11-14 09-12 30-02 19-22 8.500.000

56 Hot Works 3 18-20 15-17 06-08 19-21 22-24 19-21 19-21 07-09 20-22 18-20 06-08 27-29 6.500.00057 HSE MANAGEMENT SYSTEM 4 24-27 21-24 14-17 25-28 16-19 13-16 25-28 22-25 26-29 24-27 14-17 05-08 8.500.00058 HSE WORK PRACTICES AT CONFINED SPACE 3 04-06 01-03 22-24 05-07 22-24 19-21 05-07 14-16 06-08 04-06 22-24 27-29 6.500.000

59 JOB SAFETY ANALYSIS (JSA) ANALISAKESELAMATAN PEKERJAAN 3 11-13 08-10 29-31 10-12 31-02 19-21 12-14 28-30 13-15 11-13 29-01 13-15 6.500.000

60 MANAGING CONTRACTOR SAFETY 3 16-18 13-15 01-03 17-19 02-04 19-21 17-19 02-04 18-20 16-18 01-03 18-20 6.500.000

61 MODERN SAFETY AND LOSS CONTROLMANAGEMENT 4 23-26 20-23 07-10 24-27 09-12 05-08 24-27 08-11 25-28 23-26 07-10 04-07 8.500.000

62 OCCUPATIONAL HEALTH, SAFETY ANDENVIRONMENT (HSE) AUDITING 5 02-06 30-03 13-17 03-07 15-19 12-16 03-07 21-25 04-08 02-06 13-17 11-15 9.250.000

Page 23: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

23

63 Occupational Health, Safety and Environment(HSE) on Paper and Pulp Industry 4 09-12 06-09 20-23 10-13 29-01 06-09 10-13 28-31 11-14 09-12 20-23 19-22 8.500.000

64 ONSHORE DRILLING SAFETY OPERATIONS HSEASPECTS IN ONSHORE DRILLING OPERATIONS 4 17-20 14-17 27-30 18-21 02-05 12-15 18-21 31-03 19-22 17-20 27-30 05-08 8.500.000

65ONSHORE DRILLING SAFETY OPERATIONS HSEASPECTS IN ONSHORE DRILLING OPERATIONSFOR MANAGERS AND SUPERINTENDENTS

3 25-27 22-24 27-01 26-28 22-24 19-21 26-28 14-16 27-29 25-27 30-01 27-29 6.500.000

66 PENCEGAHAN DAN PENANGGULANGANKEBAKARAN (FIRE PREVENTION & PROTECTION) 3 02-04 30-01 06-08 03-05 08-10 19-21 03-05 07-09 04-06 02-04 06-08 27-29 6.500.000

67 PRODUCTION SAFETY SYSTEM 5 09-13 06-10 13-17 17-21 15-19 05-09 10-14 21-25 11-15 09-13 13-17 11-15 8.500.000

68 PROFESSIONAL ACCIDENT INCIDENTINVESTIGATION 3 16-18 13-15 22-24 10-12 22-24 19-21 17-19 14-16 18-20 16-18 22-24 18-20 6.500.000

69 SAFETY MANAGEMENT FOR SUPERVISORS ANDMANAGERS 4 23-26 20-23 28-31 24-27 30-02 13-16 24-27 28-31 25-28 23-26 28-01 04-07 8.500.000

70 TRANSPORTATION SAFETY MANAGEMENTSYSTEM 4 03-06 31-03 28-03 04-07 02-05 05-08 04-07 01-04 05-08 03-06 31-03 11-14 8.500.000

71 WAREHOUSE SAFETY MANAGEMENT 4 09-12 06-09 07-10 10-13 09-12 12-15 10-13 08-11 11-14 09-12 07-10 19-22 8.500.00072 HIRADC 3 18-20 15-17 13-15 17-19 15-17 19-21 19-21 14-16 20-22 18-20 13-15 27-29 6.500.00073 PROCESS SAFETY MANAGEMENT 4 24-27 21-24 20-23 25-28 29-01 06-09 25-28 21-24 26-29 24-27 20-23 05-08 8.500.000

74 Chemical Hazard Safety in Mining andWorkplace 4 09-12 06-09 27-30 10-13 02-05 06-09 10-13 31-03 11-14 09-12 27-30 18-21 8.750.000

75 HAZARDOUS MATERIAL HANDLING 4 02-05 30-02 06-09 03-06 08-11 05-08 03-06 07-10 04-07 02-05 06-09 11-14 7.950.00076 HAZID (HAZARD IDENTIFICATON) 4 09-12 06-09 13-16 10-13 15-18 13-16 10-13 21-24 11-14 09-12 13-16 18-21 7.950.00077 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 16-19 13-16 20-23 17-20 29-01 06-09 17-20 28-31 18-21 16-19 20-23 05-08 7.950.00078 WASTE WATER TREATMENT & MANAGEMENT 4 16-19 13-16 06-09 17-20 29-01 06-09 17-20 28-31 18-21 16-19 06-09 19-22 7.950.00079 Water Treating and Chemicals 4 24-27 21-24 13-16 25-28 02-05 12-15 25-28 01-04 26-29 24-27 13-16 04-07 7.950.00080 PENGENDALIAN PENCEMARAN AIR 3 11-13 08-10 27-29 10-12 22-24 19-21 12-14 14-16 13-15 11-13 27-29 27-29 6.500.00081 PENGENDALIAN PENCEMARAN UDARA 3 18-20 15-17 01-03 19-21 22-24 19-21 19-21 14-16 20-22 18-20 01-03 27-29 6.500.00082 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 02-05 30-02 13-16 03-06 15-18 12-15 03-06 07-10 04-07 02-05 13-16 18-21 7.950.000

83 ISU PEMENUHAN KUALITAS DAN KEAMANANPANGAN 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 21-24 11-14 09-12 20-23 04-07 7.950.000

84 PEMENUHAN PERSYARATAN PERIZINAN 4 16-19 13-16 27-30 17-20 02-05 13-16 17-20 28-31 18-21 16-19 27-30 11-14 7.950.000

85 POTENSI DAN PERKEMBANGAN INDUSTRIPANGAN 4 23-26 20-23 27-02 24-27 08-11 06-09 24-27 31-03 25-28 23-26 30-02 19-22 7.950.000

86 HSE MANAGEMENT SYSTEM INTERNALAUDITOR 4 02-05 30-02 20-23 03-06 02-05 12-15 03-06 28-31 04-07 02-05 20-23 18-21 8.500.000

87 PRODUCTION SYSTEM SAFETY 4 23-26 20-23 27-02 24-27 02-05 13-16 24-27 28-31 25-28 23-26 30-02 18-21 7.950.00088 FIT FOR DUTY 2 09-10 06-07 06-07 10-11 22-23 19-20 10-11 14-15 11-12 09-10 06-07 27-28 3.950.00089 SURVEILANS KESEHATAN PEKERJA 2 16-17 13-14 13-14 17-18 23-24 20-21 17-18 15-16 18-19 16-17 13-14 28-29 3.950.00090 APLIKASI PROGRAM PERLINDUNGAN 2 23-24 20-21 20-21 24-25 22-23 19-20 24-25 14-15 25-26 23-24 20-21 27-28 4.500.000

Page 24: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

24

PERNAFASAN91 FOOD HYGIENE SANITATION AND MONITORING 2 02-03 30-31 27-28 03-04 23-24 20-21 03-04 15-16 04-05 02-03 27-28 28-29 4.500.00092 HEARING CONSERVATION PROGRAM 2 11-12 08-09 27-28 12-13 22-23 19-20 12-13 14-15 13-14 11-12 30-31 27-28 4.500.00093 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 18-19 15-16 08-09 19-20 23-24 20-21 19-20 15-16 20-21 18-19 08-09 28-29 4.500.000

94 CATERING SERVICE, HYGIENE & SANITATION(INCLUDING PERSONAL HYGIENE) 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 6.500.000

95 Penerapan Hazard Analysis Critical ControlPoint (HACCP) pada Pengelolaan Makanan 3 04-06 01-03 15-17 05-07 22-24 19-21 05-07 14-16 06-08 04-06 15-17 27-29 5.950.000

96 BEHAVIOR BASED SAFETY 2 23-24 20-21 27-28 24-25 22-23 19-20 24-25 14-15 25-26 23-24 27-28 27-28 4.500.00097 CSMS AWARENESS 2 02-03 30-31 27-28 03-04 02-03 20-21 03-04 31-01 04-05 02-03 30-31 28-29 4.500.00098 HSE LEADERSHIP 2 09-10 06-07 06-07 10-11 08-09 19-20 10-11 07-08 11-12 09-10 06-07 27-28 4.500.00099 INCIDENT INVESTIGATION 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 27-29 6.500.000

100 AMDAL (ENVIRONMENTAL IMPACTASSESMENT) FOR EXECUTIVES 3 02-04 30-01 06-08 03-05 22-24 19-21 03-05 14-16 04-06 02-04 06-08 27-29 6.500.000

101 EMERGENCY PREPAREDNESS 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6.500.000

102 ENVIRONMENTAL LEGISLATION (ANTICIPATINGCONFLICS) 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 27-29 6.500.000

103 ENVIRONMENTAL MONITORING KEY TOPOLUTION FREE 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6.500.000

104 HSE AUDIT TECHNIQUES 3 04-06 01-03 27-01 05-07 22-24 19-21 05-07 14-16 06-08 04-06 30-01 27-29 6.500.000

105 OCCUPATIONAL HEALTH, SAFETY ANDENVIRONMENTAL IN THE OIL & GAS INDUSTRY 3 11-13 08-10 08-10 11-13 22-24 19-21 12-14 14-16 13-15 11-13 08-10 27-29 6.500.000

106 WASTE HANDLING & TREATMENT IN THE OIL &GAS INDUSTRIES 3 18-20 15-17 15-17 19-21 22-24 19-21 19-21 14-16 20-22 18-20 15-17 27-29 6.500.000

107 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 6.950.000

108 HANDLING OF DANGEROUS GOODS IN AIRTRANSPORT 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000

109 PRODUCTION SAFETY SYSTEM 4 17-20 14-17 14-17 18-21 30-02 06-09 18-21 28-31 19-22 17-20 14-17 11-14 7.950.000

110 SAFETY INSTRUMENTED SYSTEM (SIS) ANDCONTROL 4 23-26 20-23 21-24 24-27 02-05 12-15 24-27 31-03 25-28 23-26 21-24 18-21 7.950.000

111 CATERING & ACCOMMODATIONMANAGEMENT (INCLUDING TABLE MANNER) 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

112 WELDING SAFETY 2 02-03 30-31 02-03 03-04 02-03 12-13 03-04 28-29 04-05 02-03 02-03 27-28 3.950.000113 H2S AWARENESS 3 04-06 01-03 20-22 05-07 22-24 19-21 05-07 14-16 06-08 04-06 20-22 27-29 5.950.000

114Higiene Sanitasi Makanan Berbasis HACCP 2 09-10 06-07 27-28 10-11 29-30 05-06 10-11 28-29 11-12 09-10 27-28 11-12 4.500.000

MANAJEMEN1 STRESS & CONFLICT MANAGEMENT 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 21-23 18-20 16-18 20-22 18-20 5.950.000

Page 25: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

25

2 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 02-06 30-03 27-31 03-07 08-12 05-09 03-07 31-04 04-08 02-06 27-01 11-15 8.950.000

3 CORPORATE BUILIDNG DALAM MEMBANGUNKULTUR DAN ETIKA INTERNAL ORGANISASI 4 16-19 13-16 06-09 17-20 02-05 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.000

4 MODEL PEMBINAAN ANGGOTA YANGEXCELLENT DALAM DUNIA KERJA PERUSAHAAN 3 16-18 13-15 27-29 17-19 31-02 19-21 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000

5 Office COMMUNICATION AND BEHAVIOR ETHIC 3 04-06 01-03 06-08 05-07 08-10 19-21 05-07 07-09 06-08 04-06 06-08 04-06 5.950.000

6 CHANGE & CONFLICT MANAGEMENT ANDDEALING WITH DIFFICULT PEOPLE 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000

7 SPEED AND INNOVATION 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000

8 HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP 2 09-10 06-07 27-28 10-11 23-24 20-21 10-11 15-16 11-12 09-10 30-31 28-29 3.950.000

9 CONTEMPORARY COMMUNICATION &LEADERSHIP 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000

10 TALENT MANAGEMENT 4 03-06 31-03 28-31 04-07 29-01 05-08 04-07 28-31 05-08 03-06 28-01 05-08 7.950.000

11 COMMUNICATION, ASSERTIVENESS ANDCONFLICT MANAGEMENT 2 12-13 09-10 29-30 12-13 22-23 19-20 13-14 30-31 14-15 12-13 29-30 14-15 3.950.000

12 INNER SUCCESS TRAINING 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

13PETROLEUM FINANCE, COST CONTROL &RESERVOIR MANAJEMEN (PetroleumEconomics)

4 24-27 21-24 06-09 25-28 30-02 05-08 25-28 22-25 26-29 24-27 06-09 19-22 8.500.000

14 ENGINEERING MATERIAL KNOWLEDGE FORWAREHOUSE PEOPLE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 28-30 04-06 02-04 27-29 27-29 6.500.000

15 CULTURE CHANGE FOR MAINTENANCE ANDRELIABILITY IMPROVEMENT 3 09-11 06-08 27-29 10-12 29-31 05-07 10-12 28-30 11-13 09-11 27-29 11-13 6.500.000

16 CATERING & ACCOMMODATIONMANAGEMENT (INCLUDING TABLE MANNER) 4 23-26 20-23 13-16 24-27 29-01 05-08 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

17 LIFE CYCLE COSTING 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 6.500.00018 ACCOUNT RECEIVABLE MANAGEMENT 2 09-10 06-07 27-28 10-11 29-30 05-06 10-11 28-29 11-12 09-10 27-28 11-12 3.950.00019 Accounting Information Systems 3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 5.950.00020 Asset Management 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

21 BALANCED SCORECARD (BSC) CONCEPT ANDIMPLEMENTATION 2 02-03 30-31 13-14 03-04 15-16 07-08 03-04 14-15 04-05 02-03 13-14 04-05 3.950.000

22 BASIC ACCOUNTING 3 11-13 08-10 20-22 11-13 22-24 14-16 12-14 21-23 13-15 11-13 20-22 13-15 5.950.00023 BASIC AUDIT FINANCE 3 18-20 15-17 29-31 19-21 31-02 19-21 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000

24 BASIC KNOWLEDGE ABOUT FINANCIALMANAGEMENT 3 25-27 22-24 01-03 26-28 03-05 07-09 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000

25 BUDGET PLANNING, CONTROLLING &ANALYSING 3 04-06 01-03 08-10 05-07 10-12 12-14 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

26 BUDGETING AND PROJECT COST CONTROL 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 11-13 5.950.00027 BUDGETING AND REPORTING 3 16-18 13-15 22-24 17-19 22-24 05-07 17-19 23-25 18-20 16-18 22-24 18-20 5.950.000

Page 26: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

26

28 CASH MANAGEMENT 2 23-24 20-21 27-28 24-25 29-30 15-16 24-25 28-29 25-26 23-24 27-28 27-28 3.950.00029 CUSTOMER RELATION MANAGEMENT(CRM) 3 18-20 15-17 13-15 19-21 15-17 12-14 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00030 Export import 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 18-20 5.950.000

31 FINANCE FOR NON FINANCE FOR OIL & GASINDUSTRY 3 25-27 22-24 15-17 26-28 17-19 07-09 26-28 14-16 27-29 25-27 15-17 27-29 5.950.000

32 FINANCE FOR NON FINANCE MANAGER 3 04-06 01-03 22-24 05-07 22-24 12-14 05-07 23-25 06-08 04-06 22-24 06-08 5.950.00033 Financial Planning and Budgeting for Banking 3 11-13 08-10 29-31 11-13 31-02 19-21 12-14 28-30 13-15 11-13 29-01 13-15 5.950.000

34 Holistic CSR and Sustainable CommunityDevelopment 2 19-20 16-17 02-03 20-21 02-03 05-06 20-21 03-04 21-22 19-20 02-03 21-22 3.950.000

35 HR Based On Competency for Recruitment 2 02-03 30-31 13-14 03-04 15-16 19-20 03-04 14-15 04-05 02-03 13-14 04-05 3.950.00036 INTERMEDIATE ACCOUNTING 3 09-11 06-08 20-22 10-12 22-24 07-09 10-12 21-23 11-13 09-11 20-22 11-13 5.950.00037 Key Account Management 2 16-17 13-14 27-28 17-18 29-30 12-13 17-18 30-31 18-19 16-17 27-28 18-19 3.950.000

38 LAPORAN KEUANGAN PEMAHAMAN DANPENGGUNAANNYA 3 25-27 22-24 27-01 26-28 03-05 19-21 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000

39 Managing Training Function 3 04-06 01-03 08-10 05-07 10-12 05-07 05-07 09-11 06-08 04-06 08-10 06-08 5.950.00040 OUTSOURCING MANAGEMENT 3 11-13 08-10 15-17 11-13 17-19 14-16 12-14 14-16 13-15 11-13 15-17 13-15 5.950.000

41 PETTY CASH MANAGEMENT &ADMINISTRATION 2 18-19 15-16 23-24 19-20 22-23 19-20 19-20 24-25 20-21 18-19 23-24 20-21 3.950.000

42 PROBLEM SOLVING AND DECISION MAKING 4 02-05 30-02 28-03 03-06 02-05 12-15 03-06 01-04 04-07 02-05 31-03 04-07 7.950.000

43 PROFIT PLANNING COST - VOLUME - PROFITRELATIONSHIP ANALYSIS 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 11-13 5.950.000

44 Project Cost Estimation & Cost Control 3 18-20 15-17 13-15 19-21 15-17 05-07 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000

45 Standard Operational Procedure, Accounting &Finance 3 25-27 22-24 20-22 26-28 22-24 14-16 26-28 21-23 27-29 25-27 20-22 27-29 5.950.000

46 Total Quality Management 3 16-18 13-15 08-10 17-19 10-12 12-14 17-19 09-11 18-20 16-18 08-10 18-20 5.950.000

47 TRAINING EVALUATION AND MEASUREMENTMETHOD 2 23-24 20-21 16-17 24-25 18-19 20-21 24-25 14-15 25-26 23-24 16-17 27-28 3.950.000

48 TRAINING NEED ANALYSIS 2 02-03 30-31 23-24 03-04 22-23 05-06 03-04 24-25 04-05 02-03 23-24 04-05 3.950.000

49 Training untuk pegawai persiapan masapensiun (training pra-purnabakti) 5 09-13 06-10 27-31 17-21 29-02 12-16 10-14 31-04 11-15 09-13 27-01 11-15 8.950.000

50 ACCOUNT PAYABLE MANAGEMENT 2 19-20 16-17 01-02 10-11 04-05 19-20 20-21 28-29 21-22 19-20 01-02 21-22 3.950.00051 COST ACCOUNTING 3 25-27 22-24 06-08 26-28 08-10 07-09 26-28 07-09 27-29 25-27 06-08 27-29 5.950.00052 FIXED ASSET 3 04-06 01-03 13-15 05-07 15-17 12-14 05-07 14-16 06-08 04-06 13-15 06-08 5.950.00053 ANALISIS KEEKONOMISAN PROYEK 3 09-11 06-08 20-22 11-13 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.000

54 SISTEM INFORMASI MANAJEMEN DANAKUNTANSI 3 16-18 13-15 27-29 17-19 29-31 05-07 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000

55 COST VOLUME PROFIT ANALYSIS 3 23-25 20-22 01-03 24-26 02-04 14-16 24-26 31-02 25-27 23-25 01-03 27-29 5.950.000

56 INTERNATIONAL FINANCIAL REPORTINGSTANDARD (IFRS) 2 02-03 30-31 09-10 03-04 11-12 19-20 03-04 10-11 04-05 02-03 09-10 04-05 4.500.000

57 TREASURY AND CASH FLOW MANAGEMENT 2 12-13 09-10 16-17 10-11 18-19 08-09 13-14 14-15 14-15 12-13 16-17 14-15 4.500.000

Page 27: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

27

58 ADVANCE SECURITY MANAGEMENT 4 09-12 06-09 13-16 10-13 29-01 05-08 10-13 21-24 11-14 09-12 13-16 11-14 7.950.00059 ANALISIS BEBAN KERJA 2 09-10 06-07 20-21 10-11 22-23 12-13 10-11 21-22 11-12 09-10 20-21 11-12 3.950.00060 ANALITYCAL HIERARCHY PROCESS 2 16-17 13-14 27-28 17-18 29-30 19-20 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000

61IMPLEMENTASI BALANCED SCORE CARD (BSC)SEBAGAI ALAT UKUR PERFORMANSIKARYAWAN

3 02-04 30-01 06-08 03-05 08-10 14-16 03-05 07-09 04-06 02-04 06-08 04-06 5.950.000

62 KESEIMBANGAN LINTAS PRODUKSI (LINEBALANCING) 2 11-12 08-09 13-14 12-13 15-16 20-21 12-13 14-15 13-14 11-12 13-14 13-14 3.950.000

63 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 18-19 15-16 22-23 19-20 23-24 07-08 19-20 23-24 20-21 18-19 22-23 20-21 3.950.00064 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 25-26 22-23 29-30 26-27 31-01 12-13 26-27 30-31 27-28 25-26 29-30 28-29 3.950.00065 MANAJEMEN LOGISTIK 3 04-06 01-03 01-03 05-07 03-05 19-21 05-07 02-04 06-08 04-06 01-03 06-08 5.950.00066 MANAJEMEN PENGEMBANGAN PRODUK 3 11-13 08-10 08-10 10-12 10-12 07-09 12-14 09-11 13-15 11-13 08-10 13-15 5.950.000

67 MANAJEMEN PERGUDANGAN DANPERSEDIAAN 2 19-20 16-17 15-16 20-21 17-18 14-15 20-21 15-16 21-22 19-20 15-16 21-22 3.950.000

68 MANAJEMEN PROYEK 3 25-27 22-24 22-24 26-28 22-24 19-21 26-28 23-25 27-29 25-27 22-24 27-29 5.950.00069 OPERATION MANAGEMENT 2 02-03 30-31 30-31 03-04 01-02 05-06 03-04 28-29 04-05 02-03 30-01 04-05 3.950.00070 PEMILIHAN PEMASOK (VENDOR) 2 09-10 06-07 27-28 12-13 02-03 15-16 10-11 31-01 11-12 09-10 30-31 11-12 3.950.00071 STANDARD OPERATING PROCEDURE 2 23-24 20-21 16-17 24-25 18-19 07-08 24-25 14-15 25-26 23-24 16-17 27-28 3.950.00072 STUDI KELAYAKAN PROYEK 2 04-05 01-02 20-21 05-06 22-23 12-13 05-06 21-22 06-07 04-05 20-21 06-07 3.950.000

73 TANGGUNG JAWAB SOSIAL PERUSAHAAN(CORPORATE SOCIAL RESPONSIBILITY) 2 11-12 08-09 27-28 10-11 29-30 20-21 12-13 30-31 13-14 11-12 27-28 13-14 3.950.000

74 VALUE ENGINEERING (REKAYASA NILAI) 2 18-19 15-16 01-02 19-20 04-05 08-09 19-20 02-03 20-21 18-19 01-02 20-21 3.950.00075 Sistem Informasi manajemen Pergudangan 2 25-26 22-23 08-09 26-27 10-11 14-15 26-27 09-10 27-28 25-26 08-09 28-29 395000076 Sistem Life Cycle Costing 2 05-06 02-03 13-14 06-07 15-16 19-20 06-07 15-16 07-08 05-06 13-14 07-08 395000077 ANALISIS KEPUTUSAN 2 12-13 09-10 22-23 12-13 23-24 05-06 13-14 23-24 14-15 12-13 22-23 14-15 3.950.00078 MANAJEMEN PRODUKSI 2 19-20 16-17 29-30 20-21 31-01 15-16 20-21 28-29 21-22 19-20 29-30 21-22 3.950.00079 METODE PENGAMBILAN KEPUTUSAN 2 26-27 23-24 02-03 27-28 02-03 20-21 27-28 03-04 28-29 26-27 02-03 27-28 3.950.00080 BUSINESS PROCESS REENGINEERING 2 16-17 13-14 27-28 17-18 23-24 20-21 17-18 15-16 18-19 16-17 27-28 28-29 3.950.000

81 LOGISTICS AND SUPPLY CHAIN MANAGEMENTCONCEPT, STRATEGY AND IMPLEMENTATION 4 02-05 30-02 06-09 03-06 08-11 05-08 03-06 07-10 04-07 02-05 06-09 11-14 7.950.000

82 MANAJEMEN STRATEGI 3 11-13 08-10 13-15 11-13 15-17 19-21 12-14 14-16 13-15 11-13 13-15 27-29 5.950.000

83 PRACTICAL PROJECT EVALUATION ANDFINANCING 2 18-19 15-16 22-23 19-20 23-24 19-20 19-20 21-22 20-21 18-19 22-23 18-19 3.950.000

84PROJECT MANAGEMENT WITH MICROSOFTPROJECT APPLICATION,Win QSB & MONTECARLO SIMULATION

3 25-27 22-24 29-31 26-28 29-31 19-21 26-28 28-30 27-29 25-27 29-01 27-29 5.950.000

85 RISK-BASED MANAGEMENT 3 04-06 01-03 01-03 05-07 02-04 19-21 05-07 31-02 06-08 04-06 01-03 04-06 5.950.00086 STRATEGI PENGEMBANGAN BISNIS 3 09-11 06-08 08-10 10-12 10-12 12-14 10-12 09-11 11-13 09-11 08-10 13-15 5.950.00087 SUPPLY CHAIN MANAGEMENT 3 18-20 15-17 15-17 19-21 17-19 19-21 19-21 14-16 20-22 18-20 15-17 20-22 5.950.00088 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 31-03 11-14 09-12 30-02 11-14 7.950.000

Page 28: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

28

89 PROJECT MANAGEMENT 4 10-13 07-10 28-31 10-13 02-05 05-08 11-14 01-04 12-15 10-13 28-01 19-22 7.950.00090 ACCOUNT OfficeR 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.00091 AUDITING SDM 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.00092 BUSINESS STRATEGY FOR MANAGERS 3 25-27 22-24 27-01 26-28 02-04 05-07 26-28 31-02 27-29 25-27 30-01 27-29 5.950.00093 COSTUMER SERVICE(CS) 3 18-20 15-17 22-24 19-21 22-24 07-09 19-21 23-25 20-22 18-20 22-24 20-22 5.950.000

94 KEPEMIMPINAN (LEADERSHIP HIGH LEVELMANAGER) 5 09-13 06-10 06-10 17-21 08-12 05-09 10-14 07-11 11-15 09-13 06-10 11-15 8.950.000

95 KEPEMIMPINAN (LEADERSHIP LOWER LEVELMANAGER) 3 16-18 13-15 13-15 10-12 15-17 12-14 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000

96 KEPEMIMPINAN (LEADERSHIP MIDDLE LEVELMANAGER) 4 24-27 21-24 20-23 25-28 29-01 05-08 25-28 21-24 26-29 24-27 20-23 04-07 7.950.000

97 KEWIRANIAGAAN (SALESMANSHIP) 3 04-06 01-03 27-29 05-07 22-24 19-21 05-07 28-30 06-08 04-06 27-29 27-29 5.950.000

98 MANAJEMEN PERUBAHAN (CHANGEMANAGEMENT) 3 09-11 06-08 27-01 11-13 02-04 14-16 10-12 31-02 11-13 09-11 30-01 11-13 5.950.000

99 MANAJEMEN SDM (PERSONALIA ATAUTENAGA KERJA) 5 16-20 13-17 06-10 17-21 08-12 05-09 17-21 07-11 18-22 16-20 06-10 18-22 8.950.000

100MANAJEMEN PERILAKU DALAMORGANISASI(MANAGEMENT OFORGANIZATION BEHAVIOR)

4 23-26 20-23 14-17 24-27 16-19 12-15 24-27 22-25 25-28 23-26 14-17 05-08 7.950.000

101 MANAJEMEN STRATEGI 5 02-06 30-03 20-24 03-07 29-02 05-09 03-07 31-04 04-08 02-06 20-24 11-15 8.950.000102 MANUSIA DALAM KERJA (MEN IN WORK) 2 12-13 09-10 30-31 10-11 22-23 19-20 13-14 14-15 14-15 12-13 30-01 27-28 3.950.000

103 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR(SUPERVISORY MANAGEMENT) 4 16-19 13-16 28-03 17-20 02-05 13-16 17-20 28-31 18-21 16-19 31-03 18-21 7.950.000

104PENGANTAR KONSEPMANAJEMEN(INTRODUCTION TOMANAGEMENT)

4 24-27 21-24 06-09 25-28 08-11 05-08 25-28 07-10 26-29 24-27 06-09 04-07 7.950.000

105 RAPAT YANG PRODUKTIF (PRODUCTIVEMEETING) 2 23-24 20-21 27-28 24-25 02-03 20-21 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000

106 TEAM DEVELOPMENT 3 25-27 22-24 29-31 26-28 29-31 05-07 26-28 29-31 27-29 25-27 29-01 27-29 5.950.000107 TEKNIK NEGOSIASI 3 02-04 30-01 01-03 03-05 03-05 14-16 03-05 02-04 04-06 02-04 01-03 04-06 5.950.000108 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 24-27 21-24 13-16 25-28 15-18 05-08 25-28 22-25 26-29 24-27 13-16 05-08 7.950.000109 GOOD CORPORATE GOVERNANCE 3 23-25 20-22 08-10 24-26 08-10 07-09 24-26 09-11 25-27 23-25 08-10 27-29 5.950.000110 HOW TO IMPROVE BUSINESS PERFORMANCE 3 04-06 01-03 15-17 05-07 17-19 14-16 05-07 14-16 06-08 04-06 15-17 04-06 5.950.000111 KEMADYAAN 5 16-20 13-17 27-31 17-21 29-02 05-09 17-21 31-04 18-22 16-20 27-01 18-22 8.500.000

112 MANAGEMENT PROJECT STRATEGI DANIMPLEMENTASI 4 24-27 21-24 27-02 25-28 02-05 12-15 25-28 28-31 26-29 24-27 30-02 05-08 7.950.000

113 MANAJEMEN OPERASI – PRODUKSI 3 02-04 30-01 06-08 03-05 10-12 19-21 03-05 07-09 04-06 02-04 06-08 27-29 5.950.000114 PERFORMANCE MANAGEMENT 3 11-13 08-10 13-15 11-13 15-17 05-07 12-14 14-16 13-15 11-13 13-15 11-13 5.950.000115 SIX SIGMA CHAMPIONS 4 16-19 13-16 21-24 17-20 29-01 13-16 17-20 22-25 18-21 16-19 21-24 18-21 7.950.000116 HANDLING CUSTOMER COMPLAINT 2 05-06 02-03 02-03 06-07 02-03 08-09 06-07 31-01 07-08 05-06 02-03 04-05 3.950.000

Page 29: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

29

117 PELAYANAN PRIMA BAGI APARATURPEMERINTAHAN 3 09-11 06-08 08-10 10-12 08-10 12-14 10-12 09-11 11-13 09-11 08-10 13-15 5.950.000

118 MARKETING MANAGEMENT 4 24-27 21-24 20-23 25-28 30-02 13-16 25-28 28-31 26-29 24-27 20-23 05-08 7.950.000119 MANAJEMEN PERPUSTAKAAN 3 02-04 30-01 29-31 03-05 22-24 19-21 03-05 14-16 04-06 02-04 29-01 27-29 5.950.000120 COST CONTROL AND ESTIMATING 4 09-12 06-09 07-10 10-13 08-11 12-15 10-13 07-10 11-14 09-12 07-10 05-08 7.950.000121 FEASIBILITY STUDY & PROJECT EVALUATION 4 10-13 07-10 27-02 10-13 09-12 12-15 11-14 08-11 12-15 10-13 30-02 12-15 7.950.000122 MATERIAL MANAGEMENT 4 17-20 14-17 14-17 18-21 16-19 06-09 18-21 22-25 19-22 17-20 14-17 04-07 7.950.000123 Office MANAGEMENT AND FILING SYSTEM 4 09-12 06-09 27-02 10-13 08-11 12-15 10-13 07-10 11-14 09-12 30-02 05-08 7.950.000124 QA & QC Inspection Program 3 18-20 15-17 20-22 19-21 22-24 19-21 19-21 14-16 20-22 18-20 20-22 27-29 6.500.000125 CONTEMPORARY LEADERSHIP 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000126 CUSTOMER SERVICE IN CREDIT UNION 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 27-29 5.950.000127 KEWIRAUSAHAAN PRA PURNA BAKTI 4 23-26 20-23 07-10 24-27 09-12 12-15 24-27 08-11 25-28 23-26 07-10 11-14 8.500.000128 MOSSAD STRATEGY ON BUSINESS 3 25-27 22-24 27-01 26-28 03-05 19-21 26-28 02-04 27-29 25-27 30-01 27-29 5.950.000129 PERSUASIVE MARKETING 3 18-20 15-17 22-24 19-21 22-24 19-21 19-21 21-23 20-22 18-20 22-24 20-22 5.950.000130 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000131 MANAJEMEN PERPAJAKAN 3 02-04 30-01 27-01 03-05 22-24 19-21 03-05 14-16 04-06 02-04 30-01 27-29 5.950.000

132 INDONESIA TAX OUTLOOK 2015-2016 DAN TAXAMNESTY 2 09-10 06-07 06-07 10-11 22-23 19-20 10-11 14-15 11-12 09-10 06-07 27-28 4.500.000

133 CUSTOMER LOYALITY STRATEGY 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5950000134 Crisis Management 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.000

135 INTERVIEWING SKILL FOR RECRUITMENTPROMOTION 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000

136 QUALITY MANAGEMENT SYSTEM ISO 90012008 STANDARD (SISTEM MANAJEMEN MUTU) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 14-16 11-13 09-11 30-01 27-29 5.950.000

137 SECURITY MANAGEMENT SYSTEM 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 5.950.000138 BASIC LEADERSHIP 3 25-27 22-24 13-15 26-28 22-24 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.000

139DINAMIKA SERIKAT PEKERJA DALAMPERUSAHAAN TERKAIT MENGHADAPI ERAGLOBALISASI

2 05-06 02-03 23-24 06-07 22-23 19-20 06-07 14-15 07-08 05-06 23-24 27-28 3.950.000

140 HOUR OF CHANGE MANAGEMENT 3 11-13 08-10 29-31 11-13 29-31 19-21 12-14 28-30 13-15 11-13 29-01 27-29 5.950.000141 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 18-20 5.950.000

142 HUKUM KEIMIGRASIAN TERKAIT PEMBERIANIJIN MEMPERKERJAKAN TENAGA KERJA ASING 3 23-25 20-22 08-10 24-26 08-10 19-21 24-26 07-09 25-27 23-25 08-10 27-29 5.950.000

143 LOBBYING AND SCHEDULLING 3 02-04 30-01 15-17 03-05 15-17 19-21 03-05 14-16 04-06 02-04 15-17 04-06 5.950.000144 MAN POWER PLANNING 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 11-13 5.950.000145 PROBLEM SOLVING & DECISION MAKING 3 16-18 13-15 27-29 17-19 31-02 05-07 17-19 29-31 18-20 16-18 27-29 20-22 5.950.000146 STRATEGI MEMBANGUN IMAGE CORPORATE 3 25-27 22-24 27-01 26-28 03-05 12-14 26-28 02-04 27-29 25-27 30-01 27-29 5.950.000147 TRANSFORMATION LEADERSHIP 3 04-06 01-03 06-08 05-07 10-12 19-21 05-07 09-11 06-08 04-06 06-08 06-08 5.950.000148 MANAJEMEN RESIKO 3 11-13 08-10 13-15 11-13 17-19 07-09 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000149 INTELLIGENT AND INVESTIGATION SKILLS 3 18-20 15-17 22-24 19-21 22-24 14-16 19-21 23-25 20-22 18-20 22-24 18-20 5.950.000

Page 30: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

30

150 ASSET SECURITY MANAGEMENT 3 23-25 20-22 29-31 24-26 29-31 19-21 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000151 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 02-04 30-01 01-03 03-05 02-04 05-07 03-05 31-02 04-06 02-04 01-03 04-06 5.950.000152 MEASURING CUSTOMER SATISFACTION 3 09-11 06-08 08-10 10-12 08-10 12-14 10-12 07-09 11-13 09-11 08-10 11-13 5.950.000153 CREATIVE ACCOUNTING DAN DISCLOSURE 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 14-16 18-20 16-18 20-22 27-29 5.950.000154 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.000155 ASSET MANAGEMENT 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 14-16 11-13 09-11 27-29 27-29 5.950.000156 ASSET MANAGEMENT BERBASIS ICT 3 16-18 13-15 27-01 17-19 02-04 19-21 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000

157 DOCUMENT CONTROL ( VERIFICATION ANDCLASSIFICATION ) 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

158 DOCUMENT MANAGEMENT SYSTEM ANDELECTRONIC FILING 3 04-06 01-03 13-15 05-07 15-17 05-07 05-07 14-16 06-08 04-06 13-15 04-06 5.950.000

159 MANAGEMENT INFORMATION SYSTEM 3 11-13 08-10 22-24 11-13 22-24 12-14 12-14 21-23 13-15 11-13 22-24 11-13 5.950.000

160 MANAGEMENT OF DOCUMENT CONTROL &MODERN LIBRARY 3 18-20 15-17 29-31 19-21 29-31 19-21 19-21 28-30 20-22 18-20 29-01 20-22 5.950.000

161 Office MANAGEMENT AND ELECTRONIC FILINGSYSTEM 3 25-27 22-24 01-03 26-28 03-05 07-09 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000

162 Office MODERN FILING MANAGEMENT 3 02-04 30-01 08-10 03-05 10-12 14-16 03-05 09-11 04-06 02-04 08-10 06-08 5.950.000163 EFFECTIVE REPORT WRITING TECHNIQUE 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000164 Office AUTOMATION SKILL 3 16-18 13-15 20-22 17-19 22-24 05-07 17-19 23-25 18-20 16-18 20-22 18-20 5.950.000165 TATACARA PENYUSUNAN SILABUS DIKLAT 3 23-25 20-22 27-29 24-26 31-02 12-14 24-26 29-31 25-27 23-25 27-29 27-29 5.950.000

166 COMERCIAL CONTRACT DRAFTING ANDMANAGEMENT 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.000

167 CONTRACT MANAGEMENT 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 27-29 5.950.000168 Cost control 3 18-20 15-17 13-15 19-21 15-17 19-21 19-21 14-16 20-22 18-20 13-15 27-29 5.950.000169 Creative Problem Solving 4 24-27 21-24 21-24 25-28 29-01 05-08 25-28 21-24 26-29 24-27 21-24 04-07 7.950.000170 Effective Business Letters Writing 3 04-06 01-03 29-31 05-07 22-24 19-21 05-07 28-30 06-08 04-06 29-01 27-29 5.950.000

171 Effective Inventory Management and ModernWarehousing for Support Personal 4 10-13 07-10 28-03 10-13 02-05 13-16 11-14 01-04 12-15 10-13 31-03 11-14 7.950.000

172 Excellent Supervisory 4 02-05 30-02 20-23 03-06 30-02 06-09 03-06 22-25 04-07 02-05 20-23 05-08 7.950.000173 Integrated and Effective Logistic Management 4 17-20 14-17 27-02 18-21 02-05 12-15 18-21 31-03 19-22 17-20 30-02 18-21 7.950.000

174 Leadership Skill How Become a More EffectiveLeader 3 25-27 22-24 06-08 26-28 08-10 19-21 26-28 07-09 27-29 25-27 06-08 27-29 5.950.000

175 Modern Office Administration and FillingSystem 4 16-19 13-16 28-31 17-20 29-01 05-08 17-20 28-31 18-21 16-19 28-01 19-22 7.950.000

176 PROJECT MANAGEMENT DARI KONSEPTUALSAMPAI OPERASIONAL 4 02-05 30-02 07-10 03-06 09-12 13-16 03-06 08-11 04-07 02-05 07-10 05-08 7.950.000

177 PRODUCTION PLANNING AND INVENTORYCONTROL (PPIC) 3 09-11 06-08 15-17 10-12 17-19 19-21 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000

Page 31: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

31

178TRAINING NEEDS ANALYSIS(TNA),TRAININGPLAN, TRAINING BUDGET AND TRAININGIMPACT EVALUATION(TIE)

3 04-06 01-03 27-01 05-07 03-05 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000

179 MANAJEMEN ARSIP DINAMIS DANPERPUSTAKAAN BERBASIS TI 2 23-24 20-21 27-28 24-25 02-03 19-20 24-25 31-01 25-26 23-24 30-31 27-28 3.950.000

180 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 02-04 30-01 06-08 03-05 08-10 19-21 03-05 07-09 04-06 02-04 06-08 27-29 5.950.000181 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 23-25 20-22 13-15 24-26 22-24 19-21 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000182 CAREER MANAGEMENT 3 23-25 20-22 06-08 24-26 08-10 12-14 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

183 COMPREHENSIVE TRAINING MANAGEMENTSYSTEM 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 04-06 5.950.000

184 ESSENTIAL SKILL FOR SECRETARY ANDADMINISTRATION PROFESSIONAL 4 17-20 14-17 28-31 18-21 29-01 13-16 18-21 28-31 19-22 17-20 28-01 19-22 7.950.000

185 INTEGRATED HUMAN RESOURCESMANAGEMENT 3 16-18 13-15 22-24 17-19 22-24 19-21 17-19 23-25 18-20 16-18 22-24 18-20 5.950.000

186 LEADERSHIP AND EFFECTIVE SUPERVISORY 4 23-26 20-23 27-30 24-27 30-02 05-08 24-27 28-31 25-28 23-26 27-30 04-07 7.950.000

187 PELAKSANAAN DAN PERMASALAHANPENGADAAN TANAH PEMBEBASAN LAHAN 3 02-04 30-01 27-01 03-05 02-04 14-16 03-05 31-02 04-06 02-04 30-01 27-29 5.950.000

188 PENERAPAN EKONOMI TEKNIK DALAM PROSESPENGAMBILAN KEPUTUSAN BISNIS 4 10-13 07-10 06-09 10-13 08-11 06-09 11-14 07-10 12-15 10-13 06-09 11-14 7.950.000

189 PLANNING AND ORGANIZE TRAINING 3 18-20 15-17 13-15 19-21 15-17 19-21 19-21 14-16 20-22 18-20 13-15 20-22 5.950.000190 TRAINING DEVELOPMENT MANAGEMENT 3 09-11 06-08 01-03 10-12 03-05 19-21 10-12 02-04 11-13 09-11 01-03 13-15 5.950.000191 Salesmanship Skills 2 16-17 13-14 09-10 17-18 11-12 15-16 17-18 10-11 18-19 16-17 09-10 18-19 4.500.000

192 BASIC RELATIONSHIP MANAGEMENT FORLEADERS 3 23-25 20-22 13-15 24-26 15-17 07-09 24-26 14-16 25-27 23-25 13-15 27-29 5.950.000

193 COMPREHENSIVE MANAGERIAL SKILLS &LEADERSHIP TRAINING 3 18-20 15-17 01-03 19-21 03-05 05-07 19-21 02-04 20-22 18-20 01-03 20-22 5.950.000

194 DEVELOVING HIGH PERFORMANCE TEAMS 2 26-27 23-24 09-10 27-28 11-12 12-13 27-28 10-11 28-29 26-27 09-10 27-28 3.950.000195 EFFECTIVE EXECUTIVE SECRETARY 2 02-03 30-31 16-17 03-04 18-19 20-21 03-04 14-15 04-05 02-03 16-17 04-05 3.950.000196 FILLING SYSTEM FOR SECRETARY 3 16-18 13-15 29-31 17-19 29-31 14-16 17-19 28-30 18-20 16-18 29-01 18-20 5.950.000197 HR MANAGEMENT 2 04-05 01-02 06-07 05-06 08-09 05-06 05-06 07-08 06-07 04-05 06-07 06-07 3.950.000198 HR MANAGEMENT OF CHANGE 3 11-13 08-10 13-15 11-13 15-17 12-14 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000

199 INTEGRATED DOCUMENT & ELECTRONIC FILINGSYSTEM 2 19-20 16-17 20-21 20-21 22-23 19-20 20-21 21-22 21-22 19-20 20-21 21-22 3.950.000

200 INVENTORY MANAGEMENT AND COSTINVESTMENT RECOVERY 4 03-06 31-03 28-03 04-07 02-05 13-16 04-07 01-04 05-08 03-06 31-03 05-08 7.950.000

201 Logistic Management 2 09-10 06-07 08-09 10-11 10-11 20-21 10-11 09-10 11-12 09-10 08-09 11-12 3.950.000

202 LOGISTIC MANAGEMENT & SUPPLY CHAINMANAGEMENT 3 16-18 13-15 15-17 17-19 17-19 07-09 17-19 14-16 18-20 16-18 15-17 18-20 5.950.000

203 MAN POWER PLANNING 3 23-25 20-22 22-24 24-26 22-24 12-14 24-26 23-25 25-27 23-25 22-24 27-29 5.950.000204 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 02-05 30-02 28-31 03-06 29-01 05-08 03-06 28-31 04-07 02-05 28-01 04-07 7.950.000

Page 32: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

32

205 MATERIAL MANAGEMENT FOR PROJECT 4 10-13 07-10 27-02 10-13 02-05 13-16 11-14 31-03 12-15 10-13 30-02 12-15 7.950.000

206 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR 2 19-20 16-17 09-10 20-21 11-12 19-20 20-21 10-11 21-22 19-20 09-10 21-22 3.950.000

207 PLAN LAY OUT Office 3 25-27 22-24 13-15 26-28 15-17 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.000208 SERVICE EXCELLENT 3 04-06 01-03 20-22 05-07 22-24 07-09 05-07 21-23 06-08 04-06 20-22 06-08 5.950.000

209 SUPERVISORY LEADERSHIP AND DECISSIONMAKING 3 09-11 06-08 27-29 10-12 31-02 12-14 10-12 28-30 11-13 09-11 27-29 11-13 5.950.000

210 WAREHOUSE MANAGEMENT OPERATION ANDCONTROL 2 23-24 20-21 06-07 24-25 08-09 19-20 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

211 Warehousing & Distribution Management 3 02-04 30-01 15-17 03-05 17-19 14-16 03-05 14-16 04-06 02-04 15-17 04-06 5.950.000212 TAX ACCOUNTING 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

213 RESTITUSI PAJAK, PEMERIKSAAN PAJAK,KEBERATAN, BANDING DAN GUGATAN 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000

214 MANAJEMEN MUTU TERPADU 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 21-22 11-12 09-10 20-21 11-12 3.950.000

215 TOTAL QUALITY MANAGEMENT SERIESMANAJEMEN MUTU TERPADU 2 16-17 13-14 27-28 17-18 29-30 20-21 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000

216 BUILDING A TEAM 2 02-03 30-31 06-07 03-04 22-23 19-20 03-04 14-15 04-05 02-03 06-07 27-28 3.950.000217 CAREER PLANNING SYSTEM 2 09-10 06-07 13-14 10-11 23-24 20-21 10-11 15-16 11-12 09-10 13-14 28-29 3.950.000218 COMPENSATION SYSTEM DEVELOPMENT 2 23-24 20-21 27-28 24-25 29-30 20-21 24-25 28-29 25-26 23-24 27-28 28-29 3.950.000

219 COMPETENCY-BASED HUMAN RESOURCESMANAGEMENT 2 04-05 01-02 27-28 05-06 02-03 19-20 05-06 31-01 06-07 04-05 30-31 27-28 3.950.000

220 EFFECTIVE PERFORMANCE APPRAISAL 2 18-19 15-16 15-16 19-20 15-16 19-20 19-20 15-16 20-21 18-19 15-16 18-19 3.950.000221 EFFECTIVE TRAINING MANAGEMENT 3 25-27 22-24 22-24 26-28 22-24 12-14 26-28 21-23 27-29 25-27 22-24 27-29 5.950.000

222 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 2 05-06 02-03 29-30 06-07 31-01 20-21 06-07 30-31 07-08 05-06 29-30 04-05 3.950.000

223 JOB COMPETENCY PROFILING 2 12-13 09-10 01-02 10-11 04-05 05-06 13-14 02-03 14-15 12-13 01-02 13-14 3.950.000224 MEASURING TRAINING IMPACT 2 19-20 16-17 09-10 20-21 10-11 15-16 20-21 09-10 21-22 19-20 09-10 20-21 3.950.000225 PERFORMANCE BASED PAY 2 23-24 20-21 16-17 24-25 17-18 19-20 24-25 14-15 25-26 23-24 16-17 27-28 3.950.000

226STRATEGIC HUMAN RESOURCESMANAGEMENT FOR GLOBAL COMPETITIVEADVANTAGE

2 09-10 06-07 30-31 12-13 01-02 12-13 10-11 28-29 11-12 09-10 30-01 14-15 3.950.000

227 WORKLOAD ANALYSIS 2 16-17 13-14 02-03 17-18 02-03 20-21 17-18 03-04 18-19 16-17 02-03 21-22 3.950.000228 ACTIVITY BASED MANAGEMENT 2 23-24 20-21 06-07 24-25 08-09 05-06 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

229NEGOTIATION IMPROVE YOUR NEGOTIATINGSKILLS AND MAKE YOU MORE EFFECTIVENEGOTIATOR

2 02-03 30-31 13-14 03-04 15-16 12-13 03-04 14-15 04-05 02-03 13-14 04-05 3.950.000

230 STRATEGIC MANAGEMENT 3 25-27 22-24 27-01 26-28 02-04 14-16 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000231 Supply Chain Management (SCM) 2 04-05 01-02 08-09 05-06 10-11 20-21 05-06 09-10 06-07 04-05 08-09 06-07 3.950.000232 Supplier Management 2 11-12 08-09 15-16 12-13 17-18 08-09 12-13 15-16 13-14 11-12 15-16 13-14 3.950.000233 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 09-12 06-09 27-30 10-13 15-18 05-08 10-13 07-10 11-14 09-12 27-30 11-14 7.950.000

Page 33: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

33

234 ASPEK HUKUM DAN PENYELESAIAN KONFLIKPERTANAHAN 3 23-25 20-22 06-08 24-26 22-24 19-21 24-26 14-16 25-27 23-25 06-08 27-29 5.950.000

235 ANTI MONOPOLI 3 02-04 30-01 13-15 03-05 22-24 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000236 HUKUM KEPAILITAN 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 14-16 11-13 09-11 20-22 27-29 5.950.000

237 HUKUM KETENAGAKERJAAN & HUBUNGANINDUSTRIAL 3 16-18 13-15 27-29 17-19 22-24 19-21 17-19 28-30 18-20 16-18 27-29 27-29 5.950.000

238 HUKUM PERLINDUNGAN KONSUMEN DANPERSAINGAN BISNIS 3 25-27 22-24 27-01 26-28 02-04 19-21 26-28 31-02 27-29 25-27 30-01 27-29 5.950.000

239 HUKUM TINDAK PIDANA KORUPSI 3 04-06 01-03 08-10 05-07 08-10 19-21 05-07 07-09 06-08 04-06 08-10 04-06 5.950.000

240 STRATEGI MENGANTISIPASI RISIKO TINDAKPIDANA (KORUPSI) 3 11-13 08-10 15-17 11-13 15-17 19-21 12-14 14-16 13-15 11-13 15-17 11-13 5.950.000

241 TINDAK PIDANA PENCUCIAN UANG DANPERANAN BANK UNTUK MENCEGAHNYA 3 18-20 15-17 22-24 19-21 22-24 05-07 19-21 21-23 20-22 18-20 22-24 18-20 5.950.000

242 TIPIKOR DALAM PENGELOLAAN KEUANGANPERUSAHAAN & PERBANKAN 3 23-25 20-22 29-31 24-26 29-31 12-14 24-26 29-31 25-27 23-25 29-01 27-29 5.950.000

243 BERITA ACARA PEMERIKSAAN 3 02-04 30-01 01-03 03-05 03-05 19-21 03-05 02-04 04-06 02-04 01-03 06-08 5.950.000244 MARITIME & SHIPPING LAW IN INDONESIA 3 09-11 06-08 06-08 10-12 10-12 07-09 10-12 09-11 11-13 09-11 06-08 13-15 5.950.000245 HUKUM DAN KONTRAK KONSTRUKSI 3 16-18 13-15 13-15 17-19 17-19 14-16 17-19 14-16 18-20 16-18 13-15 20-22 5.950.000246 BASIC OF SUPPLY CHAIN MANAGEMENT 2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000247 EFFECTIVE LINE BALANCING 2 23-24 20-21 13-14 24-25 15-16 05-06 24-25 14-15 25-26 23-24 13-14 27-28 3.950.000

248 FILLING MANAGEMENT FOR SECRETARY ANDADMINISTRATION STAFF 3 02-04 30-01 20-22 03-05 22-24 12-14 03-05 21-23 04-06 02-04 20-22 04-06 5.950.000

249INFORMATION SYSTEMS AND INFORMATIONTECHNOLOGIES FOR SUPPLY CHAINMANAGEMENT

3 09-11 06-08 27-29 10-12 29-31 19-21 10-12 28-30 11-13 09-11 27-29 11-13 5.950.000

250 ISO WAREHOUSING 2 25-26 22-23 08-09 26-27 10-11 15-16 26-27 09-10 27-28 25-26 08-09 28-29 3.950.000251 KOMPUTERISASI PERGUDANGAN 2 05-06 02-03 15-16 06-07 17-18 19-20 06-07 15-16 07-08 05-06 15-16 07-08 3.950.000

252 MAINTENANCE MANAGEMENT (FORMANUFACTURE AND OIL & GAS COMPANY) 3 11-13 08-10 22-24 11-13 22-24 05-07 12-14 23-25 13-15 11-13 22-24 13-15 6.500.000

253 MEASURING AND MANAGING COSTESCALATION IN PROJECT 2 26-27 23-24 02-03 27-28 02-03 20-21 27-28 03-04 28-29 26-27 02-03 27-28 3.950.000

254 MODERN WAREHOUSE DESIGN 2 02-03 30-31 09-10 03-04 11-12 08-09 03-04 10-11 04-05 02-03 09-10 04-05 3.950.000255 NEGOTIATION SKILL FOR PURCHASING STAFF 3 09-11 06-08 15-17 10-12 17-19 14-16 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000

256 OPERATING SYSTEMS TECHNOLOGIES ANDINSTALLATION PROCEDURES 3 18-20 15-17 20-22 19-21 22-24 19-21 19-21 21-23 20-22 18-20 20-22 20-22 5.950.000

257 PLANNING AND MANAGING INVENTORIES IN ASUPPLY CHAIN 3 23-25 20-22 27-29 24-26 29-31 05-07 24-26 28-30 25-27 23-25 27-29 27-29 5.950.000

258 PLANNING DEMAND AND SUPPLY IN A SUPPLYCHAIN 3 04-06 01-03 27-01 05-07 03-05 12-14 05-07 31-02 06-08 04-06 30-01 06-08 5.950.000

259 PROJECT EVALUATION AND FINANCING 3 16-18 13-15 13-15 17-19 15-17 07-09 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000

Page 34: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

34

260 PROJECT MANAGEMENT USING MICROSOFTPROJECT 3 25-27 22-24 22-24 26-28 22-24 14-16 26-28 23-25 27-29 25-27 22-24 27-29 5.950.000

261 PROJECT MANAGEMENT(PM) WITHPRIMAVERA V6 3 02-04 30-01 29-31 03-05 31-02 19-21 03-05 29-31 04-06 02-04 29-01 04-06 5.950.000

262 RFID for WAREHOUSE 2 09-10 06-07 02-03 10-11 02-03 05-06 10-11 03-04 11-12 09-10 02-03 11-12 3.950.000

263 STRATEGI SISTEM INFORMASI KESEHATAN DIRUMAH SAKIT 3 18-20 15-17 08-10 19-21 10-12 12-14 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000

264 STUDI KELAYAKAN INVESTASI MENGGUNAKANAPLIKASI MICROSOFT EXCEL 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000

265 TRANSPORTATION AND FACILITY DECISIONS INA SUPPLY CHAIN 3 04-06 01-03 20-22 05-07 22-24 07-09 05-07 21-23 06-08 04-06 20-22 06-08 5.950.000

266 VENDOR MANAGED INVENTORY 2 11-12 08-09 27-28 12-13 29-30 15-16 12-13 28-29 13-14 11-12 27-28 13-14 3.950.000267 Workload Analysis 2 16-17 13-14 27-28 17-18 04-05 19-20 17-18 31-01 18-19 16-17 30-31 18-19 3.950.000268 ENTERPRISE RESOURCES PLANNING (ERP) 4 24-27 21-24 06-09 25-28 08-11 05-08 25-28 07-10 26-29 24-27 06-09 04-07 7950000269 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 02-04 30-01 13-15 03-05 15-17 12-14 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000270 PROJECT COST MANAGEMENT 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 23-25 13-15 11-13 22-24 13-15 5.950.000

271 PROJECT MANAGEMENT IN ENGINEERING,PROCUREMENT & CONSTRUCTION 3 18-20 15-17 29-31 19-21 31-02 07-09 19-21 29-31 20-22 18-20 29-01 20-22 5.950.000

272 ADVANCED LAND TRANSPORT 3 23-25 20-22 01-03 24-26 02-04 14-16 24-26 02-04 25-27 23-25 01-03 27-29 5.950.000

273 HUMAN RESOURCE PLANNING ANDPRODUCTIVITY 3 09-11 06-08 13-15 10-12 22-24 19-21 10-12 14-16 11-13 09-11 13-15 27-29 6500000

274 JOB DESCRIPTION ANALYSIS, DEVELOPMENT,AND DESIGN 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000

275 Project Management (3 Hr) 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 6500000276 PROJECT MANAGEMENT (PM) (5Hr) 5 02-06 30-03 27-03 03-07 08-12 05-09 03-07 31-04 04-08 02-06 30-03 11-15 9500000277 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 11-13 08-10 06-08 11-13 02-04 19-21 12-14 07-09 13-15 11-13 06-08 27-29 6500000

278 STRATEGIC HUMAN RESOURCE MANAGEMENTAND ORGANIZATION DEVELOPMENT 3 18-20 15-17 15-17 19-21 15-17 19-21 19-21 14-16 20-22 18-20 15-17 18-20 6500000

279 Strategic Performance Management 3 25-27 22-24 22-24 26-28 22-24 19-21 26-28 21-23 27-29 25-27 22-24 27-29 6500000280 Strategic Planning 5 02-06 30-03 27-31 03-07 29-02 12-16 03-07 31-04 04-08 02-06 27-01 04-08 9500000281 CRYSTALL BALL 4 09-12 06-09 27-02 10-13 02-05 05-08 10-13 28-31 11-14 09-12 30-02 11-14 7.950.000

282DECISION MAKING BY USING STRATEGICTHINKING (PENDEKATAN SISTEMIK DAN NEW 7TOOLS APPROACH)

2 16-17 13-14 06-07 17-18 08-09 19-20 17-18 07-08 18-19 16-17 06-07 18-19 3.950.000

283 INOVASI DAN KREATIFITAS MENUJUORGANISASI PEMBELAJARAN 2 02-03 30-31 20-21 03-04 22-23 20-21 03-04 14-15 04-05 02-03 20-21 27-28 3.950.000

284 LEADERSHIP FOR MANAGER 4 10-13 07-10 27-30 10-13 29-01 06-09 11-14 28-31 12-15 10-13 27-30 12-15 7.950.000285 ADMINISTRASI KEPABEANAN 4 09-12 06-09 20-23 10-13 29-01 05-08 10-13 21-24 11-14 09-12 20-23 11-14 7.950.000

286 Custom facility, Shipping Documents & ExportImport Procedure 2 16-17 13-14 27-28 17-18 22-23 12-13 17-18 28-29 18-19 16-17 27-28 18-19 3.950.000

Page 35: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

35

287 EFFECTIVE PUBLIC RELATIONS SKILL 3 23-25 20-22 27-01 24-26 02-04 19-21 24-26 31-02 25-27 23-25 30-01 27-29 5.950.000288 Export-Import 3 02-04 30-01 06-08 03-05 08-10 07-09 03-05 07-09 04-06 02-04 06-08 04-06 5.950.000289 Export-Import and Incoterm 3 11-13 08-10 13-15 10-12 15-17 14-16 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000290 FREIGHT FORWARDING 2 18-19 15-16 23-24 19-20 23-24 19-20 19-20 24-25 20-21 18-19 23-24 20-21 3.950.000291 Incoterm 2010 2 26-27 23-24 29-30 27-28 01-02 05-06 27-28 30-31 28-29 26-27 29-30 27-28 3.950.000

292 PEMAHAMAN SHIPPING DOCUMENT &PROSEDUR KEPABEANAN 3 04-06 01-03 01-03 05-07 03-05 12-14 05-07 02-04 06-08 04-06 01-03 06-08 5.950.000

293 INFORMATION TECHNOLOGY PROJECTMANAGEMENT 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.000

294 INVENTORY MANAGEMENT FOR RAWMATERIAL 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000

295 Office Automation 2 16-17 13-14 30-31 17-18 22-23 19-20 17-18 14-15 18-19 16-17 30-01 27-28 3.950.000296 PROBLEM SOLVING & DECISION MAKING 3 23-25 20-22 27-01 24-26 03-05 12-14 24-26 02-04 25-27 23-25 30-01 27-29 5.950.000

297 STRATEGIC PLANNING FOR INFORMATIONSYSTEMS 3 25-27 22-24 27-29 26-28 22-24 19-21 26-28 14-16 27-29 25-27 27-29 27-29 5.950.000

298 SUPPLY MARKET ANALYSIS 4 02-05 30-02 28-03 03-06 02-05 12-15 03-06 31-03 04-07 02-05 31-03 04-07 7.950.000299 TOTAL COST OF OWNERSHIP ANALYSIS 3 16-18 13-15 15-17 17-19 17-19 19-21 17-19 14-16 18-20 16-18 15-17 18-20 5.950.000300 CONTRACT MANAGEMENT 4 23-26 20-23 27-30 24-27 15-18 12-15 24-27 07-10 25-28 23-26 27-30 04-07 7.950.000301 PAJAK DAN PROSEDUR IMPLEMENTASI 4 02-05 30-02 27-02 03-06 29-01 05-08 03-06 21-24 04-07 02-05 30-02 11-14 7.950.000302 TAX AND FINANCIAL CONTROL 3 09-11 06-08 06-08 10-12 22-24 19-21 10-12 14-16 11-13 09-11 06-08 27-29 5.950.000303 Inventory Management Manufacturing Industry 4 24-27 21-24 13-16 25-28 02-05 13-16 25-28 28-31 26-29 24-27 13-16 12-15 7.950.000304 OPTIMIZATION FOR PRODUCTION SYSTEM 4 10-13 07-10 07-10 10-13 16-19 12-15 11-14 08-11 12-15 10-13 07-10 04-07 7.950.000305 Perancangan Tata Letak Pabrik 4 16-19 13-16 06-09 17-20 29-01 05-08 17-20 21-24 18-21 16-19 06-09 19-22 7.950.000306 PRODUCTION AND OPERATION MANAGEMENT 4 24-27 21-24 07-10 25-28 02-05 13-16 25-28 28-31 26-29 24-27 07-10 12-15 7.950.000307 PRODUCTION AND PLANNING CONTROL 4 03-06 31-03 14-17 04-07 09-12 06-09 04-07 01-04 05-08 03-06 14-17 19-22 7.950.000

308 Production Handling Separation andMeasurement 4 09-12 06-09 21-24 10-13 15-18 12-15 10-13 07-10 11-14 09-12 21-24 04-07 7.950.000

309 QUALITY CONTROL OF PRODUCT 4 24-27 21-24 27-30 25-28 02-05 13-16 25-28 28-31 26-29 24-27 27-30 04-07 7.950.000310 QUALITY SYSTEM ENGINEERING 4 03-06 31-03 28-03 04-07 09-12 06-09 04-07 01-04 05-08 03-06 31-03 11-14 7.950.000311 SYSTEM AND COST PRODUCTION 4 23-26 20-23 21-24 24-27 02-05 13-16 24-27 28-31 25-28 23-26 21-24 12-15 7.950.000312 ANALISA KEUANGAN 2 09-10 06-07 27-28 10-11 22-23 19-20 10-11 14-15 11-12 09-10 30-31 27-28 4.500.000

313 ANALISA KREDIT MODAL KERJA KONTRAKTORDAN STANDBY KREDIT 2 16-17 13-14 06-07 17-18 23-24 20-21 17-18 15-16 18-19 16-17 06-07 28-29 4.500.000

314 ANALISA PERKREDITAN 4 23-26 20-23 13-16 24-27 02-05 12-15 24-27 28-31 25-28 23-26 13-16 18-21 7.950.000315 BASIC ACCOUNTING 4 02-05 30-02 20-23 03-06 08-11 05-08 03-06 31-03 04-07 02-05 20-23 04-07 7.950.000

316 PEMBERIAN KREDIT DENGAN PENDEKATANLAPORAN ARUS KAS_CASH FLOW 2 11-12 08-09 27-28 12-13 22-23 19-20 12-13 14-15 13-14 11-12 27-28 27-28 4.500.000

317 PENILAIAN KELAYAKAN PROYEK (FEASIBILITYSTUDY) 2 18-19 15-16 01-02 19-20 23-24 20-21 19-20 15-16 20-21 18-19 01-02 28-29 4.500.000

Page 36: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

36

318 PENYELESAIAN KREDIT BERMASALAH 2 26-27 23-24 08-09 27-28 22-23 19-20 27-28 07-08 28-29 26-27 08-09 27-28 4.500.000319 PENYUSUNAN DAN ANALISA SCORING RATING 2 05-06 02-03 16-17 06-07 15-16 20-21 06-07 14-15 07-08 05-06 16-17 28-29 4.500.000

320 PENYUSUNAN PERATURAN INTERNALPERKREDITAN BANK 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 21-23 13-15 11-13 22-24 27-29 5.950.000

321 GOOD CORPORATE GOVERNANCE 3 18-20 15-17 29-31 19-21 29-31 19-21 19-21 28-30 20-22 18-20 29-01 27-29 5.950.000322 COST MANAGEMENT 3 16-18 13-15 27-01 17-19 22-24 19-21 17-19 14-16 18-20 16-18 30-01 27-29 5.950.000323 DASAR-DASAR PERBENDAHARAAN 4 23-26 20-23 06-09 24-27 29-01 05-08 24-27 21-24 25-28 23-26 06-09 18-21 7.950.000324 MANAJEMEN RISIKO INVESTASI 4 02-05 30-02 13-16 03-06 02-05 12-15 03-06 28-31 04-07 02-05 13-16 04-07 7.950.000

325 MANAJEMEN KEUANGAN UNTUK NONMANAJER KEUANGAN 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 14-15 11-12 09-10 20-21 27-28 3.950.000

326 STUDY KELAYAKAN BISNIS 2 16-17 13-14 27-28 17-18 23-24 20-21 17-18 15-16 18-19 16-17 27-28 28-29 3.950.000

327 CUSTOMER RELATIONSHIP MANAGEMENT(CRM) 4 09-12 06-09 27-30 10-13 02-05 12-15 10-13 28-31 11-14 09-12 27-30 11-14 7.950.000

328 FINANCING CONDOTEL HOTEL OPERATION 4 16-19 13-16 27-02 17-20 08-11 06-09 17-20 31-03 18-21 16-19 30-02 18-21 7.950.000

329 MANAGEMENT OF OUTSOURCE STAFFHOUSING AND CATERING SERVICES 4 24-27 21-24 06-09 25-28 15-18 13-16 25-28 07-10 26-29 24-27 06-09 05-08 7.950.000

330 Service Recovery Create Loyal Customers forLife 3 11-13 08-10 22-24 10-12 22-24 19-21 12-14 14-16 13-15 11-13 22-24 27-29 5.950.000

331 MEMBEDAH PROFESI SEKRETARISPROFESSIONAL 4 09-12 06-09 27-30 10-13 29-01 05-08 10-13 21-24 11-14 09-12 27-30 18-21 7.950.000

332PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWERPOINT)

2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.000

333 IT AUDIT PRACTICES 3 11-13 08-10 27-29 10-12 29-31 19-21 12-14 28-30 13-15 11-13 27-29 11-13 5.950.000334 IT HELPDESK 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.000

335 Change & conflict management and dealingwith difficult people 2 02-03 30-31 27-28 03-04 02-03 19-20 03-04 31-01 04-05 02-03 30-31 04-05 3.950.000

336 Strategic and Systematic Thinking 2 05-06 02-03 27-28 06-07 29-30 19-20 06-07 30-31 07-08 05-06 27-28 07-08 3.950.000337 THE LEADERSHIP CHALLENGE 2 12-13 09-10 27-28 12-13 02-03 08-09 13-14 31-01 14-15 12-13 30-31 14-15 3.950.000338 COACHING & CONSELING DI PERUSAHAAN 3 11-13 08-10 15-17 11-13 17-19 19-21 12-14 14-16 13-15 11-13 15-17 13-15 5.950.000339 COACHING AND COUNSELING ( MONITORING) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 28-30 11-13 09-11 30-01 27-29 5.950.000340 PERFORMANCE COACHING FOR MANAGER 2 02-03 30-31 27-28 03-04 22-23 19-20 03-04 14-15 04-05 02-03 27-28 27-28 3.950.000

341 EFFECTIVE PRESENTATION AND REPORTWRITING 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 20-22 5.950.000

342 Effective Time Management 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000

343 HANDLING CONFLICT AND COMPLAINTEFFECTIVELY 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 29-31 11-13 09-11 27-29 13-15 5.950.000

344 Strategic Time Management 3 18-20 15-17 20-22 19-21 22-24 07-09 19-21 23-25 20-22 18-20 20-22 18-20 5.950.000345 TIME MANAGEMENT 4 16-19 13-16 28-03 17-20 02-05 05-08 17-20 01-04 18-21 16-19 31-03 18-21 7.950.000346 HOW TO HANDLE CRITICISM AND COMPLAIN 2 23-24 20-21 06-07 24-25 08-09 15-16 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

Page 37: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

37

347 Pengendalian Dokumen ISO 9001 20154 02-05 30-02 27-02 03-06 02-05 05-08 03-06 31-03 04-07 02-05 30-02 04-07 7.950.000

348Akuntansi Perpajakan pada Badan Usaha MilikNegara (BUMN)

3 02-04 30-01 27-01 03-05 02-04 05-07 03-05 31-02 04-06 02-04 30-01 04-06 5.950.000

349Fraud Prevention, Detection And InvestigationAudit

3 09-11 06-08 06-08 10-12 08-10 12-14 10-12 07-09 11-13 09-11 06-08 11-13 5.950.000

350General Affairs Management 3 16-18 13-15 13-15 17-19 15-17 19-21 17-19 14-16 18-20 16-18 13-15 18-20 5.950.000

351Hubungan Industrial Dan Tenaga Kerja 3 23-25 20-22 20-22 24-26 22-24 07-09 24-26 21-23 25-27 23-25 20-22 27-29 5.950.000

352ISO 26000 UNDERSTANDING ANDIMPLEMENTING CSR

3 04-06 01-03 27-29 05-07 29-31 14-16 05-07 28-30 06-08 04-06 27-29 06-08 5.950.000

353Legal Due Diligence (LC Perdagangan) 3 11-13 08-10 01-03 11-13 03-05 19-21 12-14 02-04 13-15 11-13 01-03 13-15 5.950.000

354Keterampilan Pengelolaan Hubungan IndustrialSampai Dengan Penyelesaian Perselisihan

3 18-20 15-17 08-10 19-21 10-12 05-07 19-21 09-11 20-22 18-20 08-10 20-22 5.950.000

355Merger Dan Akuisisi 2 26-27 23-24 16-17 27-28 18-19 12-13 27-28 14-15 28-29 26-27 16-17 27-28 3.950.000

356Pengendalian Kinerja Bisnis Dan Aliran Kas 3 02-04 30-01 22-24 03-05 22-24 19-21 03-05 23-25 04-06 02-04 22-24 04-06 5.950.000

357Rekonsiliasi Fiskal & Penyusunan SPT TahunanPPH Badan

3 16-18 13-15 27-01 17-19 02-04 12-14 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000

358Training Analysis Program 3 23-25 20-22 06-08 24-26 08-10 19-21 24-26 07-09 25-27 23-25 06-08 27-29 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MANAJEMEN - PROCUREMENT

1 Prinsip dasar dan prosedur pengadaan barang& jasa 3 23-25 20-22 29-31 24-26 31-02 07-09 24-26 28-30 25-27 23-25 29-01 27-29 5.950.000

2 HARGA PERKIRAAN SENDIRI (HPS) 2 23-24 20-21 27-28 24-25 02-03 05-06 24-25 31-01 25-26 23-24 30-31 27-28 3.950.0003 ASPEK TKDN 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 14-15 11-12 09-10 20-21 27-28 3.950.0004 INTEGRATED PROCUREMENT MANAGEMENT 2 23-24 20-21 27-28 24-25 22-23 19-20 24-25 14-15 25-26 23-24 30-31 27-28 3.950.000

5TEKNIK DAN METODE PENYUSUNAN HPS OE(HARGA PERKIRAAN SENDIRI) ATASPENGADAAN BARANG DAN JASA

3 23-25 20-22 22-24 24-26 22-24 07-09 24-26 23-25 25-27 23-25 22-24 27-29 5.950.000

6 BASIC PROCUREMENT & PURCHASING 3 16-18 13-15 06-08 17-19 08-10 19-21 17-19 07-09 18-20 16-18 06-08 18-20 5.950.0007 PROCUREMENT MANAGEMENT 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 21-22 11-12 09-10 20-21 11-12 3.950.000

Page 38: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

38

8 PROCUREMENT STRATEGY 2 16-17 13-14 27-28 17-18 29-30 07-08 17-18 28-29 18-19 16-17 27-28 18-19 3.950.0009 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 04-06 01-03 08-10 05-07 10-12 19-21 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

10 E-PROCUREMENT (E-Proc) 3 16-18 13-15 06-08 17-19 22-24 19-21 17-19 14-16 18-20 16-18 06-08 27-29 5.950.00011 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 09-11 06-08 06-08 10-12 08-10 19-21 10-12 07-09 11-13 09-11 06-08 13-15 5.950.000

12 SUSTAINABLE PROCUREMENT IN RELATIONWITH QUALITY ASSURANCE 4 17-20 14-17 28-31 18-21 30-02 05-08 18-21 22-25 19-22 17-20 28-01 12-15 7.950.000

MOTIVASI DAN PERSONALDEVELOPMENT

1 Communication SKILL 2 12-13 09-10 06-07 12-13 08-09 08-09 13-14 07-08 14-15 12-13 06-07 14-15 3.950.0002 Dynamic Interpersonal & Comunication Skills 2 25-26 22-23 20-21 26-27 22-23 20-21 26-27 21-22 27-28 25-26 20-21 28-29 3.950.000

3 EFFECTIVE PRESENTATION & NEGOTIATIONSKILLS 2 04-05 01-02 29-30 05-06 31-01 05-06 05-06 30-31 06-07 04-05 29-30 06-07 3.950.000

4 Effective public speaking and businesspresentation 2 09-10 06-07 01-02 10-11 04-05 15-16 10-11 02-03 11-12 09-10 01-02 11-12 3.950.000

5 CARA MENYENANGKAN MEMBANGUN TIMIMPIAN 4 16-19 13-16 20-23 17-20 02-05 12-15 17-20 31-03 18-21 16-19 20-23 18-21 7.950.000

6 Constructive Anger Management 3 02-04 30-01 27-01 03-05 22-24 19-21 03-05 14-16 04-06 02-04 30-01 27-29 5.950.0007 Menjadi pribadi yang asertif 3 04-06 01-03 13-15 05-07 15-17 19-21 05-07 14-16 06-08 04-06 13-15 04-06 5.950.0008 Menjadi pribadi yang berpengaruh 3 11-13 08-10 22-24 11-13 22-24 19-21 12-14 21-23 13-15 11-13 22-24 11-13 5.950.0009 Motivating staff for excellent performance 3 23-25 20-22 01-03 24-26 02-04 19-21 24-26 02-04 25-27 23-25 01-03 27-29 5.950.000

10 BOOST YOUR CREATIVITY IN THINKING MINDMAP 2 09-10 06-07 27-28 10-11 22-23 19-20 10-11 14-15 11-12 09-10 27-28 27-28 3.950.000

11 BRAIN DEVELOPMENT FOR PERSONALASSISTANT & SECRETARY 3 16-18 13-15 27-01 17-19 02-04 19-21 17-19 31-02 18-20 16-18 30-01 18-20 5.950.000

12 EFFECTIVE MASTER OF CEREMONY (MC) 3 11-13 08-10 20-22 11-13 22-24 05-07 12-14 21-23 13-15 11-13 20-22 11-13 5.950.00013 ACHIEVEMENT MOTIVATION 2 02-03 30-31 27-28 03-04 29-30 05-06 03-04 28-29 04-05 02-03 27-28 04-05 3.950.00014 Advance Negotiation Skill 3 09-11 06-08 27-01 10-12 02-04 12-14 10-12 31-02 11-13 09-11 30-01 11-13 5.950.00015 CHANGE YOUR MINDSET 4 03-06 31-03 20-23 04-07 30-02 13-16 04-07 21-24 05-08 03-06 20-23 05-08 7.950.00016 MC (MASTER OF CEREMONY) 3 02-04 30-01 20-22 03-05 22-24 19-21 03-05 14-16 04-06 02-04 20-22 27-29 5.950.000

17 COMMUNICATION, ASSERTIVENESS ANDCONFLICT MANAGEMENT 2 12-13 09-10 29-30 12-13 22-23 19-20 13-14 30-31 14-15 12-13 29-30 14-15 3.950.000

18 INNER SUCCESS TRAINING 4 23-26 20-23 13-16 24-27 15-18 12-15 24-27 21-24 25-28 23-26 13-16 04-07 7.950.00019 TOTOK AURA MENUJU TOTAL BEAUTY 3 09-11 06-08 08-10 10-12 10-12 19-21 10-12 09-11 11-13 09-11 08-10 11-13 5.950.00020 SPEED AND INNOVATION 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 11-13 5.950.000

21 HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP 2 09-10 06-07 27-28 10-11 23-24 20-21 10-11 15-16 11-12 09-10 30-31 28-29 3.950.000

22 CONTEMPORARY COMMUNICATION &LEADERSHIP 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5.950.000

Page 39: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

39

23 TALENT MANAGEMENT 4 03-06 31-03 28-31 04-07 29-01 05-08 04-07 28-31 05-08 03-06 28-01 05-08 7.950.00024 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 16-17 13-14 13-14 17-18 22-23 19-20 17-18 14-15 18-19 16-17 13-14 27-28 3.950.00025 ASSERTIVE TRAINING 3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.00026 BRAIN POWER 3 16-18 13-15 27-29 17-19 29-31 19-21 17-19 28-30 18-20 16-18 27-29 18-20 5.950.000

27 CAPACITY BUILDING(MEMBANGUN KAPASITASDAN KEMAMPUAN) 3 04-06 01-03 08-10 05-07 08-10 12-14 05-07 07-09 06-08 04-06 08-10 04-06 5.950.000

28 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 23-25 20-22 29-31 24-26 31-02 14-16 24-26 29-31 25-27 23-25 29-01 27-29 5.950.000

29 INDIVIDUAL DEVELOPMENT (SERVICEPRODUCT) 3 02-04 30-01 01-03 03-05 03-05 19-21 03-05 02-04 04-06 02-04 01-03 06-08 5.950.000

30PENINGKATAN MOTIVASIBERPRESTASI(ACHIEVEMENT MOTIVATIONTRAINING)

3 02-04 30-01 13-15 03-05 15-17 19-21 03-05 14-16 04-06 02-04 13-15 27-29 5.950.000

31 PEOPLE SKILL 5 09-13 06-10 20-24 17-21 29-02 12-16 10-14 21-25 11-15 09-13 20-24 11-15 8.950.00032 PRIBADI EFEKTIF 2 19-20 16-17 27-28 12-13 23-24 19-20 20-21 28-29 21-22 19-20 27-28 21-22 3.950.000

33 SENSITIVITY TRAINING (TURNING POINT ATAUNEW BORN) 3 04-06 01-03 08-10 05-07 10-12 07-09 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

34 TEKNIK PRESENTASI 2 12-13 09-10 06-07 12-13 08-09 19-20 13-14 07-08 14-15 12-13 06-07 14-15 3.950.00035 TRAINING OF TRAINER 3 18-20 15-17 13-15 19-21 15-17 07-09 19-21 14-16 20-22 18-20 13-15 20-22 5.950.00036 ACHIEVEMENT MOTIVATION 4 23-26 20-23 20-23 24-27 29-01 12-15 24-27 21-24 25-28 23-26 20-23 04-07 7.950.00037 EFFECTIVE COMMUNICATION SKILL 4 02-05 30-02 21-24 03-06 30-02 12-15 03-06 28-31 04-07 02-05 21-24 11-14 7.950.00038 EFFECTIVE PRESENTATION SKILLS 3 11-13 08-10 27-29 11-13 22-24 19-21 12-14 14-16 13-15 11-13 27-29 27-29 5.950.00039 EMOTIONAL QUETIENTS 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 20-22 5.950.00040 ICE BREAKING AND ENERGIZERS 3 09-11 06-08 20-22 10-12 22-24 19-21 10-12 21-23 11-13 09-11 20-22 13-15 5.950.00041 TRAINING OF TRAINER (TOT) 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 28-30 25-27 23-25 27-29 27-29 5.950.00042 Train the trainers 4 16-19 13-16 14-17 17-20 15-18 06-09 17-20 21-24 18-21 16-19 14-17 19-22 7.950.00043 ACHIEVEMENT MOTIVATION TRAINING 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.00044 CAPACITY BUILDING SOFT SKILL PROGRAM 3 23-25 20-22 27-29 24-26 22-24 19-21 24-26 14-16 25-27 23-25 27-29 27-29 5.950.00045 BREATHING ARTS FOR CREATIVE THINKING 3 23-25 20-22 20-22 24-26 22-24 19-21 24-26 14-16 25-27 23-25 20-22 27-29 5.950.00046 EFFECTIVE STRATEGY TO CONTROL STRESS 3 25-27 22-24 13-15 26-28 15-17 19-21 26-28 14-16 27-29 25-27 13-15 27-29 5.950.00047 ESQ FOR PEAK PERFORMANCE 3 11-13 08-10 29-31 11-13 29-31 19-21 12-14 28-30 13-15 11-13 29-01 27-29 5.950.00048 HUMAN PERFORMANCE AND LIMITATION 3 18-20 15-17 01-03 19-21 02-04 19-21 19-21 31-02 20-22 18-20 01-03 27-29 5.950.000

49 MENGGALI POTENSI DIRI UNTUK MENCAPAIPRIBADI YANG UNGGUL 2 09-10 06-07 20-21 10-11 22-23 19-20 10-11 24-25 11-12 09-10 20-21 27-28 3.950.000

50 PERFORMANCE, BEHAVIOR AND STRESSMANAGEMENT 3 11-13 08-10 13-15 11-13 15-17 19-21 12-14 14-16 13-15 11-13 13-15 13-15 5.950.000

51 MANAGING PRESSURE FOR PEAKPERFORMANCE 3 02-04 30-01 27-29 03-05 22-24 19-21 03-05 14-16 04-06 02-04 27-29 27-29 5950000

52 Stress Management Strategies 3 25-27 22-24 27-29 26-28 31-02 12-14 26-28 28-30 27-29 25-27 27-29 27-29 5.950.000

53 HYPNO-PRESENTATION SKILL UNLOCKINGYOUR POTENTIAL POWER 3 25-27 22-24 01-03 26-28 03-05 19-21 26-28 02-04 27-29 25-27 01-03 27-29 5.950.000

Page 40: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

40

54 ICE BREAKER FOR EFFECTIVE TRAININGDELIVERY 3 04-06 01-03 08-10 05-07 10-12 07-09 05-07 09-11 06-08 04-06 08-10 06-08 5.950.000

55 IMPROVING PERSONAL SKILL FOR SECRETARY &ADMINISTRATIVE ASSISTANT 3 09-11 06-08 15-17 10-12 17-19 12-14 10-12 14-16 11-13 09-11 15-17 13-15 5.950.000

56 SEVEN HABITS WITH NLP APPROACH 3 25-27 22-24 20-22 26-28 22-24 12-14 26-28 21-23 27-29 25-27 20-22 27-29 5.950.000

57 EMOTIONAL INTELLIGENCE FOR MENTALATTITUDE 3 09-11 06-08 22-24 10-12 22-24 07-09 10-12 23-25 11-13 09-11 22-24 11-13 5.950.000

58 FINDING YOUR ESSENTIAL SELF 3 23-25 20-22 27-01 24-26 02-04 19-21 24-26 31-02 25-27 23-25 30-01 27-29 5.950.00059 INTERPERSONAL COMMUNICATION SKILL 2 26-27 23-24 27-28 27-28 01-02 07-08 27-28 30-31 28-29 26-27 27-28 27-28 3.950.000

60 DYNAMIC INTERPERSONAL &COMMUNICATION SKILLS 2 11-12 08-09 08-09 12-13 08-09 20-21 12-13 07-08 13-14 11-12 08-09 11-12 3.950.000

61 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 30-31 20-21 03-04 22-23 07-08 03-04 24-25 04-05 02-03 20-21 06-07 3.950.000

62 PERSONALITY DEVELOPMENT BERBASISEMOTIONAL AND SPRITUAL QUETIENTS 4 23-26 20-23 06-09 24-27 08-11 05-08 24-27 31-03 25-28 23-26 06-09 11-14 7.950.000

63 STRESS & CONFLICT MANAGEMENT 3 16-18 13-15 20-22 17-19 22-24 19-21 17-19 21-23 18-20 16-18 20-22 18-20 5.950.00064 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 02-06 30-03 27-31 03-07 08-12 05-09 03-07 31-04 04-08 02-06 27-01 11-15 8.950.000

65 CORPORATE BUILIDNG DALAM MEMBANGUNKULTUR DAN ETIKA INTERNAL ORGANISASI 4 16-19 13-16 06-09 17-20 02-05 13-16 17-20 07-10 18-21 16-19 06-09 18-21 7.950.000

66 MODEL PEMBINAAN ANGGOTA YANGEXCELLENT DALAM DUNIA KERJA PERUSAHAAN 3 16-18 13-15 27-29 17-19 31-02 19-21 17-19 29-31 18-20 16-18 27-29 18-20 5.950.000

67 Office COMMUNICATION AND BEHAVIOR ETHIC 3 04-06 01-03 06-08 05-07 08-10 19-21 05-07 07-09 06-08 04-06 06-08 04-06 5.950.000

68 CHANGE & CONFLICT MANAGEMENT ANDDEALING WITH DIFFICULT PEOPLE 2 16-17 13-14 20-21 17-18 22-23 19-20 17-18 14-15 18-19 16-17 20-21 27-28 3.950.000

69 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 04-06 01-03 27-01 05-07 02-04 19-21 05-07 31-02 06-08 04-06 30-01 04-06 5.950.000

70 Change & conflict management and dealingwith difficult people 2 02-03 30-31 27-28 03-04 02-03 19-20 03-04 31-01 04-05 02-03 30-31 04-05 3.950.000

71 Strategic and Systematic Thinking 2 05-06 02-03 27-28 06-07 29-30 19-20 06-07 30-31 07-08 05-06 27-28 07-08 3.950.00072 THE LEADERSHIP CHALLENGE 2 12-13 09-10 27-28 12-13 02-03 08-09 13-14 31-01 14-15 12-13 30-31 14-15 3.950.00073 COACHING & CONSELING DI PERUSAHAAN 3 11-13 08-10 15-17 11-13 17-19 19-21 12-14 14-16 13-15 11-13 15-17 13-15 5.950.00074 COACHING AND COUNSELING ( MONITORING) 3 09-11 06-08 27-01 10-12 22-24 19-21 10-12 28-30 11-13 09-11 30-01 27-29 5.950.00075 PERFORMANCE COACHING FOR MANAGER 2 02-03 30-31 27-28 03-04 22-23 19-20 03-04 14-15 04-05 02-03 27-28 27-28 3.950.000

76 EFFECTIVE PRESENTATION AND REPORTWRITING 3 16-18 13-15 08-10 17-19 10-12 19-21 17-19 09-11 18-20 16-18 08-10 20-22 5.950.000

77 Effective Time Management 3 23-25 20-22 15-17 24-26 17-19 19-21 24-26 14-16 25-27 23-25 15-17 27-29 5.950.000

78 HANDLING CONFLICT AND COMPLAINTEFFECTIVELY 3 09-11 06-08 27-29 10-12 22-24 19-21 10-12 29-31 11-13 09-11 27-29 13-15 5.950.000

79 Strategic Time Management 3 18-20 15-17 20-22 19-21 22-24 07-09 19-21 23-25 20-22 18-20 20-22 18-20 5.950.00080 TIME MANAGEMENT 4 16-19 13-16 28-03 17-20 02-05 05-08 17-20 01-04 18-21 16-19 31-03 18-21 7.950.00081 HOW TO HANDLE CRITICISM AND COMPLAIN 2 23-24 20-21 06-07 24-25 08-09 15-16 24-25 07-08 25-26 23-24 06-07 27-28 3.950.000

Page 41: PT. MAIRODI MANDIRI SEJAHTERAmairodi-training.com/wp-content/uploads/2017/05/Agenda-Bandung... · simulasi proses teknik kimia menggunakan hysys 4 09-12 06-09 27-02 10-13 15-18 13-16

41

Keterangan :

Seluruh judul training yang ada, apabila ada permintaan dapat kami selenggarakan sebagai Inhouse Training Jadwal terupdate dapat dilihat di website kami di http://www.mairodi-training.com atau di www.pelatihan-indonesia.com atau di www.training-bandung.com Venue Training : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci, dll), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll Untuk korespondensi bisa dikirimkan via email : [email protected] atau [email protected]