proposed road -...

Post on 21-Jun-2019

214 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

END POINT 11/000 K.M.

21° - 14' - 16.6"73° - 24' - 09.0"

ST. POINT 2/800 K.M.

21° - 10' - 01.2"73° - 34' - 01.9"

PROPOSED ROAD

EXECUTIVE ENGINEERTAPI ( R & B ) DIVISION

VYARA

DEPUTY EXECUTIVE ENGINEERVYARA ( R & B ) SUB DIVISION

VYARA

CONSTRUCTION OF SONGADH UKAI SHERULLA ROADK.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE

top related