proposed road -...
TRANSCRIPT
END POINT 11/000 K.M.
21° - 14' - 16.6"73° - 24' - 09.0"
ST. POINT 2/800 K.M.
21° - 10' - 01.2"73° - 34' - 01.9"
PROPOSED ROAD
EXECUTIVE ENGINEERTAPI ( R & B ) DIVISION
VYARA
DEPUTY EXECUTIVE ENGINEERVYARA ( R & B ) SUB DIVISION
VYARA
CONSTRUCTION OF SONGADH UKAI SHERULLA ROADK.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE