proposed road -...

1
END POINT 11/000 K.M. ST. POINT 2/800 K.M. PROPOSED ROAD EXECUTIVE ENGINEER TAPI ( R & B ) DIVISION VYARA DEPUTY EXECUTIVE ENGINEER VYARA ( R & B ) SUB DIVISION VYARA CONSTRUCTION OF SONGADH UKAI SHERULLA ROAD K.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE

Upload: haphuc

Post on 21-Jun-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

END POINT 11/000 K.M.

21° - 14' - 16.6"73° - 24' - 09.0"

ST. POINT 2/800 K.M.

21° - 10' - 01.2"73° - 34' - 01.9"

PROPOSED ROAD

EXECUTIVE ENGINEERTAPI ( R & B ) DIVISION

VYARA

DEPUTY EXECUTIVE ENGINEERVYARA ( R & B ) SUB DIVISION

VYARA

CONSTRUCTION OF SONGADH UKAI SHERULLA ROADK.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE