D1.3_v1.0 QualityPlan

Page1

D1.3QUALITYPLAN

DeliverableNo.: D1.3

DeliverableTitle: QualityPlan

ProjectAcronym: Fandango

ProjectFullTitle: FAkeNewsdiscoveryandpropagationfrombigDataandartificialinteliGenceOperations

GrantAgreementNo.: 780355

WorkPackageNo.: 1

WorkPackageName: ProjectManagement

ResponsibleAuthor(s): SaverioGravina(LVT)

Date: 28.06.2018

Status: v1.0-Final

Deliverabletype: REPORT

Distribution: Confidential

ThisprojecthasreceivedfundingfromtheEuropeanUnion’sHorizon2020researchandinnovationprogrammeundergrantagreementNo780355 Ref. Ares(2018)3643895 - 09/07/2018

D1.3_v1.0 QualityPlan

Page2

REVISIONHISTORYVERSION DATE MODIFIEDBY COMMENTS

V0.1 14.05.2018 Saverio Gravina(LVT)

ToC

V0.2 11.06.2018 Saverio Gravina(LVT)

FullDraft

V0.3 18.06.2018 Massimo Magaldi(ENG)

InternalReview

V0.4 28.06.2018 Saverio Gravina(LVT)

Integrationoffeedbackfrompeerreview

V1.0 29.06.2018 SilviaBoi(ENG) Qualitycheck

D1.3_v1.0 QualityPlan

Page3

TABLEOFCONTENTSExecutiveSummary.........................................................................................................6

1. Organizationalstructureoftheprojectforqualityassuranceandmanagement.......71.1. QualityControlActivities.........................................................................................................9

2. Coordinationbetweenthepartners.......................................................................10

3. Planningandcontrol..............................................................................................113.1. ReportingProcedures............................................................................................................113.1.1. SupplementaryReports.....................................................................................................123.1.2. EvaluationProcess.............................................................................................................13

4. Controlofthedocumentation................................................................................144.1. Language...............................................................................................................................144.2. FANDANGOpublicandPrivatewebsites..............................................................................144.3. Documentsexchangemethods.............................................................................................144.4. Listoftemplatestobeused..................................................................................................154.4.1. Templatefordeliverables..................................................................................................154.5. FilesandArchives..................................................................................................................154.6. DocumentsNaming...............................................................................................................154.6.1. Deliverables.......................................................................................................................154.6.2. OtherDocuments..............................................................................................................164.7. Processforpeerreviewandcontrolofnon-conformingofdeliverables..............................174.8. Publications,Presentations,Papers......................................................................................18

5. Annex1-ActionListTemplate...............................................................................19

6. Annex2-DeliverableTemplate.............................................................................20

7. Annex3-DeliverablePeer-ReviewReportTemplate..............................................31

D1.3_v1.0 QualityPlan

Page4

LISTOFFIGURESFig.1:OverallOrganizationalstructureofFANDANGO..........................................................................7

Fig.2:WPFANDANGOManagementBoard...........................................................................................8

LISTOFTABLESTable1:Stepsforthepreparationofdeliverables................................................................................12

D1.3_v1.0 QualityPlan

Page5

ABBREVIATIONSABBREVIATION DESCRIPTION

H2020 Horizon2020

EC EuropeanCommisiion

WP WorkPackage

EU EuropeanUnion

GA GeneralAssembly

IMB InnovationManagementBoard

PD ProjectDirector

QP QualityPlan

ToC TableofContents

WPL WorkPackageLeader

D1.3_v1.0 QualityPlan

Page6

EXECUTIVESUMMARYThe goal of this document is to set-up the rules and procedures in order to produce high-qualitydeliverablesandreportsoftheFANDANGOproject,soastoguaranteethattheoutcomesoftheprojectmeet its objectives and are of high quality. Additionally, the quality plan will determine the specificarrangements for controlling the developments that aremade in the several design and developmentcentresofFANDANGOpartners.

This deliverablewill describe theplanning and reporting throughout theproject, aswell as refer to allissues related to documentation, such as repository for exchanging documents, language, templatedocuments,deliverablesreviewprocessandscientificpublications.

D1.3_v1.0 QualityPlan

Page7

1. ORGANIZATIONALSTRUCTUREOFTHEPROJECTFORQUALITYASSURANCEANDMANAGEMENT

LargeEuropeanintegrationprojectssuchasFANDANGOarecomplexorganizations,whereentitieswithdifferentbackgrounds,cultureand interests join forcesandknow-howtoachievecommongoals.Forasuccessfulcompletionoftheproject,afunctionalorganizationalstructureisessentialtoensureefficient,result-drivenmanagement.ThefollowingimagedescribestheorganizationalstructureofFANDANGO.

Fig.1:OverallOrganizationalstructureofFANDANGO

TheEPM (ExecutiveProjectManagement) isresponsiblefortheday-by-dayprojectmanagementoftheentireproject.Itconsistsofthefollowingentities:

• ProjectDirector (PD):ThePD is the intermediarybetween theCommission and theConsortium.ThePDisresponsiblefortheprojectcontrol,foradministrativeandfinancialreporting,projecttimecontrol, coordination issues and overall IP activities (e.g. training, dissemination) and is alsoresponsiblefortheoveralltechnicalmanagementandtechnicalcoordinationwithinandbetweenworkpackages.ThePDisthedirectcontactpointtotheWorkPackageLeaders(WPLs).TheWPLssendalltechnicalprogressreportstothePD.TheisalsoresponsibleforthecorrectapplicationofallEUrules,particularlyconcerningthehandlingofpaymentsandmaintenanceofaccounts.

D1.3_v1.0 QualityPlan

Page8

• Secretariat: the secretariatprovides secretarial, administrative, financial and legal support to thePD. The Secretariat will be a permanent contact person who also supports project participants,WPLsandEACmembers.

Management Board will be set up in order to guarantee an efficient management and coordination.MembersoftheManagementBoardaretheWPLeaderstheWPleaderGroupconsistofaseniorteam.InFigure2theFANDANGOcomposition.

WP Responsibility PartnerResponsible

1 ProjectManagement SilviaBoi(ENG)

2 DataAccessandInteroperability GiovanniTummarello(Sindice)

3 DatagatheringandpreprocessingforDataLakepopulation FedericoAlvarez(UPM)

4 FakeNewsidentifiers,machinelearninganddataanalytics PetrosDaras(CERTH)

5 TheFANDANGOsoftwarestack MonicaFranceschini(ENG)

6 Bigdatavaluevalidationthroughpiloting MikeMatton(VRT)

7 DisseminationActivities DavidCabo(CIVIO)

8 ReplicabilityandBusiness SaverioGravina(LvT)

Fig.2:WPFANDANGOManagementBoard

• GeneralAssembly (GA):Allpartnersof theConsortiumare represented in theGAviaoneseniorreprehensive from each of the partner organization (with the necessary delegated authority tomake decisions on behalf of their organization with respect to the project). The GA takes finaldecisions on the Consortium Agreement. The IP Coordinator will keep the GA informed aboutprogress and achievements. The GA shall solve conflicts within the Consortium that cannot beresolvedbytheEPMorthePD.TheGAmeetsregularlytwiceayear,andifmorethan30%oftheGAmembersrequireit.Itcantakedecisionsbycorrespondence.ThePDwillchairtheGA

• Innovation Management Board (IMB): Innovation is the change that brings a novelty in theprevious practice as proposed by FANDANGO tool. Innovation management is crucial for thesuccess of the project therefore an InnovationManagement Board (IMB) shall be composed ofhigh-profile business and innovationmanagers recruited from theConsortiumpartners. The IMBwhen necessarywill be consulted about the protection of privacy and personal data, aswell asotherethicalissues.AsasubdivisionofIMB:theExploitationAdvisoryCommittee(EAC),chairedbytheProjectCoordinator,addressingmarketreachproceduresandexploitationoftechnologieswillbespecificallyconsideredfortheFANDANGOprojectTheEACshalldevelopconcreteproposalsonhownewbusinessmaybegeneratedandhowexploitationshouldbeorganised fromtheprojectresults.AnyGAmembercanproposeEACmembers.TheGAdecidesregardingthecompositionofthe EAC. IMB will cover also Management of Intellectual Property Rights: The ConsortiumAgreementwill specify how IPRwill bemanaged through a IPR Audit Committee (IAC) that willmeetatleastonceayearoruponrequestbytheGA,toensurethatIPRissuesareaddressed.

D1.3_v1.0 QualityPlan

Page9

1.1. QUALITYCONTROLACTIVITIESTheQualitycontrolofactivitiesanddeliverablesareofmainimportancetotheFANDANGOproject.TheQuality Plan (QP) – this report – is issued early in the project aiming at describing the actions andmeasuresthatwillbetakenbytheConsortium,inordertoensurethequalityoftheprojectanditsfullconformancewithitscontractualrequirements.TheaimoftheQPisto:

1. Providetoallconcernedaguidefortheactionsrequiredbyeachoneinvolvedintheprojectworkanddeliverables,

2. Exhibit the performance of the project’s quality plan in accordance to the contractualrequirements,

3. Decidewhich internalmembersof theQualityControlBoardwill reviewdeliverablesandprovidethecorrespondingassignmentofresponsibilities(seebelow).

TheQPisapplicabletoalltheproject’sactivities,andastrictcompliancewiththeQPismandatoryforallpartiesinvolved.

The QP is documented and authorized by the Executive Project Management (EPM). All subsequentchangesareapprovedbytheManagementBoardandsubmittedtotheProjectDirectorforapproval.Thedescription of the quality system will focus on the prevention of deviations during each task of theproject.

The EPM is responsible for the co-ordination and supervision, regarding the implementation of themeasuresforthequalityassurance.Specifically,theManagementBoardisresponsiblefor:

• Overviewingthereportsproducedintheproject;• Controllingthetimelyandgoodexecutionoftheprojectwork;• Controlling and assuring the conformity of all deliverables with specifications described in the

project Description of Work and with additional criteria defined throughout the lifetime of theproject;

• ConsultingtheWorkPackageLeadersandprovidingthemwithguidanceontheexpectedtechnicalandscientificachievementsinthedeliverables;

• Definingprojectdeliverablereviewprocessandappointingthecorrespondingreviewers;

Inaccordancewith thecontractualagreements, theproject’squalitymanagementplan, this reporthasbeen prepared in order to define organizational structure, flow of the quality system and the qualitymanagementprocedurestobeapplied.

In the case that shortcomings inquality areencountered, the responsible task leaderwill be informedwithinapre-definedperiod(max.2weeks),inordertobeabletomakeamendments.ThereviewwillbedoneonbasisoftheQP.

D1.3_v1.0 QualityPlan

Page10

2. COORDINATIONBETWEENTHEPARTNERSAn important key of success for the FANDANGO Project project is to ensure a good communicationamong project partners and towards outside entities. A fast, reliable, and easily accessiblecommunications infrastructure is crucial for the proper operation within a large-scale pan-Europeanproject. Thiswill be realised through the intensive use of electronic communications (e.g., email,webbasedexchanges).Aprojectwebsite,inparticularthewebplatformwithintheprivatearea,willalsobeusedtoenablefastandefficientexchangesofinformation.

Additionally,WPleadersshouldkeepanupdatedlistofactions,detailingtheopenissuesoftheirWP,theseverity of the task, the deadline (probably a newdeadline if the task is for a reasonpostponed), thename or initials of the responsible assigned with the task, a small description and the issue status,accordingtothefollowinglist:

• open,• assigned,• closed,• postponed,• delayed

AtemplateActionListisavailableinANNEX1.

D1.3_v1.0 QualityPlan

Page11

3. PLANNINGANDCONTROLAspartoftheprojectmanagementactivitiesawalled-gardenenvironmentavailabletoprojectpartners,whichallowsthemtosafelyandeasilycommunicate,shareinformationandstoredocuments,hasbeensetup,usingthefollowingtools:

● Bitrix24: a collaboration platform that provides a complete suite of social collaboration,

communication and management tools, including CRM, files sharing, project management,calendars,andmore.

● GoToMeeting: this is the web conferencing solution, which is used for status meetings, WPmeetings,etc.

● GoogleDrive: cloud based file storage and synchronization service,which allows safe storage ofdeliverables,projectdocumentation,meetingreports,etc.

● GitHub:arepositoryfordistributedversioncontrol,sourcecodemanagement(SCM)andwiki.● Mailinglists:whichallowinformationsharingwithinspecificmembersgroups.

TheProjectDirectorwillberesponsibleformaintainingthefollowingkindsoflibraries,respectively,tobekeptontheportal:

• Document Library (All WP documentation including deliverables, internal documents,bibliography..)

• EventLibrary(eachevent(internalmeetings,projectmeetings,disseminationmeetings,cals,,,)willberecordedintheinternalwebsite)

Moreover, inorder to limit anyduplicationof informationand to facilitateanefficient communicationprocess by both real and virtual channels, the distribution of all relevant project information will bechannelledtoonekeypersonforeachpartner.Thispersonwillactaspartnerswitchboard,thusensuringthattheconcernedpersonwithinitsorganisationisreachedbythecommunication.

3.1. REPORTINGPROCEDURESTheforeseenreportingproceduresfortheFANDANGOprojectarethefollowing:

• Theresponsiblepartner/authorshouldbeginatleast60calendardaysbeforethedeadlinewiththepresentationofinitialTableofContents(ToC).

• Afterinput,editing,emailsanditerations,theleadingauthorshoulddeliverthefinaldocumenttotheinternalreviewerstwoweeksbeforethedeadline.

• TheinternalreviewerswilldeliverthefinaldocumenttotheTechnical&QualityManageroneweekbeforethedeadline.

• TheTechnical&QualityManagerwillapproveandsendthefinalversiontotheCoordinatorbytheDeadline.

Morespecifically,thefollowingstepswillbefollowedforthepreparationofdeliverables:

STEPS WHEN WHO WHAT

1 60 Responsiblepartner– TableofContents(ToC)

D1.3_v1.0 QualityPlan

Page12

Editor

2 58 Allinvolvedpartners CommentsonToC

3 55 Responsiblepartner–Editor

FinalToC+ChapterEditorsResponsibilities

4 54 ChapterEditors AssignSectionEditors(ifneeded)andgotoStep6,ordeclinetheresponsibilities

5 52 Allinvolvedpartners ArrangephoneconferencefornewChapterEditors

6 45 Chapter/SectionEditors Send1stinputtotheResponsiblepartner–Editor

7 43 Responsiblepartner–Editor

Circulatethe1stversionofthedeliverable

8 42 All Agreementondeliverableprogress

9 35 Chapter/SectionEditors Send2ndinputtotheDocumentEditor

10 26 Responsiblepartner–Editor

Circulatethe2ndversionofthedeliverable

11 25 All Agreementondeliverableprogress

12 23 Chapter/SectionEditors SendfinalinputtotheResponsiblepartner–Editor

13 20 Responsiblepartner–Editor

Circulatethepre-finalversionofthedeliverable

14 15 All Agreementforthepre-finalversion

TwoDocumentReviewsareassigned

15 12 InternalReviewers Approvecompletenessandscientificpartofthedeliverable

16 10 InternalReviewers Approve the syntactical and grammaticalpart

17 7 TechnicalCoordinator ApprovesandturnsdocumenttoFinal

18 1 ProjectCoordinator Approves and turns document to FinalFrozen

Table1:Stepsforthepreparationofdeliverables

3.1.1. SUPPLEMENTARYREPORTS Inadditiontothereportsdefinedinthecontract,theProjectCoordinatorwillsubmittotheCommissionInterimManagementreportseveryninemonths.Thesereportswillprovide,forthereportingperiod:

D1.3_v1.0 QualityPlan

Page13

• Thetechnicalprogressandachievementsoftheproject

• Theprojectstatus

• Workstarted

• Workcompleted

• Workdelayed

• Statusofdeliverables

• Remedialactionsrequired,ifapplicable

• Resourcesexpenditurebysubproject,work-packageandactivity.

• Absolutevaluesforthereportedperiod

• Aggregatedvalues(actualvs.planned)

3.1.2. EVALUATIONPROCESSTheworkprogressoftheFANDANGOProjectwillbeconstantlymonitoredandsupervisedbytheProjectManagementGroup.Inadditiontothat,evaluationmeetingswillbecarriedouttoevaluatetheworkandprogressoftheproject.

An internal peer reviewwill beperformed for eachdocumentproduced, especially official deliverable.EachWP leaderwill submit all theproduceddocuments to at least one appropriate expert internal toanother partner organization, which is not involved in the sameWP, to check for the quality of thedocumentsproduced.Thedeliverablereviewprocessisdescribedbelowinsection4.7.

Abasisformeasuringthequalityoftheconductedwork isthevariousmeasuresofsuccessspecifiedinthe work packages descriptions of the individual work packages (e.g. milestones, deadlines etc.). TheacademicandresearchpartnersareencouragedtotargetsubmissionofpaperstopeerreviewedjournalsindexedinSCIorSCIexpanded,havingimpactfactors(unlesstheyhavebeenestablishedrecently),andtohighimpactconferencesandworkshops.Furthermore,thepublicationofachievedresults injournalsaswellasEuropeanandinternationalconferenceswillbetakenasameasureofsuccessfortheinvolveduniversitiesandresearchteams.

D1.3_v1.0 QualityPlan

Page14

4. CONTROLOFTHEDOCUMENTATIONThedocumentationproducedbytheprojectwillbehostedintheFANDANGOGDrivefolderavailableatthefollowinglink:https://drive.google.com/drive/u/0/folders/1vFYrpPIRrnvFnwonJ2XsxUR7UJlILA7z.

TheProjectCoordinatorwillberesponsibleformaintainingontheGDrivespace:

• InterimManagementreports

• AnnualProjectReports

• MeetingMinutes

• TeleconferenceMeetingMinutes

• ContractualDocumentation

• Deliverables

• TechnicalReports

• TechnicalPapers

• MarketStudies

• Anyotherrelevantdocumentandcontent

4.1. LANGUAGEThe official language for documents and e-mail exchange will be English (UK). In case of officialdeliverables,participantsthatarenativeEnglishspeakersshouldpeer-reviewthedocuments.

4.2. FANDANGOPUBLICANDPRIVATEWEBSITESThepublicFANDANGOwebsitewillbeavailableatthefollowinglink:

https://fandango-project.eu/

Apart fromgeneral informationabout theprojectandrelatednewsandevents, thepublicdeliverablesanddocumentswillbeavailablefordownloadfromthiswebsite.

Regardingthedocumentswithrestrictedaccess,theprivateFANDANGOareasaredevelopedindifferentwebtools such as: Bitrix24, Google Drive, GitHub and TRELLO are accessible only by the FANDANGOpartnersandotherauthorizedpeople(e.g.membersoftheadvisoryboard,otherrelevantexperts,etc.)

4.3. DOCUMENTSEXCHANGEMETHODSDocumentswillbeexchangedviauploadingattheFANDANGOprivateportal.Aftersuccessfuluploadingof the document, the partner should also provide (via e-mail) the document title and link. In casedocumentuploadingisnotfeasible,e-mailexchangewillbeusedinstead.

D1.3_v1.0 QualityPlan

Page15

4.4. LISTOFTEMPLATESTOBEUSEDThefollowingtemplatesaretobeusedforthepreparationofFANDANGOdeliverablesandreports.Theyareavailableontheprojectwebsite(privatearea)orfromtheTechnical&QualityManagerorProjectCoordinator.

• Templatefordeliverables(ANNEX2)

• Template“Peer-ReviewReport”(ANNEX3)

4.4.1. TEMPLATEFORDELIVERABLESTheofficialprojectdeliverablesshouldhaveafirstpageasforthereference/templateinAnnex2.Theyshouldalsousethepagelayout(headers/footers)suggestedinthesameAnnex.

Furthermore,theyshouldcomplywiththefollowingrules:

• Haveadocumenthistorytable;

• HavealistofabbreviationsusedwithintheDeliverable;

• Haveatableofcontents;

• HavealistofFigures,ifrelevant;

• HavealistofTables,ifrelevant;

• Startwithone-pagemaxExecutiveSummary;

• EndthemainpartwithaConclusionssectionofaround1page;

• IncludeaReferencessectionaftertheConclusionssection.

4.5. FILESANDARCHIVESAll“released”versionsoftheprojectdeliverablesarecentrallystoredfordownloadontheprojectWebsite, either in the “restricted” area for deliverables classified as “CO”, or in the public area for alldeliverablesclassifiedas“PU”.Flexibleaccessrightscanbeattributedalternatively.

4.6. DOCUMENTSNAMINGProperdocumentnaming isessential inorder tokeep trackof theproject technicalandadministrativeresources.

4.6.1. DELIVERABLESTheofficialdeliverablewillbenamedusingthenamingformat

FANDANGO_Dw.d_Title_ACR_Vx.y.ext

where:

w:istheworkpackagenumber

D1.3_v1.0 QualityPlan

Page16

d:isthedeliverablenumber

Title:istheTitleofthedeliverable

ACR:isthepartnerAcronymthatinitiatedandhastheresponsibilityforthedocument

x:istheversionmajornumber

y:istheversionminornumber

ext:istheextension(.doc,.pdf,.ppt,.xls,.exe,.zip)

Thepartnerthatinitiatedandhastheresponsibilityforthedocumentwillhavetheauthoritytochangetheversionnumber. Incaseapartneraims tosendcommentson thedocument, trackchangescanbeused,addingthepartner’sacronymattheend.

FANDANGO_Dw.d_Title_ACR_Vx.y_ACR2.ext

After some iterations, the responsible partner (editor) will have the authority to change the versionnumberanddate.

Whenthedeliverableisfinalised,thepartnerthathastheresponsibilityforitwillhavetheauthoritytochangetheversionnumberanddate.

FANDANGO_Dw.d_Title_ACR_Vx.y_FF.ext

WhereFFrepresentsthe“FinalFrozen”version,whichcannotbemodified,unlessrequestedbythePOortheexternalreviewersappointedbytheEC.

4.6.2. OTHERDOCUMENTS TheFANDANGOdocuments(publicandprivate)willhavethefollowingformat:

FANDANGO_WPw_ShortTitle_YYYYMMDD_ACR_Vx.y.ext

where:

w:istheworkpackagenumber

ACR:isthepartnerAcronymthatinitiatedandhastheresponsibilityforthedocument

ShortTitle:isanexplanatoryshorttitleofthedocument

x:istheversionmajornumber

y:istheversionminornumber

YYYY:istheyear

MM:isthemonth

DD:istheday

ext:istheextension(.doc,.pdf,.ppt,.xls,.exe,.zip)

D1.3_v1.0 QualityPlan

Page17

4.7. PROCESS FOR PEER REVIEW AND CONTROL OF NON-CONFORMING OFDELIVERABLES

The following procedure refers only to project deliverables and not to internal reports and otherdocuments.

EachdeliverablewillbereviewedbyatleastonememberoftheConsortiumwhohasnotparticipatedtothat deliverable, acting as internal reviewer. He/she will evaluate the deliverable with respect to thefollowingmattersandmustconcludewhetherthedeliverableisinternalacceptedornot:

• Deliverablecontents

• Relevance

• Qualityofachievements

• Qualityofpresentationofachievements

• Comprehensibility,spelling,etc.

• Technicalterminology

TherelevantcommentswillbeincludedinaDeliverablePeer-ReviewReport,asindicatedinAnnex3.

The layout and format of the deliverable will finally be checked by the Quality Manager to assure auniformlayout.ThefinalratingoftheDeliverabledraftwillbemarkedas:

• Fullyaccepted

• Acceptedwithreservation

• Rejectedunlessmodifiedproperly

The deliverable under consideration/examination will be sent by the author (according to the timingdefinedinsection2)totheCoordinator,whowillforwardittothereviewers.

The reviewers foreachdeliverableare listed ina table thatwill keptupdateby theCoordinator in theinternalcollaborationplatform.

Thereviewerswillrevisethedeliverableandpreparethe«PeerReviewReport»,whichareallcollectedby the Technical & Quality Manager. The reviewers will also send back the deliverable with detailedcomments, suggestions, and changes directly within theMSWord document by activating the “trackchanges”option.

TheQualityManager upon receiving the above reportswill send them to the deliverable authorwithpotentially someadditional commentsor suggestions ina separatePeerReviewReportand/ordirectlywithintheMSWorddocumentbyactivatingthe“trackchanges”option.

Themainauthorofthedeliverablehastosendbackthepeerreviewreport,wherethe"Authorresponse"fieldsundereachquestionarecompletedandthedeliverable(twoWorddocument:onewithallchangesvisibleandonecleanedandreadytobepublished).Ifneeded,theauthorsendsalsoadocumentwiththesummaryofmainfeedbackandactionstaken,asaresultofthecommentsinthePeerReviewReports.

D1.3_v1.0 QualityPlan

Page18

4.8. PUBLICATIONS,PRESENTATIONS,PAPERSIfapartner isabouttosubmit forpublicationapartofworkperformedwithintheproject, thepartnershall informthecoordinator,theTechnical&QualityManagerandtheconsortiummembersbeforethesubmission, by sending an email to themwith the relevant information about that publication (titles,authors,abstract).

Awrittenacceptance shall be returned to thepartner (within2weeks)beforehe/sheproceeds to thesubmission.Moreover,theparticipationinexhibitionsthroughastandandthepresentationofdemosoftheprojectresultsrequireprioragreementofthewholeprojectConsortium.

All publications, presentations, active participation to events etc. in the name of the projectmust beannouncedtotheCoordinatorandtheTechnical&QualityManagerandwillbecentrallydocumented.Updatesneedtobedoneintherespectivetablesintheinterimreports.Inaddition,eachpartnershallfillin the respective template “Dissemination Form” which is available from the Coordinator and theDisseminationresponsible.

D1.3_v1.0 QualityPlan

Page19

5. ANNEX1-ACTIONLISTTEMPLATE

WP ACTION WHO TO WHEN STATUS NOTE

WP1 CompletePeerReview ENG LVT 15.06.2018 Closed Waiting for arevisedversion

D1.3_v1.0 QualityPlan

Page20

6. ANNEX2-DELIVERABLETEMPLATE

----DeliverableTemplatebeginsonnextpage---

D1.3_v1.0 QualityPlan

Page21

FANDANGODELIVERABLE

DeliverableNo.: DD0.0

DeliverableTitle: Title

ProjectAcronym: Fandango

ProjectFullTitle: FAkeNewsdiscoveryandpropagationfrombigDataandartificialinteliGenceOperations

GrantAgreementNo.: 780355

WorkPackageNo.: 0

WorkPackageName: LoremIpseDixitLoremIpseDixitLoremIpseDixitLoremIpseDixit

ResponsibleAuthor(s): Firmn.1,Firmn.2,Firmn.3

Date: 30.09.2017

Status: v0.1-Draft

Deliverabletype: REPORT|ORDP|OTHER|ETHIC

Distribution: PUBLIC

ThisprojecthasreceivedfundingfromtheEuropeanUnion’sHorizon2020researchandinnovationprogrammeundergrantagreementNo780355

D1.3_v1.0 QualityPlan

Page22

REVISIONHISTORYVERSION DATE MODIFIEDBY COMMENTS

V0.1 07.12.2016 Firstdraft

V0.2 14.12.2016 contributions,2.2

V0.3 19.12.2016 firstcontributions,2.4

V0.4 30.12.2016 contributions,2.3

V0.5 09.01.2017 Fulldraft

V0.6 InternalReview

V1.0 Qualitycheck

D1.3_v1.0 QualityPlan

Page23

TABLEOFCONTENTSExecutiveSummary.......................................................................................................26

1. Introduction...........................................................................................................271.1. Paragraph..............................................................................................................................271.1.1. Title..................................................................................................................................................28

2.Introduction...............................................................................................................29

Annex–Title..................................................................................................................30

D1.3_v1.0 QualityPlan

Page24

LISTOFFIGURESFigure1Caption..............................................................................Errore.Ilsegnalibrononèdefinito.

LISTOFTABLESTable1Caption...............................................................................Errore.Ilsegnalibrononèdefinito.

D1.3_v1.0 QualityPlan

Page25

ABBREVIATIONSABBREVIATION DESCRIPTION

H2020 Horizon2020

EC EuropeanCommisiion

WP WorkPackage

EU EuropeanUnion

D1.3_v1.0 QualityPlan

Page26

EXECUTIVESUMMARYLoremipsumdolorsitamet,consecteturadipiscingelit,seddoeiusmodtempor incididuntut laboreetdoloremagnaaliqua.Utenimadminimveniam,quisnostrudexercitationullamcolaborisnisiutaliquipexeacommodoconsequat.Duisauteiruredolorinreprehenderitinvoluptatevelitessecillumdoloreeufugiatnullapariatur. Excepteur sintoccaecat cupidatatnonproident, sunt in culpaquiofficiadeseruntmollitanimidestlaborum.

"Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium,totamremaperiam,eaqueipsaquaeabilloinventoreveritatisetquasiarchitectobeataevitaedictasuntexplicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quiaconsequunturmagnidoloreseosquirationevoluptatemsequinesciunt.Nequeporroquisquamest,quidoloremipsumquiadolorsitamet,consectetur,adipiscivelit,sedquianonnumquameiusmoditemporaincidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quisnostrumexercitationemullamcorporissuscipit laboriosam,nisiutaliquidexeacommodiconsequatur?Quisautemveleumiurereprehenderitquiineavoluptatevelitessequamnihilmolestiaeconsequatur,velillumquidoloremeumfugiatquovoluptasnullapariatur?"

D1.3_v1.0 QualityPlan

Page27

1. INTRODUCTIONSedutperspiciatisundeomnisistenatuserrorsitvoluptatemaccusantiumdoloremque

1.1. PARAGRAPHSed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium,totamremaperiam,eaqueipsaquaeabilloinventoreveritatisetquasiarchitectobeataevitaedictasuntexplicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quiaconsequunturmagnidoloreseosquirationevoluptatemsequinesciunt.Nequeporroquisquamest,quidoloremipsumquiadolorsitamet,consectetur,adipiscivelit,sedquianonnumquameiusmoditemporaincidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quisnostrumexercitationemullamcorporissuscipit laboriosam,nisiutaliquidexeacommodiconsequatur?Quisautemveleumiurereprehenderitquiineavoluptatevelitessequamnihilmolestiaeconsequatur,velillumquidoloremeumfugiatquovoluptasnullapariatur?

TITLE TITLE

Title Content

Title Content

Title Content

Table2Caption

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium,totamremaperiam,eaqueipsaquaeabilloinventoreveritatisetquasiarchitectobeataevitaedictasuntexplicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quiaconsequunturmagnidoloreseosquirationevoluptatemsequinesciunt.Nequeporroquisquamest,quidoloremipsumquiadolorsitamet,consectetur,adipiscivelit,sedquianonnumquameiusmoditemporaincidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quisnostrumexercitationemullamcorporissuscipit laboriosam,nisiutaliquidexeacommodiconsequatur?Quisautemveleumiurereprehenderitquiineavoluptatevelitessequamnihilmolestiaeconsequatur,velillumquidoloremeumfugiatquovoluptasnullapariatur?

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium,totamremaperiam,eaqueipsaquaeabilloinventoreveritatisetquasiarchitectobeataevitaedictasuntexplicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quiaconsequunturmagnidoloreseosquirationevoluptatemsequinesciunt.Nequeporroquisquamest,quidoloremipsumquiadolorsitamet,consectetur,adipiscivelit,sedquianonnumquameiusmoditemporaincidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quisnostrumexercitationemullamcorporissuscipit laboriosam,nisiutaliquidexeacommodiconsequatur?Quisautemveleumiurereprehenderitquiineavoluptatevelitessequamnihilmolestiaeconsequatur,velillumquidoloremeumfugiatquovoluptasnullapariatur?

D1.3_v1.0 QualityPlan

Page28

1.1.1. TITLESed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium,totamremaperiam,eaqueipsaquaeabilloinventoreveritatisetquasiarchitectobeataevitaedictasuntexplicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quiaconsequunturmagnidoloreseosquirationevoluptatemsequinesciunt.Nequeporroquisquamest,quidoloremipsumquiadolorsitamet,consectetur,adipiscivelit,sedquianonnumquameiusmoditemporaincidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quisnostrumexercitationemullamcorporissuscipit laboriosam,nisiutaliquidexeacommodiconsequatur?Quisautemveleumiurereprehenderitquiineavoluptatevelitessequamnihilmolestiaeconsequatur,velillumquidoloremeumfugiatquovoluptasnullapariatur?

Figure1Caption

D1.3_v1.0 QualityPlan

Page29

2. INTRODUCTIONTest

D1.3_v1.0 QualityPlan

Page30

3. ANNEX–TITLETITLE TITLE

Title Content

Title Content

Title Content

---EndofDocumentTemplate---

D1.3_v1.0 QualityPlan

Page31

7. ANNEX3-DELIVERABLEPEER-REVIEWREPORTTEMPLATE

----PeerReviewTemplatebeginsonnextpage---

D1.3_v1.0 QualityPlan

Page32

FANDANGOPEERREVIEWREPORT

DeliverableNo.: DD0.0

DeliverableTitle: Title

ProjectAcronym: Fandango

ProjectFullTitle: FAkeNewsdiscoveryandpropagationfrombigDataandartificialinteliGenceOperations

GrantAgreementNo.: 780355

WorkPackageNo.: 0

WorkPackageName: LoremIpseDixitLoremIpseDixitLoremIpseDixitLoremIpseDixit

ResponsibleAuthor(s): Firmn.1,Firmn.2,Firmn.3

Date: 30.09.2017

Status: v0.1-Draft

Deliverabletype: REPORT|ORDP|OTHER|ETHIC

Distribution: PUBLIC

ThisprojecthasreceivedfundingfromtheEuropeanUnion’sHorizon2020researchandinnovationprogrammeundergrantagreementNo780355

D1.3_v1.0 QualityPlan

Page33

PROCEDURESUSEDFORPEERREVIEWLoremipsumdolorsitamet,consecteturadipiscingelit,seddoeiusmodtempor incididuntut laboreetdoloremagnaaliqua.Utenimadminimveniam,quisnostrudexercitationullamcolaborisnisiutaliquipexeacommodoconsequat.Duisauteiruredolorinreprehenderitinvoluptatevelitessecillumdoloreeufugiatnullapariatur. Excepteur sintoccaecat cupidatatnonproident, sunt in culpaquiofficiadeseruntmollitanimidestlaborum.

"Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium,totamremaperiam,eaqueipsaquaeabilloinventoreveritatisetquasiarchitectobeataevitaedictasuntexplicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quiaconsequunturmagnidoloreseosquirationevoluptatemsequinesciunt.Nequeporroquisquamest,quidoloremipsumquiadolorsitamet,consectetur,adipiscivelit,sedquianonnumquameiusmoditemporaincidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quisnostrumexercitationemullamcorporissuscipit laboriosam,nisiutaliquidexeacommodiconsequatur?Quisautemveleumiurereprehenderitquiineavoluptatevelitessequamnihilmolestiaeconsequatur,velillumquidoloremeumfugiatquovoluptasnullapariatur?"

REVIEWERNAME PARTNER EMAIL

OVERALLPEERREVIEWRESULTThedeliverableis:

¨ Fullyaccepted

¨ Acceptedwithreservation

¨ Rejectedunlessmodifiedassuggested

¨ Fullyrejected

D1.3_v1.0 QualityPlan

Page34

SUGGESTEDACTIONSTOTHEAUTHORS

THEFOLLOWINGCHANGESSHOULDBEIMPLEMENTED:Loremipsum

SPECIFYMISSINGCHAPTERS/SUBJECTS:Loremipsum

REQUIREDCHANGESONDELIVERABLEESSENCEANDCONTENTS:Loremipsum

FURTHERRELEVANTREQUIREDIMPROVEMENTS:Loremipsum

D1.3_v1.0 QualityPlan

Page35

GENERALCOMMENTSREVIEWER:Loremipsum

AUTHORRESPONSE:Loremipsum

D1.3_v1.0 QualityPlan

Page36

SPECIFICCOMMENTS

RELEVANCETOTHESUBJECTANDPARTICULARACTIVITIESWPCOVERSREVIEWER:Loremipsum

AUTHORRESPONSE:Loremipsum

METHODOLOGICALFRAMEWORKSOUNDNESSREVIEWER:Loremipsum

AUTHORRESPONSE:Loremipsum

QUALITYOFACHIEVEMENTSREVIEWER:Loremipsum

AUTHORRESPONSE:Loremipsum

QUALITYOFPRESENTATIONOFACHIEVEMENTSREVIEWER:Loremipsum

AUTHORRESPONSE:Loremipsum

DELIVERABLELAYOUT/SPELLING/FORMATREVIEWER:Loremipsum

D1.3_v1.0 QualityPlan

Page37

AUTHORRESPONSE:Loremipsum

---EndofPeerReviewTemplate---