primary
Post on 16-Oct-2021
7 Views
Preview:
TRANSCRIPT
1A2
1A1
1A3
1A4
103
104
101
102
A-01-101
5
A-01-101
3
A-01-101
4
A-01-101
6
41'-4"
30
'-0
"
(FIELD VERIFY)
(F
IE
LD
V
ER
IF
Y)
2'-6
"
2'-6"
Primary
Sludge Pump
Station No. 1
101 102
A
A A
103
A
104
3'-6
"
3'-6
"
EQ
EQ
PR
IN
TE
D: 11/2/2018 @
8:24A
M
FILE
N
AM
E: G
:\4649-T
ow
nB
ranchT
hick\W
orking D
raw
ings\A
utoC
AD
\4649-A
-01-101.dw
g
DATE:
SCALE:
SHEET NO.
TO
WN
B
RA
NC
H W
WT
P T
HIC
KE
NIN
G P
RO
CE
SS
U
PG
RA
DE
S
LE
XIN
GT
ON
-F
AY
ET
TE
U
RB
AN
C
OU
NT
Y G
OV
ER
NM
EN
T
DE
SIG
NE
D:
DR
AW
N:
RE
VIE
WE
D:
AP
PR
OV
ED
:
DA
TE
BY
DE
SC
RIP
TIO
NN
O.
RE
VIS
IO
NS
SC
AL
E C
HE
CK
:T
HIS
M
AR
K S
HO
UL
D M
EA
SU
RE
E
XA
CT
LY
1
" W
HE
N P
LO
TT
ED
CLIE
NT
P
RO
JE
CT
N
O.
GR
W P
RO
JE
CT
N
O. 4649
AL
L R
IG
HT
S R
ES
ER
VE
D:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F
GR
W E
NG
IN
EE
RS
, IN
C. A
ND
S
HA
LL
N
OT
BE
R
EP
RO
DU
CE
D IN
W
HO
LE
O
R IN
P
AR
T
OR
U
SE
D F
OR
C
ON
ST
RU
CT
IO
N O
F
OT
HE
R T
HA
N T
HIS
S
PE
CIF
IC
P
RO
JE
CT
WIT
HO
UT
W
RIT
TE
N P
ER
MIS
SIO
N
OCTOBER, 2018
BID
S
ET
engi
neer
inga
rchi
tect
ureg
eosp
atia
l
PLO
TT
ED
B
Y: bgoodw
in ww
w.g
rwin
c.co
m
A-01-101
1/4" = 1'
RD
H
RD
H
RD
H
--
PR
IM
AR
Y S
LU
DG
E P
UM
PIN
G S
TA
TIO
N N
O. 1
AR
CH
IT
EC
TU
RA
L P
LA
NS
SHEET KEYNOTES:
D ROOF DEMOLITION: REMOVE LIGHTNING PROTECTION
SYSTEM AND RETAIN FOR RE-INSTALLATION. REMOVE
ALL LAYERS OF THE EXISTING ROOF DOWN TO THE
CONCRETE DECK. INSPECT CONCRETE ROOF DECK
AND REPAIR AS NEEDED FOR NEW ROOF
INSTALLATION.
NEW WORK:
1. PRIME CONCRETE DECK AND INSTALL TAPERED
POLYISOCYANURATE INSULATION.
2. INSTALL SBS MODIFIED BITUMEN BASE SHEET AND
CAP SHEET
3. RE-INSTALL LIGHTNING PROTECTION SYSTEM. (TYP.
AT PERIMETER AND ALL STACKS, FANS AND UNITS)
4. INSTALL BOOT FLASHING FOR EXISTING PIPE/VENT
ROOF PENETRATION (SEE EXISTING CONDITIONS AND
MECH/PLUMBING DRAWINGS FOR EXACT QUANTITY
AND LOCATIONS)
5. INSTALL CURB FLASHING FOR EXISTING ROOF
PENETRATION (SEE EXISTING CONDITIONS AND
MECH/PLUMBING DRAWINGS FOR EXACT QUANTITY
AND LOCATIONS)
6. REMOVE EXISTING DOOR AND ALL ASSOCIATED
HARDWARE. INSTALL NEW INSULATED FRP DOOR TO
MATCH EXISTING FRAME OPENING. INSTALL NEW
DOOR HARDWARE TO MATCH EXISTING SET AND
FUNCTION.SEE DOOR SCHEDULE ON SHEET A-00-601.
7. REMOVE EXISTING ALUMINUM WINDOW UNIT. CLEAN
ALL CAULK AND PREP OPENING FOR NEW UNIT.
INSTALL NEW THARMALLY BROKEN ALUMINUM
WINDOW UNIT W/ INSULATED GALZING TO MATCH
EXISTING OPENING. CAULK INSIDE AND OUTSIDE
(TYP)
8. EXISTING WINDOW OPENING WITH WINDOW AIR
CONDITIONING UNIT TO REMAIN.
9. (NOTE NOT USED THIS BUILDING)
10. NEW 42-INCH HIGH TWO-RAIL GUARD RAIL ANCHORED
TO DECK. EXTEND ENDS OF GUARD RAIL 30-INCHES
BEYOND LIMITS OF ROOFTOP EQUIPMENT. SEE
DETAIL 7/A-01-101 FOR NOTES AND DIMENSIONS.
6
SCALE: 1/4"=1'-0"
0 4' 8'2'
1
FLOOR PLAN
PLAN
NORTH
SCALE: 1/4"=1'-0"
0 4' 8'2'
2
ROOF PLAN
PLAN
NORTH
SCALE: 1/4"=1'-0"
0 4' 8'2'
3
SOUTH ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
4
EAST ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
5
NORTH ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
6
WEST ELEVATION
87
6
6
8
7
6
7
7
5
5
5
4
4
4 4
4
4
4
4
3
1
D
2
TYPICAL
TYPICAL
TYPICAL
TYPICAL
687
7 7
6
6
6
7 8
10
10
SCALE: 1/2"=1'-0"
0 2' 4'1'
7
DETAIL AT GUARD RAIL
1A
DD
EN
DU
M N
O. 1
11
/2
/2
01
8D
RH
1
1
1
201
203
202
A-02-101
5
A-02-101
3
A-02-101
6
39'-8"
(FIELD VERIFY)
15'-4"
(F
IE
LD
V
ER
IF
Y)
2'-6"
2'-6"
Primary
Sludge Pump
Station No. 2
201
201
PR
IN
TE
D: 11/2/2018 @
8:29A
M
FILE
N
AM
E: G
:\4649-T
ow
nB
ranchT
hick\W
orking D
raw
ings\A
utoC
AD
\4649-A
-02-101.dw
g
DATE:
SCALE:
SHEET NO.
TO
WN
B
RA
NC
H W
WT
P T
HIC
KE
NIN
G P
RO
CE
SS
U
PG
RA
DE
S
LE
XIN
GT
ON
-F
AY
ET
TE
U
RB
AN
C
OU
NT
Y G
OV
ER
NM
EN
T
DE
SIG
NE
D:
DR
AW
N:
RE
VIE
WE
D:
AP
PR
OV
ED
:
DA
TE
BY
DE
SC
RIP
TIO
NN
O.
RE
VIS
IO
NS
SC
AL
E C
HE
CK
:T
HIS
M
AR
K S
HO
UL
D M
EA
SU
RE
E
XA
CT
LY
1
" W
HE
N P
LO
TT
ED
CLIE
NT
P
RO
JE
CT
N
O.
GR
W P
RO
JE
CT
N
O. 4649
AL
L R
IG
HT
S R
ES
ER
VE
D:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F
GR
W E
NG
IN
EE
RS
, IN
C. A
ND
S
HA
LL
N
OT
BE
R
EP
RO
DU
CE
D IN
W
HO
LE
O
R IN
P
AR
T
OR
U
SE
D F
OR
C
ON
ST
RU
CT
IO
N O
F
OT
HE
R T
HA
N T
HIS
S
PE
CIF
IC
P
RO
JE
CT
WIT
HO
UT
W
RIT
TE
N P
ER
MIS
SIO
N
OCTOBER, 2018
BID
S
ET
engi
neer
inga
rchi
tect
ureg
eosp
atia
l
PLO
TT
ED
B
Y: bgoodw
in ww
w.g
rwin
c.co
m
A-02-101
1/4" = 1'
RD
H
RD
H
RD
H
--
PR
IM
AR
Y S
LU
DG
E P
UM
PIN
G S
TA
TIO
N N
O. 2
AR
CH
IT
EC
TU
RA
L P
LA
NS
PLAN
NORTH
SCALE: 1/4"=1'-0"
0 4' 8'2'
1
FLOOR PLAN
SCALE: 1/4"=1'-0"
0 4' 8'2'
2
ROOF PLAN
SCALE: 1/4"=1'-0"
0 4' 8'2'
3
SOUTH ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
4
EAST ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
5
NORTH ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
6
WEST ELEVATION
PLAN
NORTH
SHEET KEYNOTES:
D ROOF DEMOLITION: REMOVE LIGHTNING PROTECTION
SYSTEM AND RETAIN FOR RE-INSTALLATION. REMOVE
ALL LAYERS OF THE EXISTING ROOF DOWN TO THE
CONCRETE DECK. INSPECT CONCRETE ROOF DECK
AND REPAIR AS NEEDED FOR NEW ROOF
INSTALLATION.
NEW WORK:
1. PRIME CONCRETE DECK AND INSTALL TAPERED
POLYISOCYANURATE INSULATION.
2. INSTALL SBS MODIFIED BITUMEN BASE SHEET AND
CAP SHEET
3. RE-INSTALL LIGHTNING PROTECTION SYSTEM. (TYP.
AT PERIMETER AND ALL STACKS, FANS AND UNITS)
4. INSTALL BOOT FLASHING FOR EXISTING PIPE/VENT
ROOF PENETRATION (SEE EXISTING CONDITIONS AND
MECH/PLUMBING DRAWINGS FOR EXACT QUANTITY
AND LOCATIONS)
5. INSTALL CURB FLASHING FOR EXISTING ROOF
PENETRATION (SEE EXISTING CONDITIONS AND
MECH/PLUMBING DRAWINGS FOR EXACT QUANTITY
AND LOCATIONS)
6. REMOVE EXISTING DOOR AND ALL ASSOCIATED
HARDWARE. INSTALL NEW INSULATED FRP DOOR TO
MATCH EXISTING FRAME OPENING. INSTALL NEW
DOOR HARDWARE TO MATCH EXISTING SET AND
FUNCTION.SEE DOOR SCHEDULE ON SHEET A-00-601.
7. (NOTE NOT USED THIS BUILDING)
8. (NOTE NOT USED THIS BUILDING)
9. (NOTE NOT USED THIS BUILDING)
10. NEW 42-INCH HIGH TWO-RAIL GUARD RAIL ANCHORED
TO DECK. EXTEND ENDS OF GUARD RAIL 30-INCHES
BEYOND LIMITS OF ROOFTOP EQUIPMENT. SEE
DETAIL 7/A-01-101 FOR NOTES AND DIMENSIONS.
2
2
2
6
6
5
4
4
4
4
4
4
3
D
1
2
TYPICAL
TYPICAL
TYPICAL
TYPICAL
10
10
1A
DD
EN
DU
M N
O. 1
11
/2
/2
01
8D
RH
1
1
304
A-03-101
6
A-03-101
3
A-03-101
4
A-03-101
5
303
301
302
305
306
3B23B3
3B4
3B1
36'-4"
(F
IE
LD
V
ER
IF
Y)
45'-8"
(FIELD VERIFY)
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
B
303
B
B B
301 302
PR
IN
TE
D: 11/2/2018 @
8:33A
M
FILE
N
AM
E: G
:\4649-T
ow
nB
ranchT
hick\W
orking D
raw
ings\A
utoC
AD
\4649-A
-03-101.dw
g
DATE:
SCALE:
SHEET NO.
TO
WN
B
RA
NC
H W
WT
P T
HIC
KE
NIN
G P
RO
CE
SS
U
PG
RA
DE
S
LE
XIN
GT
ON
-F
AY
ET
TE
U
RB
AN
C
OU
NT
Y G
OV
ER
NM
EN
T
DE
SIG
NE
D:
DR
AW
N:
RE
VIE
WE
D:
AP
PR
OV
ED
:
DA
TE
BY
DE
SC
RIP
TIO
NN
O.
RE
VIS
IO
NS
SC
AL
E C
HE
CK
:T
HIS
M
AR
K S
HO
UL
D M
EA
SU
RE
E
XA
CT
LY
1
" W
HE
N P
LO
TT
ED
CLIE
NT
P
RO
JE
CT
N
O.
GR
W P
RO
JE
CT
N
O. 4649
AL
L R
IG
HT
S R
ES
ER
VE
D:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F
GR
W E
NG
IN
EE
RS
, IN
C. A
ND
S
HA
LL
N
OT
BE
R
EP
RO
DU
CE
D IN
W
HO
LE
O
R IN
P
AR
T
OR
U
SE
D F
OR
C
ON
ST
RU
CT
IO
N O
F
OT
HE
R T
HA
N T
HIS
S
PE
CIF
IC
P
RO
JE
CT
WIT
HO
UT
W
RIT
TE
N P
ER
MIS
SIO
N
OCTOBER, 2018
BID
S
ET
engi
neer
inga
rchi
tect
ureg
eosp
atia
l
PLO
TT
ED
B
Y: bgoodw
in ww
w.g
rwin
c.co
m
A-03-101
1/4" = 1'
RD
H
RD
H
RD
H
---
GR
AV
IT
Y T
HIC
KE
NE
RS
B
UILD
IN
G P
LA
N
AR
CH
IT
EC
TU
RA
L P
LA
NS
6
SCALE: 1/4"=1'-0"
0 4' 8'2'
1
FLOOR PLAN
PLAN
NORTH
SCALE: 1/4"=1'-0"
0 4' 8'2'
2
ROOF PLAN
PLAN
NORTH
SCALE: 1/4"=1'-0"
0 4' 8'2'
3
SOUTH ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
4
WEST ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
5
EAST ELEVATION
SCALE: 1/4"=1'-0"
0 4' 8'2'
6
NORTH ELEVATION
SHEET KEYNOTES:
D ROOF DEMOLITION: REMOVE LIGHTNING PROTECTION
SYSTEM AND RETAIN FOR RE-INSTALLATION. REMOVE
ALL LAYERS OF THE EXISTING ROOF DOWN TO THE
CONCRETE DECK. INSPECT CONCRETE ROOF DECK
AND REPAIR AS NEEDED FOR NEW ROOF
INSTALLATION.
NEW WORK:
1. PRIME CONCRETE DECK AND INSTALL TAPERED
POLYISOCYANURATE INSULATION.
2. INSTALL SBS MODIFIED BITUMEN BASE SHEET AND
CAP SHEET
3. RE-INSTALL LIGHTNING PROTECTION SYSTEM. (TYP.
AT PERIMETER AND ALL STACKS, FANS AND UNITS)
4. INSTALL BOOT FLASHING FOR EXISTING PIPE/VENT
ROOF PENETRATION (SEE EXISTING CONDITIONS AND
MECH/PLUMBING DRAWINGS FOR EXACT QUANTITY
AND LOCATIONS)
5. INSTALL CURB FLASHING FOR EXISTING ROOF
PENETRATION (SEE EXISTING CONDITIONS AND
MECH/PLUMBING DRAWINGS FOR EXACT QUANTITY
AND LOCATIONS)
6. REMOVE EXISTING DOOR AND ALL ASSOCIATED
HARDWARE. INSTALL NEW INSULATED FRP DOOR TO
MATCH EXISTING FRAME OPENING. INSTALL NEW
DOOR HARDWARE TO MATCH EXISTING SET AND
FUNCTION.SEE DOOR SCHEDULE ON SHEET A-00-601.
7. REMOVE EXISTING ALUMINUM WINDOW UNIT. CLEAN
ALL CAULK AND PREP OPENING FOR NEW UNIT.
INSTALL NEW THARMALLY BROKEN ALUMINUM
WINDOW UNIT W/ INSULATED GALZING TO MATCH
EXISTING OPENING. CAULK INSIDE AND OUTSIDE
(TYP)
8. EXISTING WINDOW OPENING WITH WINDOW AIR
CONDITIONING UNIT TO REMAIN.
9. EXISTING OVERHEAD DOOR TO REMAIN
10. NEW 42-INCH HIGH TWO-RAIL GUARD RAIL ANCHORED
TO DECK. EXTEND ENDS OF GUARD RAIL 30-INCHES
BEYOND LIMITS OF ROOFTOP EQUIPMENT. SEE
DETAIL 7/A-01-101 FOR NOTES AND DIMENSIONS.
7
7
6
77
6
6
D
1
2
TYPICAL
TYPICAL
TYPICAL
6
6
9
9
6
6
6
7
7
7
5
4
4
4
4
4
5
5
5
3 TYPICAL
10
10
10
10
1A
DD
EN
DU
M N
O. 1
11
/2
/2
01
8D
RH
1
1
1
top related