POMPANO G.O. BOND STREETSCAPEDR. MARTIN LUTHER KING JR. BLVD. RECONSTRUCTIONPHASE 2 (BETWEEN NW 10th AVE. AND NW 6th AVE.)

CITY PROJECT NO. 19356SECOND PUBLIC OUTREACH MEETING

JULY 29, 2019

PROJECT BACKGROUND

CONSTRUCTION PHASING - 2014

BLA

NC

HE

ELY

/ 6TH

AVE

ATLANTIC BLVD

I-95

MLK/HAMMONDVILLE RD

PHASE 2PHASE 2 PHASE 1PHASE 1

MLK BLVD. – PHASE 2

MLK BLVD. – PHASE 2

PROJECT BACKGROUND

LANDSCAPE CONCEPT - 2012

MLK BLVD. – PHASE 2PREVIOUSLY DESIGNED AND PERMITTED PLANS 

MLK BLVD. – PHASE 2PROJECT DESCRIPTION –ROADWAY RECONSTRUCTION AND STREETSCAPECOMPLETED PHASE 1 (EAST OF NW 6th AVENUE)

MLK BLVD. – PHASE 2PROJECT DESCRIPTION –LANDSCAPE & HARDSCAPE BEAUTIFICATION / MULTI‐MODAL / PEDESTIAN SAFETYCOMPLETED PHASE 1 (EAST OF NW 6th AVENUE)

MLK BLVD. – PHASE 2PROJECT CONSTRUCTION

• MLK PHASE 1 AND 2 WERE PREVIOUSLY FULLY DESIGNED AND PERMITTED.

• SOME PERMITS HAVE EXPIRED FOR PHASE 2 AND ARE CURRENYLY BEING REPROCESSED.

• THE CITY’s INTENT IS TO HAVE THIS PROJECT BE THE FIRST UNDER THE G.O. BOND TO GO UNDER CONSTRUCTION.

• THE CITY IS IN THE PROCESS OF FORMALLY SELECTING THE CONTRUCTION‐MANAGER‐AT‐RISK (CMAR)

• PROJECT SCHEDULECONSTRUCTION COMPLETION – 2021ANTICIPATED CONSTRUCTION DURATION 12‐MONTHS