polymer concrete service pedestal foundations catalog · polymer concrete performance . quazite®...

Post on 10-Apr-2020

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Polymer Concrete Service Pedestal Foundations

Catalog

10-2014 1

Polymer Concrete Performance QUAZITE® Service Pedestal Foundations are constructed of strong polymer concrete and reinforced with a heavy-weave fiberglass. In either our 4” deep flat pad design or our 24”-25” box pad design. QUAZITE® polymer concrete Service Pedestal Foundations are also resist UV rays, chemicals and water absorption. Concrete bases are susceptible to damage caused by freeze/thaw cycles. Thermoplastic fiberglass bases can become brittle and eventually crack when exposed to the weather. The durability that QUAZITE® provides means lower maintenance and life cycle cost.

2

Quick & Easy Installation Installing QUAZITE® Service Pedestal Foundations are easy and cost effective because they require no special equipment to set the base. Depending on the size of the Service Pedestal Foundations. One person or a small backhoe is all that is necessary to lift the base into place. QUAZITE® Service Pedestal Foundations save time during installation. Unlike poured-in- placed bases that take days to a week to build, pour, set and remove the forms. QUAZITE® Service Pedestal Foundations can be installed quickly, in a matter of minutes, allowing the service pedestal and equipment installation to begin immediately after setting the base. The QUAZITE® Box Pad Foundations include a center divider to separate the Utilities from the Service conduits and mounting hardware for the Service Pedestal. Please see back of catalog for installation instructions.

3

Part Number Dimensions Throat Opening Bolt Pattern Pallet Quantity

Approx. Unit Weight

PB10140310501 10" x 14" x24" 3 1/2" x 10" 5 1/4" x 8" 4 76.5

PB25250310500 25" x 25" x 25" 3 1/2" x 10" 5 3/4" x 8" 2 172

PB25250318500 25" x 25" x 25" 3 1/2" x 18" 5 3/4" x 16" 2 172

PB25250618500 25" x 25" x 25" 6" x 18" centered 16 " x 8" 2 165

PB25250618501 25" x 25" x 25" 6" x 18" moved forward 16 " x 8" 2 165

PB25251214500 25" x 25" x 25" 12" x 14" 12 1/4" x 14" 2 172

PB25251214503 25" x 25" x 25" 12" x 14" 12 1/4" x 14" 2 172

PB25251420500 25" x 25" x 25" 14" x 20" 12 1/4" x 22 3/4" 2 142

PB25251614501 25" x 25" x 25" 16" x 14" 18 3/4" x 12 1/4" 2 128

PB25251814501 25" x 25" x 25" 18" x 14" 20 1/2" x 12 1/4" 2 125

PB25252018501 25" x 25" x 25" 20" x 18 1/2" 20 1/2" x 12 1/4" 2 142

The smaller PB1014 incudes the 3/8"-17 UNC bolts with oversized washers. All other sizes Includes 1/2"-13 UNC bolts and oversized washers.

Other size foundations, throat operning and bolts patters are easily available. Please call your local Quazite Rep for details.

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

Part Number Dimensions Throat Opening Bolt Pattern Pallet Quantity

Approx. Unit Weight

PH27290618502 29" x 27" x 4" 6" x 18" 8 1/4" x 16" 5 103

PH27291412502 29" x 27" x 4" 14" x 12" 14 3/4" x 12 1/4" 5 70

PH27291416501 29" x 27" x 4" 14" x 16" 18 3/4" x 12 1/4" 5 64

PH27291418501 29" x 27" x 4" 14" x 20" 12 1/4" x 20 1/2" 5 62

PH27291420502 29" x 27" x 4" 14" x 20" 12 1/4" x 22 3/4" 5 60

PH27291820501 29" x 27" x 4" 18 1/2" X 20" 20" X 20 1/4" 5 60

PH54482813502 54" X 48" X 4" 27 1/2" x 13" 26" x 15 3/8" 5 203

PH54482813503 54" X 48" X 4" 25 15/16" x 13" 27 1/2" x 15 1/4" 5 203

PH54482814501 54" X 48" X 4" 27 1/2" x 14" 30 3/4" x 12 1/4" 5 203

PH54484014501 54" X 48" X 4" 40" x 14" 44 1/2" x 12 1/4" 5 189

Includes 1/2"-13 UNC Bolts and Washers included

19

20

21

22

23

24

25

26

27

28

29

Part Number Weight Width Length Height

PH242500002T 70 24" 25" 1 1/2"

PH243600002T 95 24" 36" 1 1/2"

PH244000002T 120 24" 44" 1 1/2"

PH245800002T 160 24" 58" 1 1/2"

Save time & money by simply installing the Quazite work pad.

30

Installation for Box Pads 1. The following installation procedure is the same for all sizes of foundation

bases.

2. Determine cable/conduit entry position.

3. Excavate hole for the bases. Make hole 1’-2’ longer and wider and approximately 6” deeper than the base.

4. Put eyebolts into lifting inserts on top of the base (4 bolts as shipped with the foundation base).

5. Attach lifting chain or straps to bolts.

6. Lift and position base in to hole using a backhoe. Check plan for proper orientation of box pad or foundation.

7. Place gravel in the base to a depth of approximately 6” to 8”.

8. Lift the base to proper elevation, allowing gravel to run out under the base.

9. Check the elevation of the base.

10. Make necessary elevation adjustments with the bucket and recheck the elevation.

11. Remove the bolts once the base is set to proper elevation.

12. Following these steps will eliminate movement or “heaving up” of the box pad in unstable soil conditions.

13. Bolt Cabinet/Pedestal to box pad.

31

Installation for Flat Pads 1. The following installation procedure is the same for all sizes

of foundation flat pads.

2. Determine cable/conduit entry position.

3. Dig recess for pad so that top surface of pad will be level with surrounding area.

4. Level dirt around cable opening.

5. Level and tamp down dirt in the area to be occupied by the foundation pad.

6. Backfill and tamp in trench area leading to cable opening.

7. Place pad in prepared, level area with opening in pad (throat) directly over cable entry position.

8. Attach equipment to the foundation pad with bolts, brackets, and/or lugs provided by equipment manufacturer.

9. Backfill and tamp earth around pad so it is level with surrounding landscape.

10. Bolt Cabinet/Pedestal to flat pad.

32

top related