pocket guide for installation - k-patents · pocket guide for insertion and retraction 10....

Post on 02-Aug-2020

10 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

IM-EN-SDI21INST-PGRev. 2.00

PR-23-SDSDI2-23-SN2-XSSDI2-23-WP2-XS

SDI2-23-PL-SSSDR2-23

Pocket Guidefor Installation

Safe-Drive™ Generation 2.1

SAFETY REQUIREMENTS

1. Drill

2. Hole saw 1" and 2"

3. Angle grinder

4. Welding machine

5. Adjustable wrench

6. Thread seal tape

7. Allen keys 5 and 8 mm

8. Installation pocket guide

9. Product user manual

10. Drilling guide sticker

INSTALLATION EQUIPMENT

1. Retractor inner casing

2. Retractor outer casing

3. Combination wrenches 32 mm, 14 mm, 8 mm

4. Allen keys 8 mm, 5 mm

5. Torque wrench

5a. open end fitting 19 mm

5b. hex bit socket 8 mm

6. Screwdriver

6a. Phillips head

6b. Flat head

7. Pliers

8. Thread seal tape

9. Pocket guide for insertion and retraction

10. Laminated instruction cards

11. Best Practices document

SENSOR INSERTION EQUIPMENT

INSTALLATIONLOCATION(horizontal)

Installation on the outsideregion of the pipe.

0.6m (2ft)

0.6m (2ft)

0,6

m

(1ft 10

ins)

0,4

m

(1ft 3

ins)

0,5m(1ft 6ins)

0,5m(1ft 6ins)

FLOW

23SD-021

INSTALLATIONLOCATION(vertical)

INSTALLING AT HEIGHT

DISASSEMBLY

DRILLING(horizontal)

dia

50m

m

2 in

ch

dia

25m

m

1 in

ch

DN 50

2 ”

DN 150

6 ”

DN

80

-100

D

N200

8”

or

larg

er

Process pipe

Position drilling guidesticker

Drilling guidesticker

Remove

between holes

accordingly positionedto suit process pipe size

Drill1in/25mm hole

Drill 2in/50mm hole

90° indicated area

WELDING(horizontal)

Weld

Cutout

SAFE-DRIVE mounting flange

Process pipe

Material:SAF 2205

(EN 1.4462 PGTN S33205/S31803)

Welding groundpoint near toweld position

Important:Remove nozzle before welding.

DRILLING(vertical)

dia 50mm

2 inch

dia 25mm

1 inch

DN

50

2”

DN

15

0

6”

DN80

-10

0

DN20

0

8”

or

la

rger

Remove indicated area between holes

Position drilling guidesticker

Drilling guidesticker

90°

Process pipe

Drill 1in/25mm hole

Drill 2in/50mm hole

accordingly positionedto suit process pipe size

WELDING(vertical) WeldCutout

SAFE-DRIVEmounting flange

Welding groundpoint near toweld position

Process pipe

Material:SAF 2205

(EN 1.4462 PGTN S33205/S31803)

Important:Remove nozzle before welding.

WeldCutout Safe-Drive

mounting flange

Process pipeProcess pipe

Cutout Weld1

Cut and remove2

Continueweld

3

Material: AISI 316 L

WELDING PLATE(Brown stock washing fiber line installation)horizontal, with knife

WELDING PLATE(Brown stock washing fiber line installation)vertical, with knife Weld

Cutout

Safe-Drive mounting flange

Process pipe

Cutout

Weld1

Cut andremove

2

Continue weld3

ASSEMBLY (horizontal)

Tightening torque 17 Nm (13 lb/ft)

M10 Nyloc nut

Tightening torque 17 Nm (13 lb/ft)

ASSEMBLY(vertical)

M10Nyloc nut

STEAMLINEINSTAL-LATION

Flow

Air

Max hoselength 0.6m

Min 1/2”

Steam in9-13 bar andmax 180°C

Steam supply

See user manualfor correct pressure

Pressurereducer

Water & steamdrain

Strainer

Steamshut-off

Steam trap

valve

STEAMLINEINSULATION

HIGHPRESSUREWATERINSTAL-LATION

Flow

Air

Air

Manometer

Preconditioningto sewer

Solenoid connectionsto Indicating transmitter DTR

Hot blow-outwater

Max hoselength 0.6m

Shut-off ball valve 3/8”

Shut-off ball valve 3/8”

INSULATION

Required

Recommended

TRANS-MITTERMOUNTING

1 2 3

4 5 6

7 8 9

- 0 .

BACK

ENTER

Flow

connection

Power switch

Eye

mA outputcable

Power supply110-240 v

Sensor connection

Solenoid valve

level

www.vaisala.com

top related