picture 1: baza gardens stp blowers for aeration system · 2018. 4. 10. · picture 19: close up of...

Post on 26-Nov-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Picture 1: Baza Gardens STP blowers for aeration system

Appendix STP-D Baza GArdens STP

VP0989 1 of 20 Guam Waterworks Authority Island of Guam

Picture 2: Grit chamber in head works and control building.

Appendix STP-D Baza GArdens STP

VP0989 2 of 20 Guam Waterworks Authority Island of Guam

Picture 3: Bar screen and comminutor.

Appendix STP-D Baza GArdens STP

VP0989 3 of 20 Guam Waterworks Authority Island of Guam

Picture 4: Overview of aeration, clarifier, and digester.

Appendix STP-D Baza GArdens STP

VP0989 4 of 20 Guam Waterworks Authority Island of Guam

Return activated sludge discharge into aeration basin (upper left).

Appendix STP-D Baza GArdens STP

VP0989 5 of 20 Guam Waterworks Authority Island of Guam

Picture 6: Digester.

Appendix STP-D Baza GArdens STP

VP0989 6 of 20 Guam Waterworks Authority Island of Guam

Picture 7: Influent discharge to aeration basin.

Appendix STP-D Baza GArdens STP

VP0989 7 of 20 Guam Waterworks Authority Island of Guam

Picture 8: Clarifier looking towards digester. Grey pipes are for aeration of digester.

Appendix STP-D Baza GArdens STP

VP0989 8 of 20 Guam Waterworks Authority Island of Guam

Picture 9: Clarifier looking towards aeration tank.

Appendix STP-D Baza GArdens STP

VP0989 9 of 20 Guam Waterworks Authority Island of Guam

Picture 10: Close up of effluent discharge from clarifier. Note heavy corrosion of weir. Pinkish color in water possibly due to bacteria.

Appendix STP-D Baza GArdens STP

VP0989 10 of 20 Guam Waterworks Authority Island of Guam

Picture 11: Scum collection box in clarifier. Skimmer arm would hang in the vicinity of the scum box.

Appendix STP-D Baza GArdens STP

VP0989 11 of 20 Guam Waterworks Authority Island of Guam

Picture 12: Scum box return line discharging back into the aeration tank.

Appendix STP-D Baza GArdens STP

VP0989 12 of 20 Guam Waterworks Authority Island of Guam

Picture 13: Duckweed in aeration tank at wall between aeration tank and digester.

Appendix STP-D Baza GArdens STP

VP0989 13 of 20 Guam Waterworks Authority Island of Guam

Picture 14: Hole corroded through wall between aeration tank and clarifier. Water was splashing through the wall into the effluent trough of the clarifier.

Appendix STP-D Baza GArdens STP

VP0989 14 of 20 Guam Waterworks Authority Island of Guam

Picture 15: View over clarifier towards aeration tank. Note the lack of aeration in the aeration tank away from the interior wall.

Appendix STP-D Baza GArdens STP

VP0989 15 of 20 Guam Waterworks Authority Island of Guam

Picture 16: View over clarifier on opposite side as Picture 15. Digester is out of frame to the left. Note very limited aeration in this area.

Appendix STP-D Baza GArdens STP

VP0989 16 of 20 Guam Waterworks Authority Island of Guam

Picture 17: Holes corroded through baffle wall between clarifier and aeration tank.

Appendix STP-D Baza GArdens STP

VP0989 17 of 20 Guam Waterworks Authority Island of Guam

Picture 18: V-notch weir for measuring effluent discharge flow rate from the plant. Operator was demonstrating measuring depth of flow by placing staff directly into notch of weir.

Appendix STP-D Baza GArdens STP

VP0989 18 of 20 Guam Waterworks Authority Island of Guam

Picture 19: Close up of v-notch weir. Weir appears to be near 135 degrees. Chart used to determine flow rate based on depth of flow was for a 60 degree weir.

Appendix STP-D Baza GArdens STP

VP0989 19 of 20 Guam Waterworks Authority Island of Guam

Picture 20: Data logger connected to influent depth monitor.

Appendix STP-D Baza GArdens STP

VP0989 20 of 20 Guam Waterworks Authority Island of Guam

top related