Offline status of the FMD. Kristj án Gulbrandsen Niels Bohr Institute. HW Detector Status. FMD3 installed fully HW tested FMD2 installed initially HW tested Full testing with miniframe (~Nov.) FMD1 not yet installed Installation ~Feb. FMD1. FMD2. FMD3. C-side. A-side. Geometry. - PowerPoint PPT Presentation

TRANSCRIPT

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 1

Offline status of the FMD

Kristján Gulbrandsen

Niels Bohr Institute

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 2

HW Detector Status

• FMD3 installed– fully HW tested

• FMD2 installed– initially HW tested– Full testing with miniframe

(~Nov.)

• FMD1 not yet installed– Installation ~Feb.

FMD3

FMD2

FMD1

C-side A-side

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 3

Geometry

• Geometry consists of TGeo objects• Geometry constructed by half-rings

(for alignment)• FMD3

– All material described

• FMD2– Most material described

• Some support structure missing

• FMD1– Support needs better description

• Check of final positions necessary

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 4

Calibration

• 2 types of calibration necessary– Pedestals– Gains

• Gains taken in standalone run– Procedure implemented on FE Firmware– Injects known charge into pre-amplifiers

• Pedestals can be done 2 ways– Standalone run with no beam– In beam run with past-future protection

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 5

Calibration procedure

• Pedestal and Gain Finders written for standalone runs– Ped. - normal run, no beam– Gain - special run– Not in Aliroot– Need info from DCS

• Fx. Oversampling

– Need DCM from CDB– Possibly send peds to FEE

LDC

Calib.run

PedestalFinderGainFinder

DCS:Start

Calib.run

DCSFE-DB

CDB

FEE

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 6

Shuttle

• Fetch files from FXS(s) and put in OCDB• Interact with DAQ and DCS networks

– Not clear how to get info from DCS FE DB

• Procedure depends on new RCU Firmware

FEEDAQ

DA

DAQLogbook

DB

DCSFEDB

DCSDA

DAQFXS

DCSFXS

ShuttleOCDBDirect Communication?

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 7

Other Open Tasks

• EVE Display– Stands as open task (because we didn’t do it)– Was this implemented by someone else?

• Digit Quality Assurance– Don’t know what should be done here - need input

• Survey Data Format– Only needed for FMD1– Will be done early next year

• HLT output– FMD has no HLT output

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 8

Planning

• Main goal is to prepare for dress rehearsal– Prioritize tasks based on this criterion

• Automatic procedures get high priority– For offline shuttle is most important

• Manpower– C. Holm must work on Ph.D. thesis until Jan.– Offline work hopefully to be done by current

research assistant (prospective Ph.D. student)