NORTH CENTRAL RAILWAY
ALIGARH PARLIAMENTARY CONSTITUENCY
Uttar Pradesh, the most populous state of Nation is served
by North Central Railway along with Northern, North Eastern
and East Central Railways. Indian Railways (IR) plays a very
important role in development of the state and provides
connectivity for freight and passengers, including international
tourists. IR has a history of more than 160 years in the state and
has the highest route kilometers - 9100 route kilometers - within
it, which is 14% of entire railway network. IR has made Uttar
Pradesh proud by giving it Nation's first semi high speed train
Gatimaan Express, which initially ran between Agra and Delhi.
It has now been extended upto Jhansi with effect from
01.04.2018 - a move that will boost tourism in bundelkhand
region of Uttar Pradesh. Efforts for further development of
railway infrastructure in Uttar Pradesh have been intensified in
last four years with 376% more investment in comparison to
previous years. Results of such a massive investment are
becoming visible with enhanced infrastructure and modern
passenger amenities. Soon the era of congestion and
inconvenience will be a matter of past and a new Railway
equipped with state-of-the-art facilities will be able to serve the
citizens with greater level of satisfaction. The longest stretch of
the under construction Eastern Dedicated Freight Corridor i.e.
almost 57% of the entire length lies in Uttar Pradesh from
Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad.
In this brochure, we have compiled the important
contributions and achievements of Indian Railways in the
development of the ALIGARH constituency of Uttar Pradesh in
the last four years. I hope that it will serve as a ready reckoner
for those eager to know about the role of Railways in the
development of this constituency.
It may be noted that the budgets allocated to various
projects are not apportioned constituency wise but reflect the
cost of the project.
M. C. ChauhanGeneral Manager
North Central Railway
INPUTS BY RAILWAY IN ALIGARH PARLIAMENTARY CONSTITUENCY
ALIGARH PARLIAMENTARY CONSTITUENCY
A. ASSEMBLY SEGMENTS: Koil, Aligarh, Barauli, Atrauli, Khair
B. WORKS COMPLETED IN LAST FOUR YEARS:1. Infrastructural Developments:
At Aligarh station:Extra Loop line at Aligarh junction station commissioned at a cost of Rs. 33.44 Cr. Three New Platforms at Aligarh junction station commissioned at a cost of Rs. 33.23 Cr. Solid State Interlocking of Aligarh junction commissioned on 09.10.2016 at a cost of Rs.10.00 Cr.To improve power supply arrangement at Aligarh railway station and other installations one new 3311 KV
electric substation has been installed at a cost of Rs. 2.79 Cr.
Road Over Bridge (ROB) in lieu of: Level Crossing No-83B at Km 160 of 3-4 at a cost of Rs. 23.25 Cr.Level Crossing No-100C at Km-1307 of 9-11at a cost of Rs. 23.05 Cr. Level Crossing No-115 Spl at Km-1338 of 27-29 at a cost of Rs. 20.10 Cr.Level Crossing No - 84 A at Km 161 of 8 - 9 Aligarh Jn-Harduaganj section at a cost of Rs. 19.95 Cr. Level Crossing No-102 Km 1312 of 31-33 at a cost of Rs. 17.50 Cr.
Limited Height Subway (LHS) in lieu of: Manned level crossing No-80C, 81C, 82C in Aligarh Jn.-Harduaganj section at a cost of Rs. 12.78 Cr. Level Crossing No. 55 in Chandausi-Aligarh section.
2. Improvements in Passenger Amenities:Replacement of existing Foot Over Bridge along with covered shed at Aligarh at a cost of Rs. 4.30 Cr.Foot Over Bridge at Aligarh at a cost of Rs. 0.40 Cr. Foot Over Bridge at Daudkhan at a cost of Rs. 1.30 Cr. Electrification of Manzoorgarhi Railway station has been done in view of improving passenger amenity & passenger safety at a cost of Rs. 0.19 Cr. 100% LED lights have been provided at platform, station building & circulating area.
C. OTHER DEVELOPMENTS:New Trains introduced with stoppage over Aligarh Constituency.Train No 64168/64167 Aligarh - Palwal EMU Service. Train No 14320/14319 Bareilly - Indore Express via Aligarh Jn. Train No 22857/22858 Santragachi - Anand Vihar T Express - Bi-Weekly - from Santragachi - Anand Vihar (T) via AligarhTrain No 22427/22428 Bhrigu Express -Weekly-from Ballia to Anand Vihar (T) via Aligarh. Train No 22431/22432 Allahabad-Udhampur Express - Bi-weekly - from Allahabad to Udhampur via Aligarh. New Stoppages: Train No 12033 - Kanpur -New Delhi Shatabdi Express at Aligarh Junction. Train No 12487/12488 Seemanchal Exp-from Jogbani to Anand Vihar (T) at Aligarh Junction.
D. ON-GOING WORKSConstruction of Fly over between Aligarh-Harduaganj at a cost of Rs. 728.44 Cr. Aligarh-Daud Khan - 3rd line 6.9 km with construction of flyover at Daud Khan a cost of Rs. 447.99 Cr. Automatic signalling in place of absolute block working on UP line in connection with 3rd line on Aligarh-Gaziabad section at a cost of Rs. 66.45 Cr. Bidirectional Automatic signalling on middle line in connection with 3rd line on Aligarh-Gaziabad section at a cost of Rs. 53.28 Cr. Multi section digital axle counter for Dual Detection in Aligarh - Chipyana section of Allahabad Division at a cost of Rs. 29.03 Cr. Conversion of Electromechanical colour light signalling system with Electronic Interlocking at Harduagunj station. Work in progress at a cost of Rs. 11.46 Cr. Conversion of Electromechanical colour light signaling system with Electronic Interlocking at Manzoorgarhi station at a cost of Rs. Rs. 8.19 Cr. Construction of Limited height subway on Bareily-Hathras section at Level Crossing no. 87 at a cost of Rs. 4.01 Cr. Implementation of Roof top Solar project at Aligarh station. 02 escalators at Aligarh at a cost of Rs. 0.92 Cr. Lifts at Aligarh Railway station.
llll
lllll
ll
llll
l
lll
ll
ll
lll
l
l
l
l
l
lll
New Foot Over Bridge at Aligarh. 03 new Platforms at Aligarh.
Inauguration of stoppage of Shatabdi Exp at Aligarh. Automatic Ticket Vending Machine facility at Aligarh.
Water vending machine at Aligarh. New interlocking for improved mobility.