MV BERING ID
Inspected in port Shanghai from 26th to 28th Sept. 2013 by NCL
Forward side view accommodation ladder
After view port side ship’s hull view
Port side Load line mark view
Isolating valve inspected in order Fresh water filling pipe secured
After winch well maintained After winch clutch level securing pin in place
After mooring line well maintained poop deck garbage station
Poop deck bulkhead cracked coating Oxygen bottles well stored Well treated by ground and touch up
Air pipe valve hand wheel corroded s main deck in way of No.5 ch well maintained
No.5 H s coaming view log stanchion s of no.5 hold maintained
Main deck s of No.5,4 H well maintained step in cross deck of No.5,4 corroded
No.4 mast house view No.5 CH condition
No.5 cargo hold condition
No.5 cargo hold condition view
No.5 cargo hold condition view
No.5 cargo hold condition view
No.4 cargo hold condition view
No.4 cargo hold condition view
No.4 cargo hold condition view
No.4 cargo hold condition view
No.4 H s coaming well maintained No.4 H s main deck well maintained
S side bulwark well maintained cross deck no.3,4 partly rusted
No.3 H s comaing load stanchion s of No.3 h maintained
Log stanchion s of No.3 H maintained bulwark stiffener s of No.3 H corroded
No.2 cargo hold condition view
No.2 cargo hold condition view
No.2 cargo hold condition view
No.2 cargo hold condition view
No.2 cargo hold condition view
Cross deck No.2,3 partly rusted Main deck s of No.2 H maintained
Log stanchion s of No.2 H well maintained Main deck s of No.2 H well maintained
Main deck s of No.1 H well maintained log stanchion s of no.1 H well maintained
Cross deck fore of No.1 H partly rusted Star board side windlass view
Port side windlass view forecastle deck maintained
Forecastle deck maintained Echo sounder in good order
Dewater system control panel Autopilot station in order
Accommodation stair conditoin officer washing machines station in order
Ship
Ship office condition officer bathing room
Office WC condition Office WC room condition
Galley room condition Galley room condition
Office mess room condition office mess room condition
Office room sofa condition accommodation alleyway
Crew WC crew bath device condition
Gymnasium view crew washing machines
Port side Life raft view Bridge deck starboard side view
Bridge deck star board view star board side life raft
Crew WC washing basin Crew staff bath device
Aux. Boiler top view Aux. Boiler top view
Engine Grounding machine in work shop ME top view
Incinerator view ME exhaust manifold
Spare parts store room spare parts store room
New purifier control panel new Al Cap purifier installed in May 2013
AE fuel oil flow meter ME fuel oil flow meter
New purifier feed oil pump Main air compressor
AE condition AE condition
AE tank top condition view AE condition view
AE
AE tank top condition view ME port side scavenging deck view
ME area tank top condition view ME port side view
Bilge water pump and pipe view storm valve condition view
O.W.S condition view Engine room tank top condition view
OWS over boat valve ME port side view
Engine room MGP control panel Quick close valve control station
Aux. Boiler exhaust pipe wasted Engine room funnel condition Which repaired by ship staff
Funnel damper operation tested in order Engine vent damper tested in order
Batter for GMDSS in order life boat inspected in order
Life boat engine tested in order incinerator tested in order
Deck crane inspected in order crane in side in cleaning condition
Crane in side fire extinguishers to be inspected P side of No.1 H deck and stanchion maintained
No.1 CH condition view
No1 cargo hold condition view
No.1 cargo hold condition view
No.1 cargo hold condition view
No.1 cargo hold condition view
No.3 Cargo hold condition view
No.3 cargo hold condition view
No.3 cargo hold condition view
No.3 cargo hold condition view
No.3 cargo hold condition view
No.3 cargo hold condition view
No.3 H lower side view S side life boat launched in water
Deck crane hook condition view ME exhaust valve reconditioned
ME exhaust valve seat reconditioned Sopep materials inspected in order
Deck crane slewing bearing measure tools Ship ready for departure