MC PRODUCTION
MC Production. C. Willmott CMS Week Sep 20th , 2005
C. Fernández and F. Dal Corso
2RO Minicrates
CMS Week Sep 20th , 2005MC Production. C. Willmott
Up to 160 MCs have already been delivered to Legnaro.
We have sent enough MCs to complete YB+2, YB+1 and YB0. MCs for YB-1 arebeing assembled now.
We will try to keep from now on the rate of 18 MCs/month.
Next delivery will wait until October due interference with ROS tests.
The 250 MCs will be finished by February 2006, and then the spares will beassembled.
YB+2 YB+1 YB0
YB-1 YB-2
3RO Minicrates
CMS Week Sep 20th , 2005MC Production. C. Willmott
0
50
100
150
200
250
300
may. 0
4
june.
04
july.
04
augu
st. 0
4
sept.
04
oct.
04
nov.
04
dec.
04
jan. 0
5
feb. 0
5
mar. 05
april.
05
may. 0
5
june.
05
july.
05
augu
st. 0
5
sept.
05
oct.
05
nov.
05
dec.
05
jan. 0
6
feb. 0
6
DeliveredExpected16 MCs/month 160 MCs
Next delivery delayed to October
4
CMS Week Sep 20th , 2005
Flavio Report
• MC delivery up to now: 104. 71 already installed; 9 for the September
installation (100% of the chambers to be installed), 21 for the November-
January installation (45% of the chambers to be installed).
• In August we produced 11 MC. Not so bad, taking into account the holiday
period.
• TRB delivery from Novatel stopped during August. Now we have some
suffering from TRB-phi, as we have buffers only for about 30 MC (but
about 20 is the number of MC already assembled –not tested-). Anyway I
believe that the situation will improve soon.
MC production in Italy
MC Production. C. Willmott
5
CMS Week Sep 20th , 2005
MC Production: Italy
MC Production. C. Willmott
MC production rate
0
20
40
60
80
100
120
sep-04
oct-04
nov-04
dic-04
ene-05
feb-05
mar-05
abr-05
may-05
jun-05
jul-05 ago-05
MC totalMC/monthLNLBo
CMS Week Sep 20th , 2005
MC Production: Italy
MC Production. C. Willmott
Wheel Station Sector MC type LabelMC type barcode
Padova/Bologna 12-sep 19-sep 26-sep 03-oct 10-oct 17-oct 24-oct 31-oct 07-nov
0 2 12 MB2-R /S- 212 Bo-1 2 11 MB2-R /S- 212 Bo-1 2 10 MB2-R /S- 212 Bo-1 2 9 MB2-R /S- 212 Bo-1 2 8 MB2-R /S- 212 Bo-2 1 11 MB1-R /S+ 111 Bo-2 3 11 MB3-L /S0 300 Bo-2 3 10 MB3-L /S0 300 Bo0 1 6 MB1-L /S- 102 LNL0 1 3 MB1-L /S- 102 LNL0 1 2 MB1-L /S- 102 LNL0 2 6 MB2-L /S+ 201 LNL0 2 3 MB2-L /S+ 201 LNL0 2 2 MB2-L /S+ 201 LNL0 3 12 MB3-L /S0 300 LNL0 3 9 MB3-L /S0 300 LNL-1 2 12 MB2-R /S- 212 LNL-1 3 12 MB3-L /S0 300 LNL-1 3 11 MB3-L /S0 300 LNL-1 3 10 MB3-L /S0 300 LNL-1 3 9 MB3-L /S0 300 LNL-1 3 8 MB3-L /S0 300 LNL-1 4 10,1 MB4(10)-L /S- 802 LNL-2 4 10,2 MB4(4)-R /S0 510 LNL-2 4 10,1 MB4(4)-R /S0 510 LNL-2 2 11 MB2-R /S- 212 NA-2 2 10 MB2-R /S- 212 NA
MC Schedule
6
CMS Week Sep 20th , 2005
MC Production: Italy
MC Production. C. Willmott
TRB production
0
200
400
600
800
1000
1200
2-no
v-04
2-di
c-04
2-en
e-05
1-fe
b-05
4-m
ar-0
5
3-ab
r-05
4-m
ay-0
5
3-ju
n-05
4-ju
l-05
3-ag
o-05
2-se
p-05
3-oc
t-05
TRB totalTRB/month
7