MC PRODUCTION

MC Production. C. Willmott CMS Week Sep 20th , 2005

C. Fernández and F. Dal Corso

Page 2: MC PRODUCTION - web.physik.rwth-aachen.deweb.physik.rwth-aachen.de/.../DT_session/050920MC_prod_CF_FDC.… · • In August we produced 11 MC. Not so bad, taking into account the

2RO Minicrates

CMS Week Sep 20th , 2005MC Production. C. Willmott

Up to 160 MCs have already been delivered to Legnaro.

We have sent enough MCs to complete YB+2, YB+1 and YB0. MCs for YB-1 arebeing assembled now.

We will try to keep from now on the rate of 18 MCs/month.

Next delivery will wait until October due interference with ROS tests.

The 250 MCs will be finished by February 2006, and then the spares will beassembled.

YB+2 YB+1 YB0

YB-1 YB-2

Page 3: MC PRODUCTION - web.physik.rwth-aachen.deweb.physik.rwth-aachen.de/.../DT_session/050920MC_prod_CF_FDC.… · • In August we produced 11 MC. Not so bad, taking into account the

3RO Minicrates

CMS Week Sep 20th , 2005MC Production. C. Willmott

0

50

100

150

200

250

300

may. 0

4

june.

04

july.

04

augu

st. 0

4

sept.

04

oct.

04

nov.

04

dec.

04

jan. 0

5

feb. 0

5

mar. 05

april.

05

may. 0

5

june.

05

july.

05

augu

st. 0

5

sept.

05

oct.

05

nov.

05

dec.

05

jan. 0

6

feb. 0

6

DeliveredExpected16 MCs/month 160 MCs

Next delivery delayed to October

Page 4: MC PRODUCTION - web.physik.rwth-aachen.deweb.physik.rwth-aachen.de/.../DT_session/050920MC_prod_CF_FDC.… · • In August we produced 11 MC. Not so bad, taking into account the

4

CMS Week Sep 20th , 2005

Flavio Report

• MC delivery up to now: 104. 71 already installed; 9 for the September

installation (100% of the chambers to be installed), 21 for the November-

January installation (45% of the chambers to be installed).

• In August we produced 11 MC. Not so bad, taking into account the holiday

period.

• TRB delivery from Novatel stopped during August. Now we have some

suffering from TRB-phi, as we have buffers only for about 30 MC (but

about 20 is the number of MC already assembled –not tested-). Anyway I

believe that the situation will improve soon.

MC production in Italy

MC Production. C. Willmott

Page 5: MC PRODUCTION - web.physik.rwth-aachen.deweb.physik.rwth-aachen.de/.../DT_session/050920MC_prod_CF_FDC.… · • In August we produced 11 MC. Not so bad, taking into account the

5

CMS Week Sep 20th , 2005

MC Production: Italy

MC Production. C. Willmott

MC production rate

0

20

40

60

80

100

120

sep-04

oct-04

nov-04

dic-04

ene-05

feb-05

mar-05

abr-05

may-05

jun-05

jul-05 ago-05

MC totalMC/monthLNLBo

Page 6: MC PRODUCTION - web.physik.rwth-aachen.deweb.physik.rwth-aachen.de/.../DT_session/050920MC_prod_CF_FDC.… · • In August we produced 11 MC. Not so bad, taking into account the

CMS Week Sep 20th , 2005

MC Production: Italy

MC Production. C. Willmott

Wheel Station Sector MC type LabelMC type barcode

Padova/Bologna 12-sep 19-sep 26-sep 03-oct 10-oct 17-oct 24-oct 31-oct 07-nov

0 2 12 MB2-R /S- 212 Bo-1 2 11 MB2-R /S- 212 Bo-1 2 10 MB2-R /S- 212 Bo-1 2 9 MB2-R /S- 212 Bo-1 2 8 MB2-R /S- 212 Bo-2 1 11 MB1-R /S+ 111 Bo-2 3 11 MB3-L /S0 300 Bo-2 3 10 MB3-L /S0 300 Bo0 1 6 MB1-L /S- 102 LNL0 1 3 MB1-L /S- 102 LNL0 1 2 MB1-L /S- 102 LNL0 2 6 MB2-L /S+ 201 LNL0 2 3 MB2-L /S+ 201 LNL0 2 2 MB2-L /S+ 201 LNL0 3 12 MB3-L /S0 300 LNL0 3 9 MB3-L /S0 300 LNL-1 2 12 MB2-R /S- 212 LNL-1 3 12 MB3-L /S0 300 LNL-1 3 11 MB3-L /S0 300 LNL-1 3 10 MB3-L /S0 300 LNL-1 3 9 MB3-L /S0 300 LNL-1 3 8 MB3-L /S0 300 LNL-1 4 10,1 MB4(10)-L /S- 802 LNL-2 4 10,2 MB4(4)-R /S0 510 LNL-2 4 10,1 MB4(4)-R /S0 510 LNL-2 2 11 MB2-R /S- 212 NA-2 2 10 MB2-R /S- 212 NA

MC Schedule

6

Page 7: MC PRODUCTION - web.physik.rwth-aachen.deweb.physik.rwth-aachen.de/.../DT_session/050920MC_prod_CF_FDC.… · • In August we produced 11 MC. Not so bad, taking into account the

CMS Week Sep 20th , 2005

MC Production: Italy

MC Production. C. Willmott

TRB production

0

200

400

600

800

1000

1200

2-no

v-04

2-di

c-04

2-en

e-05

1-fe

b-05

4-m

ar-0

5

3-ab

r-05

4-m

ay-0

5

3-ju

n-05

4-ju

l-05

3-ag

o-05

2-se

p-05

3-oc

t-05

TRB totalTRB/month

7