<Reference>March 22, 2013

Tokyo Electric Power Company

Air dose rates in the buildings

1

Data collection period (1/2)

• Unit 1: April, 2011 - February (2/18), 2013• Unit 2: April, 2011 - February (2/18), 2013• Unit 3: April (4/25), 2011 - February (2/18), 2013• Unit 4: March (3/31), 2011 - February (2/18), 2013• Unit 5: February (2/25), 2013• Unit 6: February (2/26), 2013

2

Process Main Building (PM): April, 2011 – February (2/18), 2013

Incineration Workshop Building (MSW):May, 2011 – February (2/14), 2013

Miscellaneous Solid Waste Volume Reduction Treatment Building (HTI):April, 2011 – February (2/13), 2013

Side Bunker Building (SB):May, 2011 – March (3/7), 2012

Suppression Pool Water Surge-Tank Building (SPT)May, 2011 – November (11/30), 2012

Auxiliary Operation Shared Facility:August, 2011 – January (1/18), 2013

Data collection period (2/2)

3Unit 1 Reactor Building 1F

2.0

12

5.1

2.5

4.5

4.0

725 6.0

12801100220300247

290 800 1820

138 600 260

127

26

48

121

220

90

4538

90

22

3.5 0.56

6.0

5.0

4.5

7.0

7.0

0.1

4.0

0.25 0.23

0.3

0.30

0.12 0.12 0.14

X-49 SurfaceMAX 800

9.09.0

54

1.5

Floor Penetration

4700

Directlyabove Funnel

2200

5.0

4.5

2.0

4.5

10

0.18

4.7 8.5

0.08

X-40 B Surface MAX 20

Unit: mSv/h

Detail

Shield installed onSeptember 8, 2011

Upper part is 2.2mfrom the floor

20Upperpart150

3.5Upperpart30

2.5Upperpart9

7

Upperpart100Upper

part7

Upperpart5

1.5

11.4

Upperpart50

20

Upperpart4.5

130

Upperpart4

Upperpart4.5 Upper

part5 10

1.5

8

2.51.8

3

4

410 2 6

2.5

1200Upper part

1700

11.430

6180

183Surface of water220

Stairs1FL - MBFL

Large carry-inentranceRooftop

Unit 1

4Unit 1 Reactor Building 2F

6

46

30

240

700

180

9

24

41

>1000

100

52

189

11.6

Unit: mSv/h

5Unit 1 Reactor Building 3F

9

17

5.0

5.0

126.02.72.2

1.7

4.0

Floor debris100

10 22

9

3.5

13

3.5

2.2

2.0Debris

15

1.4

10

7.05.5

19

6

2.6

6

2.7

1.2

5.0

100

149

40

74

10

17

30

16

30

Puddle 200 - 300

Under thestairs654

5

Unit: mSv/h

6Unit 1 Reactor Building 4F

35 520

30

90

1619

40

2621

20 5

2050

19

3545

22

18 20 20

20

20

22

17

19

Unit: mSv/h

7Unit: mSv/h

(2 - 2.5m above the floor)

60

Unit 1 Reactor Building 5F

8Unit 1 Turbine Building B1F

20

10(階段踊り場)

20

8 (landing of the stairs)

5.5 (landing of the stairs)16

Max60 50

65

80

50

95

65

65

80

65

50

8.5

Unit: mSv/h

9Unit 1 Turbine Building 1F

70 0.451.5

0.1

0.2

0.13

0.6

0.3

0.045

0.14

0.08

0.4

25

1.00.15

5.50.55

0.3

0.2

0.15

0.24

0.5 1.3

0.04

0.02

0.250.05

0.12

0.050.05 0.1

0.50.35

0.90.05

0.30.450.1 0.11

1.0

0.1

0.7

0.04

0.1

0.25

0.18

0.1

Surface of the hose4.0

0.1

0.14Ground

5.0

0.3

Surface ofthe hose

6

0.06

0.4

Surface of the hose7.0

0.008

0.005

0.04

0.015

0.015

0.5

Surface ofthe hose

2.0

0.08

Surface of airlock1.7

Bottom part of the wall>1000

0.01

0. 040.25

Unit: mSv/h

Surface of airlock1.5

10Unit 1 Turbine Building 2F

0.18

>5000

0.03

0.08

0.04 0.05

2000

300

0.05 0.03

0.04

0.05

0.03

0.1

0.07

0.1

0.08 0.04

0.15 - 0.190.08- 2

0.08- 0.12

Railing of the overheadtraveling crane

0.1- 0.3

0.1- 0.2

0.04

0.04

0.1

0.07

Detail of the shielding

2018

0.030.10.0350.5 0.04

0.040.03

0.025

0.35Surface of the cask

2.2

Surface of the cask1.8

0.03 0.045 0.015

0.04 0.055

0.06

0.025 0.04 0.03

0.03

0.02

0.045

0.04

0.035

0.04

0.04

0.04

5.0

Temporary instrumentation rack room

0.15

0.1

0.1

0.02

0.15

0.1

0.080.10.27Surface of the filter

1.3

0.130.6

0.130.046

0.13 0.08

0.04 0.042 0.025

0.07 0.03 0.025

0.0550.04

Unit: mSv/h

Door

Shielding

PipingPrefab

air-

cond

ition

ing

mac

hine

room

Surface ofa tinplate

1.0

11Unit 1 Waste Treatment Building 1F

16020

11360

101.00.25

0.05

0.04

0.8

2520018090

350

3.0

1.2

0.075

3.0

0.5

9.5

2.0

4.0

Unit: mSv/h

12

1号機Rw/B

新FSTR

旧FSTR

× 2.0

× 2.0

× 2.0

× 1.0

× 1.0

Water puddle

× 30 × 60 × 60

× 12× 30

× 10

× 13

× 10

× 15

× 38

× 6

Unit 1 Waste Treatment Building Oil Drum Carry Out Gate

0.25

0.4

0.5

1.4

2.56.0

4.0 5.5

7.0

0.7

0.5

0.6

1.5 0.5

1.0

0.9 - 1.3

0.05 - 0.26

Surface of the filter3.0

Unit: mSv/h

13Unit 1, 2 Service Building 1F

0.035 0.035

0.04

0.045

0.08 0.220.10 0.018

0.08

Unit: mSv/h

14Unit 1, 2 Service Building 2F

0.016

0.016

0.022

0.0070.005 0.011

0.006

0.0070.007

0.0080.003

0.005

0.011

0.009

0.0020.009

0.007

0.007

0.006

0.035

0.008

Unit: mSv/h

15Unit 2 Reactor Building MB1F

11

130

7

90

Surface of accumulated water

~66

42

48

42

85

55

40

88

38

38

51

30

82

73

88

118

53

424713 20

10

6

7.2

7.0

13

1210

126

40

Stairs1FL - MBFL

8

11

73

108

68

50

Stairs1FL - MBFL

15

Unit: mSv/h

16Unit 2 Reactor Building 1F

21

10

10

9.5

18

15

In front of theinstrumentation rack

22

14

2.3

36

6.5

2416

10

Surface of the upper pene 3000 - 4400Surface of the upper pene 310 - 500

Close to the upper pene20 - 63

Atmosphere inside the shielding box

2.5 - 7

Upper part of 315°side

28 - 60mSv/h

13 15

9

13

ペネ表面10~73

40

21

Close to the upperX-40, 27 pene

25 - 70 (1.2m from the floor)52 - 100 (4.5 - 5.0m from the floor)

6.0 10

8.0

8.06.0

6.0

6.0

12

20

24

2.513

24

28

20

25 18

15

2.5

20

24

7.8

10

9

13

8

7

Landing5.0

Landing13

0.4

14

0.750.350.230.21

0.075

0.22

0.150.15

0.15 0.16

4.0

30

7.0

RCIC-26

Surface 130

15

13

13

15

12

Unit: mSv/h

In front of thesump rack

28

8.0Large carry-in entrance 1F

Large carry-in entrance 2F

17Unit 2 Reactor Building 1F Southeast Side (Inside the TIP Room)

11

18

1.5

2.8 1.8

4.0

2.0

2.7

2.6

16 14

10

63.5

6

21

4.58.0 56.5

4.5

Unit: mSv/h

18Unit 2 Reactor Building 2F

16 15 24

97.2

5267.630.4

79.1

38.1

55.6

31

43

31.1

Landing

23

Upper part of the floor29 - 33

Close to the penetration36 - 100

303F

2F

56

22

25Working floor 100

X29B/C pene 330 - 1640

10

14

16

12

Unit: mSv/h

19Unit 2 Reactor Building 3F

25

29

40

3811

13

12

23

18

17

10

11

10

Landing

8

10

4F

3F

12

10

13 21 22

40

31

22

26

34

44

Unit: mSv/h

20Unit 2 Reactor Building 4F

45

10

13

5F

4F

15

Landing12

11

14

14

11 17

22

1816

18

Unit: mSv/h

21Unit 2 Reactor Building 5F

114

190

207

250

154

47

57

99

81

230

11167

45

40

78

48 60

80

77

7855

59 128 153

356

173

133

80

139

506

376

401

415

829

880

783

530

Unit: mSv/h

(Blow-out Panel Opening)

22

Unit 2 Turbine Building B1F

>1000

Unit: mSv/h

23

Unit 2 Turbine Building 1F

0.4

0.05

0.6

0.05

0.110.060.30.35

0.23

7.0

0.6

0.1

1.0

0.8

0.4

0.20

0.10.05

0.3

2

0.06

0.70.50

2.0

0.80 10

0.5

0.5

0.025

0.03

1.0

0.05 1.5

0.55

0.05

0.1

0.1

0.09

0.4

0.15

0.02

0.02

0.015 0.2

0.025

4.5

3.5

0.9

2.0

2.2

1.0

0.60.35

0.08

0.10.4

0.01

0.012

0.02

0.015

0.04

0.04

0.12

0.11

0.8

4.0 0.1

0.150.05

0.1

9

0.40

0.2

0.60

0.450.5

0.020.04 0.04

0.04

0.015

0.1 0.5

Surface3.0

Surface2.5

Surface3.5

Surface6.0

Surface3.0

Surface5.0

0.70

Unit: mSv/h

0.7

24

Unit 2 Turbine Building 2F

80 600

40 10

2

0.04

0.1

0.020.060.015

0.02

0.3

0.05 0.050.13

0.10.1

0.10.02

0.050.017

0.035

0.05

0.0230.018

0.025

0.018

0.028

0.0230.02

0.04

0.18

0.02

0.16

0.500.040

0.08

0.020

1.9

0.045

0.25

0.22

0.02

0.04

0.020

0.025 0.070.25

0.04

0.02

0.02

0.03

Unit: mSv/h

25

Unit 2 Waste Treatment Building 1F

0.50 0.50

0.20

0.2

0.2

0.04

0.04

350.35

0.025

0.03

0.02 0.03

0.05

0.12

0.05

0.05

0.03

0.45

1.5Surface of piping

12

15

4

2.5

0.02

Unit: mSv/h

26Unit 2 Waste Treatment Building MB1F

Surface of accumulated water~140

15 - 20

50 - 75

4

18

100

46

190

173

125

Side of hatch154

176230

192

158

176

180

179

186

234

Side of hatch360

169

158

164

186

240

193

Unit: mSv/h

27Unit 3 Reactor Building 1F

34

20

27

52

8.0

69.8

96

74.37

30 - 4051

42

96

37

53

5044

46

27

155

151098

37.51

2227

35

68.88

55

430

2290

200

203.1

4.5

50

3545

25

8.0

91.646.2

73.22

15.91

65.59

18.50

95.83

21.74

34.12

27.50

24 36 90

13

2.2

Surface of the floor

MAX4780

50

4445

Unit: mSv/h

28Unit 3 Reactor Building 2F

Close to a valve 45

Top of the access ladder 50

Floor 60

4845

70

75

5032

Close to a handle of a valve

170Shielding box

280

5254

90

9898

22

Unit: mSv/h

29Unit 3 Reactor Building 5F

500

Unit: mSv/h

30Unit 3 Turbine Building B1F

Unit: mSv/h

Max750

Max400

31Unit 3 Turbine Building 1F

134.0 1.2 4.0 4.0 3.5

4.0

5.0

2.5

1.0

0.4

6.0

3.5

0.1

1.0

0.1

0.8

0.3

10

2.5

0.20.08

0.170.4

0.2

1.8

30

1.0

3.5

0.5

4.0 4.0

Surface oftransfer pipingMax 12

0.2

Surface of transfer pipingMax 60

1.5

4.0

0.9 1.5

0.7

10

3.00.4

8.0

Surface of transfer pipingMax 80

0.60.3

0.8 0.5

90

35

0.7

12

0.1 0.6

0.25

Surface of transfer pipingMax 40

Surface oftransfer pipingMax 40

Surface of transfer pipingMax 50

0.1

0.15

0.5

Surface4.00.3

1.5

0.15

Surface of a hose60

Surface of a hose30

0.1

0.4

3.5

0.015

0.850.03

0.4

0.05

0.5

8.5

1.3

1.00.81.5

2.0

0.2

0.2

3.5

3.0

0.1

Surface2.8

Surface3.0

Surface7.0

Surface2.5

Surface2.5

0.08

0.11

Unit: mSv/h

4.0

0.8

0.5

0.4

0.7

4.0

32

Unit 3 Turbine Building 2F

5.01.0

3.06.0

2.6

1.5 2.0

1.0 0.65

0.25 0.25

0.3

0.120.27

0.3

0.27

0.32

4.0 3.5 3.0

0.25

0.25

0.6

0.6

0.3

1.5 1.0 0.4

0.12 0.4

0.7

1.0 0.6

2.0

2.0

2.0

1.5

2.0

0.2

0.4

0.5

0.3

3.0

0.180.8

2.5

0.32

0.35

1.2

1.5

0.55

Temporary Shielding Installation

0.55

0.2

3.03.0

6.0

0.50.5

4.0

6.0

0.5

0.3

0.652.0

Surface of a hose60

Surface of a hose50

2.5

3.0 4.0

0.12

0.035 0.075

0.7

0.5

0.6 0.65

Debris16

Unit: mSv/h

33

Unit 3 Waste Treatment Building 1F

0.8

0.8

1.0

0.7

0.4

1.02.5

1.6

1.1

0.6

0.8

0.3

1.1 0.8 1.3 1.3

0.6

1.0

4

2.0

0.9

2.0

2.0

0.4

3.5

0.6

Cooling building1.0Control house

0.25

0.04

0.04

0.05

0.35

5.0

1.5

0.05

0.05

0.05

0.35

1.1Surface ofpiping

5.0

1.0

Unit: mSv/h

34

Unit 3, 4 Service Building MB1F

0.8

0.3

1.2

15

0.15

0.7

0.1

0.3

0.4

0.2

8

0.2

0.1

0.15

0.3

1

Unit: mSv/h

35

Unit 3, 4 Service Building 1F

0.121.0

0.4 3.0

0.25

0.06

0.15

0.3

0.15

0.10.1

0.15

0.15

0.70.18 0.2

0.130.10.060.11.0

2.0

1.51.6

0.03

0.025

0.02

0.070.09

0.035

0.018

0.015

0.038

Unit: mSv/h

36

Unit 3, 4 Service Building 2F

0.06

0.03

0.035

0.03

0.015

0.017 0.013 0.014

0.018

0.0120.0120.045

0.017

0.028

0.035

0.028

0.021 0.03

0.02

Unit: mSv/h

37Unit 4 Reactor Building MB1F

0.035

0.04

0.2

0.1

0.2

0.15

0.20.1

0.120.07

0.3

0.15

0.15

0.15

0.02

0.2

0.2

0.1

0.150.150.1

0.25

0.25

0.35

0.35

0.26

0.1Landing of the stairs

0.35

0.06

0.15 0.55

Unit: mSv/h

38

0.025

0.025

0.06

0.02

0.055

0.07

0.017

0.015

0.017

0.2

0.02 0.150.06

0.06

0.017

0.050.035

0.05

0.07

0.025 Debris piping0.3

Average of the upper part0.04

0.05

0.04

0.015

0.02

0.055

0.0150.01

0.03

0.020.035

0.055

0.05

Unit: mSv/hUnit 4 Reactor Building 1F

39Unit 4 Reactor Building 2F

0.060.04

0.06

0.07

0.015

0.06

0.015

0.025

0.045

0.4 0.9

0.03

0.03

0.05

0.8

1.2 0.35

0.02

0.04

0.250.015

0.13

0.1

0.2

0.2

0.03

0.04

0.03

Debris0.1

Debris0.1

0.9

0.26

0.5

0.07

Above thescaffolding

0.2 - 0.5

Unit: mSv/h

40Unit 4 Reactor Building 3F

0.04

0.05

0.7

0.2 0.6

0.250.25Hx Surface

4.5

0.040.045

0.05

0.15

0.04

Above thescaffolding

Unit: mSv/h

41Unit 4 Reactor Building 4F

0.08

0.1 0.05

0.1

0.1

0.07

0.1

0.05

0.1

0.1

0.1

0.07

0.09

0.08

0.65

0.25

0.17

0.150.15

0.09

Above the scaffolding

0.12

0.15

0.2 0.3

0.2

0.12 0.1

0.1

Unit: mSv/h

42Unit 4 Reactor Building 5F

0.3

0.25

0.35 0.35

0.55

0.5

0.45

0.4

0.35

0.5

0.45

0.4

0.35

1.0

0.3 0.3

0.5 0.45 0.6

0.45

0.5

1.0

0.3

0.71.3

0.5

0.8

0.45

0.5

0.4

0.3

0.3 0.45 0.35

0.35 0.4

Overhead traveling crane

0.4

0.4 0.50.45

0.15

0.2 0. 15

Upper part

0.25

0.7

0.25

0.4

0.4

DebrisMAX1.0

0.3

0.4

Floor collapsed

0.75

0.18

0.35

DebrisMAX28

0.6

0.5 0.5

0.8

0.9 0.6

0.55

0.4

0.6

1.0

0.35

0.3

0.25

Unit: mSv/h

0.15

43

14××23

Unit 4 Turbine Building 1F

0.15

0.2

0.2

0.3

2.0

1.7

1.0 0.4

0.5

0.10.3

1.02.1

0.22

0.2

0.1

0.5

1.5

1.30.2

8.0

0.068

0.3

Surface of a hose20Surface of a hose

35

Surface of a hose10

0.35

0.4

1.7

1.8 0.7

0.6

1.0 0.5 0.5 0.65

Surface of a hose8

0.02

0.050.025

0.75

0.02

0.05

Surface of a hatch10

2.5

0.2

Unit: mSv/h

×0.5×5.5

Surface of water

0.18

0.2 2.0

0.50.1

44Unit 4 Turbine Building 2F

0.15

0.3

0.080.1

0.14

0.150.13 0.11

0.260.2 0.09

0.2

0.10.1

0.08

0.07

0.08 0.080.07

0.020.030.020.040.050.07

0.1 0.05

0.09

0.09

0.13

0.12

0.0060.20.3

0.180.18

0.120.11

0.1

2.00.16

0.1

0.10

0.50

0.10

0.05

0.2

0.15 0.20.2

0.2 0.20.2

0.13

0.04

0.07 0.1

0.4

0.13

0.05

0.04

Debris1.0

0.15

0.07 0.02

0.35

0.5

0.6

0.25

0.5

0.20.16

Unit: mSv/h

45Unit 4 Waste Treatment Building 1F

0.04

1.0

2.0

0.7

0.3

0.055

0.06

0.03

0.030.08

2.1

0.6

0.020.18

0.1

0.15

0.0070.15

2.0

0.05

0.05

Surface6.0

2.5

1.5

2.0

1.7 Surface6.0

0.06

Surface5.0

4.0

4.0

1.0

1.0

3.5

1.6

1.4

0.01

0.01

0.004

0.7

1.5

1.01.0

1.4

Surface5.0

Surface6.5

Unit: mSv/h

46Unit 4 Waste Treatment Building 4F, 3F, 2F

0.55

0.2

4.0

5.0

0.30.20.31.5

0.4

0.05

0.15

0.2

1.5

1.4

1.51.3

0.008

0.2

0.055

0.2

0.2

Unit: mSv/h

4F 3F

2F

47Unit 5 Reactor Building B1F

0.030

0.0065

×

×

Unit: mSv/h

48Unit 5 Reactor Building 1F

0.0020

0.0014

0.00070

×

× ×Unit: mSv/h

49Unit 5 Reactor Building 2F

0.0012

0.00070

×

×Unit: mSv/h

50Unit 5 Reactor Building 3F

0.00030

×

0.00090×

Unit: mSv/h

51Unit 5 Reactor Building 4F

0.00080×Unit: mSv/h

52Unit 5 Reactor Building 5F

×

0.16

0.0012×Unit: mSv/h

53

Unit 5 Turbine Building B1F

0.00030

0.00050×

×

Unit: mSv/h

54Unit 5 Turbine Building 1F

0.00040

0.00050

×

×Unit: mSv/h

55Unit 5 Turbine Building 2F

0.00060

0.00040× ×

Unit: mSv/h

56

Unit 5 Waste Treatment Building B1F

0.0055×

Unit: mSv/h

57

Unit 5 Waste Treatment Building 1F

0.00030

×

Unit: mSv/h

58Unit 6 Reactor Building B2F

×

0.0011

Unit: mSv/h

59

Unit 6 Reactor Building B1F

×

0.00090

Unit: mSv/h

60Unit 6 Reactor Building 1F

×

0.013×

0.0060

Unit: mSv/h

61Unit 6 Reactor Building 2F

×

0.00070

×

0.015

Unit: mSv/h

62Unit 6 Reactor Building 3F

×

0.0018

0.0025

×

Unit: mSv/h

63Unit 6 Reactor Building 4F

×

0.0020

Unit: mSv/h

64

Unit 6 Reactor Building 5F

×

0.0010

Unit: mSv/h

65Unit 6 Reactor Building 6F

×

0.00090

×

0.0013

Unit: mSv/h

66

Unit 6 Turbine Building B1F

×

0.00050

×

0.00030

Unit: mSv/h

67Unit 6 Turbine Building 1F

×

0.00030×0.00030

Unit: mSv/h

68

Unit 6 Turbine Building 2F

×0.00040×

0.0010

Unit: mSv/h

69

Unit 6 Waste Treatment Building B1F

×

0.0075

Unit: mSv/h

70

Unit 6 Waste Treatment Building 1F

×

0.00030

Unit: mSv/h

71Process Main Building 1F

2.21.2

0.03

0.80

25 16

6.5150

22

2.02.7

0.5

0.6

0.8

0.6

0.055

0.14

0.4

1.0

9.0

0.15

0.3

0.12

1.5

0.45 0.1 1.0

0.03

2.00.5

0.15

0.07 0.11

0.2

0.015

0.030

0.030

0.0600.020

0.030

0.080.028

0.75 0.6

0.65

0.5

0.01

0.027

0.25

0.08

0.100.05

0.02

0.06

0.07 0.03 0.025

0.05

0.02

0.02 0.7

0.7

0.7

Surface of piping5.0

0.075 Surface of piping7.0

Surface of piping8.0

1.5

72Process Main Building 2F

0.02 0.01

0.04

0.3

0.012

0.05

0.13 0.03

0.012

150.1

0.002 0.002

0.002 0.002

~0.65

0.012

2.00.2

0.5

0.09

0.01

0.020.0190.04

0.004

0.003

0.005

0.004

0.03

0.050.05

0.150.04

0.0450.5

0.025 0.02 0.04

0.06

0.04

0.11

73Process Main Building 3F

0.008

0.006 0.01

0.003

0.006

0.0070.007

0.006

0.003 0.0040.004

0.003 0.04 0.12

0.004

Above the opening1.3

0.06

0.005

0.007

10

2.3

3.0

0.006

0.005

0.023

0.015

1.7

0.011

0.05 0.01

0.08

9.0

2.5

0.1

0.2

0.08

0.5 - 12

3.2

Surface of piping7.0

Surface of piping40

74Process Main Building 4F

0.4

0.02 0.015

0.015

0.050.08

0.15

0.045

9.0

0.012

0.009

0.2

Above the opening0.3

8.5

0.015

0.021

0.011

0.0080.008

0.0120.02

45 24

70

45

20

0.3

20

0.17

0.015 0.009

0.021

0.006

0.005

0.0060.005

Above the opening0.12

0.110.8

0.03

0.015

0.130.09

0.10.035

0.060.1

0.25 3.0 11

4.0

0.021

0.008

0.008

1.00.25

75Incineration Workshop Building B1F

0.008

0.007

0.010.008 0.008

0.012 0.01

0.0060.008

0.009

0.01

0.01 0.01

0.01

0.01

0.008

0.008

0.01

0.01

0.009Unit: mSv/h

76Incineration Workshop Building 1F

0.07 0.1 0.06

0.01

0.09

0.008

0.003

0.02 0.003

0.003

0.004

0.008

0.0090.009

0.008

0.008

0.01

0.01

0.70.014

0.02

0.01

0.01

0.007

0.010.008

0.0080.008

0.008

0.0080.02

0.015

0.126

0.0120.6

7.5

0.1

0.6

0.10 0.12

0.9 0.004

0.371

0.003

0.005

0.005

0.04

0.016

0.05

Upper side of large carry-in entrance (overheadtraveling crane area)

0.008 - 0.23

0.13 - 0.4

4.0

0.1

0.14

0.14

0.2

1.0

Maximumsurface dose

0.4

Maximumsurface dose

0.26

Overheadtraveling crane

0.104

0.089

0.034

0.219

0.11

Unit: mSv/h

77Incineration Workshop Building 2F

0.005

0.004

0.0045

0.004

0.0021 0.0015

0.0013

0.0013

0.0011

0.001

0.001

0.00120.001

0.0016

0.0018Unit: mSv/h

78Miscellaneous Solid Waste Volume Reduction Treatment Building 1F

0.05

0.35

0.22

0.025

0.006

0.008

0.08 0.035

0.065

5.0

0.15

0.06

1.1

0.065

0.003

0.055 0.09

40 10 5

2

0.16

0.05

0.15

0.15

2.2

0.075

3.5

0.2

0.11

3.0

0.0350.075

1.0

Surface of piping8.0

0.85

0.4

0.20.12

0.15

0.30

0.4

0.25 0.08

0.17

Surface of piping11

0.25

0.15

0.03

0.06

Surface of piping10

0.030

0.35

0.12 0.060.25

Surface of piping45

5.0Surface of piping

7.5

2.0

0.03

0.06

0.01

0.1

0.013

0.15

0.1

0.1

0.25

0.015

0.08

0.07

0.13

0.08

0.50

0.22

0.035

0.030

0.04

0.045

0.12

0.16

Surface of piping0.8

0.14

0.15

Unit: mSv/h

0.100.12

0.250.620.750.550.420.320.45

0.500.500.450.450.350.400.60

0.08 0.04

0.50

0.50

PI-902B2.3

PI-902A5.0 PIT-400A

2.3

PIT-500A1.9

0.26 0.20 0.27 0.30 0.28 0.23

0.28 0.20 0.15 0.25 0.20 0.20

PIT-300B1.8

PI-400B2.2

PI-500B3.0

0.50

0.10

0.06

79Miscellaneous Solid Waste Volume Reduction Treatment Building 2F

0.4

0.03

0.08 0.005

0.012

0.2

0.35

0.1

0.14

0.01

0.01

0.025

0.010.0050.06

0.010.005 0.005

0.013

0.023

0.04

0.03

0.04

0.025

0.02

0.06

2.0

0.004

0.008

0.015 0.015

0.020

0.045

0.008

0.007

0.01

0.005

0.0060.004

0.004 0.006

0.008 0.007

0.3

0.1 0.75

0.15

Surface of piping40

0.055

0.03

0.01

0.0070.0030.006

0.0040.004

0.005

0.02

Unit: mSv/h

80Site Bunker Building B1F

0.015

Trench0.015

0.0150.08

0.03

0.02

0.15

0.08

0.02

0.01

0.01

0.013

0.0230.01

0.0060.005 0.005

4.51.5

Unit: mSv/h

81Site Bunker Building 1F

0.005

0.04

0.02

0.002

0.008 0.04

0.085

0.03

0.006

0.0020.0020.003

0.16 0.06 0.025 0.012

0.04

0.02

0.020.02

0.018

2.5

0.15

1.1

1.6

0.035

0.020

0.10.08

0.06 0.055

0.03 0.04

0.035 0.04

Unit: mSv/h

82Site Bunker Building 2F

0.008

Air extractor filterMAX 0.8

0.0080.01

0.007

0.01

0.01

0.018

0.024

0.030.01

0.015

0.08

0.015

0.002

0.05

0.05 0.05 0.05

0.030.03

0.040.04

0.14 0.08 0.07

0.02

0.015

0.005

0.15 0.20

0.0150.013

0.020

0.15

0.02

0.006

Unit: mSv/h

83Suppression Pool Water Surge-Tank Building B1F

0.50.40.4

0.2

0.16

0.17

0.18

2.0

1.0

Unit: mSv/h

B1F

84Suppression Pool Water Surge-Tank Building 1F

0.004

0.006 0.004

0.06

0.007 0.013 0.05

0.01

0.1

0.14

0.18

0.08

0.015 0.02

0.015 0.020.012

0.012

To HTI/B0.08

0.080.1

0.18

Unit: mSv/h

1F

2F

85Auxiliary Operation Shared Facility B1F

0.001

0.0022

0.00180.0020.007

0.009

0.006

0.0050.005

0.004 0.0015

0.004 0.0006

0.003

0.0015

0.004

0.002

0.0025

0.0040.0035

Surface of waste2.5

0.0015

0.0045

Duct

Wall

Temporary scaffolding(4.0m from the floor)

0.0045

0.007

0.008

0.007

0.008

0.008

0.002 0.0030.003

0.004

0.0010.005

0.001

0.00040.001

0.501.0

2.0 0.080

0.13

0.30

0.100.0013

0.0006 0.0006

0.0006

0.0005

0.0010.005

0.002

0.0007

0.0050.0005

0.0013

0.002

0.02 0.025

0.00080.01

0.0012

0.0008

0.0007

0.0004

Unit: mSv/h

86Auxiliary Operation Shared Facility 1F

0.030

0.02

0.012 0.02

0.03

0.007

0.3

0.012

0.020.011

0.009

0.02

0.008

0.0220.011

0.45

0.010

0.01

0.011

0.008

0.015

0.045

0.006

0.04

0.016

0.015

0.035 0.02

0.015

0.007

0.003

0.0045

0.008

0.007

0.0110.0100.002

0.004

0.065

0.0020.003

0.0040.003

0.050

0.02

0.004

0.0080.004

0.004

0.004

Surface of piping1.5

Surface of piping1.0

Surface of piping2.0

Unit: mSv/h

0.040

87Auxiliary Operation Shared Facility 3F

0.004 0.004 0.004

0.004

0.004

0.003

0.004 0.0050.005

0.006

0.010

0.005

0.006 0.007 0.004 0.004 0.002

Overheadtraveling crane

0.008 0.003

0.004

0.0050.002

0.010 0.006 0.005

Fuel Handling Machine

0.009

0.003

0.0030.003 0.005 0.004

0.003 0.005 0.003 0.003

0.0030.002

0.002

3FL 2FL 1FL

Unit: mSv/h