manatee county utilities department manatee county public works sarasota- manatee traffic management...
Post on 17-Dec-2015
222 Views
Preview:
TRANSCRIPT
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
Sarasota- ManateeTraffic Management Center
Coordination with Partnering Agencies
TRANSPO 2012
Presented by:SAGE KAMIYA, P.E., PTOE
DEPUTY DIRECTOR, TRAFFIC MANAGEMENTPUBLIC WORKS DEPARTMENT
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
Traffic Management Center
SARASOTA-MANATEE
TMC
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
INTELLIGENT TRANSPORTATIONSYSTEMS
ARTERIALMANAGEMENT
FREEWAYMANAGEMENT
CRASHPREVENTION
ROAD WEATHERMANAGEMENT
TRANSITMANAGEMENT
EMERGENCYMANAGEMENT
TRAVELERINFORMATION
TRAFFIC INCIDENTMANAGEMENT
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
PHASE II88 SIGNALS
MANATEE ATMS PROJECTS
PHASE I143 SIGNALS
• 231 Signal Cabinet Upgrades
• 58 CCTV Monitoring Cameras
• 60 Vehicle Detection System Devices
• Includes Cities of Bradenton and Palmetto
• Includes communication hub for Sarasota County ATMS
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
• 365 Signal Cabinet Upgrades
• ~100 CCTV Monitoring Cameras
• 26 Vehicle Detection System Devices
• Includes Cities of Sarasota, Venice, and North Port
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
BACKGROUND• Sarasota Manatee MPO lead
• Identified stakeholders
• Outlined an ITS framework for the logical and physical architectural of regional ATMS
• Included high level design and implementation plan
• 2004 FDOT Concept of Operations
• 2005 Interlocal Agreement - Unified Regional Intelligent Transportation System
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
IMPLEMENTATION
• Intelligent Transportation Systems Management Team
• Proportionate cost share based on population
• Defined responsibilities
• Shared training
• Technical integration meetings
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
FUNDING
• Manatee County – Work Program Funds/ ARRA
• Sarasota County – Local and TRIP funds
• Operations – Congestion Management Funds?
• FDOT Support
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
GOALS• Fewer stops and less stop time at traffic signals
• Respond to traffic disruptions immediately
• Improve response time for Emergency vehicles and improve bus service reliability
• Improve emergency evacuations
• Improve safety by providing real time traffic information
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
ARTERIALMANAGEMENT
TRAFFIC INCIDENTMANAGEMENT
TRAFFIC SIGNALMAINTENANCE
Operations Performance Measures• Travel time reliability/consistency
• Travel time (before and after improvements)
• Reduction in delay
• Vehicle Throughput
PERFORMANCE MEASURES
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
ARTERIALMANAGEMENT
TRAFFIC INCIDENTMANAGEMENT
TRAFFIC SIGNALMAINTENANCE
Maintenance Performance Measures
• Percentage of operational vehicle detection devices
• Percentage of operational pedestrian detection devices
• Proactive identification of malfunctions (percentage)
PERFORMANCE MEASURES
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
LESSONS LEARNED
• Clearly Defined Goals
• Staff Continuity
• Communication
• Funding Sources
Ma
na
tee
Cou
nty U
tilities D
ep
artmen
tM
an
atee
Co
un
ty Pu
blic
Wo
rks
THANK YOU
14
SAGE KAMIYA, P.E., PTOEDEPUTY DIRECTOR, TRAFFIC MANAGEMENT
MANATEE COUNTY PUBLIC WORKS DEPARTMENT
E-Mail: sage.kamiya@mymanatee.org
top related