lomas msw treatment plant - urbaser · lomas msw treatment plant client madrid city government...

Post on 29-Jul-2020

13 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

LOMAS MSW TREATMENT PLANT

ClientMadrid City Government

Residents served1,100,000 residents

Processes• Treated waste (total): 477,093 t• Pre-treatment: 19,668 t of recovered

materials• Energy generation from the energy

valuation of waste: 189,727 MWhe (50% renewable)

2016 data

Treatment capacity• 532,000 t/year of MSW

140.1 kt CO2 prevented

Installed power• 29 MW Energy Valuation

top related