level 01 level 02 - ece illinois building map 8-2014.pdfprojects instructional lab 2026 projects...

Post on 14-Mar-2018

215 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

UP

DN

UP

DN

DN

DN

UP

DN DN DN

DN

DN

UP

DN

DN

UP

SMALLAUDITORIUM

1015

SMALLAUDITORIUM

1013

DEV OFFICE1066

DEV OFFICE1064

DEV OFFICE1062

DEV OFFICE1072

INTERNS1060

OFFICEMANAGER

1076

RECEIVINGSTORAGE

1024

OFFICE1036

PRINT SHOP /STORAGE

1031A1

OPEN OFFICEAREA1031A2

ECE STORE1031

PARTS STORAGE /GRAVEYARD

1046

METAL STORAGE1044TECH'S WORK RM

1042

STUDENT WORKBENCH ASSEMBLY

1041

MACHINE SHOP1048

STUDENT WORKSHOP

1047

WAITING1070

CATERINGKITCHEN

1014A2

CAFE1014

CAFE PREP1014A1

INSTRUCTIONALCLEAN ROOM

1003

TOOL CRIB1045

AUDITORIUM1002

ECE 1101001

STUDENTORGANIZATIONAL

OFFICE1016

INSTRUCTIONALSUPPORT

1001A2

FURNITURESTORAGE

1006

CLASS LAB1005

CITES1021

ELEC1029

ELEC1051

409E-1ELEV

STAIR3STAIR3

ELEV 3409E-3

MENS1027

WOMENS1025

STAIR2STAIR2

SHAFT5SHAFT5

CITES1004

SHAFT1SHAFT1

STAIR4STAIR4

CONFERENCE1068

STAIR1STAIR1

CORRIDORC1040

SHAFT3SHAFT3

JANITOR1011

SHAFT2SHAFT2

VESTIBULE1007A1

VESTIBULE1009A1

LOBBYC1000

CORRIDORC1010

CORRIDORC1001

CORRIDORC1050

CORRIDORC1060

VESTIBULEC1020A

CORRIDORC1020

STAFF LOUNGE1022

SHAFT6SHAFT6

MENS1009

WOMENS1007

ELEC1008

ELEV 2409E-2

VESTIBULE 5C1050A

OFFICE1049

SHAFT7SHAFT7

OFFICE1032

CORRIDORC1030

Administration

Classrooms

Instructional Labs

Research Labs

Student Lounges & Study

Support Services

Vertical Circulation

CORRIDORC1040

VESTIBULEC1010A1

STUDENTWORKSTATIONS/

FILES/WORK ROOM1034

LOBBYC1000

REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com

Plot

Dat

e:

Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633

Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585

The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250

TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123

KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673

JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE

PROJECT NO.

SHEET NO.

OF ( ) SHEETS

CHECKED APPROVED

DRAWN

Pat Quinn, GovernorState of Illinois

CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY

REVISIONS

NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.

University of Illinois Project No. U08032

[830-010-331]

Targeting Platinum

LEED REGISTERED

APPROVEDTRACED

PREPARED

12/01/2011

6/26

/201

4 4:

48:3

6 P

M

FIRST FLOOR PLAN-COLOR

ECE_1-C

Author

Checker Approver

ApproverChecker

Author

SCALE: 3/32" = 1'-0"1

ECE-FIRST FLOOR COLOR COMPOSITEPLAN

UP

UP

DN

UP

DN

UP

UP

DN

DN

LARGECLASSROOM

2017

MEDIUMCLASSROOM

2015

MEDIUMCLASSROOM

2013

PROJECTSINSTRUCTIONAL

LAB2026

PROJECTS CLASSLAB / DIRTY AREA

2024

EWS COMPUTERLAB2022

GROUP STUDYROOM

2016LARGE LAB

2076LARGE LAB

2070

CLASS LAB2072

CLASS LAB2074

INSTRUCTIONALSUPPORT

2070A1

TA MEETINGROOM

2036

RECEPTION/CLERICAL

2030

CONFERENCE2032

WORK ROOM2065

OPEN TO BELOW

CONFERENCE2088

ASSOC DEPTHEAD

2084

ADVISOR2098

ADVISOR2094

ASSNTTO DH

2104

BM2110

GM2108

PC2106

HR2100

DH ADMIN ASSNTS2081

ADMIN ASSNT2087

ASSOC DEPTHEAD

2080

CONFERENCEROOM

2082

ADMIN ASSNT2086

DEPT HEAD2090

KITCHENETTE/WORK ROOM

2085

ADVISOR2096

ADVISOR2092

ADVISINGRECEPTION

2090A1

HR2102

BUSINESSRECEPTION

2080A2

ELEV1ELEV1

JANITOR2011

DH RECEPTION2080A1

409E-3ELEV3

STAIR2STAIR2

CITES2004

STAIR 1ST-201

STAIR4STAIR4

SHAFT1SHAFT1

STAIR3STAIR3

CITES2021

ELEC2029

MENS2027

WOMENS2025

SECURITY2053

SHAFT5SHAFT5

ELEC2051

SHAFT3SHAFT3

CORRIDORC2002

CORRIDORC2010

TOILET2007A1

TOILET2009A1

CLERKS2083

TA MEETINGROOM

2034

409E-2ELEV2

RESEARCHOFFICE

2042

RESEARCHOFFICE

2044

RESEARCHOFFICE

2046

RESEARCHOFFICE

2048

RESEARCHOFFICE

2050

RESEARCHOFFICE

2052

RESEARCHOFFICE

2054

RESEARCHOFFICE

2056

RESEARCHOFFICE

2058

RESEARCHOFFICE

2060

RESEARCHOFFICE

2062

RESEARCHOFFICE

2064

GROUP STUDYROOM

2014

SHAFT2SHAFT2

ELEC2008

MENS2009

WOMENS2007

CORRIDORC2000

CORRIDORC2040

SHAFT6SHAFT6

CORRIDORC2050

RESEARCH OFFICE2038

INSTRUCTIONALSUPPORT

2076A1

CLEAN ROOMSUPPORT

C2003

CORRIDORC2020

CORRIDORC2001

RESEARCH OFFICE2068

SHAFT7SHAFT7

OD RD

OD RD

OD

RD

OD

RD

SLOPE MIN.1/4" = 1'-0"

SLOPE MIN.1/4" = 1'-0"

FILESC2080

Administration

Classrooms

Instructional Labs

Research Offices

Student Lounges & Study

Support Services

Vertical Circulation

RESEARCHOFFICE

2066

RESEARCHOFFICE

2040

JANITOR2023

REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com

Plot

Dat

e:

Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633

Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585

The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250

TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123

KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673

JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE

PROJECT NO.

SHEET NO.

OF ( ) SHEETS

CHECKED APPROVED

DRAWN

Pat Quinn, GovernorState of Illinois

CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY

REVISIONS

NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.

University of Illinois Project No. U08032

[830-010-331]

Targeting Platinum

LEED REGISTERED

APPROVEDTRACED

PREPARED

12/01/2011

6/26

/201

4 4:

48:5

7 P

M

SECOND FLOOR PLAN-COLOR

ECE_2-C

Author

Checker Approver

ApproverChecker

Author

SCALE: 3/32" = 1'-0"1

ECE-SECOND FLOOR COLORCOMPOSITE PLAN

LEVEL 01 LEVEL 02

Welcome to the ECE Building!

Instructional LaboratoryFaculty TA/RA Offices

Student Organization SpaceResearch Laboratory

AdministrationClassrooms

Stairs and ElevatorsSupport ServicesMeeting RoomsStudent Projects

Instructional LaboratoryResearch Offices

Student Organization SpaceResearch Laboratory

AdministrationClassrooms

Stairs and ElevatorsSupport Services

DN

UP

DN

UP

POWERELECTRONICS LAB

4024

INSTRUCTIONALSUPPORT

4022A1

ELECTRICCIRCUITS LAB

4022

CLASS LAB4026

POWER LAB4020

COMPUTER LAB4076

INSTRUCTIONALLAB4074

INSTRUCTIONALLAB4072

TA MEETINGROOM

4034

TA MEETINGROOM

4036

RECEPTIONCLERICAL

4030

CONFERENCE4032

WORK ROOM4065

CLASS LAB4070

INSTRUCTIONALSUPPORT

4072A1

CITES4021

ELEC4051

STAIR2STAIR2

SHAFT5SHAFT5

STAIR409-3409-3

409E-3ELEV3

SHAFT6SHAFT6

STAIR1STAIR1

WOMENS4025

MENS4027

ELEC4029

CORRIDORC4050

409E-2ELEV2

CORRIDORC4020

RESEARCHOFFICE

4058

RESEARCHOFFICE

4064

RESEARCHOFFICE

4068

CORRIDORC4040

JANITOR4041

RD

OD

RD

OD

RD

OD

RD

OD

RD

OD

RD

OD

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

SLO

PE M

IN.

1/4"

= 1

'-0"

Instructional Labs

Research Labs

RESEARCH OFFICE

Research Offices

Support Services

Vertical Circulation

INVERTERROOM

4080

VESTIBULE4082

409E-1ELEV1

ELEVCONTROL

ROOM4084

SECURITY4053

RESEARCHOFFICE

4062

RESEARCHOFFICE

4066

RESEARCHOFFICE

4060

RESEARCHOFFICE

4056

RESEARCHOFFICE

4054

RESEARCHOFFICE

4052

RESEARCHOFFICE

4050

RESEARCHOFFICE

4048

RESEARCHOFFICE

4046

RESEARCHOFFICE

4044

RESEARCHOFFICE

4042

RESEARCHOFFICE

4040RESEARCH

OFFICE4038

REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com

Plot

Dat

e:

Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633

Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585

The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250

TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123

KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673

JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE

PROJECT NO.

SHEET NO.

OF ( ) SHEETS

CHECKED APPROVED

DRAWN

Pat Quinn, GovernorState of Illinois

CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY

REVISIONS

NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.

University of Illinois Project No. U08032

[830-010-331]

Targeting Platinum

LEED REGISTERED

APPROVEDTRACED

PREPARED

12/01/2011

6/26

/201

4 4:

49:2

4 P

M

FOURTH FLOOR-COLOR

ECE_4-C

Author

Checker Approver

ApproverChecker

Author

SCALE: 3/32" = 1'-0"1

ECE-FOURTH FLOOR COLORCOMPOSITE PLAN

LEVEL 04

DN

DN DN

UPUP

DNUP

LARGECLASSROOM

3017

MEDIUMCLASSROOM

3015

MEDIUMCLASSROOM

3013

INSTRUCTIONALLAB3077

INSTRUCTIONALLAB3071

INSTRUCTIONALLAB3073

INSTRUCTIONALLAB3075

OPTICAL IMAGING3016

INSTRUCTIONALSUPPORT

3016A1

ELECTRONICMUSIC SYNTHESIS

3024

WIRELESSCOMPUTER

NETWORKING3022

CLASS LAB3020

ECE 3913026

CLASS LAB3014

INSTRUCTIONALSUPPORT

3005

120 SEAT LAB3002

GROUP STUDYROOM

3001

GROUP STUDYROOM

3003

WORK ROOM3065

RECEPTION/CLERICAL

3030

TA MEETINGROOM

3034

TA MEETINGROOM

3036

CONFERENCE3032

TELECONFERENCE3081

INSTRUCTIONALSUPPORT

3022A1UNDERGRAD

LOUNGE3070

CONTROL ROOM3081A2

GRAD LOUNGE3072

FACULTY LOUNGE3082

CATERING3002A2

ELEC3051

409E-1ELEV1

IT SUITE3080

STAIR3STAIR3 409E-3

ELEV3 SHAFT5SHAFT5

STAIR2STAIR2

MENS3009

STAIR 1STAIR1

STAIR4STAIR4

SHAFT3SHAFT3

MENS3027

WOMENS3025

SHAFT6SHAFT6

CORRIDORC3002

CORRIDORC3070

CITES3021

409E-2ELEV2

SHAFT2SHAFT2

TOILET3007A1

CORRIDORC-301B

TOILET3009A1

ELEC 3EL 3029

33'-8 5/8"

STORAGE3018

RESEARCHOFFICE

3042

RESEARCHOFFICE

3044

RESEARCHOFFICE

3046

RESEARCHOFFICE

3048

RESEARCHOFFICE

3050

RESEARCHOFFICE

3052

RESEARCHOFFICE

3054

RESEARCHOFFICE

3056

RESEARCHOFFICE

3058

RESEARCHOFFICE

3060

RESEARCHOFFICE

3062

RESEARCHOFFICE

3064

CORRIDORC3040

JANITOR3011

ELEC3008

WOMENS3007

VEST3081A1

CORRIDORC3050

CORRIDORC3020

CITES3004

VESTIBULE3002A1

CORRIDORC3001

CORRIDORC3000

SHAFT1SHAFT1

RESEARCH OFFICE3038

RESEARCH OFFICE3068

CORRIDORC3080

SHAFT7SHAFT7

RD

OD

OD

RD

RD OD SLOPE MIN.1/4" = 1'-0"

SLOPE MIN.1/4" = 1'-0"

SLOPE MIN.1/4" = 1'-0"

FACULTY MAILROOM3082A1

Administration

Classrooms

Instructional Labs

RESEARCH OFFICE

Research Offices

Student Lounges & Study

Support Services

Vertical Circulation

RESEARCHOFFICE

3066

RESEARCHOFFICE

3040

JANITOR3023

STORAGE3080A2

RESEARCH OFFICE3080A1

SECURITY3053

REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com

Plot

Dat

e:

Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633

Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585

The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250

TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123

KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673

JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE

PROJECT NO.

SHEET NO.

OF ( ) SHEETS

CHECKED APPROVED

DRAWN

Pat Quinn, GovernorState of Illinois

CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY

REVISIONS

NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.

University of Illinois Project No. U08032

[830-010-331]

Targeting Platinum

LEED REGISTERED

APPROVEDTRACED

PREPARED

12/01/2011

6/26

/201

4 4:

49:1

3 P

M

THIRD FLOOR-COLOR

ECE_3-C

Author

Checker Approver

ApproverChecker

Author

SCALE: 3/32" = 1'-0"1

ECE-THIRD FLOOR COLORCOMPOSITE PLAN

LEVEL 03

DN

UP

DN

ANACHOICCHAMBER

5028

LARGE LAB5024

SMALL LAB5022

MEDIUM OPTICSLAB5088

MEDIUM OPTICSLAB5084

ELECTRONICS LAB5020

LIBRARY / WORKROOM

5086

LARGE OPTICS LAB5082

INSTRUCTIONALLAB5080

INSTRUCTIONALLAB5076

INSTRUCTIONALLAB5074

INSTRUCTIONALSUPPORT

5072

CONFERENCE5070

INSTRUCTIONALSUPPORT

5072A1

EMI/RF SHIELDEDROOM

5078

VESTIBULE5078A1

OPTICS LAB5036

RECEPTION/CLERICAL5030

CONFERENCE5032

WORK ROOM5065

CITES5021ELEC

5029ELEC

5051

STAIR3STAIR3

409E-3ELEV3

SHAFT6SHAFT6

SHAFT5SHAFT5

STAIR 2ST-502

WOMENS5025

MENS5027

CORRIDORC5020

TA MEETINGROOM

5034

RESEARCHOFFICE

5042

RESEARCHOFFICE

5046

RESEARCHOFFICE

5050

RESEARCHOFFICE

5054

RESEARCHOFFICE

5056

RESEARCHOFFICE

5062

CORRIDORC5050

409E-2ELEV2

SHAFT4SHAFT4

JANITOR5023

RESEARCHOFFICE

5058

RESEARCHOFFICE

5060

RESEARCHOFFICE

5040

CORRIDORC5040

RESEARCH OFFICE5038

SECURITY5053

RESEARCHOFFICE

5044

RESEARCHOFFICE

5048

RESEARCHOFFICE

5052

RESEARCHOFFICE

5064

RESEARCHOFFICE

5066

RESEARCH OFFICE5068

Instructional Labs

Research Labs

Research Offices

Support Services

Vertical Circulation

REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com

Plot

Dat

e:

Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633

Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585

The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250

TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123

KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673

JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE

PROJECT NO.

SHEET NO.

OF ( ) SHEETS

CHECKED APPROVED

DRAWN

Pat Quinn, GovernorState of Illinois

CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY

REVISIONS

NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.

University of Illinois Project No. U08032

[830-010-331]

Targeting Platinum

LEED REGISTERED

APPROVEDTRACED

PREPARED

12/01/2011

6/26

/201

4 4:

49:3

2 P

M

FIFTH FLOOR PLAN-COLOR

ECE_5-C

Author

Checker Approver

ApproverChecker

Author

SCALE: 3/32" = 1'-0"1

ECE-FIFTH FLOOR COLOR COMPOSITEPLAN

LEVEL 05

Meeting RoomsStudent Projects

top related