level 01 level 02 - ece illinois building map 8-2014.pdfprojects instructional lab 2026 projects...
TRANSCRIPT
UP
DN
UP
DN
DN
DN
UP
DN DN DN
DN
DN
UP
DN
DN
UP
SMALLAUDITORIUM
1015
SMALLAUDITORIUM
1013
DEV OFFICE1066
DEV OFFICE1064
DEV OFFICE1062
DEV OFFICE1072
INTERNS1060
OFFICEMANAGER
1076
RECEIVINGSTORAGE
1024
OFFICE1036
PRINT SHOP /STORAGE
1031A1
OPEN OFFICEAREA1031A2
ECE STORE1031
PARTS STORAGE /GRAVEYARD
1046
METAL STORAGE1044TECH'S WORK RM
1042
STUDENT WORKBENCH ASSEMBLY
1041
MACHINE SHOP1048
STUDENT WORKSHOP
1047
WAITING1070
CATERINGKITCHEN
1014A2
CAFE1014
CAFE PREP1014A1
INSTRUCTIONALCLEAN ROOM
1003
TOOL CRIB1045
AUDITORIUM1002
ECE 1101001
STUDENTORGANIZATIONAL
OFFICE1016
INSTRUCTIONALSUPPORT
1001A2
FURNITURESTORAGE
1006
CLASS LAB1005
CITES1021
ELEC1029
ELEC1051
409E-1ELEV
STAIR3STAIR3
ELEV 3409E-3
MENS1027
WOMENS1025
STAIR2STAIR2
SHAFT5SHAFT5
CITES1004
SHAFT1SHAFT1
STAIR4STAIR4
CONFERENCE1068
STAIR1STAIR1
CORRIDORC1040
SHAFT3SHAFT3
JANITOR1011
SHAFT2SHAFT2
VESTIBULE1007A1
VESTIBULE1009A1
LOBBYC1000
CORRIDORC1010
CORRIDORC1001
CORRIDORC1050
CORRIDORC1060
VESTIBULEC1020A
CORRIDORC1020
STAFF LOUNGE1022
SHAFT6SHAFT6
MENS1009
WOMENS1007
ELEC1008
ELEV 2409E-2
VESTIBULE 5C1050A
OFFICE1049
SHAFT7SHAFT7
OFFICE1032
CORRIDORC1030
Administration
Classrooms
Instructional Labs
Research Labs
Student Lounges & Study
Support Services
Vertical Circulation
CORRIDORC1040
VESTIBULEC1010A1
STUDENTWORKSTATIONS/
FILES/WORK ROOM1034
LOBBYC1000
REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com
Plot
Dat
e:
Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633
Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585
The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250
TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123
KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673
JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE
PROJECT NO.
SHEET NO.
OF ( ) SHEETS
CHECKED APPROVED
DRAWN
Pat Quinn, GovernorState of Illinois
CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY
REVISIONS
NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.
University of Illinois Project No. U08032
[830-010-331]
Targeting Platinum
LEED REGISTERED
APPROVEDTRACED
PREPARED
12/01/2011
6/26
/201
4 4:
48:3
6 P
M
FIRST FLOOR PLAN-COLOR
ECE_1-C
Author
Checker Approver
ApproverChecker
Author
SCALE: 3/32" = 1'-0"1
ECE-FIRST FLOOR COLOR COMPOSITEPLAN
UP
UP
DN
UP
DN
UP
UP
DN
DN
LARGECLASSROOM
2017
MEDIUMCLASSROOM
2015
MEDIUMCLASSROOM
2013
PROJECTSINSTRUCTIONAL
LAB2026
PROJECTS CLASSLAB / DIRTY AREA
2024
EWS COMPUTERLAB2022
GROUP STUDYROOM
2016LARGE LAB
2076LARGE LAB
2070
CLASS LAB2072
CLASS LAB2074
INSTRUCTIONALSUPPORT
2070A1
TA MEETINGROOM
2036
RECEPTION/CLERICAL
2030
CONFERENCE2032
WORK ROOM2065
OPEN TO BELOW
CONFERENCE2088
ASSOC DEPTHEAD
2084
ADVISOR2098
ADVISOR2094
ASSNTTO DH
2104
BM2110
GM2108
PC2106
HR2100
DH ADMIN ASSNTS2081
ADMIN ASSNT2087
ASSOC DEPTHEAD
2080
CONFERENCEROOM
2082
ADMIN ASSNT2086
DEPT HEAD2090
KITCHENETTE/WORK ROOM
2085
ADVISOR2096
ADVISOR2092
ADVISINGRECEPTION
2090A1
HR2102
BUSINESSRECEPTION
2080A2
ELEV1ELEV1
JANITOR2011
DH RECEPTION2080A1
409E-3ELEV3
STAIR2STAIR2
CITES2004
STAIR 1ST-201
STAIR4STAIR4
SHAFT1SHAFT1
STAIR3STAIR3
CITES2021
ELEC2029
MENS2027
WOMENS2025
SECURITY2053
SHAFT5SHAFT5
ELEC2051
SHAFT3SHAFT3
CORRIDORC2002
CORRIDORC2010
TOILET2007A1
TOILET2009A1
CLERKS2083
TA MEETINGROOM
2034
409E-2ELEV2
RESEARCHOFFICE
2042
RESEARCHOFFICE
2044
RESEARCHOFFICE
2046
RESEARCHOFFICE
2048
RESEARCHOFFICE
2050
RESEARCHOFFICE
2052
RESEARCHOFFICE
2054
RESEARCHOFFICE
2056
RESEARCHOFFICE
2058
RESEARCHOFFICE
2060
RESEARCHOFFICE
2062
RESEARCHOFFICE
2064
GROUP STUDYROOM
2014
SHAFT2SHAFT2
ELEC2008
MENS2009
WOMENS2007
CORRIDORC2000
CORRIDORC2040
SHAFT6SHAFT6
CORRIDORC2050
RESEARCH OFFICE2038
INSTRUCTIONALSUPPORT
2076A1
CLEAN ROOMSUPPORT
C2003
CORRIDORC2020
CORRIDORC2001
RESEARCH OFFICE2068
SHAFT7SHAFT7
OD RD
OD RD
OD
RD
OD
RD
SLOPE MIN.1/4" = 1'-0"
SLOPE MIN.1/4" = 1'-0"
FILESC2080
Administration
Classrooms
Instructional Labs
Research Offices
Student Lounges & Study
Support Services
Vertical Circulation
RESEARCHOFFICE
2066
RESEARCHOFFICE
2040
JANITOR2023
REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com
Plot
Dat
e:
Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633
Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585
The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250
TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123
KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673
JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE
PROJECT NO.
SHEET NO.
OF ( ) SHEETS
CHECKED APPROVED
DRAWN
Pat Quinn, GovernorState of Illinois
CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY
REVISIONS
NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.
University of Illinois Project No. U08032
[830-010-331]
Targeting Platinum
LEED REGISTERED
APPROVEDTRACED
PREPARED
12/01/2011
6/26
/201
4 4:
48:5
7 P
M
SECOND FLOOR PLAN-COLOR
ECE_2-C
Author
Checker Approver
ApproverChecker
Author
SCALE: 3/32" = 1'-0"1
ECE-SECOND FLOOR COLORCOMPOSITE PLAN
LEVEL 01 LEVEL 02
Welcome to the ECE Building!
Instructional LaboratoryFaculty TA/RA Offices
Student Organization SpaceResearch Laboratory
AdministrationClassrooms
Stairs and ElevatorsSupport ServicesMeeting RoomsStudent Projects
Instructional LaboratoryResearch Offices
Student Organization SpaceResearch Laboratory
AdministrationClassrooms
Stairs and ElevatorsSupport Services
DN
UP
DN
UP
POWERELECTRONICS LAB
4024
INSTRUCTIONALSUPPORT
4022A1
ELECTRICCIRCUITS LAB
4022
CLASS LAB4026
POWER LAB4020
COMPUTER LAB4076
INSTRUCTIONALLAB4074
INSTRUCTIONALLAB4072
TA MEETINGROOM
4034
TA MEETINGROOM
4036
RECEPTIONCLERICAL
4030
CONFERENCE4032
WORK ROOM4065
CLASS LAB4070
INSTRUCTIONALSUPPORT
4072A1
CITES4021
ELEC4051
STAIR2STAIR2
SHAFT5SHAFT5
STAIR409-3409-3
409E-3ELEV3
SHAFT6SHAFT6
STAIR1STAIR1
WOMENS4025
MENS4027
ELEC4029
CORRIDORC4050
409E-2ELEV2
CORRIDORC4020
RESEARCHOFFICE
4058
RESEARCHOFFICE
4064
RESEARCHOFFICE
4068
CORRIDORC4040
JANITOR4041
RD
OD
RD
OD
RD
OD
RD
OD
RD
OD
RD
OD
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
SLO
PE M
IN.
1/4"
= 1
'-0"
Instructional Labs
Research Labs
RESEARCH OFFICE
Research Offices
Support Services
Vertical Circulation
INVERTERROOM
4080
VESTIBULE4082
409E-1ELEV1
ELEVCONTROL
ROOM4084
SECURITY4053
RESEARCHOFFICE
4062
RESEARCHOFFICE
4066
RESEARCHOFFICE
4060
RESEARCHOFFICE
4056
RESEARCHOFFICE
4054
RESEARCHOFFICE
4052
RESEARCHOFFICE
4050
RESEARCHOFFICE
4048
RESEARCHOFFICE
4046
RESEARCHOFFICE
4044
RESEARCHOFFICE
4042
RESEARCHOFFICE
4040RESEARCH
OFFICE4038
REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com
Plot
Dat
e:
Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633
Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585
The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250
TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123
KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673
JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE
PROJECT NO.
SHEET NO.
OF ( ) SHEETS
CHECKED APPROVED
DRAWN
Pat Quinn, GovernorState of Illinois
CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY
REVISIONS
NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.
University of Illinois Project No. U08032
[830-010-331]
Targeting Platinum
LEED REGISTERED
APPROVEDTRACED
PREPARED
12/01/2011
6/26
/201
4 4:
49:2
4 P
M
FOURTH FLOOR-COLOR
ECE_4-C
Author
Checker Approver
ApproverChecker
Author
SCALE: 3/32" = 1'-0"1
ECE-FOURTH FLOOR COLORCOMPOSITE PLAN
LEVEL 04
DN
DN DN
UPUP
DNUP
LARGECLASSROOM
3017
MEDIUMCLASSROOM
3015
MEDIUMCLASSROOM
3013
INSTRUCTIONALLAB3077
INSTRUCTIONALLAB3071
INSTRUCTIONALLAB3073
INSTRUCTIONALLAB3075
OPTICAL IMAGING3016
INSTRUCTIONALSUPPORT
3016A1
ELECTRONICMUSIC SYNTHESIS
3024
WIRELESSCOMPUTER
NETWORKING3022
CLASS LAB3020
ECE 3913026
CLASS LAB3014
INSTRUCTIONALSUPPORT
3005
120 SEAT LAB3002
GROUP STUDYROOM
3001
GROUP STUDYROOM
3003
WORK ROOM3065
RECEPTION/CLERICAL
3030
TA MEETINGROOM
3034
TA MEETINGROOM
3036
CONFERENCE3032
TELECONFERENCE3081
INSTRUCTIONALSUPPORT
3022A1UNDERGRAD
LOUNGE3070
CONTROL ROOM3081A2
GRAD LOUNGE3072
FACULTY LOUNGE3082
CATERING3002A2
ELEC3051
409E-1ELEV1
IT SUITE3080
STAIR3STAIR3 409E-3
ELEV3 SHAFT5SHAFT5
STAIR2STAIR2
MENS3009
STAIR 1STAIR1
STAIR4STAIR4
SHAFT3SHAFT3
MENS3027
WOMENS3025
SHAFT6SHAFT6
CORRIDORC3002
CORRIDORC3070
CITES3021
409E-2ELEV2
SHAFT2SHAFT2
TOILET3007A1
CORRIDORC-301B
TOILET3009A1
ELEC 3EL 3029
33'-8 5/8"
STORAGE3018
RESEARCHOFFICE
3042
RESEARCHOFFICE
3044
RESEARCHOFFICE
3046
RESEARCHOFFICE
3048
RESEARCHOFFICE
3050
RESEARCHOFFICE
3052
RESEARCHOFFICE
3054
RESEARCHOFFICE
3056
RESEARCHOFFICE
3058
RESEARCHOFFICE
3060
RESEARCHOFFICE
3062
RESEARCHOFFICE
3064
CORRIDORC3040
JANITOR3011
ELEC3008
WOMENS3007
VEST3081A1
CORRIDORC3050
CORRIDORC3020
CITES3004
VESTIBULE3002A1
CORRIDORC3001
CORRIDORC3000
SHAFT1SHAFT1
RESEARCH OFFICE3038
RESEARCH OFFICE3068
CORRIDORC3080
SHAFT7SHAFT7
RD
OD
OD
RD
RD OD SLOPE MIN.1/4" = 1'-0"
SLOPE MIN.1/4" = 1'-0"
SLOPE MIN.1/4" = 1'-0"
FACULTY MAILROOM3082A1
Administration
Classrooms
Instructional Labs
RESEARCH OFFICE
Research Offices
Student Lounges & Study
Support Services
Vertical Circulation
RESEARCHOFFICE
3066
RESEARCHOFFICE
3040
JANITOR3023
STORAGE3080A2
RESEARCH OFFICE3080A1
SECURITY3053
REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com
Plot
Dat
e:
Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633
Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585
The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250
TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123
KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673
JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE
PROJECT NO.
SHEET NO.
OF ( ) SHEETS
CHECKED APPROVED
DRAWN
Pat Quinn, GovernorState of Illinois
CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY
REVISIONS
NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.
University of Illinois Project No. U08032
[830-010-331]
Targeting Platinum
LEED REGISTERED
APPROVEDTRACED
PREPARED
12/01/2011
6/26
/201
4 4:
49:1
3 P
M
THIRD FLOOR-COLOR
ECE_3-C
Author
Checker Approver
ApproverChecker
Author
SCALE: 3/32" = 1'-0"1
ECE-THIRD FLOOR COLORCOMPOSITE PLAN
LEVEL 03
DN
UP
DN
ANACHOICCHAMBER
5028
LARGE LAB5024
SMALL LAB5022
MEDIUM OPTICSLAB5088
MEDIUM OPTICSLAB5084
ELECTRONICS LAB5020
LIBRARY / WORKROOM
5086
LARGE OPTICS LAB5082
INSTRUCTIONALLAB5080
INSTRUCTIONALLAB5076
INSTRUCTIONALLAB5074
INSTRUCTIONALSUPPORT
5072
CONFERENCE5070
INSTRUCTIONALSUPPORT
5072A1
EMI/RF SHIELDEDROOM
5078
VESTIBULE5078A1
OPTICS LAB5036
RECEPTION/CLERICAL5030
CONFERENCE5032
WORK ROOM5065
CITES5021ELEC
5029ELEC
5051
STAIR3STAIR3
409E-3ELEV3
SHAFT6SHAFT6
SHAFT5SHAFT5
STAIR 2ST-502
WOMENS5025
MENS5027
CORRIDORC5020
TA MEETINGROOM
5034
RESEARCHOFFICE
5042
RESEARCHOFFICE
5046
RESEARCHOFFICE
5050
RESEARCHOFFICE
5054
RESEARCHOFFICE
5056
RESEARCHOFFICE
5062
CORRIDORC5050
409E-2ELEV2
SHAFT4SHAFT4
JANITOR5023
RESEARCHOFFICE
5058
RESEARCHOFFICE
5060
RESEARCHOFFICE
5040
CORRIDORC5040
RESEARCH OFFICE5038
SECURITY5053
RESEARCHOFFICE
5044
RESEARCHOFFICE
5048
RESEARCHOFFICE
5052
RESEARCHOFFICE
5064
RESEARCHOFFICE
5066
RESEARCH OFFICE5068
Instructional Labs
Research Labs
Research Offices
Support Services
Vertical Circulation
REMARKSNO. DATE SMITHGROUP, INC35 EAST WACKERSUITE 2200CHICAGO, IL 60601T 312.641.0770F 312.641.6728www.smithgroup.com
Plot
Dat
e:
Code Consultants IncCode Consulting1804 Borman Circle DriveSt. Louis, Missouri 63146(314) 991 - 2633
Shen Milsom & WilkeAudio/Visual Consulting2 North Riverside PlazaSuite 1460Chicago, Illinois 60606(312) 559 - 4585
The Concord GroupCost Estimating161 North Clard StreetSuite 2050Chicago, IL 60601(312) 424 - 0250
TERRACivil Engineering225 W. Ohio Street4th FloorChicago, Illinois 60654(312) 467 - 0123
KJWWMechanical Engineering623 26th AvenueRock Island, Illinois 61201(309) 788 - 0673
JJRLandscape Architecture35 East Wacker DriveSuite 2200Chicago, Illinois 60101(312) 641 - 0510 DATE
PROJECT NO.
SHEET NO.
OF ( ) SHEETS
CHECKED APPROVED
DRAWN
Pat Quinn, GovernorState of Illinois
CHAMPAIGN COUNTY, ILLINOISUNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNELECTRICAL & COMPUTER ENGINEERING FACILITY
REVISIONS
NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.
University of Illinois Project No. U08032
[830-010-331]
Targeting Platinum
LEED REGISTERED
APPROVEDTRACED
PREPARED
12/01/2011
6/26
/201
4 4:
49:3
2 P
M
FIFTH FLOOR PLAN-COLOR
ECE_5-C
Author
Checker Approver
ApproverChecker
Author
SCALE: 3/32" = 1'-0"1
ECE-FIFTH FLOOR COLOR COMPOSITEPLAN
LEVEL 05
Meeting RoomsStudent Projects