Terminator DE-B/FAK-1LED End of Circuit Light Kit for
Electrically Heated TubeTrace® Bundles
INSTALLATION PROCEDURES
2
Receiving, Storing and Handling 1. Inspect materials for damage incurred during shipping.2. Reportdamagestothecarrierforsettlement.3. Identifypartsagainstthepacking list toensuretheproper
typeandquantityhasbeenreceived.4. Storeinadrylocation.
Item Quantity Description
1 1 Expediter Assembly: Flat Mount Base, Grommet, Grommet Compressor.
2 1 LightModuleCover
3 1 LED Light Module
4 1 FAK-1 Top
5 1 FAK-1 Base
6 1 HeatReflectiveTape,1.75”Wide
7 1 Glass Fiber Tape
8 2 RTV Sealant Tube
9 1 SiliconeGasket
10 1 Self-Vulcanizing Tape
Tools Required
Terminator DE-B/FAK-1 Kit Contents
Required: Order separately for each heater to be terminated.
When using wire connector connection option:
When using terminal block connection option:
IP66/Type4X-60°C≤Ta≤+45°C,T6,T85°C -60°C≤Ta≤+55°C,T5T85°C Ordinary&HazardousLocationsClassI,Division2,GroupsA,B,C,&D,Zone2IICT6...T5ClassII,Division2,GroupsF&G,ClassIII
Terminator DE-B Certifications/Approvals
ThefollowinginstallationproceduresaresuggestedguidelinesfortheinstallationoftheTerminatorDE-B/FAK-1BulkheadEntryKit.
Dimensions
A mm (inches)
B mm (inches)
C mm (inches)
Terminator DE-B/ FAK-1
220mm(8-5/8”) 340mm(13-3/8”) 107mm(4-1/4”)
C
B
A
Installation Precautions • Tominimizethepotentialforarcingonelectricalheattracingandfirecausedbyproductdamageorimproperinstallation,useground-faultprotection.TheNationalElectricalCode(NEC)andCanadianElectricalCode(CEC)requireground-faultprotectionof equipment for each branch circuit supplying electrical heat tracing.
• Installationmust complywith Thermon requirements andbe installed inaccordancewith theNEC,CEC,or anyotherapplicablenationalandlocalcodes.
• ComponentapprovalsandperformanceratingsarebasedontheuseofThermonspecifiedpartsonly.Usersuppliedpowerconnectionfittingsmustbelistedorcertifiedforintendeduse.
• De-energize all power sources before opening enclosure.• Keependsofbundles,heat tracingandkit componentsdrybeforeandduringinstallation.
• Individuals installing these products are responsible forcomplying with all applicable safety and health guidelines. Proper personal protective equipment, or PPE, should beutilizedduringinstallation.ContactThermonifyouhaveanyadditionalquestions.
21 4
5
6 8 97 10
3
Terminator DE-B/FAK-1
SCTK Terminal Block Connection Kits (per cable)SCTK-1TB for BSX, RSX, VSX-HT
SCTK-2TB for KSX, HTSX
SCTK-3TB for FP, HPT
SCTK Connection Termination Kits (per cable)SCTK-1D for BSX, RSX, VSX-HT
SCTK-2D for KSX, HTSX
SCTK-3D for FP, HPT
8 each stainless steel bolts, nuts and washers required (by others) formounting.8-32sizerecommended.
3
2. Trimheattracingtowithin305mm-381 mm(12”- 15”) of the end of the insulation. Ifself regulating heat trace proceed to step 3. For Zone-type heat trace continuewithindentificationofbusconnectiononstep2a.
1. Removeouterjacketandinsulationfromtubingbundle as included from end of the tubing bundle.Ensuresufficientheattraceisavailablefor electrical connection. See instructions includedwithheattraceSCTKkit.
2a. Stripbackbundle insulation38mm (11/2”)to 76mm(3”)beyond bus connection heat tracing. If bus connection indentation is lessthan305 mm(12”)-381mm(15”)fromendofthe heat tracing, proceed stripping the bundle insulationtothenextindentation.
3. Wraptubesandheattracingwithpassofheatreflectivetape(25%overlap).Thenwrapwith3passesofglassfibertape(50%overlap),oruntilfibertapeisequaltooriginalbundleinsulationthickness.
4. Complete with additional passes of heat reflectivetape.
Trim as Required forConnection
Tubing Bundle
Tubing
Heat Tracing
Tubing
Self-Regulating Heat Tracing
Heat Tracing
305 mm - 381 mm(12”-15”)
Insulation
Zone Type Heat Tracing
Tubing
BusConnectionIndentations
(ZoneHeaterOnly)
305 mm - 381 mm(12”-15”)
Insulation
Glass Fiber Tape
HeatReflectiveTape
Heat Tracing
5. Cut FAK-1 top and base ends to match outside diameterof tubingbundle and removeendpieces.
HeatReflectiveTape
Glass Fiber Tape
Heat TracingTubing
CAUTION (Found on TubeTrace SE/ME bundles)
Do not cut or damage the heat trace or sampling tube.
Tubing Bundle
CutandRemovetofit
Heat Tracing
Field Drilled (By Others)
6. Mount expediter base with o-ring to FAK-1 baseusing(3)M5mountingscrewsand lockwashers. Punch out weep hole.
O-Ring
Expediter Base
Mount Screw andWashers
WeepHoleFAK-1 Base
Silicone Gasket
7. InstallRTVsiliconeandgasket,cuttingoffexcess.ApplyRTVsealanttobothhalves.
FAK-1 BottomCover
FAK-1 TopCover
8. Assemble FAK-1 top, tubing bundle, and FAK-1 bottomtogetherasshownSnaptogetherfirmly.Inspectendsoftubingsplicecoverforsnugfit.ApplyadditionalRTVsealantwhereneeded.
INSTALLATION PROCEDURES
4
Drilled hole for bundle entry
Drilled holes for securing FAK-1
Drilled holes for securing FAK-1 Useastemplate
RTV Sealant
RTV Bead
BacksideView
Stainless Steel Bolts
PowerConnectionBoot
Heat Tracing
Ground Braid
15. When using wire connector: Connect bus wires us ing smal l wire nuts ( for BSX, HTSX and KSX) or medium wire nuts (for RSX, VSX, VSX-HT, HPT and FP). When using terminal block: See steps 16–18. Seewiringschematicforconnectiondetails.
Wiring Schematic for LED Light
Light Module
Expediter Assembly WireConnector
LED Light PigtailHeatingCable
16. WhenusingSCTK-TBConnectionKit,firsttrimexposed bus wires of the LED pigtail to 8 mm (.32"),thenconnecttotheterminalblock.
8 mm (3/8")
Terminator DE-B/FAK-1
9. Applyself-vulcanizingtapearoundbundlejacketandworkupoverFAKends.
10. Terminate heat tracing with appropriate SCTK termination kit. Refer to SCTK installationinstructionsfordetails(notaddressedhere).
11. Fielddrillrequiredentryholeinwall/plate.UsetheFAK-1flangeasatemplateandmarkanddrill holes for bolts.
14. ApplyRTVbeadaroundFAK-1flange.13. SecureFAK-1tobulkhead/wallusing(8)eightstainless steel bolts. Note: stainless steel bolts,washers,andnutsprovidedbyothers.Recommended bolt size is 8-32.
12. ApplyRTVbeadtobackofFAK-1flangepriortosecuringtobulkhead.
CorporateHeadquarters:100ThermonDr•POBox609SanMarcos,TX78667-0609•Phone:512-396-5801•1-800-820-4328 FortheThermonofficenearestyouvisitusat...www.thermon.com
©Thermon,Inc.•PrintedinU.S.A.•Informationsubjecttochange.FormPN50064-1218
LockedPosition
18. Connect the bus wires of the trace heater to theterminalblock.
21. To remove cap, de-energize circuit, lift latchmechanism, and unscrew cap.
17. Use the terminal blockmounting screw tomountterminalblocktotheLEDlightmodule.Bend each pigtail lead around the sides of the terminalblock.
20. Engage threads. Rotate lightmodule coverclockwiseandtightencapsecurely.Makesurelatchmechanismisinthelockedposition.
19. Slidethelightmodulecoveroverlightmodule.
Light ModuleCover
Lens
Expediter AssemblyLight Module
UnlockedPosition
INSTALLATION PROCEDURES