lean paradigm – 5s - iowa healthcare collaborative · pdf filemay 10, 2007 (ihc) s....

Post on 13-Mar-2018

215 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Lean Paradigm – 5S

Sarah Pavelka, MHA, OTR/L, CPHQ, SSBB, CEES

S. Pavelka 2May 10, 2007 (IHC)

Objectives

Common tools5SAction Plans

Spaghetti Diagram

Lean conceptsElements of a lean foundationLean principlesLean processContinuous Improvement

Common Tools

S. Pavelka 4May 10, 2007 (IHC)

Some Common Lean Tools

5SAction PlansSpaghetti/Layout Diagram

Time observation - metricsSimple Process MapComplex Process Map –swim lanesValue Stream MapRPIW/mini-RPIW (Kaizen)

S. Pavelka 5May 10, 2007 (IHC)

5S is used to develop the most efficient workspace and eliminate waste in the

day-to-day operations.

5S

S. Pavelka 6May 10, 2007 (IHC)

The 5Ss

Sorting (Separate)Store (Simplify)Shine (Scrub)StandardizingSustaining

S. Pavelka 7May 10, 2007 (IHC)

The 5Ss

Sorting Separate the needed from the unneeded, and remove the unneeded –Survey work area and remove the unnecessary

Red Tag

S. Pavelka 8May 10, 2007 (IHC)

Red Tag

Use the “red tag” strategyGarbageMisplacedOut of date“Up for grabs”

S. Pavelka 9May 10, 2007 (IHC)

Red Tag Area

S. Pavelka 10May 10, 2007 (IHC)

The 5SsStore

A place for everything and every-thing in its place, clean and ready for use –Simplify - use footprints, boards, labeling & color

S. Pavelka 11May 10, 2007 (IHC)

Supply Room

S. Pavelka 12May 10, 2007 (IHC)

S. Pavelka 13May 10, 2007 (IHC)

S. Pavelka 14May 10, 2007 (IHC)

The 5SsShine

Conduct regular cleaning and inspection; use mess prevention –Scrubbing, organize & establish preventative maintenance (PM’s)

S. Pavelka 15May 10, 2007 (IHC)

The 5SsShine

Unnecessary items removedSupplies organized and labeledFloors and aisles clearEquipment clean and functional Work instruction in proper place

S. Pavelka 16May 10, 2007 (IHC)

S. Pavelka 17May 10, 2007 (IHC)

The 5SsStandardizing

Document and follow the best known methods –revisit steps 1-3Conduct weekly auditsDetermine root cause of abnormalitiesImplement countermeasures for prevention

S. Pavelka 18May 10, 2007 (IHC)

S. Pavelka 19May 10, 2007 (IHC)

S. Pavelka 20May 10, 2007 (IHC)

The 5SsSustaining

Hold the gains, continue to improve, and make 5S a way of lifeEveryone must be committedUse checklists for monitoringQuantify results of workplace inspectionsDisplay each area’s results

S. Pavelka 21May 10, 2007 (IHC)

Expected Payoffs

TimeReduction of stepsProductivity increased

S. Pavelka 22May 10, 2007 (IHC)

Action Plans - A3

One-page story boardLogical action steps and strategy planningExamples

S. Pavelka 23May 10, 2007 (IHC)

Layout/Spaghetti Diagram

Lab Exam 1 Exam 2

MD OfficeBillingCheckIn

Waiting

MA

Patient

Provider

Legend

S. Pavelka 24May 10, 2007 (IHC)

Related Documents & Service Contact

FOR MORE INFO...

Please contact Sarah Pavelka 641-780-0810spavelka@lisco.com

top related