Kopeopeo Canal Remediation ProjectCommunity Liaison Group Meeting

24 April 2018

2

Meeting agenda topics• Welcome & introduction – John Pullar

• Approval of minutes from previous meeting

• Communications update – Abby Tozer

• Project update – Brendon Love/Ken Tarboton

• Independent Monitor – Matt James

• Cultural Monitor – Eula Toko

• Health, Safety and Monitoring – Des McCleary

• Other business

• Light lunch

3

Communications• Website www.boprc.govt.nz/kopeopeo

• Project page updates

• Pedestrian accessway open

• CLG site tour

4

Project page• Register to follow the project

• You’ll get email alerts when updates are published

• You can unfollow at any time

5

Kopeopeo – Orini Public Access Path

6

CLG Site Tour

7

Project updateOverview

• Progress made over previous period

• Dredging (progress, monitoring, validation)

• CS3 Enabling works

• CS3 Works

• Public access

• Activities planned for upcoming period

8

Overview of progress (5 March – 20 April) Main dredging completed to Paroa Road First section complete and validated Second lift over bridge completed CS3 enabling works mostly complete CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to Paroa Road Alternative pedestrian access to Whakatāne river

stopbank constructed

9

Dredging progress

270m

660mS1. 270m

S2. 390m

1180m

S3. 520m

1850m

S4. 670m

Containment Site 1CS1

FCS West

Dredged to date 20-04-2018

Validated to date 20-04-2018

Lift over bridge 1Lift over bridge 2

Lift over Paroa RdBridge 3

Lift over SH30Bridge 4

10

Geobags filled

Bags 2-7

full & closed

Bags 9-10actively being filled

Bag 8Unrolled ready to

fill Bag 1 initial bag partially

full

11

Barge lift over second bridge

12

Sand bug operations

13

Weed removal

14

Wood pellet processing

15

CS3 preliminary works

16

CS3 works

17

Activities planned for upcoming period

• Progress dredging in Section 4

• CS3 construction based on final design

• Processing of eels

• Ongoing weed removal ahead of large objects

• Sand-bug dredging under bridges and Kope/Orini pump intake channel

19

Independent Monitor update• Powerpole incident investigation ongoing

• CLG site visit

• Excavator removing weed ahead of dredging

• Complaints received – Dredging and dust

• Eel removal report reviewed

• MP8 turbidity monitor installed

• Bone finds at CS3

• FCS-East fixed

• Sand bug dredging

20

ACM & Wood Waste at CS3

21

Canal Sediment Validation

The canal sediment Total PCDD/F WHO-TEQUpperbound results ranged between 23 and 45 pg/g, which is below the remedial target of 60 pg/g.

22

Dioxin Air & Groundwater Monitoring

– Tested – Awaiting results for review

Air Tested – Awaiting results for review

Groundwater Six groundwater samples (including two duplicates ) were collected from the four monitoring wells located at CS1. Total PCDD/F I-TEQ Upperbound results of between 6.67 and 9.53 pg/L were recorded in the water samples. All were below the adopted Tier 1 trigger level criteria outlined in the Environmental Monitoring and Validation Plan (EMVP) of 13.5 pg/L and the consented limit of 30 pg/g.

Geobags Tested – Awaiting results for review

Over-sized bulk bags

Tested – Awaiting results for review

23

Cultural Monitor update

• Recent finds –determined by Archaeologist to be modern, not archaeological artefacts

• Modified protocol

24

Health, Safety & Environment

• Safety incident regarding overhead powerlines investigated

• CS3 Site closed to public

• Asbestos find at CS3 and sampling

• Disposal of material from trial site

25

Dust Monitoring – CS3

At Kope/Orini Pump station Mobile dust monitor at CS3

Example false alarm3:47am 27 March

No dust exceedances in period

26

Traffic Management

• CS3 traffic management

• Road closures associated with each crane lift

27

Other Business

• Next meeting: Tuesday 29th May 2018

• Tech Talk at next meeting – Monitoring system by Karam de Lacey of Control Tech