7/27/2019 IR Driven Piling
1/2
INSPECTION REQUEST FORM FOR PILING WORKS (DRIVEN PILE) NO:
Unless otherwise approved,this inspection request form shall be submitted during
the daily morning meeting among LTA,Contractor and QP(S)
Contractor: Project:
To: Date:
LTA Time:
The work described below has been inspected by our Site Engineer and is complete
and ready for your inspection. A checklist is attached overleaf.
Location
Checked and Requested By:
Chainage
Activity
Drawings Used for Construction
Other Description Contractor's PM Name & Signature
work approved to start:__________________
INITIAL INSPECTION DECISION BY QP(S)
We have inspected the above referenced works and found them acceptable. You may proceed.
However, please return the completed checklist upon completion of the remaining work.
You cannot proceed. Please carry out corrective works as noted on the checklist and
submit a fresh request for inspection.
Other comments:
RTO/RE Name & Signature/ Date
FINAL INSPECTION DECISION BY QP(S)
__________________________________
LTA
__________________________________
QP(S) Name& Signature/Date
work approved to start:_______________ work completed on:_______________________
The above process for request for inspection of work by Contractor and approval by Qp(S) is noted.
LTA's Representative/date/time
SAMWOH CORPORATION PTE LTD SK E & C
ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA
GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL
ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND
ASSOCIATED ROAD WIDENING WORKS INTERCHANGE
The meeting noted that the information provided by the Contractor is adequate/not adequate*.
QP(S) may proceed Request Rejected
work completed on:________________________
-
7/27/2019 IR Driven Piling
2/2
Location:
S/No Description of Works Checked by Confirmed by
Contractor QP(S)1 Check setting out
2 Check pegged position of individual pile
3 Check services plan
4 Locate services with cable detector and digging trial trench
5 Check mill certificate
6 Check whether coating on pile is required
7 Check set specified
8 Check certificate of fitness of piling machine and service crane
9 Check certificate of crane operator
10 Check piling frame and crane located on firm bases
11 Check pile dimensions
12 Check pile defects
13 Check verticality of piles
14 Check welding requirement for joints and plates
15 Check set and calculate working load
16 Check risen piles
17 Check eccentricity of individual pile
18 Check cut-off level of pile
19 Take sample for testing
20 Check sufficient temporary traffic devices if lane
closure is required
21 Others
CHECKLIST FOR PILING WORKS (DRIVEN PILE) NO:
Date,Time: Chainage: